Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Project management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

Long Term Environment and Economic Impacts of Coal Liquefaction in China

The project currently is composed of six specific tasks – three research tasks, two outreach and training tasks, and one project management and communications task. Task 1 addresses project management and communication. Research activities focused on Task 2 (Describe and Quantify the Economic Impacts and Implications of the Development and Deployment of Coal-to-Liquid Facilities in China), Task 3 (Development of Alternative Coal Gasification Database), and Task 4 (Geologic Carbon Management Options). There also were significant activities related to Task 5 (US-China Communication, Collaboration, and Training on Clean Coal Technologies) as well as planning activity performed in support of Task 6 (Training Programs).

01 COAL, LIGNITE, AND PEAT↗

MACCS (MELCOR Accident Consequence Code System) User Guide

The MELCOR Accident Consequence Code System (MACCS) is used by Nuclear Regulatory Commission (NRC) and various national and international organizations for probabilistic consequence analysis of nuclear power accidents. This User Guide is intended to assist analysts in understanding the MACCS/WinMACCS model and to provide information regarding the code. This user guide version describes MACCS Version 3.10.0. Features that have been added to MACCS in subsequent versions are described in separate documentation. This User Guide provides a brief description of the model history, explains how to set up and execute a problem, and informs the user of the definition of various input parameters and any constraints placed on those parameters. This report is part of a series of reports documenting MACCS. Other reports include the MACCS Theory Manual, MACCS Verification Report, Technical Bases for Consequence Analyses Using MACCS, as well as documentation for preprocessor codes including SecPop, MelMACCS, and COMIDA2. PAPERWORK REDUCTION ACT STATEMENT The NUREG does not contain information collection requirements and, therefore, is not subject to the requirements of the Paperwork Reduction Act of 1995 (44 USC 3501, et seq.). PUBLIC PROTECTION NOTIFICATION The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid OMB control number. ACKNOWLEDGEMENTS Contributions to this User Guide were received from NRC and Sandia National Laboratories (SNL) project managers, technical experts, and code authors dedicated to the production of a valuable resource for the MACCS user community. Instructions and guidance included herein were developed over many years and include advancements in the code that provide users the ability to develop complex consequence modeling scenarios. WinMACCS and many of the early MACCS developments were due to vision of an earlier Project Manager, Jocelyn Mitchell. Jonathan Barr and AJ Nosek also contributed to the development of this report. The current NRC Project Manager, Salman Haq, provided the leadership to ensure this document was completed. Several other NRC and Sandia staff provided insights supporting development of the MACCS code and of this document.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Customer Responsiveness

If you know anyone who's been involved in building a spacecraft, I'm sure you've heard the mantra, 'Test what you fly, and fly what you test.' Listen to a project manager from my institution (The Johns Hopkins Applied Physics Laboratory, a.k.a. APL) talking in his or her sleep, and this is likely what you're going to hear. At APL, we do a lot of testing. We probably do more testing in the initial stages of a project than we could explain to review boards. Perhaps we are conservative in this respect, but our project managers and engineers believe in getting a good night's sleep before a launch, and testing is a good way of ensuring that. So you can imagine my reaction when the NASA project manager, Don Margolies, suggested that on the Advanced Composition Explorer (ACE) mission we pull all the instruments off the spacecraft after we had just completed the full range of environmental testing. This would allow the scientists to do a better job of calibrating their instruments.

Chiu, Mary↗

Institutionalizing Lessons Learned

The NASA Integrated Action Team (NIAT) was formed by the NASA Administrator in March 2000. The purpose of this team was to identify the actions that NASA must take to address systemic findings reported in 4 different anomaly investigations. Team membership represented senior managers from all the field centers and NASA Headquarters. NIAT report addressed 165 findings and developed 17 action plans that are described in five themes: people and teams, technology, risk, formulation rigor, and communications. The NIAT actions present a systems solution for strengthening formulation and implementation of programs and improving the environment for their support. NIAT results included: enhancing success by avoiding failures that could have been prevented through good planning and sound practice; ensuring that prudent risks do not compromise safety; and ensuring that mission risks are objectively assessed, appropriately mitigated and consciously accepted by the program team and customers. Definitions of Faster, Better, Cheaper and Success Criteria were also developed and included as part of the NIAT report. As a result of the NIAT report, program and project management process changes were incorporated into NASA's quality system documentation, including NPG 7120.513, "NASA Program and Project Management Processes and Requirements. This paper describes the NIAT results and the resulting updates to NPG 7120.5 that keep this program and project management description a living process.

McBrayer, Robert O.↗

When My Name Suddenly Was "Murphy"

The author recounts how he was named the Launch Vehicle Manager for the Mars Pathfinder mission, after his project manager suffered a heart attack shortly before launch. He explains that he was prepared for the sudden responsibilities, since his project manager required that he learn many new skills.

Mitchell, David↗

Preparing Los Alamos National Laboratory's Waste Management Program for the Future - 12175

The waste management program at Los Alamos National Laboratory (LANL) is undergoing significant transition to establish a lean highly functioning waste management program that will succeed the large environmental cleanup waste management program. In the coming years, the environmental cleanup activities will be mostly completed and the effort will change to long-term stewardship. What will remain in waste management is a smaller program focused on direct off-site shipping to cost-effectively enable the enduring mission of the laboratory in support of the national nuclear weapons program and fundamental science and research. It is essential that LANL implement a highly functioning efficient waste management program in support of the core missions of the national weapons program and fundamental science and research - and LANL is well on the way to that goal. As LANL continues the transition process, the following concepts have been validated: - Business drivers including the loss of onsite disposal access and completion of major environmental cleanup activities will drive large changes in waste management strategies and program. - A well conceived organizational structure; formal management systems; a customer service attitude; and enthusiastic managers are core to a successful waste management program. - During times of organizational transition, a project management approach to managing change in a complex work place with numerous complex deliverables is successful strategy. - Early and effective engagement with waste generators, especially Project Managers, is critical to successful waste planning. - A well-trained flexible waste management work force is vital. Training plans should include continuous training as a strategy. - A shared fate approach to managing institutional waste decisions, such as the LANL Waste Management Recharge Board is effective. - An efficient WM program benefits greatly from modern technology and innovation in managing waste data and reports. - Use of six-sigma tools can help improve the quality and efficiency of waste management processes. - A fair, easy to understand, transparent, and well-overseen process for distributing the cost of waste disposal and waste program oversight is essential. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Extension of MBSE for Project Programmatics Management on the Asteroid Redirect Robotic Mission

Model-based Systems Engineering can be employed beyond management of the technical architecture development of a system to also manage the programmatics associated with Systems Engineering activities of a project. On NASA’s Asteroid Redirect Robotic Mission, MBSE has been successfully employed to manage, generate, and interact with the documentation-based deliverables associated with System Engineering activities. This has been involved in defining and tracking project document, milestone, and personnel metadata via the same modeling framework used for the technical architecture management. Additionally, it has focused on improving overall user experiences through linkage of documentation to technical content in the system model, automation of manually intensive tasks, and others stakeholderoriented features.

Mozafari, Tanaz↗

FY 2020 Radionuclide Migration Project Status

The Waste Management Project provides safe, compliant, and cost-effective waste management services for the Hanford Site and the U.S. Department of Energy (DOE) complex. Part of these services includes safe disposal of low-level waste and mixed low-level waste at the Hanford Low-Level Waste Burial Grounds in accordance with the requirements of DOE Order 435.1, Radioactive Waste Management. To partially satisfy these requirements, performance assessment analyses were completed and approved. DOE Order 435.1 also requires continuing data collection to increase confidence in the critical assumptions used in these analyses to characterize the operational features of the disposal facility that are relied on to satisfy the performance objectives identified in the order.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

America's Next Great Ship: Space Launch System Core Stage Transitioning from Design to Manufacturing

The Space Launch System (SLS) Program is essential to achieving the Nation's and NASA's goal of human exploration and scientific investigation of the solar system. As a multi-element program with emphasis on safety, affordability, and sustainability, SLS is becoming America's next great ship of exploration. The SLS Core Stage includes avionics, main propulsion system, pressure vessels, thrust vector control, and structures. Boeing manufactures and assembles the SLS core stage at the Michoud Assembly Facility (MAF) in New Orleans, LA, a historical production center for Saturn V and Space Shuttle programs. As the transition from design to manufacturing progresses, the importance of a well-executed manufacturing, assembly, and operation (MA&O) plan is crucial to meeting performance objectives. Boeing employs classic techniques such as critical path analysis and facility requirements definition as well as innovative approaches such as Constraint Based Scheduling (CBS) and Cirtical Chain Project Management (CCPM) theory to provide a comprehensive suite of project management tools to manage the health of the baseline plan on both a macro (overall project) and micro level (factory areas). These tools coordinate data from multiple business systems and provide a robust network to support Material & Capacity Requirements Planning (MRP/CRP) and priorities. Coupled with these tools and a highly skilled workforce, Boeing is orchestrating the parallel buildup of five major sub assemblies throughout the factory. Boeing and NASA are transforming MAF to host state of the art processes, equipment and tooling, the most prominent of which is the Vertical Assembly Center (VAC), the largest weld tool in the world. In concert, a global supply chain is delivering a range of structural elements and component parts necessary to enable an on-time delivery of the integrated Core Stage. SLS is on plan to launch humanity into the next phase of space exploration.

Birkenstock, Benjamin↗

Earned Value Management (EVM): Reference Guide for Project-Control Account Managers

The purpose of this guide is intended to be a quick reference for a Project-Control Account Manager (P CAM) or technical manager empowered with a project’s cost, schedule, and technical responsibilities of a control account(s) when Earned Value Management (EVM) is required. The overall objective is to support the P CAM in performing their responsibilities as they relate to EVM. In addition, the reference guide describes at a summary level how the scope, schedule, and budget of a project integrate for optimal planning and control of prime contracts and in-house projects.

Control Account Manager↗

Managing the Development of the Wide-Field Infrared Survey Explorer Mission

The Wide-field Infrared Survey Explorer (WISE), a NASA Medium-Class Explorer (MIDEX) mission, is surveying the entire sky in four bands from 3.4 to 22 microns with a sensitivity hundreds to hundreds of thousands times better than previous all-sky surveys at these wavelengths. The single WISE instrument consists of a 40 cm three-mirror anastigmatic telescope, a two-stage solid hydrogen cryostat, a scan mirror mechanism, and reimaging optics giving 6" resolution (full-width-half-maximum). WISE was placed into a Sun-synchronous polar orbit on a Delta II 7320 launch vehicle on December 14, 2009. NASA selected WISE as a MIDEX in 2002 following a rigorous competitive selection process. To gain further confidence in WISE, NASA extended the development period one year with an option to cancel the mission if certain criteria were not met. MIDEX missions are led by the principal investigator who in this case delegated day-to-day management to the project manager. With a cost cap and relatively short development schedule, it was essential for all WISE partners to work seamlessly together. This was accomplished with an integrated management team representing all key partners and disciplines. The project was developed on budget and on schedule in spite of the need to surmount significant technical challenges. This paper describes our management approach, key challenges and critical decisions made. Results are described from a programmatic, technical and scientific point of view. Lessons learned are offered for projects of this type.

cryogenic↗

Technology Maturation in Support of DOE 413.3B Project Execution - 16436

The DOE Order 413.3B 'Program and Project Management for the Acquisition of Capital Assets' provides program and project management direction for the acquisition of capital assets with the goal of delivering projects within the original performance baseline (PB), cost and schedule, and fully capable of meeting mission performance, safeguards and security, and environmental, safety, and health requirements. Execution of complex DOE 413.3B projects depends, in part, upon the successful integration of a technology maturation program. The Low Activity Waste Pre-Treatment System (LAWPS) is executing a detailed technology maturation program under the Technology Readiness Level/Technology Maturation Plan (TRL/TMP) guidance of DOE Order 413.3B. The interaction of the technology maturation process and the project execution including technical, programmatic, and contractual execution, has been a critical component for project success. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Fast Track Study

The NASA Fast Track Study supports the efforts of a Special Study Group (SSG) made up of members of the Advanced Project Management Class number 23 (APM-23) that met at the Wallops Island Management Education Center from April 28 - May 8, 1996. Members of the Class expressed interest to Mr. Vem Weyers in having an input to the NASA Policy Document (NPD) 7120.4, that will replace NASA Management Institute (NMI) 7120.4, and the NASA Program/Project Management Guide. The APM-23 SSG was tasked with assisting in development of NASA policy on managing Fast Track Projects, defined as small projects under $150 million and completed within three years. 'Me approach of the APM-23 SSG was to gather data on successful projects working in a 'Better, Faster, Cheaper' environment, within and outside of NASA and develop the Fast Track Project section of the NASA Program/Project Management Guide. Fourteen interviews and four other data gathering efforts were conducted by the SSG, and 16 were conducted by Strategic Resources, Inc. (SRI), including five interviews at the Jet Propulsion Laboratory (JPL) and one at the Applied Physics Laboratory (APL). The interviews were compiled and analyzed for techniques and approaches commonly used to meet severe cost and schedule constraints.

Source record↗

Innovations in Advanced Materials and Metals Manufacturing Project (IAM2)

This project, under the Jobs and Innovation Accelerator Challenge, Innovations in Advanced Materials and Metals Manufacturing Project, contracted with Cascade Energy to provide a shared energy project manager engineer to work with five different companies throughout the Portland metro grant region to implement ten energy efficiency projects and develop a case study to analyze the project model. As a part of the project, the energy project manager also looked into specific new technologies and methodologies that could change the way energy is consumed by manufacturers—from game-changing equipment and technology to monitor energy use to methodologies that change the way companies interact and use their machines to reduce energy consumption.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Summer Final Report

The summer of 2012 has been filled with many memorable events and activities. As an intern, I had responsibilities that had to be fulfilled. My tour of duty was completed as an administrative student trainee in the Information Technology and Communications Services Business Office (IT-A). In accordance with the Business Objectives and Agreement of the Business Office and my performance plan, I was to provide business office support, improve business, project management, and technical work processes. With this being stated, I supported a project called "The Big Move Project" (TBMP), which will take course over the next several years. The Big Move Project is the planning of the Information Technology (IT) Directorate's relocation to various buildings in the course of upcoming years, when designs and the building of Central Campus have been completed. Working directly with my supervisor and the project manager, I was responsible for gathering both administrative and operational area requirements for the Information Technology (IT) Directorate, along with its outsourced support and contractors, such as IMCS, NICS, and ACES. My first action was to create rubrics that will serve as a guideline for the information that should be given by each branch of IT. After receiving that information via a few KAITS actions, I was able to start the consolidation process, and begin working on a presentation. A SharePoint was created shortly after for others to view the progression of the project, which I managed. During the consolidation ofthis information, I would occasionally present to the IT Deputy Director and IT Chiefs. The draft of this presentation was shown to employees of Center Operations (T A) and stakeholders-IT Chief Officers and contractor managers-in the relocation of IT to make them aware of what requirements must be met that will enable IT to be accommodated appropriately in the design of Central Campus Phase 11-the time in which IT and its contractors are scheduled to be relocated. Besides supporting TBMP, I also supported the Section 508 Policy Compliance Coordinator, R. Liang. Section 508 is a policy that requires employers to implement accessibility assurance of information and technology to disabled communities. On Thursday, July 19, 2012, I was able to go to Camp Boggy Creek-a camp for disabled children-for an education outreach, in collaboration with the Education Office. We shared with them information about how astronauts live and work in space, they were able to ride hovercrafts, build paper rockets, and then launch them outside. Although this outreach was quite fun with the kids at the camp, this was a learning opportunity to gain some insight to those with cognitive and physical disabilities, the problems they typically face, and in tum, how to accommodate those with disabilities in the work environment. In the process of implementing accessibility and Section 508 compliance, I attended various teleconferences, did field runs to supply closed-caption call phones to employees with limited hearing, and helped with the development of the charter ofthe Section 508 Compliance Working Group.

Makidi, Nitou↗

Choosing and Developing the Right Leadership Styles for Projects

Analyzing extensive questionnaires completed by 400 project management professionals, Professor Rodney Turner of the Lille Graduate School of Management and I have identified competencies that contribute significantly to project management success. Our research helps define the managerial and emotional competencies needed to make projects work. We also found that different kinds of projects call for different combinations of competencies.

Mueller, Ralf↗

STS-26 Preflight Press Briefing: Shuttle Systems Changes (2)

This NASA KSC video release presents part of a press conference held prior to Discovery flight STS-26, the first shuttle mission flown following the 51-L Challenger accident. The video includes presentations by Gerald Smith (Solid Rocket Booster (SRB) Project Manager) and Joe Lombardo (Space Shuttle Main Engine (SSME) Project Manager) discussing the major changes that were made to the SRB and SSME between 51-L and STS-26. Mr. Smith's talk centered on the changes and redesigns made to the solid rocket motor field joint, the case to nozzle joint, the SRB aft skirt, and the ET aft attach ring. Mr. Lombardo discusses test data evaluation, SSME inspections and the SSME heat exchanger in particular.

Source record↗

Galileo Science Update

Live footage shows Jane Platt, JPL Public Information Office, introducing the moderator of the panel discussion. The moderator introduces the panel members include Bill O'Neil, Project Manager Galileo Primary Mission, Dr. Torrence V. Johnson Galileo Project Scientist, Prof. Ronald Greeley from Arizona State University Galileo Imaging Team, Bob Mitchell Project Manager Galileo Europa Mission, and Dr. Karen Buxbaum Galileo Science Planning Manager. The panelists give the audience information about the Galileo Mission and answers questions from the audience and from Kennedy Space Center. An animation of the Galileo Spacecraft approaching and passing Europa is presented. The panelists mentions High Resolution Images, Detail Gravity studies, Spectral Maps of non-ice materials, Jupiter studies, Callisto studies, Europa studies, and Io studies.

Source record↗