Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Project Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

High Performance non-PGM Transition Metal Oxide ORR Catalysts of PEMFCs

This project was designed to develop acid-stable PGM-free transition metal oxide oxygen reduction reaction (ORR) electrocatalysts to meet or exceed the performance and durability of the DOE 2020 Technical Targets for platinum-group metal (PGM) free electrocatalysts from first-principles to incorporation into membrane-electrode assemblies (MEAs) for polymer electrolyte membrane (PEM) fuel cells. The planned project was to accomplish this goal with a multi-step approach: 1) materials modeling and experimental screening to identify acid-stable oxides with high ORR activity, 2) optimization of catalyst particle size and catalyst/carbon/ionomer catalyst layer composition, 3) fabrication of MEAs for performance and durability testing. During the course of this project: 1) acid-stability descriptors were developed for manganese oxides; 2) a family of acid-stable multicomponent oxides based on antimony were developed; 3) a flexible synthesis for the formation of nanocrystalline nonstoichiometric oxides was developed; 4) limited ORR activity but modest and improving oxygen evolution reaction (OER) activity was measured for multicomponent antimony oxides. The project was programmed into five technical tasks: The development of acid-stable ORR electrocatalytic oxides through 1) identification and optimization of acid-stable oxide compositions, and 2) electrochemical characterization; 3) optimization of catalyst layer composition for MEAs using identified ORR electrocatalysts; 4) MEA fabrication and performance testing to result in performance of 44 mA-cm-2 at 0.9 V vs. RHE; and 5) accelerated-stress testing of optimized MEAs. Because no acid-stable oxide was identified with the requisite activity for ORR (4.4 µA-cm-2oxide intrinsic activity at 0.9 V vs. RHE) within the time and budget allotted in Tasks 1 and 2, the project was halted at the end of phase 1, with no activity in Tasks 3-5. The research output, while not succeeding in developing ORR electrocatalysts, advanced the development of acid-stable oxide materials, showing potential for further improvement as OER electrocatalysts.

08 HYDROGEN↗

DSN human factors project

The project plan was to hold focus groups to identify the factors influencing the ease of use characteristics of software and to bond the problem. A questionnaire survey was conducted to evaluate those factors which were more appropriately measured with that method. The performance oriented factors were analyzed and relationships hypothesized. The hypotheses were put to test in the experimental phase of the project. In summary, the initial analysis indicates that there is an initial performance effect favoring computer controlled dialogue but the advantage fades fast as operators become experienced. The user documentation style is seen to have a significant effect on performance. The menu and prompt command formats are preferred by inexperienced operators. The short form mnemonic is least favored. There is no clear best command format but the short form mnemonic is clearly the worst.

Chafin, R. L.↗

Planning for Future Implementation of Section 180(c) of the Nuclear Waste Policy Act: DOE's Policy Implementation Exercise - 16612

The Department of Energy (DOE) Office of Nuclear Energy, Nuclear Fuels Storage and Transportation Planning Project (NFST) is currently conducting a 2-year Section 180(c) Proposed Policy Implementation Exercise (the Exercise) with eight states and one Native American Tribe. Under Section 180(c) of the Nuclear Waste Policy Act of 1982 (NWPA), as amended, the DOE is responsible for providing technical and financial assistance to states and Tribes through whose jurisdictions the Secretary of Energy plans to transport spent nuclear fuel (SNF) or high-level radioactive waste to a NWPA-authorized facility for training of local public safety officials. In the 2000's, DOE staff worked closely with state and tribal representatives to develop a revised proposed policy to implement Section 180(c), including grants for assessment and planning activities, as well as training for public safety officials. This revised proposed policy was published in a Federal Register Notice in 2008 (2008 FRN) (73 Federal Register 64933, Oct. 31, 2008). The purpose of the current Exercise is to evaluate the efficacy of DOE's 2008 revised proposed policy for implementing Section 180(c), and identify and resolve outstanding issues. This paper describes how the Exercise was collaboratively designed between DOE and state and tribal stakeholders; how it is being conducted; the interim lessons learned from the first year of the Exercise; and how it may inform and improve future consultations between DOE and state, tribal, and local public safety officials. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Underground Test Area Activity Quality Assurance Plan Nevada National Security Site, Nevada. Revision 2

This Quality Assurance Plan (QAP) provides the overall quality assurance (QA) requirements and general quality practices to be applied to the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO) Underground Test Area (UGTA) activities. The requirements in this QAP are consistent with DOE Order 414.1D, Change 1, Quality Assurance (DOE, 2013a); U.S. Environmental Protection Agency (EPA) Guidance for Quality Assurance Project Plans for Modeling (EPA, 2002); and EPA Guidance on the Development, Evaluation, and Application of Environmental Models (EPA, 2009). If a participant’s requirement document differs from this QAP, the stricter requirement will take precedence. NNSA/NFO, or designee, must review this QAP every two years. Changes that do not affect the overall scope or requirements will not require an immediate QAP revision but will be incorporated into the next revision cycle after identification. Section 1.0 describes UGTA objectives, participant responsibilities, and administrative and management quality requirements (i.e., training, records, procurement). Section 1.0 also details data management and computer software requirements. Section 2.0 establishes the requirements to ensure newly collected data are valid, existing data uses are appropriate, and environmental-modeling methods are reliable. Section 3.0 provides feedback loops through assessments and reports to management. Section 4.0 provides the framework for corrective actions. Section 5.0 provides references for this document.

54 ENVIRONMENTAL SCIENCES↗

Review of Feasibility and Cost Drivers for Floating Offshore Wind Energy in Washington State

The state of Washington must double its clean electricity supply by 2050 to meet its clean energy goals and comply with the Clean Energy Transformation Act. With more than 6.6 GW of technical resource potential in federal waters where Bureau of Ocean Energy Management has leasing authority, offshore wind energy could play an important role in diversifying Washington State's clean energy mix, reducing dependence on out-of-state energy sources, and helping meet state decarbonization goals. Decision makers need technology-specific information to assist with long-term energy system planning, so the Bureau of Ocean Energy Management requested that the National Renewable Energy Laboratory provide an overview of several drivers of offshore wind energy feasibility and cost in Washington. This study summarizes some of the existing engagement efforts and perspectives on offshore wind energy in the region and quantifies the offshore wind resources in Washington as well as technology costs and performance of potential projects. Furthermore, this report reviews existing grid and port infrastructure and discusses infrastructure needs along with information gaps. This study also explores opportunities and barriers to Washington entities supporting the broader floating offshore wind energy supply chain along the U.S. West Coast. Note that this study is not part of a formal project planning process or official engagement effort, nor does it assess environmental or economic impacts from potential offshore wind energy development.

17 WIND ENERGY↗

Charter for the ARM Atmospheric Modeling Advisory Group

The Atmospheric Modeling Advisory Group of the U.S. Department of Energy (DOE) Atmospheric Radiation Measurement (ARM) Climate Research Facility is guided by the following: 1. The group will provide feedback on the overall project plan including input on how to address priorities and trade-offs in the modeling and analysis workflow, making sure the modeling follows general best practices, and reviewing the recommendations provided to ARM for the workflow implementation. 2. The group will consist of approximately 6 members plus the PI and co-PI of the Large-Eddy Simulation (LES) ARM Symbiotic Simulation and Observation (LASSO) pilot project. The ARM Technical Director, or his designee, serves as an ex-officio member. This size is chosen based on the ability to efficiently conduct teleconferences and to span the general needs for input to the LASSO pilot project.

54 ENVIRONMENTAL SCIENCES↗

Agent-Based Simulations for Project Management

Currently, the most common approach used in project planning tools is the Critical Path Method (CPM). While this method was a great improvement over the basic Gantt chart technique being used at the time, it now suffers from three primary flaws: (1) task duration is an input, (2) productivity impacts are not considered , and (3) management corrective actions are not included. Today, computers have exceptional computational power to handle complex simulations of task e)(eculion and project management activities (e.g ., dynamically changing the number of resources assigned to a task when it is behind schedule). Through research under a Department of Defense contract, the author and the ViaSim team have developed a project simulation tool that enables more realistic cost and schedule estimates by using a resource-based model that literally turns the current duration-based CPM approach "on its head." The approach represents a fundamental paradigm shift in estimating projects, managing schedules, and reducing risk through innovative predictive techniques.

White, J. Chris↗

Section 180(c) Policy Implementation Exercise: Multiple Views - 17383

The Department of Energy (DOE) Office of Nuclear Energy's Office of Integrated Waste Management (formerly the Nuclear Fuels Storage and Transportation Planning Project) recently completed a two-year Section 180(c) Proposed Policy Implementation Exercise (the Exercise) with volunteers from eight states and one Native American Tribe. Under Section 180(c) of the Nuclear Waste Policy Act of 1982, as amended (NWPA), DOE is responsible for providing technical and financial assistance to states and Tribes for training of local public safety officials through whose jurisdictions the Secretary of Energy plans to transport spent nuclear fuel (SNF) or high-level radioactive waste to a NWPA-authorized facility. In the 2000's, DOE staff worked closely with state and tribal representatives to develop a revised proposed policy to implement Section 180(c), including grants for assessment and planning activities, as well as grants for training public safety officials. This revised proposed policy was published in a Federal Register Notice in 2008 (2008 FRN) (73 Federal Register 64933, Oct. 31, 2008). The purpose of the Exercise was to evaluate the efficacy of DOE's 2008 revised proposed policy for implementing Section 180(c), and identify outstanding issues to be resolved. DOE presented an interim update on the Exercise at the 2016 Waste Management Symposium and the Exercise concluded in June 2016. This paper describes the remaining activities of the Exercise that occurred since the 2016 Waste Management Symposium, and presents the perspectives of one state and one Tribal participant in the Exercise as well as DOE's perspective. The paper concludes with a discussion of the lessons learned from the Exercise, what steps are next, and how the Exercise may inform and improve future consultations between DOE and state, tribal, and local public safety officials. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Surveyor Project Final Report: Part 1 - Project Description and Performance, Volume 1

The Surveyor Project planned and conducted seven unmanned lunar missions for which spacecraft were launched between May 1966 and January 1968. Each of the spacecraft was successfully launched with the then newly developed Atlas/Centaur vehicle which utilized for the first time a high-specific-impulse, liquid hydrogen/liquid oxygen fueled stage. Five of the spacecraft successfully soft-landed and returned a great quantity of engineering and scientific data on extensive postlanding operations, accomplishing all mission and project objectives. Four of the spacecraft soft-landed at selected mare sites to provide data which were required to support the Apollo Program. The final spacecraft was then successfully used for scientific investigation of a contrasting site in the rugged lunar highlands. Surveyor was a fully attitude-stabilized spacecraft designed to receive and execute a wide variety of earth commands, as well as to perform certain automatic functions including the critical terminal-descent and soft-landing sequences. Significant new and advanced subsystems that were developed and/or used in combination to enable Surveyor to execute the complex terminal phase of flight were: (1) a solid-propellant main retro motor, (2) throttlable liquid-propellant vernier engines (also used for midcourse velocity correction), (3) highly sensitive velocity- and altitude-sensing radars, and (4) an automatic closed-loop guidance and control system. The first Surveyor spacecraft carried a survey television camera which, together with other engineering instrumentation, obtained in-flight and postlanding data. The complement of instruments carried on later missions included various combinations of the following additional devices: (1) a soil mechanics/surface sampler instrument for picking, digging, and handling lunar surface material; (2) an alpha scattering instrument for performing a chemical analysis of the lunar surface material; and (3) magnets attached to the spacecraft for determining magnetic properties of the soil.

Jet Propulsion Laboratory↗

Surveyor Project Final Report: Part 1 - Project Description and Performance, Volume 2

The Surveyor Project planned and conducted seven unmanned lunar missions for which spacecraft were launched between May 1966 and January 1968. Each of the spacecraft was successfully launched with the then newly developed Atlas/Centaur vehicle which utilized for the first time a high-specific-impulse, liquid hydrogen/liquid oxygen fueled stage. Five of the spacecraft successfully soft-landed and returned a great quantity of engineering and scientific data on extensive postlanding operations, accomplishing all mission and project objectives. Four of the spacecraft soft-landed at selected mare sites to provide data which were required to support the Apollo Program. The final spacecraft was then successfully used for scientific investigation of a contrasting site in the rugged lunar highlands. Surveyor was a fully attitude-stabilized spacecraft designed to receive and execute a wide variety of earth commands, as well as to perform certain automatic functions including the critical terminal-descent and soft-landing sequences. Significant new and advanced subsystems that were developed and/or used in combination to enable Surveyor to execute the complex terminal phase of flight were: (1) a solid-propellant main retro motor, (2) throttlable liquid-propellant vernier engines (also used for midcourse velocity correction), (3) highly sensitive velocity- and altitude-sensing radars, and (4) an automatic closed-loop guidance and control system. The first Surveyor spacecraft carried a survey television camera which, together with other engineering instrumentation, obtained in-flight and postlanding data. The complement of instruments carried on later missions included various combinations of the following additional devices: (1) a soil mechanics/surface sampler instrument for picking, digging, and handling lunar surface material; (2) an alpha scattering instrument for performing a chemical analysis of the lunar surface material; and (3) magnets attached to the spacecraft for determining magnetic properties of the soil.

Jet Propulsion Laboratory↗

Exploration Life Support Critical Questions for Future Human Space Missions

Exploration Life Support (ELS) is a current project under NASA's Exploration Systems Mission Directorate. The ELS Project plans, coordinates and implements the development of advanced life support technologies for human exploration missions in space. Recent work has focused on closed loop atmosphere and water systems for long duration missions, including habitats and pressurized rovers. But, what are the critical questions facing life support system developers for these and other future human missions? This paper explores those questions and how progress in the development of ELS technologies can help answer them. The ELS Project includes the following Elements: Atmosphere Revitalization Systems, Water Recovery Systems, Waste Management Systems, Habitation Engineering, Systems Integration, Modeling and Analysis, and Validation and Testing, which includes the Sub-Elements Flight Experiments and Integrated Testing. Systems engineering analysis by ELS seeks to optimize overall mission architectures by considering all the internal and external interfaces of the life support system and the potential for reduction or reuse of commodities. In particular, various sources and sinks of water and oxygen are considered along with the implications on loop closure and the resulting launch mass requirements. Systems analysis will be validated through the data gathered from integrated testing, which will demonstrate the interfaces of a closed loop life support system. By applying a systematic process for defining, sorting and answering critical life support questions, the ELS project is preparing for a variety of future human space missions

Kwert, Michael K.↗

NASA Net Zero Energy Buildings Roadmap

In preparation for the time-phased net zero energy requirement for new federal buildings starting in 2020, set forth in Executive Order 13514, NASA requested that the National Renewable Energy Laboratory (NREL) to develop a roadmap for NASA's compliance. NASA detailed a Statement of Work that requested information on strategic, organizational, and tactical aspects of net zero energy buildings. In response, this document presents a high-level approach to net zero energy planning, design, construction, and operations, based on NREL's first-hand experience procuring net zero energy construction, and based on NREL and other industry research on net zero energy feasibility. The strategic approach to net zero energy starts with an interpretation of the executive order language relating to net zero energy. Specifically, this roadmap defines a net zero energy acquisition process as one that sets an aggressive energy use intensity goal for the building in project planning, meets the reduced demand goal through energy efficiency strategies and technologies, then adds renewable energy in a prioritized manner, using building-associated, emission- free sources first, to offset the annual energy use required at the building; the net zero energy process extends through the life of the building, requiring a balance of energy use and production in each calendar year.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Exploration Life Support Critical Questions for Future Human Space Missions

Exploration Life Support (ELS) is a project under NASA s Exploration Technology Development Program. The ELS Project plans, coordinates and implements the development of advanced life support technologies for human exploration missions in space. Recent work has focused on closed loop atmosphere and water systems for a lunar outpost, including habitats and pressurized rovers. But, what are the critical questions facing life support system developers for these and other future human missions? This paper explores those questions and discusses how progress in the development of ELS technologies can help answer them. The ELS Project includes Atmosphere Revitalization Systems (ARS), Water Recovery Systems (WRS), Waste Management Systems (WMS), Habitation Engineering, Systems Integration, Modeling and Analysis (SIMA), and Validation and Testing, which includes the sub-elements Flight Experiments and Integrated Testing. Systems engineering analysis by ELS seeks to optimize the overall mission architecture by considering all the internal and external interfaces of the life support system and the potential for reduction or reuse of commodities. In particular, various sources and sinks of water and oxygen are considered along with the implications on loop closure and the resulting launch mass requirements.

Ewert, Michael K.↗

Recovery Act. Sub-Soil Gas and Fluid Inclusion Exploration and Slim Well Drilling, Pumpernickel Valley, Nevada

Nevada Geothermal Power Company (NGP) was awarded DOE Award DE-EE0002834 in January 2010 to conduct sub-soil gas and fluid inclusion studies and slim well drilling at its Black Warrior Project (now known as North Valley) in Washoe and Churchill Counties, Nevada. The project was designed to apply highly detailed, precise, low-cost subsoil and down-hole gas geochemistry methods from the oil and gas industry to identify upflow zone drilling targets in an undeveloped geothermal prospect. NGP ran into multiple institutional barriers with the Black Warrior project relating to property access and extensive cultural survey requirement. NGP requested that the award be transferred to NGP’s Pumpernickel Valley project, due to the timing delay in obtaining permits, along with additional over-budget costs required. Project planning and permit applications were developed for both the original Black Warrior location and at Pumpernickel. This included obtaining proposals from contractors able to conduct required environmental and cultural surveying, designing the two-meter probe survey methodology and locations, and submitting Notices of Intent and liaising with the Bureau of Land Management to have the two-meter probe work approved. The award had an expiry date of April 30, 2013; however, due to the initial project delays at Black Warrior, and the move of the project from Black Warrior to Pumpernickel, NGP requested that the award deadline be extended. DOE was amenable to this, and worked with NGP to extend the deadline. However, following the loss of the Blue Mountain geothermal power plant in Nevada, NGP’s board of directors changed the company’s mandate to one of cash preservation. NGP was unable to move forward with field work on the Pumpernickel property, or any of its other properties, until additional funding was secured. NGP worked to bring in a project partner to form a joint venture on the property, or to buy the property. This was unsuccessful, and NGP notified the DOE on February 13, 2014 that it would not be able to complete the project objectives before the recovery act awards deadline and submitted a mutual termination request to the DOE which was accepted.

15 GEOTHERMAL ENERGY↗

Mars Pathfinder mission operations concepts

The Mars Pathfinder Project plans a December 1996 launch of a single spacecraft. After jettisoning a cruise stage, an entry body containing a lander and microrover will directly enter the Mars atmosphere and parachute to a hard landing near the sub-solar latitude of 15 degrees North in July 1997. Primary surface operations last for 30 days. Cost estimates for Pathfinder ground systems development and operations are not only lower in absolute dollars, but also are a lower percentage of total project costs than in past planetary missions. Operations teams will be smaller and fewer than typical flight projects. Operations scenarios have been developed early in the project and are being used to guide operations implementation and flight system design. Recovery of key engineering data from entry, descent, and landing is a top mission priority. These data will be recorded for playback after landing. Real-time tracking of a modified carrier signal through this phase can provide important insight into the spacecraft performance during entry, descent, and landing in the event recorded data is never recovered. Surface scenarios are dominated by microrover activity and lander imaging during 7 hours of the Mars day from 0700 to 1400 local solar time. Efficient uplink and downlink processes have been designed to command the lander and microrover each Mars day.

Sturms, Francis M., Jr.↗

Analysis of Drought Impacts on Electricity Production in the Western and Texas Interconnections of the United States

Electricity generation relies heavily on water resources and their availability. To examine the interdependence of energy and water in the electricity context, the impacts of a severe drought to assess the risk posed by drought to electricity generation within the western and Texas interconnections has been examined. The historical drought patterns in the western United States were analyzed, and the risk posed by drought to electricity generation within the region was evaluated. The results of this effort will be used to develop scenarios for medium- and long-term transmission modeling and planning efforts by the Western Electricity Coordination Council (WECC) and the Electric Reliability Council of Texas (ERCOT). The study was performed in response to a request developed by the Western Governors Association in conjunction with the transmission modeling teams at the participating interconnections. It is part of a U.S. Department of Energy-sponsored, national laboratory-led research effort to develop tools related to the interdependency of energy and water as part of a larger interconnection-wide transmission planning project funded under the American Recovery and Reinvestment Act. This study accomplished three main objectives. It provided a thorough literature review of recent studies of drought and the potential implications for electricity generation. It analyzed historical drought patterns in the western United States and used the results to develop three design drought scenarios. Finally, it quantified the risk to electricity generation for each of eight basins for each of the three drought scenarios and considered the implications for transmission planning. Literature on drought impacts on electricity generation describes a number of examples where hydroelectric generation capacity has been limited because of drought but only a few examples of impact on thermoelectric generation. In all documented cases, shortfalls of generation were met by purchasing power from the market, albeit at higher prices. However, sufficient excess generation and transmission must be available for this strategy to work. Although power purchase was the most commonly discussed drought mitigation strategy, a total of 12 response strategies were identified in the literature, falling into four main categories: electricity supply, electricity demand response, alternative water supplies, and water demand response. Three hydrological drought scenarios were developed based on a literature review and historical data analysis. The literature review helped to identify key drought parameters and data on drought frequency and severity. Historical hydrological drought data were analyzed for the western United States to identify potential drought correlations and estimate drought parameters. The first scenario was a West-wide drought occurring in 1977; it represented a severe drought in five of the eight basins in the study area. A second drought scenario was artificially defined by selecting the conditions from the 10th-percentile drought year for each individual basin; this drought was defined in this way to allow more consistent analysis of risk to electricity generation in each basin. The final scenario was based upon the current low-flow hydro modeling scenario defined by WECC, which uses conditions from the year 2001. These scenarios were then used to quantify the risk to electricity generation in each basin. The risk calculations represent a first-order estimate of the maximum amount of electricity generation that might be lost from both hydroelectric and thermoelectric sources under a worst-case scenario. Even with the conservative methodology used, the majority of basins showed a limited amount of risk under most scenarios. The level of risk in these basins is likely to be amenable to mitigation by known strategies, combined with existing reserve generation and transmission capacity. However, the risks to the Pacific Northwest and Texas Basins require further study. The Pacific Northwest is vulnerable because of its heavy reliance on hydroelectric generation. Texas, conversely, is vulnerable because of its heavy dependence on thermoelectric generation, which relies on surface water for cooling, along with the fact that this basin seems to experience more severe drought events on average. Further modeling analysis will be performed in conjunction with the modeling teams at the participating interconnections (WECC and ERCOT) to explore the transmission implications of the drought scenarios in more detail. Given the first-order nature of this analysis, more detailed study of the potential impacts of drought on electricity generation is recommended. Future analyses should attempt to model the potential impacts of drought at the power-plant level, including potential mitigation strategies; include the effects of drought duration; understand the impacts of climate change; and consider economic impacts.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Enhanced Recovery Opportunities in the Appalachian Basin

The Midwest Regional Carbon Sequestration Partnership (MRCSP) has incorporated the work of geologic research teams (Geoteams) in its regional characterization, project planning and carbon dioxide (CO2) injection implementation work since the partnership was established by the U.S. Department of Energy (DOE) in 2003. Over this 16-year period, the cohort of Geoteams has grown from five to ten states and has contributed to the characterization of geologic sequestration opportunities, refinement of reservoir and seal data, and supported injection efforts through both predictive and post-injection assessments. The regional characterization work conducted by the Geoteams during the MRCSP Phase III project period (2010 – 2019) focused on the following tasks: (1) refinement of geologic seals/reservoir systems; (2) assessment of Atlantic Coastal Plain and offshore opportunities; (3) expanded assessments of oil and gas fields, particularly as they relate to enhanced recovery opportunities; (4) regional support for implementation of carbon capture utilization and storage (CCUS) in the partnership area; and (5) communication and data sharing. The findings of this work are summarized in the final report entitled Final Report of Geologic Carbon Capture Utilization and Storage Opportunities in the form of a state-by-state presentation for the MRCSP Region. In addition to the capstone deliverable mentioned above, the Geoteams have also prepared a series of topical reports to elaborate on specific geologic intervals and/or geographic areas of study completed during the Phase III project period. Specifically, these topical reports address: (1) the Atlantic Coastal Plain and adjacent offshore; (2) Cambro-Ordovician reservoirs/seals in the region; (3) enhanced oil and gas recovery opportunities in the Appalachian Basin; and (4) enhanced oil recovery (EOR) in the Michigan Basin. The remainder of this topical report presents our findings relative to enhanced recovery opportunities in the Appalachian Basin.

54 ENVIRONMENTAL SCIENCES↗

The Life Sciences program at the NASA Ames Research Center - An overview

The research projects planned for the Life Sciences program have a goal of answering basic questions concerning the nature of life itself and its evolution in the universe from basic elements, as well as the search for extraterrestrial intelligence. The program also includes studies of the evolution and development of life on the planet earth, and the global changes occurring today that affect life on the earth. The paper describes the simulation models developed to study the effects of space, the flight projects of the program, and the biomedical program, which currently focuses on the physiological changes in the human body that are associated with space flights and the interactions among these changes.

Vernikos-Danellis, Joan↗