Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Resource”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

Offshore Wind Resource, Cost, and Economic Potential in the State of Maine

This report provides information for decision-makers about floating offshore wind technologies in the state of Maine. It summarizes research efforts performed at the National Renewable Energy Laboratory between 2015 and 2017 to analyze the resource potential, cost of offshore wind, and economic potential of offshore wind from four primary reports: Musial et al. (2016); Beiter et al. (2016, 2017); and Mone et al. (unpublished). From Musial et al. (2016), Maine's technical offshore wind resource potential ranked seventh in the nation overall with more than 411 terawatt-hours/year of offshore resource generating potential. Although 90% of this wind resource is greater than 9.0-meters-per-second average velocity, most of the resource is over deep water, where floating wind technology is needed. Levelized cost of energy and levelized avoided cost of energy were computed to estimate the unsubsidized 'economic potential' for Maine in the year 2027 (Beiter et al. 2016, 2017). The studies found that Maine may have 65 gigawatts of economic potential by 2027, the highest of any U.S. state. Bottom-line costs for the Aqua Ventus project, which is part of the U.S. Department of Energy's Advanced Technology Demonstration project, were released from a proprietary report written by NREL in 2016 for the University of Maine (Mone et al. unpublished). The report findings were that economies of scale and new technology advancements lowered the cost from $300/megawatt-hour (MWh) for the two-turbine 12-megawatt (MW) Aqua Ventus 1 project, to $126/MWh for the commercial-scale, 498-MW Aqua Ventus-2 project. Further cost reductions to $77/MWh were found when new technology advancements were applied for the 1,000-MW Aqua Ventus-3 project in 2030. No new analysis was conducted for this report.

17 WIND ENERGY↗

Drivers of the Resource Adequacy Contribution of Solar and Storage for Florida Municipal Utilities

Solar’s variable generation limits its contribution to reliably meeting peak demand, or its resource adequacy contribution. Energy storage is a leading option to increase solar’s resource adequacy contribution, yet the contribution from different configurations of solar and storage is not widely understood. We develop methods for exploring the primary drivers of an estimate of the resource adequacy contribution of solar and storage, and we apply the methods to a case study in Florida, where demand peaks in winter and summer. We find that the portion of solar nameplate capacity that contributes to resource adequacy—its capacity credit—is less than 50% and that it declines with increasing solar penetration. The capacity credit of storage, even though it is fully controllable by the system operator, strongly depends on the duration of storage. The capacity credit of 1 hour of storage can be less than the capacity credit of solar. Achieving a 90% capacity credit requires at least 4–5 hours of storage when storage capacity is small relative to the system peak. As storage deployment increases to 20% of the peak demand, 9 hours—and sometimes more than 10 hours—of storage are needed to achieve a 90% capacity credit. Increased solar deployment at the system level can increase storage’s capacity credit. Directly pairing solar and storage can also impact the capacity credit. Storage with a power rating similar to the solar inverter rating loses capacity credit when coupled with solar if its duration is more than 1–2 hours, because storage competes with solar for use of the inverter. On the other hand, there is no reduction in capacity credit when the storage is small relative to the solar inverter. The approach and tools developed here for exploratory analysis can be useful for many other utilities and regions grappling with similar preliminary questions, prior to evaluation of specific cases using more detailed and resource-intensive modeling.

14 SOLAR ENERGY↗

Best Practices Handbook for the Collection and Use of Solar Resource Data for Solar Energy Applications: Third Edition

As the world looks for low-carbon sources of energy, solar power stands out as the single most abundant energy resource on Earth. Harnessing this energy is the challenge for this century. Photovoltaics, solar heating and cooling, and concentrating solar power (CSP) are primary forms of energy applications using sunlight. These solar energy systems use different technologies, collect different fractions of the solar resource, and have different siting requirements and production capabilities. Reliable information about the solar resource is required for every solar energy application. This holds true for small installations on a rooftop as well as for large solar power plants; however, solar resource information is of particular interest for large installations because they require substantial investment, sometimes exceeding 1 billion dollars in construction costs. Before such a project is undertaken, the best possible information about the quality and reliability of the fuel source must be made available. That is, project developers need reliable data about the solar resource available at specific locations, including historic trends with seasonal, daily, hourly, and (preferably) subhourly variability to predict the daily and annual performance of a proposed power plant. Without these data, an accurate financial analysis is not possible. Additionally, with the deployment of large amounts of distributed photovoltaics, there is an urgent need to integrate this source of generation to ensure the reliability and stability of the grid. Forecasting generation from the various sources will allow for larger penetrations of these generation sources because utilities and system operators can then ensure stable grid operations. Developed by the foremost experts in the field who have come together under the umbrella of the International Energy Agency’s Solar Heating and Cooling Task 46, this handbook summarizes state-of-the-art information about all these topics.

14 SOLAR ENERGY↗

Duke Energy Carbon-Free Resource Integration Study

Duke Energy has partnered with the National Renewable Energy Laboratory (NREL) to evaluate pathways to achieving their carbon-free targets and to assess the operational impacts of the resulting system. This report details findings from Phase II of the Duke Low Carbon Resource Integration study, which consisted of three separate but interrelated analyses: (1) a resource assessment exploring the technical and economic potential and characteristics of wind and solar resources in the Carolinas; (2) capacity expansion modeling identifying the least-cost investment pathways for achieving 70% CO 2 emissions reductions in North Carolina by 2030 and a net-zero electricity system by 2050; and (3) detailed production cost modeling of power system operations at the higher shares of low- and zero-carbon emitting generation sources, informed by the capacity expansion modeling portion of the analysis. The analysis finds that Duke Energy can approach the 2030 and 2050 emissions target in North Carolina through investment in a combination of solar, wind, and storage along with maintaining its existing nuclear fleet. The average cost of CO 2 abatement in the Carolinas through 2021-2050 is on the order of $\$27-33$ per metric ton (range of $\$9-34$ per metric ton across key sensitivities).Duke Energy can expected increased interchange with neighbors to help balance higher levels of solar, although the ability to do this will depend on whether neighboring regions also move to integrate more carbon-free resources. As Duke Energy moves toward both the 2030 and 2050 targets, addressing energy needs during the winter peak period becomes particularly important, and the system relies on the availability of resources such as renewable or hydrogen combustion turbines, seasonal storage, or other similar technologies that are dispatchable but able to operate at low capacity factors.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Zero-Emission Vehicle Adoption Resource Guide for Government Fleets in Jackson County, Illinois

As part of Communities LEAP (Local Energy Action Program), the National Renewable Energy Laboratory (NREL) provided technical assistance to Jackson County, Illinois to help develop their clean energy transition roadmap. Fleet electrification was identified as a potential pathway that could address the environmental injustices, high energy burden, and local pollution experienced by this former coal community. NREL worked with Jackson County, Illinois to develop a resource guide that can assist fleet managers considering a transition to electric light-duty fleet vehicles. To further understand the unique challenges of fleet electrification in Jackson County, NREL met with three leaders within the county who either managed current fleets or were responsible for fleet purchases. This resource guide includes best practices and resources that address many of the frequently asked questions that arose during these discussions. Interested fleets can then use this resource guide to help identify the initial steps needed to plan for vehicle electrification. The resource guide summarizes the basics of electric vehicle (EV) adoption for fleets, funding and incentive pathways, total cost of ownership in comparison to conventional internal combustion engine (ICE) vehicles, charging infrastructure, and pilot programs.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Cultural Resource Investigations for the Remote Handled Low Level Waste Facility at the Idaho National Laboratory

The U. S. Department of Energy, Idaho Operations Office is considering options for construction of a facility for disposal of Idaho National Laboratory (INL) generated remote-handled low-level waste. Initial screening has resulted in the identification of two recommended alternative locations for this new facility: one near the Advanced Test Reactor (ATR) Complex and one near the Idaho Comprehensive Environmental Response, Compensation, and Liability Act Disposal Facility (ICDF). In April and May of 2010, the INL Cultural Resource Management Office conducted archival searches, intensive archaeological field surveys, and initial coordination with the Shoshone-Bannock Tribes to identify cultural resources that may be adversely affected by new construction within either one of these candidate locations. This investigation showed that construction within the location near the ATR Complex may impact one historic homestead and several historic canals and ditches that are potentially eligible for nomination to the National Register of Historic Places. No resources judged to be of National Register significance were identified in the candidate location near the ICDF. Generalized tribal concerns regarding protection of natural resources were also documented in both locations. This report outlines recommendations for protective measures to help ensure that the impacts of construction on the identified resources are not adverse.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integrated Resource Planning Model (IRPM)

The Integrated Resource Planning Model (IRPM) is a decision-support software product for resource-and-capacity planning. Users can evaluate changing constraints on schedule performance, projected cost, and resource use. IRPM is a unique software tool that can analyze complex business situations from a basic supply chain to an integrated production facility to a distributed manufacturing complex. IRPM can be efficiently configured through a user-friendly graphical interface to rapidly provide charts, graphs, tables, and/or written results to summarize postulated business scenarios. There is not a similar integrated resource planning software package presently available. Many different businesses (from government to large corporations as well as medium-to-small manufacturing concerns) could save thousands of dollars and hundreds of labor hours in resource and schedule planning costs. Those businesses also could avoid millions of dollars of revenue lost from fear of overcommitting or from penalties and lost future business for failing to meet promised delivery by using IRPM to perform what-if business-case evaluations. Tough production planning questions that previously were left unanswered can now be answered with a high degree of certainty. Businesses can anticipate production problems and have solutions in hand to deal with those problems. IRPM allows companies to make better plans, decisions, and investments.

99 GENERAL AND MISCELLANEOUS↗

Cultural Resource Investigations for a Multipurpose Haul Road on the Idaho National Laboratory

The U. S. Department of Energy, Idaho Operations Office is considering options for construction of a multipurpose haul road to transport materials and wastes between the Materials and Fuels Complex (MFC) and other Idaho National Laboratory (INL) Site facilities. The proposed road will be closed to the public and designed for limited year-round use. Two primary options are under consideration: a new route south of the existing T-25 power line road and an upgrade to road T-24. In the Spring of 2010, archaeological field surveys and initial coordination and field reconnaissance with representatives from the Shoshone-Bannock Tribes were completed to identify any resources that may be adversely affected by the proposed road construction and to develop recommendations to protect any listed or eligible for listing on the National Register of Historic Places. The investigations showed that 24 archaeological resources and one historic marker are located in the area of potential effects for road construction and operation south of the T-25 powerline road and 27archaeological resources are located in the area of potential effects for road construction and operation along road T-24. Generalized tribal concerns regarding protection of natural resources were also documented in both road corridors. This report outlines recommendations for additional investigations and protective measures that can be implemented to minimize adverse impacts to the identified resources.

54 ENVIRONMENTAL SCIENCES↗

Risk-based decision making for staggered bioterrorist attacks : resource allocation and risk reduction in "reload" scenarios.

Staggered bioterrorist attacks with aerosolized pathogens on population centers present a formidable challenge to resource allocation and response planning. The response and planning will commence immediately after the detection of the first attack and with no or little information of the second attack. In this report, we outline a method by which resource allocation may be performed. It involves probabilistic reconstruction of the bioterrorist attack from partial observations of the outbreak, followed by an optimization-under-uncertainty approach to perform resource allocations. We consider both single-site and time-staggered multi-site attacks (i.e., a reload scenario) under conditions when resources (personnel and equipment which are difficult to gather and transport) are insufficient. Both communicable (plague) and non-communicable diseases (anthrax) are addressed, and we also consider cases when the data, the time-series of people reporting with symptoms, are confounded with a reporting delay. We demonstrate how our approach develops allocations profiles that have the potential to reduce the probability of an extremely adverse outcome in exchange for a more certain, but less adverse outcome. We explore the effect of placing limits on daily allocations. Further, since our method is data-driven, the resource allocation progressively improves as more data becomes available.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Modeling Sea Ice Effects for Wave Energy Resource Assessments

Wave-generated power has potential as a valuable coastal resource, but the wave climate needs to be mapped for feasibility before wave energy converters are installed. Numerical models are used for wave resource assessments to quantify the amount of available power and its seasonality. Alaska is the U.S. state with the longest coastline and has extensive wave resources, but it is affected by seasonal sea ice that dampens the wave energy and the full extent of this dampening is unknown. To accurately characterize the wave resource in regions that experience seasonal sea ice, coastal wave models must account for these effects. The aim of this study is to determine how the dampening effects of sea ice change wave energy resource assessments in the nearshore. Here, we show that by combining high-resolution sea ice imagery with a sea ice/wave dampening parameterization in an unstructured grid, the Simulating Waves Nearshore (SWAN) model improves wave height predictions and demonstrates the extent to which wave power decreases when sea ice is present. The sea ice parametrization decreases the bias and root mean square errors of wave height comparisons with two wave buoys and predicts a decrease in the wave power of up to 100 kW/m in areas around Prince William Sound, Alaska. The magnitude of the improvement of the model/buoy comparison depends on the coefficients used to parameterize the wave–ice interaction.

16 TIDAL AND WAVE POWER↗

2013 White Book, Pacific Northwest Loads and Resources Study (summary)

The 2013 Pacific Northwest Loads and Resources Study (2013 White Book) is BPA's latest projection of the Pacific Northwest regional retail loads, contract obligations, contract purchases, and resource capabilities. The 2013 White Book is a snapshot of conditions as of October 1, 2013, documenting the loads and resources for the Federal system and region for the 10-year study period OY 2014 through 2023. The White Book contains projections of regional and Federal system load and resource capabilities, along with relevant definitions and explanations. The White Book also contains information obtained from formalized resource planning reports and data submittals including those from individual utilities, the Northwest Power and Conservation Council (Council), and the Pacific Northwest Utilities Conference Committee (PNUCC). Starting with the 2012 White Book, BPA changed the annual production schedule for future White Books. BPA is scheduled to publish a complete White Book, which includes a Federal System Needs Assessment analysis, every other year (even years). In the odd-numbered years, BPA will publish a biennial summary update (Supplement) that only contains major changes to the Federal System and Regional System analyses that have occurred since the last White Book. http://www.bpa.gov/power/pgp/whitebook/2013/index.shtml.

bonneville↗

Technical Feasibility Aspects of the Geothermal Resource Reporting Methodology (GRRM)

This paper reviews the technical assessment of the Geothermal Research Reporting Methodology (GRRM, http://en.openei.org/wiki/GRRM) being developed for reporting geothermal resources and project progress. The goal of the methodology is to provide the U.S. Department of Energy's Geothermal Technologies Office (GTO) with a consistent and comprehensible means of evaluating the impacts of its funding programs. The GRRM is designed to provide uniform assessment criteria for geothermal resource grades and developmental phases of geothermal resource exploration and development. This resource grade system provides information on twelve attributes of geothermal resource locations (e.g., temperature, permeability, land access) to indicate potential for geothermal development. The GTO plans to use these Protocols to help quantitatively identify the greatest barriers to geothermal development, develop measureable program goals that will have the greatest impact to geothermal deployment, objectively evaluate proposals based (in part) on a project's ability to contribute to program goals, monitor project progress, and report on GTO portfolio performance. The GRRM assesses three areas of geothermal potential: geological, socio-economic, and technical. Previous work and publications have discussed the work done on the geological aspects of this methodology (Young et al. 2015c); this paper details the development of the technical assessment of the GRRM. Technical development attributes considered include: reservoir management, drilling, logistics, and power conversion.

15 GEOTHERMAL ENERGY↗

Technical Requirements for Geothermal Resource Confirmation

In 2017-2018, the Bureau of Land Management's Renewable Energy Coordination Office, through its Geothermal Program, funded the National Renewable Energy Laboratory (NREL) to analyze technical and environmental considerations related to geothermal resource confirmation drilling. NREL solicited input from a group of technical and environmental experts in the geothermal industry, along with analyzing National Environmental Policy Act of 1969 (NEPA) documentation for previously approved projects. The collected data and analysis will be used by the Bureau of Land Management to examine the possibility of developing a new classification of wells and/or expediting the NEPA compliance process, which could potentially reduce permitting and regulatory compliance timelines when compared to the current process for obtaining a geothermal drilling permit for resource confirmation drilling activities. This paper provides a summary of the technical requirements for confirming a geothermal resource. The analysis showed that confirming a geothermal resource requires confirming reservoir temperature, chemistry, permeability, and flow rate. Obtaining these data requires drilling at least two-preferably three-successful wells into the resource to conduct the necessary tests, including an interference test. Bottom-hole well diameters of at least 6'' to 8'' (0.15 to 0.2 m) are needed to limit the wellbore frictional pressure drop to effectively perform well flow and interference tests. Drilling these wells requires a drill rig with a mud pump and derrick capable of holding three drill pipes. This type of rig requires a minimum well-pad size of 2.5 acres (104 m2) including surface area for a 1 million-gallon (3.8 million-liter) pit. Up to 15 acres (5x104 m2) of total surface disturbance are needed for developing access roads and well pads to drill a total of three to five wells.

15 GEOTHERMAL ENERGY↗

Evolving Metrics for Resource Adequacy Assessment

Resource adequacy analysis quantifies the likelihood of capacity shortfall on a power system in a probabilistic manner. Using a combination of statistical techniques and power system fundamentals, the analysis typically evaluates hundreds or thousands of stochastic random samples (replications) of varying load, generator outages, variable renewable energy availability, and other aspects of power system uncertainty. In this range of uncertainty, there are - at times - periods where the power system's available resources are insufficient to meet system demand, referred to as a shortfall event. Today's power systems' rapidly evolving generation mix is changing the types of data needed by system planners and regulators, which can often render traditional resource adequacy metrics insufficient for ensuring resource adequacy for tomorrow's grid. In this paper we provide a critical assessment of traditional measures of shortfall risk in power systems, discussing their shortcomings and how they compare to metrics used in other domains. From this analysis we propose four steps forward for improving power system resource adequacy risk metrics in the future.

ENERGY PLANNING, POLICY, AND ECONOMY,POWER TRANSMI↗

Beyond Expected Values Evolving Metrics for Resource Adequacy Assessment

Resource adequacy analysis quantifies the likelihood of capacity shortfall on a power system in a probabilistic manner. Using a combination of statistical techniques and power system fundamentals, the analysis typically evaluates hundreds or thousands of stochastic random samples (replications) of varying load, generator outages, variable renewable energy availability, and other aspects of power system uncertainty. In this range of uncertainty, there are - at times - periods where the power system's available resources are insufficient to meet system demand, referred to as a shortfall event. Today's power systems' rapidly evolving generation mix is changing the types of data needed by system planners and regulators, which can often render traditional resource adequacy metrics insufficient for ensuring resource adequacy for tomorrow's grid. In this paper we provide a critical assessment of traditional measures of shortfall risk in power systems, discussing their shortcomings and how they compare to metrics used in other domains. From this analysis we propose four steps forward for improving power system resource adequacy risk metrics in the future.

ENERGY PLANNING, POLICY, AND ECONOMY↗

Estimating the required logistical resources to support the development of a sustainable corn stover bioeconomy in the USA

In this paper, the logistical resources required to develop a bioeconomy based on corn stover in the USA are quantified, including field equipment, storage sites, transportation and handling equipment, workforce, corn growers, and corn lands. These resources are essential to mobilize large quantities of corn stover from corn fields to biorefineries. The logistical resources are estimated over the lifetime of the biorefineries. Seventeen corn-growing states are considered for the logistical resource assessment. Over 6.8 billion gallons of cellulosic ethanol can be produced annually from 108 million dry tons of corn stover in these states. The maximum number of required field equipment (i.e., choppers, balers, collectors, loaders, and tractors) is estimated to be 194 110 units with a total economic value of about 26 billion dollars. In addition, 40 780 trucks and flatbed trailers would be required to transport bales from corn fields and storage sites to biorefineries with a total economic value of 4.0 billion dollars. About 88 899 corn growers need to be contracted with an annual net income of over 2.1 billion dollars. About 1903 storage sites would be required to hold 53.1 million dry tons of inventory after the harvest season. These storage sites would take up about 35 320.2 acres and 4077 loaders with an economic value of 0.4 billion dollars would handle this inventory. The total required workforce to run the logistics operations is estimated to be 50 567. Furthermore, the magnitude of the estimated logistical resources demonstrates the economic and social significance of the corn stover bioeconomy in rural areas in the USA.

09 BIOMASS FUELS↗

The future of legume genetic data resources: Challenges, opportunities, and priorities

Abstract Legumes, comprising one of the largest, most diverse, and most economically important plant families, are the subject of vibrant research and development worldwide. Continued improvement of legume crops will benefit from the recent proliferation of genetic (including genomic) resources; but the diversity, scale, and complexity of these resources presents challenges to those managing and using them. A workshop held in March of 2019 addressed questions of data resources and priorities for the legumes. The workshop identified various needs and recommendations: (a) Develop strategies to effectively store, integrate, and relate genetic resources collected in different projects. (b) Leverage information collected across many legume species by standardizing data formats and ontologies, improving the state of metadata about datasets, and increasing use of the FAIR data principles. (c) Advocate for the critical role that curators exercise in integrating complex datasets into databases and adding high value metadata that enable downstream analytics and facilitate practical applications. (d) Implement standardized software and database development practices to best leverage limited developer time and expertise gained from the various legume (and other) species. (e) Develop tools and databases that can manage genetic information for the world's plant genetic resources, enabling efficient incorporation of important traits into breeding programs. (f) Centralize information on databases, tools, and training materials and establish funding streams to support training and outreach.

Bauchet, Guillaume J.↗

Fossil resource and energy security dynamics in conventional and carbon-constrained worlds

Fossil resource endowments and the future development of fossil fuel prices are important factors that will critically influence the nature and direction of the global energy system. In this paper we analyze a multi-model ensemble of long-term energy and emissions scenarios that were developed within the framework of the EMF27 integrated assessment model inter-comparison exercise. The diverse nature of these models highlights large uncertainties in the likely development of fossil resource (coal, oil, and natural gas) consumption, trade, and prices over the course of the twenty-first century and under different climate policy frameworks. We explore and explain some of the differences across scenarios and models and compare the scenario results with fossil resource estimates from the literature. A robust finding across the suite of IAMs is that the cumulative fossil fuel consumption foreseen by the models is well within the bounds of estimated recoverable reserves and resources. Hence, fossil resource constraints are, in and of themselves, unlikely to limit future GHG emissions. Our analysis also shows that climate mitigation policies could lead to a major reallocation of financial flows between regions, in terms of expenditures on fossil fuels and carbon, and can help to alleviate near-term energy security concerns via the reductions in oil imports and increases in energy system diversity they will help to motivate.

McCollum, David↗