Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “RADIOACTIVE WASTE STORAGE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

Integrated Solutions for Interim Used Fuel Management: From Pool Unloading to Safe Delivery to Recycling or Repository Facilities - 17235

Safe management of used nuclear fuel (UNF) is key to the survival of the nuclear industry. That is why it is more important than ever to have a consent-based, practical, credible, and sustainable roadmap for managing the back-end of the nuclear cycle. Worldwide UNF Light Water Reactors (LWR) inventories are currently around 200,000 tons and are estimated to grow to more than 350,000 tons by 2030, and operating nuclear reactors in the U.S. continue to discharge UNF every 18 to 24 months. International experience has demonstrated that the development of a permanent geological repository can be a multi-decade process, especially in the face of public acceptance challenges. Meanwhile, the solution for permanent disposal of UNF in the U.S. is moving at a glacial pace. As a result, industrial stakeholders have been forced to find practical interim UNF storage solutions in order to continue safely operating their reactors. Among those interim solutions are the cask- or canister-based dry storage systems that have dramatically increased in the last 10 years as they provide flexibility for expansion with a low up-front investment. With interim dry storage in place for more than 30 years, our industry is entering a new phase as we are forced to prepare for a few more decades before geological repositories begin operating. Consequently, interim dry storage has to be extended for 80 years or more. Thus, new considerations have to be taken into account to ensure the safety of this stored used fuel: - Interim storage systems are aging; - High burn-up fuel behavior overtime is uncertain; - Used fuel is losing its self-protection; - The number of shutdown sites without a fuel transfer facility, such as a pool, is increasing; - Some owners of Independent Spent Fuel Storage installation (ISFSI) at shutdown sites are not nuclear operators anymore. With increasing uncertainties, AREVA TN -- based on its long expertise with used fuel transportation and interim storage systems -- is adapting its portfolio to develop integrated and flexible solutions that will remove the burden of interim used fuel management from nuclear operators. AREVA TN is developing comprehensive solutions to reduce risks including the continued supply of proven safe high-performance dry storage systems; on-site services to safely transfer used fuel from pool to pad; the optimization of fuel heat load in the storage pool and pad; innovative aging management services including inspection, monitoring and repair; a realistic solution for consolidated interim storage with a priority to remove Used Nuclear Fuel stored in dry storage systems from shutdown sites; world-class transport and logistics services to safely move the used fuel from nuclear reactor sites to consolidated storage and repository or recycling as applicable, and turnkey management of shutdown ISFSIs. Due to the lack of an available path for transporting used fuel away from reactors, nuclear operators are faced with many challenges and growing uncertainties. Our presentation will describe the practical solutions developed and being developed in order to manage used fuel on behalf of nuclear operators and allows them to continue focusing on the important job of producing carbon-free clean energy. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Drop Testing of a Container for the Storage, Transport and Disposal of Intermediate Level Waste - 18078

Impact tests were performed, as part of a corresponding container's substantiation, during design development of a shielded container proposed for use at Sellafield for waste retrieval from the First Generation Magnox Storage Pond (FGMSP) in the UK. The mechanical test program comprised a 9 m free drop test onto an unyielding target in a container long lid edge down orientation at ambient conditions. Further, a 0,5 m free drop test onto a punch target was performed. Here, the container was orientated with the lid downwards in a way that the punch, a mild steel bar, impacts a filter lid. The test specimen was instrumented with strain gauges and accelerometers for the drop tests. Transient strains at selected points of the inner and outer container walls, at the shielding lid, as well as at the lid bolts were measured during the container's impact. Furthermore, decelerations of the container body, container lid, and the skip were measured. The complex geometrical changes of the container due to impact were determined by optical 3d- deformation measures using the projected fringes method in combination with multi-image photogrammetry. This paper summarizes the performance of the drop tests and various drop test results in context with the design development as well as aspects regarding the associated Finite Element (FE) analyses and post-test evaluation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Back-end of the fuel cycle - Indian scenario

Nuclear power has a key role in meeting the energy demands of India. This can be sustained by ensuring robust technology for the back end of the fuel cycle. Considering the modest indigenous resources of U and a huge Th reserve, India has adopted a three stage Nuclear Power Programme (NPP) based on 'closed fuel cycle' approach. This option on 'Recovery and Recycle' serves twin objectives of ensuring adequate supply of nuclear fuel and also reducing the long term radio-toxicity of the wastes. Reprocessing of the spent fuel by Purex process is currently employed. High Level Liquid Waste (HLW) generated during reprocessing is vitrified and undergoes interim storage. Back-end technologies are constantly modified to address waste volume minimization and radio-toxicity reduction. Long-term management of HLW in Indian context would involve partitioning of long lived minor actinides and recovery of valuable fission products specifically cesium. Recovery of minor actinides from HLW and its recycle is highly desirable for the sustained growth of India's NPPs. In this context, programme for developing and deploying partitioning technologies on industrial scale is pursued. The partitioned elements could be either transmuted in Fast Reactors (FRs)/Accelerated Driven Systems (ADS) as an integral part of sustainable Indian NPP. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Optimized Qualification of Legacy Waste for the Repository Konrad - 16629

The repository Konrad in Germany is planned for the acceptance of low level waste and intermediate level waste. The Wiederaufarbeitungsanlage Karlsruhe (WAK GmbH) has the assignment to decommission and dispose of the nuclear facilities on the site of the Karlsruhe Institute of Technology (KIT). The entire inventory of these installations as well as the existing waste materials stored in the interim storage of the HDB are planned to be sent to the repository Konrad and are therefore treated according to the respective acceptance criteria. These acceptance criteria were defined on the basis of safety considerations and first published as a draft in 1995. After full legal recognition in 2007 the acceptance criteria were revised in 2010 and 2014. All legacy waste treated prior to 1995 has to be re-qualified according to the current state of acceptance. The repository will not open for acceptance of waste materials until 2022. Up to now only a small amount of acceptable waste packages exist. Therefore WAK GmbH established a scheme to improve and accelerate the processes and to have 2 annual delivery capacities (5000 m{sup 3} in total) ready by the end of the decade. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Dismantling of Highly Contaminated Process Installations of the German Reprocessing Facility (WAK) - Status of New Remote Handling Technology - 13287

Decommissioning and dismantling of the former German Pilot Reprocessing Plant Karlsruhe (WAK) including the Vitrification Facility (VEK) is being executed in different Project steps related to the reprocessing, HLLW storage and vitrification complexes /1/. While inside the reprocessing building the total inventory of process equipment has already been dismantled and disposed of, the HLLW storage and vitrification complex has been placed out of operation since vitrification and tank rinsing procedures where finalized in year 2010. This paper describes the progress made in dismantling of the shielded boxes of the highly contaminated laboratory as a precondition to get access to the hot cells of the HLLW storage. The major challenges of the dismantling of this laboratory were the high dose rates up to 700 mSv/h and the locking technology for the removal of the hot cell installations. In parallel extensive prototype testing of different carrier systems and power manipulators to be applied to dismantle the HLLW-tanks and other hot cell equipment is ongoing. First experiences with the new manipulator carrier system and a new master slave manipulator with force reflection will be reported. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Applicability of Developed Calculation Models to Predict Long-term Behavior of Metal Seals - Necessary Scope of Tests - 19311

The long-term sealing behavior of metal seals, assembled in the lid system of casks for transportation and storage of radioactive materials, has been investigated. For that purpose, phenomenological models describing the time- and temperature dependent behavior have been introduced by BAM since 2016, e.g. by using the time-temperature superposition principle. Results have shown that these models describe the relaxation behavior adequately and are suitable for extrapolations. In this work, the applicability of these models is checked by analyzing the necessary scope of tests, which must be carried out to get sufficient information about the long-term behavior of metal seals based on short-term tests. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remote Robotic Equipment for Retrieval of High Level Waste to Support Environmental Closure - 18162

The Idaho Cleanup Project contractor, Fluor Idaho, LLC, is responsible for managing HLW calcine stored in the Calcined Solids Storage Facility at the Idaho Nuclear Technology and Engineering Center. The Idaho Nuclear Technology and Engineering Center is a DOE managed facility located at the INL Site in the remote portions of southeast Idaho. In 2016, DOE directed Fluor Idaho to develop and test a full-scale retrieval system to demonstrate the ability to safely retrieve HLW calcine from the Calcined Solids Storage Facility for future retrieval and processing. Removing HLW calcine from the State of Idaho is required by the 1995 Settlement Agreement, which mandates that DOE have HLW calcine ready to be moved out of Idaho by December 2035. Fluor Idaho is currently testing retrieval and transfer concepts to ensure that the Calcined Solids Storage Facility is placed in a final configuration that is protective of human health and the environment after HLW calcine has been removed to the maximum extent practical. This paper describes the full-scale prototype that will be used to prove retrieval and transfer system design capabilities, verify operating parameters, and establish a basis for calcine retrieval efficacy. Additionally, it describes the retrieval (bulk and residual) and visual monitoring systems that were designed and tested in 2017 and will continue to be tested with the full-scale prototype. Testing (i.e., full-scale mockup, bulk retrieval, residual clean-out, and visualization monitoring) performed by Fluor Idaho will demonstrate the maximum extent practical of HLW calcine removal that is achievable. This is critical to (1) establish criteria for ending calcine removal activities, (2) evaluate cost and benefits associated with performing additional removal, and (3) ensure clean up and closure standards under applicable requirements (e.g., statutes, orders, and agreements) are met. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CORROSION MONITORING IN HANFORD NUCLEAR WASTE STORAGE TANKS DESIGN AND DATA FROM 241-AN-102 MULTI-PROBE CORROSION MONITORING SYSTEM

In 2008, a new Multi-Probe Corrosion Monitoring System (MPCMS) was installed in double-shell tank 241-AN-102 on the U.S. Department of Energy's Hanford Site in Washington State. Developmental design work included laboratory testing in simulated tank 241-AN-102 waste to evaluate metal performance for installation on the MPCMS as secondary metal reference electrodes. The MPCMS design includes coupon arrays as well as a wired probe which facilitates measurement of tank potential as well as corrosion rate using electrical resistance (ER) sensors. This paper presents the MPCMS design, field data obtained following installation of the MPCMS in tank 241-AN-102, and a comparison between laboratory potential data obtained using simulated waste and tank potential data obtained following field installation.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Spent Nuclear Fuel Exploratory Roadmaps - 20054

The U.S. Department of Energy manages nearly 2,500 metric tons of heavy metal (MTHM) of spent nuclear fuel (SNF) resulting from several decades of research, testing, and production reactors [DOE 1995]. This SNF is managed at the DOE Hanford Site in Washington State (Hanford), Idaho National Laboratory (INL), and Savannah River Site in South Carolina (SRS). From 1995 to 2004, the Department of Energy (DOE) made several key programmatic decisions, supported by appropriate documentation in accordance with the National Environmental Policy Act (NEPA) for the management of SNF [DOE 1995]. These decisions have provided an overarching framework for SNF management, as well as site-specific and SNF-related management decisions for the past two decades. In the years since these decisions were made, with the notable exception of the successful drying and packaging of the production reactor fuel at Hanford, a majority of the decisions have been largely unimplemented. Also, since these decisions were made, a number of changes that bear on considerations relative to the path forward have occurred. A SNF Exploratory Road map activity, identified reasonable alternate pathways for DoE's inventory of SNF. Three fundamental pathways were identified in this activity for the long-term management and disposition of DOE SNF: Direct Disposal Pathway, Existing Processing Pathway and Alternate Processing Pathway. Further actions would be required (e.g., evaluation of NEPA analysis, technology maturity evaluations, refinement of cost and risks, benefits and advantages relative to other alternate paths) to define and inform many key decisions that will result in the selection of the disposition pathways that are most beneficial to the US Government in dispositioning DoE's SNF inventory. DOE is currently managing all SNF safely; however, the age of DOE-owned SNF and facilities for storing and processing SNF, coupled with the uncertainty of the storage duration, necessitates decisions and actions to ensure that the infrastructure will be in place to ensure continued safe and effective long-term management and eventual disposal. The identification of reasonable alternate pathways took these considerations into account in an effort to proactively manage conditions that could challenge the safety of storing and managing DOE SNF over the time periods now contemplated and also to ensure that flexibility is preserved to ensure that the DOE SNF remains compatible with final disposition pathways when they become available. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Criticality Consideration for Geologic Disposal of DOE-Owned Spent Nuclear Fuels - 20255

Decisions must be made relative to packaging spent nuclear fuel (SNF) for storage, transportation, and eventual disposal. This paper evaluates potential criticality-related loading and packaging considerations for Department of Energy (DOE)-owned SNF that could be impacted favorably or unfavorably by disposal uncertainties and proposes approaches to minimize such impacts. Using Al-Based SNF as an example and drawing on analyses performed in support of the Yucca Mountain Repository License Application (LA), this paper explores the role of natural barriers, engineered barriers, and waste form characteristics relative to reducing the potential for postclosure criticality. Several parameters important to postclosure criticality are considered in order to determine which are useful discriminators to support packaging decisions. Using these parameters, a qualitative assessment is performed relative to three options for managing DOE-owned SNFs. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The suitability of large area drift chambers as the technology choice for the Cosmic Ray Inspection and Passive Tomography (CRIPT) project

The CRIPT project brings together several Canadian institutions, concerned with the detection of Special Nuclear Materials (SNM), addressing a requirement at ports-of-entry for detection of SNM in the many thousands of containers that flow into and out of Canada every day, while at the same time providing a way of monitoring the contents of nuclear waste storage containers, for waste management and non-proliferation reasons. The scale of these applications is large - typically tens of cubic metres, requiring detectors that can cover a large area at a minimum cost. The CRIPT project considered drift chambers adapted from high energy physics experience, as one of its technology choices. We report here on the performance of a full scale prototype, which covers an area of 2.4 m x 1.2 m with only 6 readout channels, and provides a 2D data point with accuracies (in x and z) of around 2 mm. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Unlocking the Vault - Accelerated Delivery Through the Application of Innovation and Collaboration - 19011

The Pile Fuel Cladding Silo (PFCS) at Sellafield was built in 1949/50 to receive and store fuel cladding from reprocessing of Windscale Pile fuel; it has been used to store this material and other waste from the UK nuclear programme ever since. The Silo is unsuitable for indefinite storage; this along with uncertainty in the make-up and condition of the inventory combine to rank the facility alongside the most hazardous in Western Europe. Sellafield Ltd, began working with its supply chain partners Bechtel Cavendish Nuclear Solutions (BCNS - a joint venture between Bechtel Inc and Cavendish Nuclear Ltd) in 2012, to execute a suite of projects to create an access route to the waste and a capability to retrieve waste from the silo for the first time ever. However, the challenge of providing this capability, while maintaining ongoing safe storage of the waste, and underpinning future performance of both the silo and the waste packages for many hundreds of years, proved to be too much for traditional Sellafield Ltd delivery models. With both cost and schedule forecasts doubling from initial estimates, a new approach was clearly required. The team recognised that success would require all of the experience and expertise of each organisation working together to a common goal. Therefore, significant effort was expended to build a collaborative team environment into which an innovative approach to both the engineering of what was provided and the delivery methods for doing it could be launched. Focussing on collaborative culture in which innovation and fit for purpose thinking were encouraged has completely rebuilt stakeholder confidence. The project is now almost complete; 17 months ahead of schedule and British Pounds 100 m less than the approved cost. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Design and Licensing of Irradiated Uranyl Nitrate Liquid Containers and Applicable Loading and Packaging System - 18481

Irradiated highly enriched uranyl nitrate liquid (HEUNL) solutions are typically residual materials resulting from the processing of uranium target materials in the production of radioisotopes. Traditionally, these residual materials have been processed and stored at the site of origin, due to the lack of an option for packaging, transportation and disposition. Modern alternatives to process, stabilize, package and dispose of these materials have been developed, but until recently there has not been a viable Type B package solution that could be used to ship these materials in sufficient quantities to justify the cost of an off-site disposition strategy. For this reason, most facilities that generate irradiated HEUNL materials have implemented on-site storage tanks or containers, resulting in the significant accumulation of HEUNL inventories worldwide. This paper provides an overview of the design and licensing activities for the development of sealed irradiated HEUNL transport containers to permit safe transportation of this material in the NAC Legal Weight Truck (NAC-LWT) cask. A description of the robust HEUNL container, licensing and fabrication is also presented. In addition, NAC has developed a specialized loading system to optimize the process to load, package and un-package HEUNL materials to minimize worker exposure during loading, and execute the packaging process efficiently for safe transport and retrieval. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Destructive examination of shipping package 9975-02101

Destructive and non-destructive examinations have been performed on the components of shipping package 9975-02101 as part of the comprehensive Model 9975 package surveillance program. This package is one of ten high-wattage packages that were selected for field surveillance in FY15, and was identified to contain several non-conforming conditions. Most of these conditions (mold, stains, drum corrosion, calculated fiberboard dimensions and fiberboard damage) relate to the accumulation of water in the outer and lower portions of the cane fiberboard assembly. In the short term, this causes local but reversible changes in the fiberboard properties. Long-term effects can include the permanent loss of fiberboard properties (thus far observed only in the bottom fiberboard layers) and reduced drum integrity due to corrosion. The observed conditions must be fully evaluated by KAC to ensure the safety function of the package is being maintained. Three of the other nine FY15 high-wattage packages examined in the K-Area Complex showed similar behavior. Corrosion of the overpack drum has been seen primarily in those packages with relatively severe fiberboard degradation. Visual examination of the drums in storage for external corrosion should be considered as a screening tool to identify additional packages with potential fiberboard degradation. Where overpack drum corrosion has been observed, it is typically heaviest adjacent to the stitch welds along the bottom edge. It is possible that changes to the stitch weld design would reduce the degree of corrosion in this area, but would not eliminate it. Several factors can contribute to the concentration of moisture in the fiberboard, including higher than average initial moisture content, higher internal temperature (due to internal heat load and placement with the array of packages), and the creation of additional moisture as the fiberboard begins to degrade.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Retrieval of Transuranic Drums with Deflagration to Detonation Potential from a Vault at the Oak Ridge National Laboratory - 20207

During the final phase of a long-term project, a total of 80 TRU waste drums at ORNL have been retrieved from a below-grade storage vault in which they have remained untouched for about 25 years. The drums, which house material generated from past ORNL operations, are now stored and ready for eventual transfer to the Transuranic Waste Processing Center, located on Highway 95 in Oak Ridge. The Transuranic Waste Processing Center will process and ship the drums to WIPP in Carlsbad, New Mexico, for disposal. Workers lifted the drums one-by-one from the underground storage vault with a 110-ton crane over a one-week period in October 2017. Although the physical work was performed in one week, years of detailed planning preceded the fieldwork. A key obstacle needed to be overcome before the project could safely proceed. This obstacle involved the need to ensure controls were developed for the Deflagration to Detonation Transition (DDT) potential. DDT refers to a phenomenon in ignitable mixtures of a flammable gas and air (or oxygen) when a sudden transition takes place from a deflagration type of combustion to a detonation type of explosion. Basically, these drums, under certain circumstances, have a potential to detonate and overpressurize. Extensive analysis of the drums verified that detonation, while unlikely, was possible. Of the total 103 drums that were retrieved or moved in preparation for retrieval, 18 had DDT potential. Extensive security requirements were also necessary, due to the nature of the material, and this added another layer of complexity to the fieldwork. Prior to retrieving the drums from the underground storage vault, space needed to be made for them within the various above-grade facilities. Inventory and security requirements dictated what could be stored where, and the first step of the field work involved a number of drum movements in preparation for storage of the newly retrieved drums. This effort involved moving 21 drums already in the storage area to facilitate the addition of the newly retrieved ones. The retrieval project required a total of 107 critical lifts using the 110-ton crane, under 3 critical lift plans. The TRU waste storage facility is a Category 2 Nuclear Facility and is managed under an extensive Documented Safety Analysis. The TRU retrieval project was conducted in accordance with DOE Order 425.1D and included three Implementation Verification Reviews, two Management Assessments, one Readiness Assessment, and seven mock-ups in preparation for the field work. Despite being stored for 25 years, the drums were in good shape due to the integrity of the facilities where the drums were stored. Of the 80 drums that were retrieved, 12 were placed in special containers called 'overpacks' based on their content. The drums were removed safely and without incident, thanks to a lot of preparation and the efforts of a highly skilled team. Lessons learned through the DDT control development and the drum retrieval and overpacking process could be beneficial to others having to manage similar drums of TRU waste. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Status Update - Installation and Operation of GeoMelt{sup R} ICV{sup TM} Process in the NNL's Central Laboratory on the Sellafield Site - 16410

Thermal treatment of nuclear waste in the UK has seen much renewed interest recently, owing to the advantages that can be gained in terms of reduced waste volumes, compatibility with reactive metals and organics and its ability to treat mixed generic wastes. Vitrification is a treatment option which destroys organics and some hazardous inorganics such as asbestos, reduces wasteform volume, and produces a robust leach resistant wasteform. Kurion's GeoMelt{sup R} In-Container Vitrification (ICV){sup TM} is a vitrification process where the treatment vessel can serve as an interim-storage, transport, and final long-term storage vessel - thus negating the need to pour glass into a separate container, effectively leading to a much simpler system than traditional waste melters. The UK's National Nuclear Laboratory (NNL) and Kurion have entered into a joint project to deploy an active waste ICV{sup TM} plant based on Kurion's GeoMelt{sup R} technology, at NNL's flagship Central Laboratory on the Sellafield site. NNL is the UK's national laboratory for civil nuclear science and technology, providing advice to government, protecting key skills, supporting industry and delivering national nuclear programs. NNL is bringing the Kurion GeoMelt{sup R} process alongside its existing capabilities in thermal waste treatment. Kurion provides technology solutions to minimize and stabilize nuclear and hazardous waste through its families of technologies: access, separation and stabilization processes. The GeoMelt{sup R} plant being installed at the NNL's Central Laboratory creates a platform to evaluate the vitrification technology for the variety of wastes from the NDA estate and creates a treatment path for problematic waste streams that currently have no disposition pathway. With the diverse facilities under NNL management coupled with the NNL's ability to import wastes from within the UK and Europe, this arrangement with Kurion provides waste owners with treatment disposition pathways for problematic wastes. The Kurion / NNL team completed non-radioactive commissioning of a GeoMelt{sup R} ICV{sup TM} treatment system in 2015. Commissioning consisted of performing two tests at NNL's Workington Laboratory. Commissioning Test 1 involved vitrification of 367 kg of glass frit over the course of approximately 18 hours. Commissioning Test 2 consisted of processing 470 kg of soil and additives in approximately 27 hours. The soil processed in the second test was non-radioactive soil from Sellafield and was used as an analog for radioactive soil to be processed during radioactive commissioning at the Central Laboratory at Sellafield. All commissioning test goals were easily achieved and all subsystems operated as designed. Radioactive commissioning will be carried out in early 2016. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Corrective Maintenance Paradigm Shift at Hanford's Tank Farms - 20077

Hanford's Tank Farms facilities have been used to safely store waste for over 70 years, with the first single-shell tanks being constructed in 1943. Tank Farm facilities consist of 149 single-shell tanks, 28 double-shell tanks, an evaporator facility, and wastewater treatment facilities. Tank Farm facilities are aging, with a tremendous corrective maintenance burden on the Tank Farm contractor. The mission of Tank Farm facilities is soon changing from waste storage to waste staging for the Hanford Waste Treatment and Immobilization Plant (WTP). WTP operations will demand a significant increase in Tank Farm facility operations, in which corrective maintenance outage windows will shrink drastically. This realization has forced the Tank Farm contractor to consider a paradigm shift in Tank Farm facilities Maintenance planning, and the use of reliability Engineering tools. The Tank Farm Production Operations Engineering Cognizant System Engineering (CSE) organization has led the way in motivating this paradigm shift. This shift has been realized through the use of: 1) technical exchange with other Department of Energy (DOE) contractors to develop improvements in the CSE program, 2) a shift from the use of lagging to leading system health indicators, and 3) a Plant Health Committee to unite Engineering, Operations, and Maintenance personnel toward a productive maintenance strategy. The CSE organization has held several technical exchanges with other DOE contractors to discuss CSE concepts, and how to better maintain aging infrastructure. The technical exchange with other contractors has greatly reduced the time required to make improvements in the Tank Farm CSE program. Other DOE contractors have already faced issues surrounding aging infrastructure, and have vast experience in improving the reliability and usable life of structures and components in nuclear facilities. The past CSE program used lagging health indicators to determine the health of systems. The key lagging indicator used to determine system health was availability, which is the percentage of time that a facility was ready for operation compared to the time the facility was demanded for operation. Availability was a good indicator of health in the waste storage mission of Tank Farms, where safe storage was the most important function of the facility, and where maintenance outage windows were typically long-duration. In current and future operations, outage windows are reducing, resulting in the need for much more reliable systems. Systems that have had high availability may suddenly become inoperable due to a failed component or sub-system. In several instances, the use of availability as an indicator of system health failed to predict system/equipment failure before its occurrence. In discussions with other DOE contractors, a set of reliability tools, including leading indicators of health, has been implemented in the CSE program. This primarily involves the use of failure modes and effects analysis and the study of equipment failure to develop system monitoring plans that focus on trending data to detect oncoming equipment failure ahead of time. In addition, the use of a Plant Health Committee has added significantly to the paradigm shift from a corrective maintenance philosophy to the use of predictive and preventive maintenance. The Plant Health Committee is a chartered team consisting of Engineering, Operations, and Maintenance personnel. CSEs use this forum to present the results of their performance monitoring, including the presentation of health via leading health indicators. The most positive aspect of this committee is the communication that it creates within these critical organizations. The Operations and Maintenance organization benefit from focusing maintenance on the reliability-centered focus provided by Engineering. Engineering benefits from the operational experience of the Operations organization and from the failure data that can be provided by Maintenance personnel. The continued use of the Plant Health Committee is expected to further decrease maintenance outage times, in better support of oncoming 24/7 operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An Evaluation of Standardized Canisters in the Waste Management System - 16317

Development of a standardized canister system represents an opportunity to develop an integrated approach to addressing storage, transportation, and disposal issues in the waste management system. However, regardless of timing and method, deployment of such a system would have the potential to cause significant system-wide impacts. This evaluation expands upon previous standardized-canister system evaluations and compares continued loading of dual-purpose canisters (i.e., the status quo) with loading of standardized canister systems in the near term, that is, before repository requirements are known and/or before operating reactors shut down. This evaluation quantitatively compares order-of-magnitude costs and logistics for different standardization scenarios with those of status quo scenarios, provides insight into quantifiable impacts of loading standardized canister systems in the near term, tests system-level analysis tools and associated input, and identifies scenarios for further analysis. This is a technical paper that does not take into account the contractual limitations under the Standard Contract (10 CFR Part 961). As work on assessing standardized canister system scenarios has progressed, new data for at-reactor and interim storage facility (ISF) operations have been collected and/or generated to provide more realism at the system level, and past scenarios were re-evaluated with this new information. In addition, new scenarios were developed and analyzed that focused on (1) bare fuel transported from reactors to an ISF in re-usable bare fuel casks and deferring deployment of a standardized canister system to the ISF, (2) alternative acceptance strategies based on conclusions from previous systems architecture studies, and (3) the impacts of having to accommodate spent fuel in differently sized canisters for different potential repository geologies. Results of this evaluation indicate that shifting the loading of standardized canisters from the reactor to the ISF does not result in a significant change in total system cost. Results also show that some alternative acceptance strategies could reduce the number of years that spent nuclear fuel (SNF) stays on-site at reactors for cases involving standardized canisters (consistent with previous results that looked at dual-purpose canisters). Finally, incorporating the new at-reactor loading data of small standardized canisters shows a significant system-wide cost reduction when compared to previous estimates of at-reactor loading of small canisters. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗