Optimization of Material Recycling During the Decommissioning Process of Nuclear Power Plants - 16123
The German Government decided in 2011 to phase out nuclear power. Therefore, in the near future there will be several nuclear power plants queued up, in parallel, for dismantling. In nuclear decommissioning there is no standardized procedure available, so that a high level of optimization potential can be assumed. We present the results of a preliminary study, in which the optimization potential of metal recycling during the dismantling process should be estimated. The project can be roughly divided into four sections: - Determination of the metal inventory of an exemplarily selected plant; - Analysis of the recycling routes of scrap metal fractions and assessment of the potential for optimization of each process step during the dismantling; - Conduction of activation calculations to uncover the potential of interim storage allowing for radioactive decay; - In collaboration with the Institute of Process Metallurgy and Metal Recycling at the RWTH Aachen, appropriate process steps and process chains of an optimized metal recycling for each of the resulting scrap metal fractions are identified. The paper and the presentation summarize the status and the results of the project implementation and will address for the optimization potentials for decommissioning projects. (authors)