Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Repair”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

Discovery and repair of software anomalies

The average time required to discover and repair anomalies which appear randomly in the end-to-end tests performed after program completion is evaluated. A model which explains anomaly discovery and repair phenomena when applied to variations in work load and multiple-stage testing is presented. The theory shows that estimates of anomaly levels and team capability can be predicted after a significant fraction of the anomalies have been found, and indicates procedures for applying these figures to schedule estimation and work-load assignment. Of particular interest is the demonstration that end-to-end testing of programs in other than the operational environment is not generally cost effective.

Tausworthe, R. C.↗

Planar scarf joints in composite repair

This study examined the effects of varying certain important geometric parameters on the stresses in an adhesive repair of a thin composite laminate. The repair, a planar scarf joint with a doubler, was studied using finite element methods at scarf angles of 6 deg and 12 deg, damage lengths between 2.5 mm and 25 mm and doubler overlaps between 10 mm and 40 mm. Finite element models also showed that significant stress peaks occur at the ends of the scarf joint adhesive, similar to shear lag phenomena in lap joints. A bending model of the planar scarf joint with a doubler, based on mechanics of materials theory, was also developed.

Adkins, D. W.↗

Repairing high-temperature glazed tiles

Tetraethyl orthosilicate (TEOS) mixture fills chips and cracks in glazed tile surface. Filler is made by mixing hydrolyzed TEOS, silicon tetraboride powder, and pulverized tile material. Repaired tiles survived testing by intense acoustic emissions, arc jets, and intense heat radiation. Repair is reliable and rapid, performed in 1-1 1/2 hours with tile in any or orientation.

Ecord, G. M.↗

Thermal protection system flight repair kit

A thermal protection system (TPS) flight repair kit required for use on a flight of the Space Transportation System is defined. A means of making TPS repairs in orbit by the crew via extravehicular activity is discussed. A cure in place ablator, a precured ablator (large area application), and packaging design (containers for mixing and dispensing) for the TPS are investigated.

Source record↗

Strength and Mechanics of Bonded Scarf Joints for Repair of Composite Materials

Experimental and analytical investigations of scarf joints indicate that slight bluntness of adherend tips induces adhesive stress concentrations which significantly reduce joint strength, and the stress distribution through the adhesive thickness is non-uniform and has significant stress concentrations at the ends of the joint. The laminate stacking sequence can have important effects on the adhesive stress distribution. A significant improvement in joint strength is possible by increasing overlap at the expense of raising the repair slightly above the original surface. Although a surface grinder was used to make most experimental specimens, a hand held rotary bur can make a surprisingly good scarf. Scarf joints wit doublers on one side, such as might be used for repair, bend under tensile loads and may actually be weaker than joints without doublers.

Pipes, R. B.↗

The effects of weld-repair and hot isostatic pressing on the fracture properties of Ti-5Al-2.5Sn ELI castings

The Ti-5Al-2.5Sn extremely low interstitial alloy employed in the large castings which form the critical attachment fittings of the Space Shuttle External Tank was selected because of its high fracture resistance at cryogenic temperatures. Casting was selected over alternative fabrication methods because of its lower cost and adaptability to design changes, although it was found necessary to weld-repair surface and subsurface casting defects in order to reduce the scrap rate and maintain the inherent cost advantage of the castings. Hot Isostatic Pressing was experimentally found to heal the surface and internal defects of the castings, but did not improve tensile or fracture properties and was therefore rejected as a production technique. Production castings are instead weld-repaired, without any mechanical property degradation.

Misra, M. S.↗

Role of metabolic rate and DNA-repair in Drosophila aging Implications for the mitochondrial mutation theory of aging

The notion that injury to mitochondrial DNA is a cause of intrinsic aging was tested by correlating the different respiration rates of several wild strains of Drosophila melanogaster with the life-spans. Respiration rate and aging in a mutant of D. melanogaster deficient in postreplication repair were also investigated. In agreement with the rate of living theory, there was an inverse relation between oxygen consumption and median life-span in flies having normal DNA repair. The mutant showed an abnormally low life-span as compared to the controls and also exhibited significant deficiency in mating fitness and a depressed metabolic rate. Therefore, the short life-span of the mutant may be due to the congenital condition rather than to accelerated aging.

Miquel, J.↗

Repair of the DSS-14 Pedestal Concrete

About three years after the Goldstone Deep Space Station antenna was dedicated, grout under the hydrostatic bearing runner was found to be interacting with the runner, causing rust to form between the runner and the sole plates upon which it rests. The rust formed unevenly and the runner could not be kept flat so in 1969 the grout was removed and replaced with a Portland cement and sand dry pack grout that was less likely to produce rust. In the years that followed, oil leaking from the runner assembly caused progressive deterioration of the drypack grout. In 1982 over one thousand hours of spacecraft tracking time were lost due to this deterioration. A plan was developed to rehabilitate the bearing. The plan called for raising the rotating structure free from the concrete pedestal and placing it on three pairs of external support columns. With the weight of the structure transferred to the columns, the pads and runner could be removed and the repair started. The very successful repair included the replacement of a significant portion of the antenna pedestal.

Mcclure, D.↗

Initial results from the repaired Solar Maximum Mission and future prospects

Goals of the recently repaired Solar Maximum Mission Observatory are outlined, including continued emphasis on diagnosing impulsive phase of flares, studies of prominence and coronal plasmas, solar cycle variations of flares, the corona and solar irradiance, and comets. Some preliminary observations taken after the repair are shown, particularly of the X13 flare of April 1984.

Woodgate, B. E.↗

Rapid adhesive bonding concepts for specimen and panel fabrication and field repair

The NASA Langley Research Center has developed bonding concepts for aerospace composite materials which employ induction heating to directly apply heat to the bond line and/or adherends without simultaneously heating the entire structure, supports, and fixtures of a bonding assembly. These methods have demonstrated bonding process time reductions of two to three orders of magnitude, by comparison with conventional press molding. Attention is presently given to rapid adhesive bonding for lap shear specimens for aerospace panel bonding or field repair, as well as for the field repair requirements of metallic and advanced polymeric matrix composite structures.

Stein, B. A.↗

Repairing Hard-to-Reach Cracks in Heat-Exchanger Tubes

Inaccessible leaks repaired from accessible side of tube. Fish-Mouth insert placed in cut in leaky heat-exchanger tube. Insert welded or brazed to tube, and remaining open area of cut patched. Method developed for repairing leaks in nozzle coolant tubes of Space Shuttle main engine. Method also used on other types of tubular heat exchangers.

Mills, R. C., Sr.↗

Repairing Foam Insulation

Large holes in polyurethane foam insulation repaired reliably by simple method. Little skill needed to apply method, used for overhead repairs as well as for those in other orientations. Plug positioned in hole to be filled and held in place with mounting fixture. Fresh liquid foam injected through plug to bond it in place. As foam cures and expands, it displaces plug outward. Protrusion later removed.

Corbin, J.↗

Rapid adhesive bonding and field repair of aerospace materials

Adhesive bonding in the aerospace industry typically utilizes autoclaves or presses which have considerable thermal mass. As a consequence, the rates of heatup and cooldown of the bonded parts are limited and the total time and cost of the bonding process are often relatively high. Many of the adhesives themselves do not inherently require long processing times. Bonding could be performed rapidly if the heat was concentrated in the bond lines or at least in the adherends. Rapid Adhesive Bonding concepts are developed to utilize induction heating techniques to provide heat directly to the bond line and/or adherends without heating the entire structure, supports, and fixtures of a bonding assembly. Bonding times for specimens can be cut by a factor of 10 to 100 compared to standard press or autoclave bonding. The development of Rapid Adhesive Bonding for lap shear specimens (per ASTM D1002 and D3163), for aerospace panel or component bonding, and for field repair needs of metallic and advanced fiber reinforced polymeric-matrix composite structures is reviewed. Equipment and procedures are described for bonding and repairing thin sheets, simple geometries, and honeycomb core panels.

Stein, B. A.↗

Method of repairing hidden leaks in tubes

A method of repairing a tubular assembly in which access to a defect in the tube is limited includes the steps of cutting an opening in the tube on the side opposite the defect so as to expose the defect from the inside of the tube. A tubular insert is inserted into the tube to cover the defect and is secured in place by means of brazing or welding. The remaining space between the opening and insert is closed by means of close-out patches which are welded or brazed to both the insert and the tube. The result is a permanent repair having great structural integrity.

Duesberg, J. D.↗

Field Repair Of Thermoplastic Windows And Canopies

Toroid bonding techniques further developed to meet typical field-repair requirements. Induction-heating power supply engineered into "ruggedized" solid-state unit, in a 1-ft to the third power package weighing 20 lb. Hand-held bonding gun weighing 3 lb plugs into this power supply on long cord. Maximum power required is 300 W. Lightly loaded repair bonds made in several minutes at average power input of 150 W on metallic, polymeric, or polymermatrix materials.

Fox, Robert L.↗

Space Station pressure wall repair techniques

Space Station components are susceptible to hypervelocity impact damage from orbital debris and meteoroids. An especially vulnerable and critical space station component is the module pressure wall. Even with shielding, sufficiently large impacting particles can create penetrations ranging from pinholes to large jagged holes. This paper describes pressure wall damage repair patches along with procedures and tools for performing the repair. One patch incorporates an aluminum foil protected from the jagged hole edge with a Kevlar or foam pad. An adhesive holds the patch in place. Another patch uses a stiff plate held away from the damaged area by a low durrometer rubber ring which also seals the plate edge. An adhesive will also secure this patch in place. Procedures were developed to prepare the punctured wall surface and apply the patch under weightless and unpressurized conditions. The procedures were tested in a laboratory and in the MSFC Neutral Buoyancy Simulator with models of the patches and tools.

Gibbins, Martin N.↗

Simulation Of Failures And Repairs

Automated Reliability/Availability/Maintainability (ARAM) computer program one of software tools designed to assess candidate architectures of data-management system of the Space Station. Evaluates reliability, availability, and maintainability characteristcs of conceptual system. Uses data representing redundancy and maintainability characteristics of system, and reliability parameters of components of equipment. Design based upon simulation of failures and possible subsequent repairs of each unit of equipment included in system. Analyzes effects of failures and repairs on system and maintains statistics of behavior of system from which results of simulation obtained. Written for IBM PC XT/AT or compatible computer.

Vallone, Antonio↗