Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Requirements Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

An Approach to Data Management Planning for Protected Data Projects

This report describes what is required in a data management plan for data that needs to be protected in some fashion. Here we provide an overview of what a data manager should consider, including the data ingestion and various extract-transform-load processes, metadata considerations and documentation, to what might need to be accounted for in the event of data loss. In addition, this report includes two appendices: forms that, when filled out, make the user compliant with DOE data management requirements as well as additional requirements for handling protected data at ORNL.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Underground Test Area Activity Quality Assurance Plan Nevada National Security Site, Nevada. Revision 1

This Quality Assurance Plan (QAP) provides the overall quality assurance (QA) requirements and general quality practices to be applied to the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Underground Test Area (UGTA) activities. The requirements in this QAP are consistent with DOE Order 414.1C, Quality Assurance (DOE, 2005); U.S. Environmental Protection Agency (EPA) Guidance for Quality Assurance Project Plans for Modeling (EPA, 2002); and EPA Guidance on the Development, Evaluation, and Application of Environmental Models (EPA, 2009). NNSA/NSO, or designee, must review this QAP every two years. Changes that do not affect the overall scope or requirements will not require an immediate QAP revision but will be incorporated into the next revision cycle after identification. Section 1.0 describes UGTA objectives, participant responsibilities, and administrative and management quality requirements (i.e., training, records, procurement). Section 1.0 also details data management and computer software requirements. Section 2.0 establishes the requirements to ensure newly collected data are valid, existing data uses are appropriate, and environmental-modeling methods are reliable. Section 3.0 provides feedback loops through assessments and reports to management. Section 4.0 provides the framework for corrective actions. Section 5.0 provides references for this document.

54 ENVIRONMENTAL SCIENCES↗

Underground Test Area Activity Quality Assurance Plan Nevada National Security Site, Nevada. Revision 2

This Quality Assurance Plan (QAP) provides the overall quality assurance (QA) requirements and general quality practices to be applied to the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO) Underground Test Area (UGTA) activities. The requirements in this QAP are consistent with DOE Order 414.1D, Change 1, Quality Assurance (DOE, 2013a); U.S. Environmental Protection Agency (EPA) Guidance for Quality Assurance Project Plans for Modeling (EPA, 2002); and EPA Guidance on the Development, Evaluation, and Application of Environmental Models (EPA, 2009). If a participant’s requirement document differs from this QAP, the stricter requirement will take precedence. NNSA/NFO, or designee, must review this QAP every two years. Changes that do not affect the overall scope or requirements will not require an immediate QAP revision but will be incorporated into the next revision cycle after identification. Section 1.0 describes UGTA objectives, participant responsibilities, and administrative and management quality requirements (i.e., training, records, procurement). Section 1.0 also details data management and computer software requirements. Section 2.0 establishes the requirements to ensure newly collected data are valid, existing data uses are appropriate, and environmental-modeling methods are reliable. Section 3.0 provides feedback loops through assessments and reports to management. Section 4.0 provides the framework for corrective actions. Section 5.0 provides references for this document.

54 ENVIRONMENTAL SCIENCES↗

Closing the data life cycle: using information management in macrosystems ecology research

An important goal of macrosystems ecology research is to advance understanding of ecological systems at both fine and broad temporal and spatial scales. Our premise in this paper is that such projects require information management that is integrated into projects from their inception. Such efforts will lead to improved communication and sharing of knowledge among diverse project participants, better science outcomes, and more open science. We promote "closing the data life cycle" by publishing well-documented data sets, which allows for re-use of data to answer new and different questions from the ones conceived by the original projects. The practice of documenting and submitting data sets to publicly accessible data repositories ensures that research results and data are accessible to and useable by other researchers, thus fostering open science. Ecologists are often not familiar with the information management tools and requirements to effectively preserve data, however, and receive little institutional or professional incentive to do so. This paper describes recommended steps to these ends, and gives examples from current macrosystem ecology projects of why information management is so critical to ensuring that scientific results can be both reproduced and data shared for future use.

Ruegg, Janine↗

Definition of the Informational Requirements of Hydrologic Resource Managers

The objectives of the integrated study are; (1) to delinate the parameters involved in hydrologic systems; (2) to outline the conventional means used in acquiring information relative to those parameters; and (3) to consider the potential usefulness of modern remote sensing techniques for acquiring certain parts of this information.

Burgy, R. H.↗

Managing Information On Technical Requirements

Technical Requirements Analysis and Control Systems/Initial Operating Capability (TRACS/IOC) computer program provides supplemental software tools for analysis, control, and interchange of project requirements so qualified project members have access to pertinent project information, even if in different locations. Enables users to analyze and control requirements, serves as focal point for project requirements, and integrates system supporting efficient and consistent operations. TRACS/IOC is HyperCard stack for use on Macintosh computers running HyperCard 1.2 or later and Oracle 1.2 or later.

Mauldin, Lemuel E., III↗

Bayesian Inference for NASA Probabilistic Risk and Reliability Analysis

This document, Bayesian Inference for NASA Probabilistic Risk and Reliability Analysis, is intended to provide guidelines for the collection and evaluation of risk and reliability-related data. It is aimed at scientists and engineers familiar with risk and reliability methods and provides a hands-on approach to the investigation and application of a variety of risk and reliability data assessment methods, tools, and techniques. This document provides both: A broad perspective on data analysis collection and evaluation issues. A narrow focus on the methods to implement a comprehensive information repository. The topics addressed herein cover the fundamentals of how data and information are to be used in risk and reliability analysis models and their potential role in decision making. Understanding these topics is essential to attaining a risk informed decision making environment that is being sought by NASA requirements and procedures such as 8000.4 (Agency Risk Management Procedural Requirements), NPR 8705.05 (Probabilistic Risk Assessment Procedures for NASA Programs and Projects), and the System Safety requirements of NPR 8715.3 (NASA General Safety Program Requirements).

Dezfuli, Homayoon↗

Phase 111A Crew Interface Specifications Development for Inflight Maintenance and Stowage Functions

This report presents the findings and data products developed during the Phase IIIA Crew Interface Specification Study for Inflight Maintenance and Stowage Functions, performed by General Electric for the NASA, Johnson Space Center with a set of documentation that can be used as definitive guidelines to improve the present process of defining, controlling and managing flight crew interface requirements that are related to inflight maintenance (including assembly and servicing) and stowage functions. During the Phase IIIA contract period, the following data products were developed: 1) Projected NASA Crew Procedures/Flight Data File Development Process. 2) Inflight Maintenance Management Process Description. 3) Preliminary Draft, General Specification, Inflight Maintenance Management Requirements. 4) Inflight Maintenance Operational Process Description. 5) Preliminary Draft, General Specification, Inflight Maintenance Task and Support Requirements Analysis. 6) Suggested IFM Data Processing Reports for Logistics Management The above Inflight Maintenance data products have been developed during the Phase IIIA study after review of Space Shuttle Program Documentation, including the Level II Integrated Logistics Requirements and other DOD and NASA data relative to Payloads Accommodations and Satellite On-Orbit Servicing. These Inflight Maintenance data products were developed to be in consonance with Space Shuttle Program technical and management requirements.

Carl, John G.↗

INDEPENDENT TECHNICAL ASSESSMENT OF MANAGEMENT OF STORMWATER AND WASTEWATER AT THE SEPARATIONS PROCESS RESEARCH UNIT (SPRU) DISPOSITION PROJECT, NEW YORK

The U.S. Department of Energy (DOE) is currently evaluating the water management procedures at the Separations Process Research Unit (SPRU). The facility has three issues related to water management that require technical assistance: (1) due to a excessive rainfall event in October, 2010, contaminated water collected in basements of G2 and H2 buildings. As a result of this event, the contractor has had to collect and dispose of water offsite; (2) The failure of a sump pump at a KAPL outfall resulted in a Notice of Violation issued by the New York State Department of Environment and Conservation (NYSDEC) and subsequent Consent Order. On-site water now requires treatment and off-site disposition; and (3) stormwater infiltration has resulted in Strontium-90 levels discharged to the storm drains that exceed NR standards. The contractor has indicated that water management at SPRU requires major staff resources (at least 50 persons). The purpose of this review is to determine if the contractor's technical approach warrants the large number of staff resources and to ensure that the technical approach is compliant and in accordance with federal, state and NR requirements.

54 ENVIRONMENTAL SCIENCES↗

A new approach to data management and its impact on frequency control requirements

A new approach to data management consisting of spacecraft and data/information autonomy and its impact on frequency control requirements is presented. An autonomous spacecraft is capable of functioning without external intervention for up to 72 hr by enabling the sensors to make observations, maintaining its health and safety, and by using logical safety modes when anomalies occur. Data/information are made autonomous by associating all relevant ancillary data such as time, position, attitude, and sensor identification with the data/information record of an event onboard the spacecraft. This record is so constructed that the record of the event can be physically identified in a complete and self-contained record that is independent of all other data. All data within a packet will be time tagged to the needed accuracy, and the time markings from packet to packet will be coherent to a UTC time scale.

Blanchard, D. L.↗

Oak Ridge National Laboratory FY 2023 Site Sustainability Plan With FY 2022 Performance Data

At the close of each fiscal year, the US Department of Energy (DOE) Sustainability Performance Division (SPD) issues guidance documents and technical resource aids/tools necessary for DOE sites and national laboratories to complete sustainability reporting requirements. SPD is part of the DOE Office of Asset Management. As required by DOE Order 436.1, Departmental Sustainability, “each site will develop and commit to an annual Site Sustainability Plan (SSP) that identifies its respective contribution toward meeting the DOE’s sustainability goals.” SPD collects and compiles information reported by each site to develop an agency-wide Sustainability Report and Implementation Plan, which is used to report DOE sustainability progress to the federal government as required by all major federal agencies. DOE launched a formal Sustainability Office and annual SSP process in 2011. Each year, Oak Ridge National Laboratory (ORNL), in concert with the Office of Science (SC), provides the resources essential to fulfill its commitment to deliver a complete and accurate SSP report and quality performance data for entry into the DOE Sustainability Dashboard as managed by SPD. The performance data entered by each DOE site are then combined to disclose the progress of each DOE Program Office and are further combined to show comprehensive progress for the agency. The Office of Asset Management provides assistance to program offices in sustaining their missions, freeing up resources by reducing waste, avoiding excess expenditure on utilities, maximizing productivity, and improving the efficiency of facilities and processes. By focusing on mission needs, programs and associated DOE sites can help the agency meet its sustainability goals, as outlined in federal statutory and regulatory requirements. In FY 2022, the SSP guidance was updated to capture requirements from Executive Order (EO) 14008, Tackling the Climate Crisis at Home and Abroad, the Energy Act of 2020 (EAct 20), actions outlined in DOE’s Climate Adaptation & Resilience Plan and Sustainability Plan, and EO 14057, Catalyzing Clean Energy Industries and Jobs Through Federal Sustainability. Updates in SSP guidance help to minimize and streamline reporting while simultaneously addressing updated federal requirements. Per DOE, each SSP report should provide an overview of the site’s planned actions, as well as an overview of efforts and accomplishments during the reporting period. SPD collects and compiles information reported by each site to develop DOE’s Annual Sustainability Report, Climate Adaptation & Resilience Plan, and Annual Energy Management Report to Congress. The agency goal has been to lower the reporting burden for sites and increase and improve the consistency of information available to decision makers, allowing them to better identify projects and potential for increased efficiency, as well as to reduce waste, lower emissions, and enhance operational resilience. Sites may elect to produce a more polished publication for their leadership and stakeholders, but this step is no longer required. The ORNL SSP narrative report (this document) and the reporting of DOE SPD Sustainability Dashboard performance data is a collaborative effort of approximately 30 subject matter experts (SMEs) from ORNL facility management and research divisions. Annually, these associates come together to provide a report that can be used by DOE to demonstrate continued agency progress in energy efficiency and sustainable federal operations.

99 GENERAL AND MISCELLANEOUS↗

Health-care district management information system plan: Review of operations analysis activities during calendar year 1975 and plan for continued research and analysis activities

Operations research activities developed to identify the information required to manage both the efficiency and effectiveness of the Veterans Administration (VA) health services as these services relate to individual patient care are reported. The clinical concerns and management functions that determine this information requirement are discussed conceptually. Investigations of existing VA data for useful management information are recorded, and a diagnostic index is provided. The age-specific characteristics of diseases and lengths of stay are explored, and recommendations for future analysis activities are articulated. The effect of the introduction of new technology to health care is also discussed.

Nielson, G. J.↗

4D Dynamic RNP Annual Interim Report-Year 1

This Annual Interim Report summarizes the activities led by Raytheon, in collaboration with GE Aviation and SAIC, and presents the results obtained during the first year of this research effort to expand the RNP concept to 4 dimensions relative to a dynamic frame of reference. Joint Program Development Office (JPDO)Concepts of Operations for the Next Generation Air Transportation System (NextGen) considers 4 Dimension Trajectory (4DT) procedures a key enabler to Trajectory Based Operations (TBO). The JPDO defines 4DT as a precise description of an aircraft path in space and time . While NextGen assumes that this path is defined within an Earth-reference frame, many 4DT procedure implementations will require an aircraft to precisely navigate relative to a moving reference such as another aircraft to form aggregate flows or a weather cell to allow for flows to shift. Current methods of implementing routes and flight paths rely on aircraft meeting a Required Navigation Performance (RNP) specification and being equipped with a monitoring and alerting capability to annunciate when the aircraft system is unable to meet the performance specification required for the operation. Since all aircraft today operate within the NAS relative to fixed reference points, the current RNP definition is deemed satisfactory. However, it is not well understood how the current RNP construct will support NextGen 4DT procedures where aircraft operate relative to each other or to other dynamic frames of reference. The objective of this research effort is to analyze candidate 4DT procedures from both an Air Navigation Service Provider (ANSP) and aircraft perspective, to identify their specific navigational requirements, assess the shortcomings of the current RNP construct to meet these requirements, to propose an extended 4 Dimensional Dynamic RNP (4D Dynamic RNP) construct that accounts for the dynamic spatial and temporal nature of the selected 4DT procedures, and finally, to design an experiment using the Airspace and Traffic Operations Simulation (ATOS) system to validate the 4D Dynamic RNP construct. This Annual Interim Report summarizes the activities led by Raytheon, in collaboration with GE Aviation and SAIC, and presents the results obtained during the first year of this research effort to expand the RNP concept to 4 dimensions relative to a dynamic frame of reference. A comprehensive assessment of the state-of-the-art international implementation of current RNP was completed and presented in the Contractor Report RNP State-of-the-Art Assessment, Version 4, 17 December 2008 . The team defined in detail two 4DT operations, Airborne Precision Spacing and Self-Separation, that are ideally suited to be supported by 4D Dynamic RNP and developed their respective conceptual frameworks, Required Interval Management Performance (RIMP) Version 1.1, 13 April 2009 and Required Self Separation Performance (RSSP) Version 1.1, 13 April 2009 . Finally, the team started the development of a mathematical model and simulation tool for RIMP and RSSP scheduled to be delivered during the second year of this research effort.

Finkelsztein, Daniel M.↗

Overflow Simulations of Unmanned Aircraft Systems

National airspace, the management for access and operation of these vehicles is required. This management is being developed under the unmanned aircraft system traffic management system (UTM) program. To determine the aerodynamic characteristics of drones, wind tunnel experiments and computation fluid dynamic (CFD) analysis have been conducted. These experiments and analyses are undertaken to understand the flight capabilities of these vehicles in variable head and cross wind conditions. The results of these investigations will provide metrics for the safe operation of these vehicles in and around civil populations and in urban settings. The focus of this paper is to model a drone installed in a wind tunnel for varying pitch attitudes and rotor rpm settings. Specifically, the IRIS drone is modeled in the NASA-Ames 7x10 ft. W/T. The tunnel mounting hardware and the tunnel enclosure are modeled with the IRIS drone geometry. The rotors of the drone are modeled using two methodologies: a rotor disk model and individual blade representations. The results of the analysis are compared with available experimental data to validate the computational approach.

Stremel, Paul M.↗

Status and prospects for renewable energy using wood pellets from the southeastern United States

Abstract The ongoing debate about costs and benefits of wood‐pellet based bioenergy production in the southeastern United States ( SE USA ) requires an understanding of the science and context influencing market decisions associated with its sustainability. Production of pellets has garnered much attention as US exports have grown from negligible amounts in the early 2000s to 4.6 million metric tonnes in 2015. Currently, 98% of these pellet exports are shipped to Europe to displace coal in power plants. We ask, ‘How is the production of wood pellets in the SE USA affecting forest systems and the ecosystem services they provide?’ To address this question, we review current forest conditions and the status of the wood products industry, how pellet production affects ecosystem services and biodiversity, and what methods are in place to monitor changes and protect vulnerable systems. Scientific studies provide evidence that wood pellets in the SE USA are a fraction of total forestry operations and can be produced while maintaining or improving forest ecosystem services. Ecosystem services are protected by the requirement to utilize loggers trained to apply scientifically based best management practices in planning and implementing harvest for the export market. Bioenergy markets supplement incomes to private rural landholders and provide an incentive for forest management practices that simultaneously benefit water quality and wildlife and reduce risk of fire and insect outbreaks. Bioenergy also increases the value of forest land to landowners, thereby decreasing likelihood of conversion to nonforest uses. Monitoring and evaluation are essential to verify that regulations and good practices are achieving goals and to enable timely responses if problems arise. Conducting rigorous research to understand how conditions change in response to management choices requires baseline data, monitoring, and appropriate reference scenarios. Long‐term monitoring data on forest conditions should be publicly accessible and utilized to inform adaptive management.

09 BIOMASS FUELS↗

Crew interface specifications development functions, phase 3A

The findings and data products developed during the crew interface specification study for inflight maintenance and stowage functions are presented. Guidelines are provided for improving the present progress of defining, controlling, and managing the flight crew requirements. The following data products were developed: (1) description of inflight maintenance management process, (2) specifications for inflight maintenance management requirements, and (3) suggested inflight maintenance data processing reports for logistics management.

Carl, J. G.↗