Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Spacecraft Telemetry”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

Autonomy for Deep Space Communications and Navigation

In more than 50 years of deep space exploration, the number and complexity of the world’s space missions have continued to increase. This has placed increasing demands on deep space communication and navigation. However, these demands have been met in spite of an essentially level overall budget. One of the reasons for this this has been the continual application of autonomy in various forms. The NASA Deep Space Network’s implementation of “Fol-low the Sun Operations” is a recent example – but certainly not the only one. During this same period, the end-to-end information system has been increasingly automated through the application of packet telemetry and virtual channels. Fully autonomous spacecraft navigation has been demonstrated, and more limited autonomy has been applied to the operational navigation process. This paper will show how autonomy and automation capabilities have been infused into operational deep space mission communication and navigation in both flight and ground systems as appropriate. It will further discuss ongoing work aimed at increasing the level of autonomy in the future, leverag-ing recent research and application of autonomy in everyday life.

Chang, Susan↗

Regenerative pseudo-noise ranging for deep space applications

Currently, ranging for deep space missions is performed by turning around the uplink ranging modulation and remodulating it onto the downlink carrier. This method results in about 1.5 MHz of noise also being modulated onto the downlink, severely degrading the received ranging SNR on the ground. This degradation must be compensated for by either increasing the integration time of the received signal, which increases the length of time for the track, or increasing the downlink ranging signal's modulation index, which decreases the power available for the telemetry modulation. A method for the regeneration on the spacecraft of a pseudo noise (PN) ranging signal has been developed. This method allows for an increase of up to 30dB in the received downlink ranging power. The increased power can be used to decrease the measurement uncertainty, reduce the time of the measurement, or increase the power allocated to the downlink telemetry. This system was implemented in the Spacecraft Transponding Modem that was developed by JPL for NASA.

deep space ranging↗

Primary lithium cell life studies

One solution for providing a truly independent power source is to package, within the critical subsystem element, a primary battery that can remain dormant for time periods as long as the mission life, which can be 10-15 years, maximum. When primary power from the spacecraft solar array/battery system is interrupted, the backup battery system, which is connected through a diode to the power input line, would automatically support the load to avoid a power interruption to the critical load for a time period long enough to ensure that ground control could access the satellite and correct the anomaly by sending appropriate commands to the spacecraft. Critical subsystems identified for the application are telemetry and command circuits, volatile computer memory, attitude control circuits, and some critical payloads. Due to volume packaging and weight restrictions that exist on most spacecraft, coupled with the long storage periods required, lithium cell technology was selected for the backup power source. Because of the high energy density (200-400 Wh/kg), long shelf life, and load capability, soluble cathode primary lithium technology was chosen. The most important lithium cell properties that require detail characterization for this application are capacity loss, shelf life, and the voltage delay mechanism. These are functions of storage time and temperature. During storage, a passive film builds up on the lithium electrode. The film protects the lithium electrode from progressive capacity decay but requires time to break down when a load is applied. This phenomenon results in a depressed voltage during the period of film breakdown which can last from fractions of a second to minutes.

Capulli, John↗

Selecting Modulation Indices For Telemetry And Ranging

Report describes algorithm for selection of optimum modulation indices in system for communication between ground station and spacecraft, in which ranging channel operated simultaneously with data (command and telemetry) channel. Provides for optimum division of power among data, ranging, and carrier channels and reduces degradation of performance by undesired interferences among signals.

Nguyen, Tien M.↗

Precision signal power measurement

Accurate estimation of signal power is an important Deep Space Network (DSN) consideration. Ultimately, spacecraft power and weight is saved if no reserve transmitter power is needed to compensate for inaccurate measurements. Spectral measurement of the received signal has proved to be an effective method of estimating signal power over a wide dynamic range. Furthermore, on-line spectral measurements provide an important diagnostic tool for examining spacecraft anomalies. Prototype equipment installed at a 64-m-diameter antenna site has been successfully used to make measurements of carrier power and sideband symmetry of telemetry signals received from the Mariner Mars 1971 spacecraft.

Winkelstein, R.↗

Preliminary Results from NASA/GSFC Ka-Band High Rate Demonstration for Near-Earth Communications

In early 2000, the National Aeronautics and Space Administration (NASA) commenced the Ka-Band Transition Project (KaTP) as another step towards satisfying wideband communication requirements of the space research and earth exploration-satellite services. The KaTP team upgraded the ground segment portion of NASA's Space Network (SN) in order to enable high data rate space science and earth science services communications. The SN ground segment is located at the White Sands Complex (WSC) in New Mexico. NASA conducted the SN ground segment upgrades in conjunction with space segment upgrades implemented via the Tracking and Data Relay Satellite (TDRS)-HIJ project. The three new geostationary data relay satellites developed under the TDRS-HIJ project support the use of the inter-satellite service (ISS) allocation in the 25.25-27.5 GHz band (the 26 GHz band) to receive high speed data from low earth-orbiting customer spacecraft. The TDRS H spacecraft (designated TDRS-8) is currently operational at a 171 degrees west longitude. TDRS I and J spacecraft on-orbit testing has been completed. These spacecraft support 650 MHz-wide Ka-band telemetry links that are referred to as return links. The 650 MHz-wide Ka-band telemetry links have the capability to support data rates up to at least 1.2 Gbps. Therefore, the TDRS-HIJ spacecraft will significantly enhance the existing data rate elements of the NASA Space Network that operate at S-band and Ku-band.

Wong, Yen↗

Telemetry and the integrated avionics approach.

The unique problems encountered in the integrated approach to aircraft and spacecraft avionics system designs are discussed with the emphasis on recent advances in telemetry as a factor facilitating the integration. A listing of subsystems planned for integration on the Space Shuttle vehicle is given, covering auxiliary pumping and propellant, crew controls and displays, computation, communications and radar, electric power, guidance, navigation and control, air-bearing engines, main engines, reaction control, and structural/mechanical elements. Considerations are given for the multiplexed data bus design applicable to integrated avionics.

Frost, W. O.↗

Tracking and Data Relay Satellite System (TDRSS) Support of User Spacecraft without TDRSS Transponders

NASA GSFC VNS TSG personnel have proposed the use of TDRSS to obtain telemetry and/or S-band one-way return Doppler tracking data for spacecraft which do not have TDRSS-compatible transponders and therefore were never considered candidates for TDRSS support. For spacecraft with less stable local oscillators (LO), one-way return Doppler tracking data is typically of poor quality. It has been demonstrated using UARS, WIND, and NOAA-J tracking data that the simultaneous use of two TDRSS spacecraft can yield differenced one-way return Doppler data of high quality which is usable for orbit determination by differencing away the effects of oscillator instability.

Jackson, James A.↗

Delta/Wind Launch with Isolated Cameras from Continuous Recording

The Wind spacecraft represents one of NASA's contributions to the International Solar Terrestrial Program (ISTP), an international effort to quantify the effects of solar energy on the Earth's magnetic field. Wind will provide continuous measurement of the solar wind, particularly charged particles and magnetic field data. The specific objectives of Wind are to: (1) provide complete plasma, energetic particle, and magnetic field input for magnetospheric and ionospheric studies; (2) determine the magnetospheric output to interplanetary space in the upstream region; (3) investigate basic plasma processes occurring in the near-Earth solar wind; and (4) provide baseline ecliptic plane observations to be used in heliospheric studies. This videotape shows the pre-dawn launch of the Wind spacecraft aboard a Delta 7925 on November 1, 1994. After the countdown and launch, the tape shows the activity in the Telemetry Room at Kennedy Space Center, where people are following the progress of the spacecraft. Following the activity in the telemetry room, there are four different replays of the launch from different locations. After showing the replays of the launch, the video returns to the Telemetry Room when an important stage in the launch and flight is achieved.

Source record↗

Seeker 1.0 GNC Flight Performance (presentation)

Seeker is an automated extravehicular inspection spacecraft that was designed and built in-house at the NASA Johnson Space Center (JSC) over approximate-ly 18 months with a budget of $1.8 million. This first version of Seeker is in-tended to be an incremental development towards an advanced inspection ca-pability. Seeker launched onboard the NG-11 Cygnus mission in 2019 and de-ployed from Cygnus on September 16, 2019. Downlinked telemetry, imagery from the chaser and target spacecraft, and onboard engineering data logs are used to provide an analysis of the system’s performance. This paper reviews the performance of the Seeker vehicle with a focus on the guidance, navigation, and control (GNC) system. The results are presented with a discussion of the re-lated system design to highlight how decisions and applied methods culminated in the observed performance.

Sam Pedrotty↗

Telemetry and command, ATS-F's vital link with earth.

The susceptibility of a synchronous satellite to interference as compared with a low orbiting satellite poses a problem for command operations. The Applications Technology Satellites F and G (ATS F & G) are unique in that they will place the first high gain antenna in space that will reduce the need for high powered ground stations. The telemetry and command subsystem provides the necessary versatility required for the conduct of the many sophisticated experiments that will be conducted by the spacecraft. The subsystem provides continuous 24-hr operation of telemetry and command functions with complete redundancy to minimize problems due to RF interference.

Trudell, B. J.↗

A new environment for multiple spacecraft power subsystem mission operations

The engineering analysis subsystem environment (EASE) is being developed to enable fewer controllers to monitor and control power and other spacecraft engineering subsystems. The EASE prototype has been developed to support simultaneous real-time monitoring of several spacecraft engineering subsystems. It is being designed to assist with offline analysis of telemetry data to determine trends, and to help formulate uplink commands to the spacecraft. An early version of the EASE prototype has been installed in the JPL Space Flight Operations Facility for online testing. The EASE prototype is installed in the Galileo Mission Support Area. The underlying concept, development, and testing of the EASE prototype and how it will aid in the ground operations of spacecraft power subsystems are discussed.

Bahrami, K. A.↗

Follow-on studies using the Voyager spacecraft thermal model

The 42-year-old Voyager mission, now named the Voyager Interstellar Mission (VIM) is operating long beyond its design life. In 2012, Voyager 1 crossed the heliopause into interstellar space and Voyager 2 made the same transit in November 2018. Due to declining power output from the Radioisotope Thermoelectric Generators (RTGs) the Science and Flight Operations teams continue to make difficult choices in terms of managing both the power and thermal margins to preserve critical science observations and maintain the health of the two spacecraft. A previous paper, “Creating a Voyager Thermal Model 39 Years Into the Flight Mission, Along With Model Correlation and Application” described how a thermal model of these 1977 spacecraft was developed and correlated without many design artifacts and with limited temperature telemetry. This paper describes how the thermal model has been used to establish an Allowable Flight Temperature (AFT) limit for hydrazine propellant in the propulsion subsystem to minimize the risk of freezing. Voyager 2 temperatures have already descended to this limit in the vicinity of the Roll thruster propellant lines. The Flight Operations team has investigated several ways of detecting propellant freezing based on analysis and trending of thruster performance telemetry. In addition, the Voyager thermal model is being used to predict the spacecraft response to possible changes in power state. These changes could involve turning off outboard science instruments and/or their heaters to increase power margin and hence power dissipation inside the spacecraft bus (i.e. in Bay 7, where the power regulation electronics are located). Changes might also be made to turn on or off other loads inside the bus to more effectively heat the coldest propellant lines.

Medina, Enrique↗

Follow-on studies using the Voyager spacecraft thermal model

The 42-year-old Voyager mission, now named the Voyager Interstellar Mission (VIM) is operating long beyond its design life. In 2012, Voyager 1 crossed the heliopause into interstellar space and Voyager 2 made the same transit in November 2018. Due to declining power output from the Radioisotope Thermoelectric Generators (RTGs) the Science and Flight Operations teams continue to make difficult choices in terms of managing both the power and thermal margins to preserve critical science observations and maintain the health of the two spacecraft. A previous paper, “Creating a Voyager Thermal Model 39 Years Into the Flight Mission, Along With Model Correlation and Application” described how a thermal model of these 1977 spacecraft was developed and correlated without many design artifacts and with limited temperature telemetry. This paper describes how the thermal model has been used to establish an Allowable Flight Temperature (AFT) limit for hydrazine propellant in the propulsion subsystem to minimize the risk of freezing. Voyager 2 temperatures have already descended to this limit in the vicinity of the Roll thruster propellant lines. The Flight Operations team has investigated several ways of detecting propellant freezing based on analysis and trending of thruster performance telemetry. In addition, the Voyager thermal model is being used to predict the spacecraft response to possible changes in power state. These changes could involve turning off outboard science instruments and/or their heaters to increase power margin and hence power dissipation inside the spacecraft bus (i.e. in Bay 7, where the power regulation electronics are located). Changes might also be made to turn on or off other loads inside the bus to more effectively heat the coldest propellant lines. Many of these changes have been or will be tested first on Voyager 1 which has more power margin and does not have the power matrix commanding issues experienced on Voyager 2. Ultimately this assessment may assist the Voyager project in making decisions on the order in which science instruments are permanently turned off.

Medina, Enrique↗

Outer planet Pioneer imaging communications system study

The effects of different types of imaging data compression on the elements of the Pioneer end-to-end data system were studied for three imaging transmission methods. These were: no data compression, moderate data compression, and the advanced imaging communications system. It is concluded that: (1) the value of data compression is inversely related to the downlink telemetry bit rate; (2) the rolling characteristics of the spacecraft limit the selection of data compression ratios; and (3) data compression might be used to perform acceptable outer planet mission at reduced downlink telemetry bit rates.

Source record↗

Enhancing the Cassini Mission Through FP Applications After Launch

Although rigorous pre-emptive measures are taken to preclude failures and anomalous conditions from occurring in JPL spacecraft missions prior to launch, unforeseeable problems can still surface after liftoff. In the case of the Cassini/Huygens Mission-to-Saturn spacecraft, several problems were observed post-launch: 1) immediately after takeoff, the collected engineering/science data stored on the Solid State Recorders (SSR) contained a significantly higher number of corrupted bits than was expected (considerably over spec) due to human error in the memory mapping of these devices, 2) numerous Solid State Power Switches (SSPS) sporadically tripped off throughout the mission due to cosmic ray bombardment from the unique space environment, and 3) false assumptions in the pressure regulator design in combination with missing heritage test data led to inaccurate design conclusions, causing the issuance of two waivers for the regulator to close properly (a potentially mission catastrophic single-point failure which occurred 24 days after launch) - amongst other problems. For Cassini, some of these anomalies led to arduous work-arounds or required continuous monitoring of telemetry variables by the ground-based Spacecraft Operations Flight Support (SOFS) team in order to detect and fix fault occurrences as they happened. Fortunately, sufficient funding and schedule margin allowed several Fault Protection (FP) solutions to be implemented into post-launch Flight Software (FSW) uploads to help resolve these issues autonomously, reducing SOFS ground support efforts while improving anomaly recovery time in order to preserve maximum science capture. This paper details the FP applications used to resolve the above issues as well as to optimize solutions for several other problems experienced by the Cassini spacecraft during its fight, in order to enhance the spacecraft's overall mission success throughout the 18 years of its 20 year expedition to and within the Saturnian system.

fault protection↗

Task four report: Telemetry, command, and data handling

An overview of the telemetry, command, and data handling features of four spacecraft developed under GSFC management is presented. Two of these spacecraft ATS and SMS, are designed for geostationary orbit; the other two OSO and ERTS, are designed for low earth orbits. The program time spans for these spacecraft are as shown. The programs are seen to be near contemporary, especially in the 1973, 1974 period. All of the spacecraft listed were developed under GSFC control and are thus subject to the standards set forth in the Aerospace Data System Standard developed by GSFC. These standards must be adhered to by all spacecraft programs under GSFC control or utilizing STDN unless waivers have been granted. The standards were developed to maximize the utilization of the large amount of standard equipment at each STDN ground facility. The standards impose bounds on both the command and telemetry formats to be compatible with the STDN ground station unless valid and acceptable reasons are raised to deviate from these restraints.

Source record↗

Optimizing Spacecraft Placement for Liaison Constellations

A navigation and communications network is proposed to support an anticipated need for infrastructure in the Earth-Moon system. Periodic orbits will host the constellations while a novel, autonomous navigation strategy will guide the spacecraft along their path strictly based on satellite-to-satellite telemetry. In particular, this paper investigates the second stage of a larger constellation optimization scheme for multi-spacecraft systems. That is, following an initial orbit down-selection process, this analysis provides insights into the ancillary problem of spacecraft placement. Two case studies are presented that consider configurations of up to four spacecraft for a halo orbit and a cycler trajectory.

lunar cycler orbits↗