Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Probabilistic Risk”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

Integration of Human Reliability Analysis Models into the Simulation-Based Framework for the Risk-Informed Safety Margin Characterization Toolkit

This report presents an application of a computation-based human reliability analysis (HRA) framework called the Human Unimodel for Nuclear Technology to Enhance Reliability (HUNTER). HUNTER has been developed not as a standalone HRA method but rather as framework that ties together different HRA methods to model dynamic risk of human activities as part of an overall probabilistic risk assessment (PRA). While we have adopted particular methods to build an initial model, the HUNTER framework is meant to be intrinsically flexible to new pieces that achieve particular modeling goals. In the present report, the HUNTER implementation has the following goals: • Integration with a high fidelity thermal-hydraulic model capable of modeling nuclear power plant behaviors and transients • Consideration of a PRA context • Incorporation of a solid psychological basis for operator performance • Demonstration of a functional dynamic model of a plant upset condition and appropriate operator response This report outlines these efforts and presents the case study of a station blackout scenario to demonstrate the various modules developed to date under the HUNTER research umbrella.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Risk-based Spacecraft Fire Safety Experiments

Viewgraphs on risk-based spacecraft fire safety experiments are presented. Spacecraft fire risk can never be reduced to a zero probability. Probabilistic risk assessment is a tool to reduce risk to an acceptable level.

Apostolakis, G.↗

Bridging the Engineering and Medicine Gap

A primary challenge NASA faces is communication between the disparate entities of engineers and human system experts in life sciences. Clear communication is critical for exploration mission success from the perspective of both risk analysis and data handling. The engineering community uses probabilistic risk assessment (PRA) models to inform their own risk analysis and has extensive experience managing mission data, but does not always fully consider human systems integration (HSI). The medical community, as a part of HSI, has been working 1) to develop a suite of tools to express medical risk in quantitative terms that are relatable to the engineering approaches commonly in use, and 2) to manage and integrate HSI data with engineering data. This talk will review the development of the Integrated Medical Model as an early attempt to bridge the communication gap between the medical and engineering communities in the language of PRA. This will also address data communication between the two entities in the context of data management considerations of the Medical Data Architecture. Lessons learned from these processes will help identify important elements to consider in future communication and integration of these two groups.

Walton, M.↗

IMPACT-ing Exploration Spaceflight Risk Prediction and Medical System Design

Human exploration spaceflight missions to the Moon and Mars present unprecedented challenges for in-mission medical care. Compared with the ISS, the greater distance from Earth will mean increased mission durations, communication delays, limited to no resupply opportunities, and significant limitations on the evacuation of ill or injured crew. Spacecraft mass, volume, and power will be curtailed while higher demands will be placed on the crew’s knowledge, skills, and abilities. In this higher risk environment, it is important to: a) quantitatively estimate human system risk attributable to medical conditions, a process known as Probabilistic Risk Analysis, and b) use these estimates to inform medical system design. IMPACT (Informing Mission Planning via Analysis of Complex Tradespaces) is a PRA and medical trade space analysis tool developed by NASA to advance exploration mission medical system design. IMPACT improves upon and will soon replace NASA’s existing tool, the Integrated Medical Model, with: a novel evidence base baselined to exploration environments; an expanded list of 120 medical conditions; a significant increase in the number of medical resources that can be utilized and in the flexibility of their use; and the modelling of time lost performing mission-specific tasks due to medical conditions. IMPACT provides evidence-based, mission-specific PRA estimates of in-flight medical risk and an initial list of clinical capabilities and medical resources/hardware to be considered. In addition, sophisticated trade space capabilities estimate how human system risk varies with changes to the mission architecture or medical capability set (e.g., if the system mass constraint decreases by 10% or ultrasound is removed). This panel will provide an overview of IMPACT, its intended use cases, and future development plans. The panel will be the first public presentation of IMPACT results, including medical risk estimates for extended duration Artemis missions, the medical conditions most influencing medical risk metrics, and the clinical capabilities that have the largest effect on medical risk.

Ben Easter↗

Preliminary Medical Risk Estimates and Clinical Capability Needs for Artemis IV

BACKGROUND Human exploration spaceflight missions to the Moon and Mars present unprecedented challenges for in- mission medical care. Compared with the ISS, the greater distance from Earth will mean increased mission durations, communication delays, limited to no resupply opportunities, and significant limitations on the evacuation of ill or injured crew. Spacecraft mass, volume, and power will be curtailed while higher demands will be placed on the crew’s knowledge, skills, and abilities. In this higher risk environment, it is important to: a) quantitatively estimate human system risk attributable to medical conditions, a process known as Probabilistic Risk Analysis, and b) use these estimates to inform medical system design. IMPACT (Informing Mission Planning via Analysis of Complex Tradespaces) is a PRA and medical trade space analysis tool developed by NASA to advance exploration mission medical system design. IMPACT v1.0 improves upon and will soon replace NASA’s existing tool, the Integrated Medical Model, with: a novel evidence base baselined to exploration environments; an expanded list of 119 medical conditions; a significant increase in the number of medical resources that can be utilized and in the flexibility of their use; and the modelling of time lost performing mission-specific tasks due to medical conditions. METHODOLOGY: This abstract will present IMPACT estimates of medical system risk and clinical capability needs for the Artemis IV mission. Artemis IV is currently scheduled for 2026 and will visit the Gateway space station in lunar orbit prior to the second lunar landing of the Artemis program. The baseline Artemis IV mission that was modeled was 28 days in duration with phases including Orion outbound, 4 days on the Gateway space station in lunar orbit, 2 crew on the surface of the Moon for approximately one week, an additional 5 days on Gateway, and then return to Earth. This baseline was compared to two alternative 34-day design reference missions (DRMs) that shifted the lunar sortie earlier or later in the mission profile. Assumptions included 2 female and 2 male crew and a notional medical system mass of 25 kg. Medical system risk estimates include loss of crew life (LOCL), consideration of medical evacuation (known as return to definitive care – RTDC), and an estimate of crew time lost due to medical conditions (Task Time Lost – TTL). The presentation will also describe the medical conditions that are the greatest drivers of risk as well as the clinical capabilities and resources that have the largest effect on risk. RESULTS: All three DRMs had very low probability of LOCL from medical conditions, primarily due to short duration. RTDC was also similar across the DRMs. In contrast, TTL was higher in the early lunar sortie DRM due to earlier occurrence of EVA-related medical conditions. Taken as a whole, there was no clinically significant difference in medical risk across the three missions. Results for clinical capabilities and an example medical equipment list will be discussed but were similar across DRMs.

D Hilmers↗

Medical Risk Estimates and Clinical Capability Needs for A Long Duration Artemis Mission

BACKGROUND Human exploration spaceflight missions to the Moon and Mars present unprecedented challenges for in-mission medical care. Compared with the ISS, the greater distance from Earth will mean increased mission durations, communication delays, limited to no resupply opportunities, and significant limitations on the evacuation of ill or injured crew. Spacecraft mass, volume, and power will be curtailed while higher demands will be placed on the crew’s knowledge, skills, and abilities. In this higher risk environment, it is important to: a) quantitatively estimate human system risk attributable to medical conditions, a process known as Probabilistic Risk Analysis, and b) use these estimates to inform medical system design. IMPACT (Informing Mission Planning via Analysis of Complex Tradespaces) is a PRA and medical trade space analysis tool developed by NASA to advance exploration mission medical system design. IMPACT v1.0 improves upon and will soon replace NASA’s existing tool, the Integrated Medical Model, with: a novel evidence base baselined to exploration environments; an expanded list of 119 medical conditions; a significant increase in the number of medical resources that can be utilized and in the flexibility of their use; and the modelling of time lost performing mission-specific tasks due to medical conditions. DISCUSSION: This abstract will present IMPACT estimates of medical system risk and clinical capability needs for an extended duration Artemis mission of approximately 9 months, with phases including outbound transit, 3 months on the Lunar Gateway space station, 3 months on the Lunar surface with EVAs, 3 months on Gateway (simulating the return phase of a Mars mission), and transit back to Earth. Medical system risk estimates include loss of crew life (LOCL), consideration of medical evacuation (known as return to definitive care – RTDC), and an estimate of crew time lost due to medical conditions (Task Time Lost – TTL). The presentation will also describe the medical conditions that are the greatest drivers of risk as well as the clinical capabilities and resources that have the largest effect on risk.

W Thompson↗

Medical Risk Estimates and Clinical Capability Needs for a Late Artemis Mission

BACKGROUND Human exploration spaceflight missions to the Moon and Mars present unprecedented challenges for in-mission medical care. Compared with the ISS, the greater distance from Earth will mean increased mission durations, communication delays, limited to no resupply opportunities, and significant limitations on the evacuation of ill or injured crew. Spacecraft mass, volume, and power will be curtailed while higher demands will be placed on the crew’s knowledge, skills, and abilities. In this higher risk environment, it is important to: a) quantitatively estimate human system risk attributable to medical conditions, a process known as Probabilistic Risk Analysis, and b) use these estimates to inform medical system design. IMPACT (Informing Mission Planning via Analysis of Complex Tradespaces) is a PRA and medical trade space analysis tool developed by NASA to advance exploration mission medical system design. IMPACT v1.0 improves upon and will soon replace NASA’s existing tool, the Integrated Medical Model, with: a novel evidence base baselined to exploration environments; an expanded list of 119 medical conditions; a significant increase in the number of medical resources that can be utilized and in the flexibility of their use; and the modelling of time lost performing mission-specific tasks due to medical conditions. DISCUSSION: This abstract will present IMPACT estimates of medical system risk and clinical capability needs for an extended duration Artemis mission of approximately 9 months, with phases including outbound transit, 3 months on the Lunar Gateway space station, 3 months on the Lunar surface with EVAs, 3 months on Gateway (simulating the return phase of a Mars mission), and transit back to Earth. Medical system risk estimates include loss of crew life (LOCL), consideration of medical evacuation (known as return to definitive care –RTDC), and an estimate of crew time list due to medical conditions (Task Time Lost –TTL). The presentation will also describe the medical conditions that are the greatest drivers of risk as well as the clinical capabilities and resources that have the largest effect on risk.

A Anderson↗

Preliminary Medical Risk Estimates and Clinical Capability Needs for Late Artemis Missions

BACKGROUND Human exploration spaceflight missions to the Moon and Mars present unprecedented challenges for in- mission medical care. Compared with the ISS, the greater distance from Earth will mean increased mission durations, communication delays, limited to no resupply opportunities, and significant limitations on the evacuation of ill or injured crew. Spacecraft mass, volume, and power will be curtailed while higher demands will be placed on the crew’s knowledge, skills, and abilities. In this higher risk environment, it is important to: a) quantitatively estimate human system risk attributable to medical conditions, a process known as Probabilistic Risk Analysis, and b) use these estimates to inform medical system design. IMPACT (Informing Mission Planning via Analysis of Complex Tradespaces) is a PRA and medical trade space analysis tool developed by NASA to advance exploration mission medical system design. IMPACT v1.0 improves upon and will soon replace NASA’s existing tool, the Integrated Medical Model, with: a novel evidence base baselined to exploration environments; an expanded list of 119 medical conditions; a significant increase in the number of medical resources that can be utilized and in the flexibility of their use; and the modelling of time lost performing mission-specific tasks due to medical conditions. METHODOLOGY: This abstract will present IMPACT estimates of medical system risk and clinical capability needs for the Artemis IV mission. Artemis IV is currently scheduled for 2026 and will visit the Gateway space station in lunar orbit prior to the second lunar landing of the Artemis program. The baseline Artemis IV mission that was modeled was 28 days in duration with phases including Orion outbound, 4 days on the Gateway space station in lunar orbit, 2 crew on the surface of the Moon for approximately one week, an additional 5 days on Gateway, and then return to Earth. This baseline was compared to two alternative 34-day design reference missions (DRMs) that shifted the lunar sortie earlier or later in the mission profile. Assumptions included 2 female and 2 male crew and a notional medical system mass of 25 kg. Medical system risk estimates include loss of crew life (LOCL), consideration of medical evacuation (known as return to definitive care – RTDC), and an estimate of crew time lost due to medical conditions (Task Time Lost – TTL). The presentation will also describe the medical conditions that are the greatest drivers of risk as well as the clinical capabilities and resources that have the largest effect on risk. RESULTS: All three DRMs had very low probability of LOCL from medical conditions, primarily due to short duration. RTDC was also similar across the DRMs. In contrast, TTL was higher in the early lunar sortie DRM due to earlier occurrence of EVA-related medical conditions. Taken as a whole, there was no clinically significant difference in medical risk across the three missions. Results for clinical capabilities and an example medical equipment list will be discussed but were similar across DRMs.

D. Hilmers↗

Physics-Informed Machine Learning-Aided System Space Discretization

Decision-making is the process of identifying and choosing alternatives based on an agreed-upon set of metrics and preferences established by the decision-maker. There are options to be considered during the decision-making process and each option offers a different trajectory and associated success profile in moving from a given system state to the desired system state. The decision-making process typically involves uncertainties associated with the current component and system states. In this sense, probabilistic risk assessment (PRA) can be an analytical method and tool for accomplishing the probabilistic aspect of the decision-making process. Dynamic PRA is an evolution of conventional PRA methodology in which driving forces on modeled plant elements and the element behaviors are explicitly modeled over time. In the recent past, risk assessment methodologies have evolved to address risk issues in a continuously evolving environment and a novel probabilistic dynamics framework in continuous time and state-space discretization forms has been proposed. While state-space discretization has shown its strength in both consequence and causal reasoning modes, several challenges, including the computational requirement and physically meaningful system state identification, exist. Conventional system space discretization has usually been done by either the equal width discretization method or a data-driven method. Those methods naturally possess challenges coming from the physical understanding of discretized system space (i.e., system state) and the trajectory moving from a given system state to another system state. The purpose of this paper is to present a physics-based and data-driven system state discretization method such that one can justify what the discretized system space implies and understand the state trajectory from the viewpoint of operational actions.

Kim, Junyung↗

Exploration of high-dimensional scalar function for nuclear reactor safety analysis and visualization

The next generation of methodologies for nuclear reactor Probabilistic Risk Assessment (PRA) explicitly accounts for the time element in modeling the probabilistic system evolution and uses numerical simulation tools to account for possible dependencies between failure events. The Monte-Carlo (MC) and the Dynamic Event Tree (DET) approaches belong to this new class of dynamic PRA methodologies. A challenge of dynamic PRA algorithms is the large amount of data they produce which may be difficult to visualize and analyze in order to extract useful information. We present a software tool that is designed to address these goals. We model a large-scale nuclear simulation dataset as a high-dimensional scalar function defined over a discrete sample of the domain. First, we provide structural analysis of such a function at multiple scales and provide insight into the relationship between the input parameters and the output. Second, we enable exploratory analysis for users, where we help the users to differentiate features from noise through multi-scale analysis on an interactive platform, based on domain knowledge and data characterization. Our analysis is performed by exploiting the topological and geometric properties of the domain, building statistical models based on its topological segmentations and providing interactive visual interfaces to facilitate such explorations. We provide a user's guide to our software tool by highlighting its analysis and visualization capabilities, along with a use case involving data from a nuclear reactor safety simulation. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Prototypic Enhanced Risk Monitor Framework and Evaluation - Advanced Reactor Technology Milestone: M3AT-15PN2301054

This research report summaries the development and evaluation of a prototypic enhanced risk monitor (ERM) methodology (framework) that includes alternative risk metrics and uncertainty analysis. This updated ERM methodology accounts for uncertainty in the equipment condition assessment (ECA), the prognostic result, and the probabilistic risk assessment (PRA) model. It is anticipated that the ability to characterize uncertainty in the estimated risk and update the risk estimates in real time based on equipment condition assessment (ECA) will provide a mechanism for optimizing plant performance while staying within specified safety margins. These results (based on impacting active component O&M using real-time equipment condition information) are a step towards ERMs that, if integrated with AR supervisory plant control systems, can help control O&M costs and improve affordability of advanced reactors.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Treatment of uncertainties associated with PRAs in risk-informed decision making (NUREG1855).

This document provides guidance on how to treat uncertainties associated with probabilistic risk assessment (PRA) in risk-informed decisionmaking. The objectives of this guidance include fostering an understanding of the uncertainties associated with PRA and their impact on the results of PRA and providing a pragmatic approach to addressing these uncertainties in the context of the decisionmaking. In implementing risk-informed decisionmaking, the U.S. Nuclear Regulatory Commission expects that appropriate consideration of uncertainty will be given in the analyses used to support the decision and in the interpretation of the findings of those analyses. To meet the objective of this document, it is necessary to understand the role that PRA results play in the context of the decision process. To define this context, this document provides an overview of the risk-informed decisionmaking process itself. With the context defined, this document describes the characteristics of a risk model and, in particular, a PRA. This description includes recognition that a PRA, being a probabilistic model, characterizes aleatory uncertainty that results from randomness associated with the events of the model. Because the focus of this document is epistemic uncertainty (i.e., uncertainties in the formulation of the PRA model), it provides guidance on identifying and describing the different types of sources of epistemic uncertainty and the different ways that they are treated. The different types of epistemic uncertainty are parameter, model, and completeness uncertainties. The final part of the guidance addresses the uncertainty in PRA results in the context of riskinformed decisionmaking and, in particular, the interpretation of the results of the uncertainty analysis when comparing PRA results with the acceptance criteria established for a specified application. In addition, guidance is provided for addressing completeness uncertainty in risk-informed decision making. Such consideration includes using a program of monitoring, feedback, and corrective action.

99 GENERAL AND MISCELLANEOUS↗

Uncertainty Considerations for Ballistic Limit Equations

The overall risk for any spacecraft system is typically determined using a Probabilistic Risk Assessment (PRA). A PRA attempts to determine the overall risk associated with a particular mission by factoring in all known risks (and their corresponding uncertainties, if known) to the spacecraft during its mission. The threat to mission and human life posed by the mircro-meteoroid & orbital debris (MMOD) environment is one of the risks. NASA uses the BUMPER II program to provide point estimate predictions of MMOD risk for the Space Shuttle and the International Space Station. However, BUMPER II does not provide uncertainty bounds or confidence intervals for its predictions. With so many uncertainties believed to be present in the models used within BUMPER II, providing uncertainty bounds with BUMPER II results would appear to be essential to properly evaluating its predictions of MMOD risk. The uncertainties in BUMPER II come primarily from three areas: damage prediction/ballistic limit equations, environment models, and failure criteria definitions. In order to quantify the overall uncertainty bounds on MMOD risk predictions, the uncertainties in these three areas must be identified. In this paper, possible approaches through which uncertainty bounds can be developed for the various damage prediction and ballistic limit equations encoded within the shuttle and station versions of BUMPER II are presented and discussed. We begin the paper with a review of the current approaches used by NASA to perform a PRA for the Space Shuttle and the International Space Station, followed by a review of the results of a recent sensitivity analysis performed by NASA using the shuttle version of the BUMPER II code. Following a discussion of the various equations that are encoded in BUMPER II, we propose several possible approaches for establishing uncertainty bounds for the equations within BUMPER II. We conclude with an evaluation of these approaches and present a recommendation regarding which of them would be the most appropriate to follow.

Schonberg, W. P.↗

Uncertainty Considerations for Ballistic Limit Equations

The overall risk for any spacecraft system is typically determined using a Probabilistic Risk Assessment (PRA). A PRA determines the overall risk associated with a particular mission by factoring in all known risks to the spacecraft during its mission. The threat to mission and human life posed by the micro-meteoroid and orbital debris (MMOD) environment is one of the risks. NASA uses the BUMPER II program to provide point estimate predictions of MMOD risk for the Space Shuttle and the ISS. However, BUMPER II does not provide uncertainty bounds or confidence intervals for its predictions. In this paper, we present possible approaches through which uncertainty bounds can be developed for the various damage prediction and ballistic limit equations encoded within the Shuttle and Station versions of BUMPER II.

Schonberg, W. P.↗

A New Layer to the PRA: Operational Performance Risk Assessment

A supervisory control system (SCS) concept developed by Oak Ridge National Laboratory provides automated risk-informed decision-making capabilities with the ultimate goal of significantly boosting plant availability while reducing dependency on human resources for multi-module advanced reactors. The decision-making process integrates online-monitoring systems, and the associated diagnostic and prognostics tools to continuously take into account the component health in an integrated probabilistic/deterministic meta model to capture the system behavior during a select set of postulated anticipated operational occurrence scenarios. The operational performance risk assessment (OPRA) approach is introduced to support SCS decisions probabilistically to minimize/prevent unnecessary trips and challenges to plant safety systems. OPRA identifies and ranks the success paths, combination of the non-safety systems and components, with the real-time failure data using event tree/fault tree method. OPRA does not interfere with the safety systems and adds a buffer zone to the existing probabilistic risk assessment (PRA) domain by minimizing the possible transients. In this work, failure scenarios of feedwater and turbine control valves are analyzed for ALMR PRISM (Power Reactor Innovative Small Module) design at full power. As an alternative to the default shutdown option, five and seven success paths (full and reduced power operation) are defined respectively within the OPRA framework.

Guler Yigitoglu, Askin↗

When the Details Matter – Sensitivities in PRA Calculations That Could Affect Risk-Informed Decision-Making

As the U.S. Nuclear Regulatory Commission (NRC) continues its efforts to increase its use of risk information in decision making, the detailed, quantitative results of probabilistic risk assessment (PRA) calculations are coming under increased scrutiny. Where once analysts and users were not overly concerned with figure of merit variations that were less than an order of magnitude, now factors of two or even less can spark heated debate regarding modeling approaches and assumptions. The philosophical and policy-related aspects of this situation are well-recognized by the PRA community. On the other hand, the technical implications for PRA methods and modeling have not been as widely discussed. This paper illustrates the potential numerical effects of choices as to the details of models and methods for parameter estimation with three examples: 1) the selection of the time period data for parameter estimation, and issues related to component boundary and failure mode definitions; 2) the selection of alternative diffuse prior distributions, including the constrained noninformative prior distribution, in Bayesian parameter estimation; and 3) the impact of uncertainty in calculations for recovery of offsite power.

99 GENERAL AND MISCELLANEOUS↗

Reduced Order Model Implementation in the Risk-Informed Safety Margin Characterization Toolkit

The RISMC project aims to develop new advanced simulation-based tools to perform Probabilistic Risk Analysis (PRA) for the existing fleet of U.S. nuclear power plants (NPPs). These tools numerically model not only the thermo-hydraulic behavior of the reactor primary and secondary systems but also external events temporal evolution and components/system ageing. Thus, this is not only a multi-physics problem but also a multi-scale problem (both spatial, µm-mm-m, and temporal, ms-s-minutes-years). As part of the RISMC PRA approach, a large amount of computationally expensive simulation runs are required. An important aspect is that even though computational power is regularly growing, the overall computational cost of a RISMC analysis may be not viable for certain cases. A solution that is being evaluated is the use of reduce order modeling techniques. During the FY2015, we investigated and applied reduced order modeling techniques to decrease the RICM analysis computational cost by decreasing the number of simulations runs to perform and employ surrogate models instead of the actual simulation codes. This report focuses on the use of reduced order modeling techniques that can be applied to any RISMC analysis to generate, analyze and visualize data. In particular, we focus on surrogate models that approximate the simulation results but in a much faster time (µs instead of hours/days). We apply reduced order and surrogate modeling techniques to several RISMC types of analyses using RAVEN and RELAP-7 and show the advantages that can be gained.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Characterizing the Benefits of Seismic Isolation of Nuclear Structures in Terms of Reduced Risk and Cost

Seismic isolation is a mature technology that has been implemented in many civil structures, including buildings, bridges, liquid natural gas tanks, and off shore oil platforms, both in the United States and other countries, to mitigate the damaging effects of earthquakes. Seismic isolation has also been used in nuclear structures in France and South Africa, but not yet in the United States: neither in the Department of Energy facilities nor in commercial nuclear power plants (NPPs). This is primarily due to a lack of guidelines, codes and standards for the analysis, design and construction specific to seismically isolated nuclear structures. However, seismic isolation of nuclear structures has seen increased research interest in the recent years and the recently published national consensus standard, America Society of Civil Engineers (ASCE) Standard 4-16 'Seismic analysis of safety related nuclear structures', now incorporates language and commentary (Chapter 12) for seismically isolating surface or near-surface-mounted nuclear facilities, including NPPs. Seismic isolation substantially reduces horizontal seismic loads (demands) on structures, systems, and components. Reduction in demand results in four potential benefits: (1) economic: reduction in capital cost, (2) increased safety: reduction in the mean annual frequency of unacceptable performance, (3) insurance: protection against increases in the known seismic hazard after construction by minimizing the effort to re-qualify and re-certify structures, systems and components, and (4) recertification: the opportunity to certify an existing NPP design for a region of higher seismic hazard. Item (2) above, an increase in safety (reduction of seismic risk), was explored in Huang et al., wherein it was demonstrated that the implementation of seismic isolation reduced seismic risk in nuclear power plant structures. Studies that assess item (1) have not been performed although the use of isolation may lead to large reductions in the capital cost of safety-related nuclear facilities. Funding provided by Nuclear Safety Research and Development in the Department of Energy (DOE) allowed the authors to develop a framework for assessing the economic benefits and reductions in seismic risk afforded by the use of seismic (base) isolation. The framework includes probabilistic risk assessment and estimation of overnight capital costs (OCC's) of a sample generic DOE nuclear facility (GDNF). The project is documented in detail in Bolisetti et al. and Yu et al., and key results are presented here. The GDNF considered in this study is based on a facility constructed at the Idaho National Laboratory. The GDNF is a two-story reinforced concrete building with an embedded basemat and is founded on soft rock at the boundary of Site Class B and Site Class C (B/C boundary) as characterized by ASCE/SEI Standard 7. The GDNF is assumed to handle radiological materials, and its structure, systems and components (SSC's) are designed to effectively confine these materials in the event of an internal failure. The GDNF is populated with components that are generic to safety-related nuclear structures. A single system, which is intended to confine a loss of materials-at-risk (MAR) to the interior of the structure, is chosen for this study. Accordingly, a hypothetical event tree and fault tree are assumed for risk assessment. The isolation system for the GDNF is designed per Chapter 12 of ASCE/SEI 4-16 but is not optimized. The isolation system consists of 38 lead rubber bearings installed in one horizontal plane below the basemat. Details of the GDNF, including the SSC's, event tree and fault tree, and isolation system, are presented in the project report and Yu et al.. This study includes seismic risk assessment and cost estimation for four cases: (1) the GDNF is located at a site of low to moderate seismic hazard and is constructed on a conventional (non-isolated) foundation; (2) the GDNF is located at the same site as case 1, but is seismically isolated; (3) the GDNF is located at a site of high seismic hazard and is constructed on a conventional foundation; and (4) the GDNF is located at the same site of high seismic hazard as case 3, but is seismically isolated. In this study, the DOE site at Idaho National Laboratory (INL) is chosen as the low to moderate seismic hazard site for cases 1 and 2, and the Los Alamos National Laboratory (LANL) is chosen as the high seismic hazard site for cases 3 and 4.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗