Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “QUEUES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

Influence of Business Models on PV-Battery Dispatch Decisions and Market Value

PV-battery hybrid projects dominate interconnection queues in some regions in the United States, but few projects have been operational long enough to assess how the hybrid capabilities may be used in practice. We interview plant operators and analyze empirical dispatch data for eleven large-scale PV-battery hybrids in three organized wholesale markets in the United States. We use the dispatch data and wholesale market prices to estimate the market value of our sample hybrids in 2020. The empirical increase in market value of a PV-battery hybrid relative to a standalone PV plant varies by project and ranges from $\$$1 to $\$$48/MWhsolar. The premium is driven by market, location, technical characteristics of the PV and battery asset, and battery dispatch strategies. In contrast to the widespread assumptions in the PV-battery hybrid modeling literature, only three of the eleven project operators optimize battery usage for wholesale market revenue as merchant plants. Instead, the majority of operators in the sample have alternate objectives. For example, load-serving entities target peak load reductions, incentive program participants focus on compliance with program requirements, and large energy consumers prioritize resiliency and utility bill minimization. Understanding prevalent dispatch signals and the degree of alignment with system-wide grid needs can increase the market value of PV-battery hybrids.

14 SOLAR ENERGY↗

Potential Infrastructure Cost Savings at Hybrid Wind Plus Solar PV Plants

This report documents the creation of NREL's Balance of System model for Hybrid Renewable Energy Systems (HybridBOSSE). Balance of System (BOS) costs account for approximately 30% of the capital expenditure required to install a land-based wind plant, and as much as 40% of the cost of installing a solar PV plant. Hybrid Renewable Energy systems present an opportunity to combine balance of system components to achieve cost savings, and HybridBOSSE aims to provide a component-level model to determine the associated BOS costs in a hybrid renewable energy system. Prior BOS models for hybrid systems (at NREL and elsewhere) have relied on empirical curve fits of legacy industry data, limiting their utility and their predictive ability for new technology combinations and configurations, such as those found in Hybrid Plants. Hybrid plants at the utility scale have considerably more interest in the last number of years, with ever-growing capacities in the interconnection queues, and many large developers pivoting to only consider hybrid plants going forward. As these plants become a commercial reality, the need for a detailed analysis of costs in a hybrid plant to fully exploit the available cost savings grows. The tool developed and documented in this work, HybridBOSSE, provides an open-source, python-based method of assessing the costs in hybrid plants. This analysis capability unlocks greater certainty in hybrid plant costs, as well as the ability to examine scenarios of hybridization and glean combinations that offer the greatest flexibility and cost reduction.

14 SOLAR ENERGY↗

Seascape Interface Control Document

This paper serves as the Interface Control Document (ICD) for the Seascape automated test harness developed at Sandia National Laboratories. The primary purposes of the Seascape system are: (1) provide a place for accruing large, curated, labeled data sets useful for developing and evaluating detection and classification algorithms (including, but not limited to, supervised machine learning applications) (2) provide an automated structure for specifying, running and generating reports on algorithm performance. Seascape uses GitLab, Nexus, Solr, and Banana, open source software, together with code written in the Python language, to automatically provision and configure computational nodes, queue up jobs to accomplish algorithms test runs against the stored data sets, gather the results and generate reports which are then stored in the Nexus artifact server.

97 MATHEMATICS AND COMPUTING↗

Small Hydropower Interconnections: Analysis of Interconnection Processes

Small hydropower projects have faced the challenge of navigating the process to interconnect their generation source to electricity distribution and transmission grids. Small hydropower developers have found interconnection procedures to be opaque and ultimately result in unexpected cost surprises and long timelines. Noting these challenges, the U.S. Department of Energy Water Power Technologies Office enlisted Pacific Northwest National Laboratory (PNNL) and Oak Ridge National Laboratory (ORNL) to investigate the small hydropower interconnection landscape across the United States. After reviewing the status of small hydropower (“Small Hydropower Interconnections: Small Hydropower in the United States”) and the interconnection procedures across the United States (“Small Hydropower Interconnections: State Interconnection Processes”) in the first two white papers of this series, this paper uses recent data from small hydropower interconnection applications to benchmark the efficacy of the process. Using data from interconnection queues hosted by utilities, balancing authorities, independent system operators (ISOs), and regional transmission organizations (RTOs), this paper provides context for the costs, timelines, and types of upgrades required for small hydropower projects. Interconnection applications and study reports for small hydropower projects were analyzed to collect key pieces of information about the interconnection process, timeline, costs, and type of upgrades required for interconnection. Information sourced from the reports was entered into an Interconnection Benchmarking database (IBdb), which may be found in Appendix A.1. Information from this database was used to evaluate the performance and challenges associated with interconnecting small hydropower projects. This white paper presents a description of the sources contained in the interconnection database (Section 2.0), an analysis of the interconnection timeline (Section 3.0), an evaluation the cost of interconnection upgrades (Section 4.0), and a description of the types of infrastructure upgrades (Section 5.0). The final paper in this series (“Small Hydropower Interconnections: Best Practices”) will use the analysis described here to outline best practices for interconnection processes that will help overcome barriers to future small hydropower development.

13 HYDRO ENERGY↗

Small Hydropower Interconnections: Best Practices

Small hydropower projects have been the predominant source of capacity growth of U.S. hydropower for more than a decade, and they present the most cost-effective and environmentally permissible avenues for hydropower growth (DOE 2016; Johnson et al. 2018). However, interconnection to electricity distribution and transmission grids is a persistent barrier due to cost surprises and schedule overruns. As a culmination to research into the status and requirements of small hydropower interconnection across the United States, this paper presents the best practices for setting interconnection standards that can improve the process for small hydropower developers. As part of the analysis, the interconnection costs are compared between small hydropower, solar, and wind. The analysis of the small hydropower interconnection landscape across the United States was carried out by Pacific Northwest National Laboratory (PNNL) and Oak Ridge National Laboratory (ORNL) with support from the U.S. Department of Energy Water Power Technologies Office. The research team was guided by a Technical Advisory Group (TAG) and gleaned data from publicly available sources, such as the HydroSource database (ORNL 2020) and interconnection queues hosted by utilities, balancing authorities, independent system operators (ISOs), and regional transmission organizations (RTOs). The results of this work are shared in a series of papers detailing the state of small hydropower in the United States (“Small Hydropower Interconnections: Small Hydropower in the United States”), the variety of state interconnection processes to connect power generators with the grid (“Small Hydropower Interconnections: State Interconnection Processes”), and an analysis of the interconnection processes (“Small Hydropower Interconnections: Analysis of Interconnection Processes”). In this, the final paper in the series, best practices for interconnection processes (“Small Hydropower Interconnections: Best Practices”) are identified from the solar energy and distributed wind energy industries that are transferrable to small hydropower development. This information will help overcome barriers to future small hydropower development.

13 HYDRO ENERGY↗

Utility-Scale Solar, 2022 Edition: Empirical Trends in Deployment, Technology, Cost, Performance, PPA Pricing, and Value in the United States [Slides]

Berkeley Lab’s “Utility-Scale Solar, 2022 Edition” provides an overview of key trends in the U.S. market, with a focus on 2021. Highlights of this year’s update include: -A record of nearly 12.5 GWAC of new utility-scale PV capacity came online in 2021, bringing cumulative installed capacity to more than 51.3 GWAC across 44 states. -90% of all new utility-scale PV capacity added in 2021 uses single-axis tracking. -Median installed project costs declined to $\$1.35$/WAC (or $\$1.02$/WDC) in 2021. -Project-level capacity factors vary widely, from 9% to 35% (on an AC basis), with a sample median of 24%. The report explores drivers of this variation. -Utility-scale PV’s LCOE fell to $\$33$/MWh in 2021 ($\$27$/MWh if factoring in the federal investment tax credit, or ITC). -PPA prices have largely followed the decline in solar’s LCOE over time, but have recently stagnated and even moved slightly higher. Prices from a sample of recent contracts average around $\$20$/MWh (levelized) in the West and $\$30-40$/MWh elsewhere in the continental US. In 2021, solar’s average market value (defined in the report to include only energy and capacity value) rose by 55% to $\$47$/MWh and exceeded average wholesale prices in 13 of the 17 balancing authorities analyzed. -Adding battery storage is one way to increase the value of solar. Our public data file tracks metadata and PPA prices from 67 PV+battery hybrid projects that are already online or that have secured offtake arrangements. -At the end of 2021, there were at least 674 GW of utility-scale solar power capacity within the interconnection queues across the nation, 284 GW of which include batteries. For more information, and to explore related interactive data visualizations, go to utilityscalesolar.lbl.gov.

14 SOLAR ENERGY↗

Documentation on How to Run the NEAMS Workbench GUI on Sawtooth

This document provides guidelines on how to run Moose-based applications from the NEAMS WorkbenchGUI on the HPC platform Sawtooth located at Idaho National Laboratory. The different steps are illustrated with a multi-app example modeling a sodium-cooled fast reactor (SFR) taken from the virtual test bed (VTB) website. The workflow consists of four steps to demonstrate the capabilities of the NEAMS Workbench GUI, that covers log into Sawtooth, editing and validating input files, submission of the job to the queue and visualization of the numerical solution and the geometry. Each step is illustrated with figures in the text, and a demonstration video is also available.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Utility-Scale Solar, 2023 Edition: Empirical Trends in Deployment, Technology, Cost, Performance, PPA Pricing, and Value in the United States [Slides]

Berkeley Lab’s “Utility-Scale Solar, 2023 Edition” presents analysis of empirical plant-level data from the U.S. fleet of ground-mounted photovoltaic (PV), PV+battery, and concentrating solar-thermal power (CSP) plants with capacities exceeding 5 MWAC (PV plants of 5 MWAC or less, including residential rooftop systems, are covered separately in Berkeley Lab’s companion annual report, Tracking the Sun). Highlights of this year’s update include: -10.4 GWAC of new utility-scale PV capacity came online in 2022, bringing cumulative installed capacity to more than 61.7 GWAC across 46 states. -94% of all new utility-scale PV capacity added in 2022 uses single-axis tracking. -Median installed project costs declined to $\$1.32$/WAC (or $\$1.07$/WDC) in 2022. -Plant-level capacity factors vary widely, from 9% to 35% (on an AC basis), with a sample median of 24%. The report explores drivers of this variation. -Utility-scale PV’s LCOE fell to $\$39$/MWh in 2022 ($\$29$/MWh if factoring in the federal investment tax credit, or ITC). -PPA prices have largely followed the decline in solar’s LCOE over time, but have recently stagnated and even moved slightly higher. Prices from a sample of recent contracts average around $\$20-30$/MWh (levelized) in the West and $\$30-40$/MWh elsewhere in the continental US. -In 2022, solar’s average market value (defined in the report to include only energy and capacity value) rose by 40% to $\$71$/MWh and exceeded average wholesale prices in 4 of the 7 ISOs/RTOs and 11 of 18 other balancing authorities analyzed. -Adding battery storage is one way to increase the value of solar. Our public data file tracks metadata and PPA prices from ~100 PV+battery hybrid projects that are already online or that have secured offtake arrangements. -the end of 2022, there were at least 947 GW of utility-scale solar power capacity within the interconnection queues across the nation, 456 GW of which include batteries. For more information, and to explore related interactive data visualizations, go to utilityscalesolar.lbl.gov.

14 SOLAR ENERGY↗

The DUNE DAQ Application Framework

The Deep Underground Neutrino Experiment (DUNE) is a next-generation neutrino experiment that will probe the properties of these elusive particles with unparalleled precision. It will also act as an observatory for neutrino bursts caused by nearby supernovae, in the event that one occurs while the experiment is in operation. Given these goals, the DUNE trigger and DAQ system must be able to maintain extremely high uptime and provide a path for full readout of the detectors for very long times (up to 100s). To achieve these ends, we have designed the DUNE DAQ system around a flexible “application framework”, which provides a modular interface for specific tasks while handling the interconnections between them. The application framework collects modules into applications which can then be interacted with as units by the control, configuration and monitoring systems. One of the key features of the framework is its communications abstraction layer, which allows for modules to interact with both internal queues and external network connections with a single transport-agnostic interface. We will report on the architecture and features of the framework.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Performance Profiling on CPUs [Slides]

Measure before modification. Use CrayPat or Intel Advisor to find performance bottlenecks. Roofline analysis is easy with intel advisor. Running from the command line will allow you to submit to the job queue and allow you to analyze results later from the front end. It is possible to do collection only on a subset of ranks.

97 MATHEMATICS AND COMPUTING↗

Creating Unit Tests for GlideinWMS using AI tools

GlideinWMS is a workload management system that uses distributed computing to complete tasks, also known as jobs. It is particularly useful for high-throughput computing that’s used in research projects. It relies on Glideins, which are pilot jobs that pull jobs from a queue and provide resources for their completion, based on the jobs requirements. These decisions are made based on resource availability and job requirements. We used new AI tools to add unit tests to GlideinWMS.

Baburashvili, Ilya↗

Hybrid Power Plants: Status of Operating and Proposed Plants, 2024 Edition [Slides]

Improving battery technology and the growth of variable renewable generation are driving a surge of interest in “hybrid” power plants that combine, for example, wind or solar generating capacity with co-located batteries. While most of the current interest involves pairing photovoltaic (PV) plants with batteries, other types of hybrid or co-located plants with wide-ranging configurations have been part of the U.S. electricity mix for decades. This annually updated briefing tracks and maps existing hybrid or co-located plants across the United States while also synthesizing data from power purchase agreements (PPAs) and generation interconnection queues to shed light on near- and long-term development pipelines. The scope includes “co-located hybrids” that pair two or more resources (e.g., multiple types of generation and/or generation with storage) that are operated largely independently behind a single point of interconnection, and “full hybrids” that also feature coordinated operations of the co-located resources. The focus is on plants with one megawatt (MW) or more of capacity; smaller (often behind-the-meter) projects are also increasingly common, but are not included in this data synthesis.

14 SOLAR ENERGY↗

Utility-Scale Solar, 2024 Edition: Empirical Trends in Deployment, Technology, Cost, Performance, PPA Pricing, and Value in the United States [Slides]

Berkeley Lab’s “Utility-Scale Solar, 2024 Edition” presents analysis of empirical plant-level data from the U.S. fleet of ground-mounted photovoltaic (PV), PV+battery, and concentrating solar-thermal power (CSP) plants with capacities exceeding 5 MWAC (PV plants of 5 MWAC or less, including residential rooftop systems, are covered separately in Berkeley Lab’s companion annual report, Tracking the Sun). Key findings from this year’s report include: -18.5 GWAC of new utility-scale PV capacity came online in 2023, bringing cumulative installed capacity to more than 80.2 GWAC across 47 states. Installed costs continued to fall in 2023. Relative to 2022, capacity-weighted averages decreased by 8% to -$\$1.43$/WAC (or $\$1.08$/WDC). Costs, based on a 7.1 GWAC sample of 76 plants completed in 2023, have fallen by 75% (averaging 10% annually) since 2010. Plant-level capacity factors vary widely, from 6% to 36% (on an AC basis), with a sample median of 24%. -Levelized cost of energy (LCOE) of new 2023 projects increased slightly to $\$46$/MWh prior to the application of tax credits but continued to fall to $\$31$/MWh when accounting for federal incentives. PPA prices have largely followed the decline in solar’s LCOE over time, but newly signed longer-term PPA prices have increased since 2021, to an average of $\$35$/MWh (levelized, in 2023 dollars). -Solar’s average energy and capacity value (i.e., ability to offset costs of other power generation sources) across the U.S. was $\$45$/MWh in 2023. Solar’s average market value was lowest in CAISO ($\$27$/MWh), the market with the greatest solar generation share, and highest in ERCOT ($\$67$/MWh). -Newer solar projects had greater market value in 2023 than their generation costs, yielding $\$1.1$ billion in benefits. Projects built in 2022 delivered on average $\$15$/MWh more market value than their costs in 2023. -Solar’s combined value from wholesale electricity markets, public health and climate damage reduction were greater than generation costs and incentives, yielding $\$13.7$ billion in net benefits in 2023. We estimate U.S. health benefits of $\$24$/MWh and reduced global climate damages of $\$101$/MWh. -Adding battery storage is one way to increase the value of solar. Deployment of 52 new PV+battery hybrid plants set a record with 5.3 GW installed in 2023. Our public data file tracks metadata and PPA prices from more than 100 PV+battery hybrid projects that are already online or that have secured offtake arrangements. -Looking ahead, a massive pipeline of at least 1,085 GW of solar capacity dominates the nation’s interconnection queues at the end of 2023. Nearly 571 GW, or 53%, of that total was paired with a battery – in CAISO it was a staggering 98%. Historically only 10% of the requested solar capacity is built. -For more information, and to explore related interactive data visualizations, go to utilityscalesolar.lbl.gov.

14 SOLAR ENERGY↗

EV Charging Infrastructure Energization An Overview of Approaches for Simplifying and Accelerating Timelines to Processing EV Charging Load Service Requests

The United States has seen significant growth in electric vehicle (EV) adoption, leading to increased demand for EV charging infrastructure. Over the past decade, EV charging infrastructure site developers, site hosts, and electric distribution utilities have navigated the process to integrate chargers onto the electric grid. Site developers and site hosts have raised the alarm that the integration process for high-powered EV charging projects does not meet the needs of the EV market for timeliness or cost. High-powered charging stations typically require a load service request or an agreement with the local utility to connect to the grid. The process of energizing a new high-powered charging site can be complex and time-consuming, often taking up to 2 years. This timeline is the result of current utility energization processes having been designed for construction projects that take longer to build (i.e., buildings). The specific challenges stem from various factors, including compartmentalization in application processes, the integration of EV charging process approvals with other distributed energy resources (DERs), and the need to ensure grid reliability. The energization process needs to evolve to meet the growing demand for high-powered EV charging. This white paper compiles information gathered through various conversations with key stakeholders, including utilities, utility regulators, EV charging operators, site developers, and authorities having jurisdiction (AHJ) as well as through an extensive literature review. This document identifies the challenges and provides potential solutions to streamline the process of connecting EV charging infrastructure to the power grid in the United States, serving as a starting point for future conversations around these solutions. The solutions noted in this white paper require collaborative efforts among utilities, regulators, and EV charging infrastructure developers to streamline the grid connection process for EV charging infrastructure. They are broadly organized into four areas: 1. Increase data access and transparency: Develop automated load service request tools, integrate hosting capacity and load service request analyses, incorporate EV adoption forecasts, and provide transparency on the processing queue. 2. Improve energization processes and timing: Create fast-track options based on prescreening criteria, provide flexibility or phased approvals in the load service request/interconnection process, build internal knowledge within utilities about EV charging technologies, and provide standardized workforce training. 3. Promote economic efficiency: Right size distribution components to accurately reflect the load requirements of EV charging infrastructure, make proactive investments in grid infrastructure based on EV adoption forecasts and growth projections, and consider energy equity and environmental justice factors such as equitable access to EV charging when planning infrastructure. 4. Improve grid reliability and resilience: Use load management/power control systems (PCS) at EV charging stations, adopt and implement harmonized standards for communication protocols and information models between the EV charging and grid control infrastructure, and address cybersecurity considerations by implementing robust security measures and standards for EV charging infrastructure—with particular emphasis on clarifying the security requirements for the interface to the grid. The objective of the solutions proposed in this white paper is to accelerate the timeline and decrease costs associated with connecting EV charging infrastructure to the grid. Electric utilities, utility regulators, EV charging infrastructure developers, and site hosts will first need to understand which solutions are available in their service territory, and if warranted, which combination of solutions would support their specific needs. Through the successful implementations of solutions at scale detailed here, industry will demonstrate a new and innovative ecosystem where timely deployment and energization of EV charging infrastructure with greater grid resiliency and reliability is a reality.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Transmission Interconnection Roadmap: Transforming Bulk Transmission Interconnection by 2035

The U.S. electricity system is amid a rapidly occurring and widespread energy transition. Regional, Tribal, state, and customer demand for new energy resources, combined with favorable policies, is driving a rapid rise of interconnection requests. Interconnection processes will need to evolve to handle this larger number of requests today and into the future, as policy and economic drivers continue to motivate significant resource development. This roadmap identifies and organizes nearer- and longer-term solutions to enable transmission interconnection processes to meet this expected demand, and it is intended for a diverse audience of stakeholders participating within transmission interconnection processes. The roadmap is a result of the Interconnection Innovation e-Xchange (i2X) program launched by the U.S. Department of Energy (DOE) in June 2022 to convene stakeholders and address interconnection challenges. The roadmap is organized into four primary goal areas, each important to the overall i2X mission to enable a simpler, faster, and fairer interconnection of clean energy resources while enhancing the reliability, resiliency, and security of our electric grid. The first goal aims to improve interconnection data transparency, to aid interconnection customers’ ability to screen and site potential projects, better enable third-party modeling, facilitate more process automation, enhance competition while ensuring equitable outcomes, and enable benchmarking, tracking, and auditing of interconnection processes and reforms. The second goal covers solutions to improve queue management practices, affected system studies, fair processes, and workforce development. The third goal incorporates solutions that aim to improve cost allocation, reduce costs to electricity consumers, enhance the coordination between transmission planning and the interconnection process, and optimize the rightsizing of transmission investment through improvements in interconnection studies. The fourth and final goal aims to reduce the performance issues not identified during interconnection studies by updating technical requirements within interconnection studies, models, and tools while also improving industry interconnection standards.

24 POWER TRANSMISSION AND DISTRIBUTION↗

American-Made Solar Prize: Edgeli Enables DER Integration (CRADA 615) (Final Report)

The purpose of this project was to demonstrate how granular time series data and automated data transformation, and impact assessment tools could speed interconnection approvals for distributed energy resource projects of various types and sizes. Types included community solar, rooftop solar, and EV charging projects. Using software routines to automate the transformation of data (e.g. GIS) to a network database and power flow model then applying scenarios to create hourly (8760) hosting capacity values and voltage and thermal impacts for specific projects, we were able to demonstrate the feasibility of quickly assembling and analyzing key utility data sets for interconnection purposes. The outcomes of this effort will become the foundation for future work that will enhance and encapsulate the software components developed as part of this project, into web services (e.g. APIs) that can be integrated into queue management systems and automate interconnection screening processes.

14 SOLAR ENERGY↗

A Framework for Streamlining Large Load Interconnection: An Assessment of Current Practices and Emerging Strategies for Fair and Efficient Load Interconnection Processes

This report focuses on current perceptions, challenges, and processes related to interconnection of LELs to the grid; while these loads include several types of entities, the primary focus of this work is on data centers, the largest current driver of this growth. It begins by summarizing relevant context related to load growth in the United States, including key stakeholder perceptions as data center deployment drive historic load growth nationwide. It then reviews the current landscape of large load interconnection processes and challenges and then proposes a framework of potential strategies intended to support a more consistent, streamlined, and fair approach to load interconnection. This framework is adapted from solutions proposed or adopted to address similar challenges faced in generator interconnection queues as well as notable reforms currently being proposed or enacted for large loads that could be more widely adopted.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Developing a GUI for the Robotic Test Stand

The introduction of this poster explains the technology behind DUNE’s far and near detectors and how passing neutrinos generate electrons that drift into a wire grid. I then explain how 3 ASICs manage signals received from electron interception. Next, the poster states how COLDATA chips are undergoing quality control by a Robotic Test Stand using a state machine. I further explained how earlier tests were done via a command line script and the necessity to implement a user-friendly Graphical User Interface with new features a command line can’t implement. For the implementation section, tools and methods for implementation are listed such as Python, tkinter, and GitHub as well as how multithreading and queue implementation was necessary for GUI functionality. Then, I elaborated on the GUIs new features. Finally, I explain how the GUI will be distributed across multiple institutions and future changes planned for the GUI. Photos of the RTS, far detector cave, diagram of anode assembly plane, COLDATA chips, set up tab, result tab, and legacy command line interface are shown.

Gutierrez Villanueva, Jaziel [DuPage Coll.]↗