Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Power Performance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

Solar Power System Options for the Radiation and Technology Demonstration Spacecraft

The Radiation and Technology Demonstration (RTD) Mission has the primary objective of demonstrating high-power (10 kilowatts) electric thruster technologies in Earth orbit. This paper discusses the conceptual design of the RTD spacecraft photovoltaic (PV) power system and mission performance analyses. These power system studies assessed multiple options for PV arrays, battery technologies and bus voltage levels. To quantify performance attributes of these power system options, a dedicated Fortran code was developed to predict power system performance and estimate system mass. The low-thrust mission trajectory was analyzed and important Earth orbital environments were modeled. Baseline power system design options are recommended on the basis of performance, mass and risk/complexity. Important findings from parametric studies are discussed and the resulting impacts to the spacecraft design and cost.

Kerslake, Thomas W.↗

Rancor-HUNTER: Using a Simulator Engine for Realistic Human Performance Modeling of Nuclear Power Operations

The Human Unimodel for Nuclear Technology to Enhance Reliability (HUNTER) is a software system to simulate human performance in support of human reliability analysis (HRA) in nuclear power plants. This paper summarizes recent work to integrate HUNTER with a plant simulator, namely the Rancor Microworld Simulator. Rancor is an offshoot of earlier work at Idaho National Laboratory (INL) to support plant modernization. The graphical software tools used to mimic digital human-system interface upgrades at INL’s Human Systems Simulation Laboratory were linked to the Rancor Microworld Simulator, an INL-developed simplified plant model. HUNTER becomes a “virtual operator” coupled to the Rancor simulator, thereby allowing a tight coupling between a digital human twin and a digital twin of the plant. Rancor-HUNTER may be run through Monte Carlo iterations across a dynamic range of performance shaping factors, thereby producing distributions of human performance in terms of procedure paths, errors instantiations, and task durations. This paper overviews the various unique features of Rancor-HUNTER and presents an example run of Rancor-HUNTER for a startup scenario.

99 - GENERAL AND MISCELLANEOUS↗

Loitering and range performance of turbojet-powered aircraft determined by off-design engine cycle analysis

The loitering and range performance of airplanes equipped with several different turbojet engines was analytically investigated by applying the results of off-design cycle analyses to specific airplane characteristics. The method of off-design cycle analysis is presented herein and is verified by a check with experimental data. For all engines considered, the loitering and the range fuel flows obtained with rated tail-pipe nozzle area, variable engine speed operations were within 2 or 3 percent of the optimum fuel flow obtainable with any method of engines operation. The optimum loitering altitude generally occurred between approximately 25,000 and 35,000 feet with corresponding optimum flight Mach numbers of 0.4 to 0.65. In general, the optimum range fuel flows occurred at 3000 to 5000 feet higher altitude and at approximately 0.15 higher flight Mach numbers than the optimum loitering fuel flow.

Koutz, Stanley L↗

Analysis of leading edge protection application on wind turbine performance through energy and power decomposition approaches

Abstract Wind power production is driven by, and varies with, the stochastic yet uncontrollable wind and environmental inputs. To compare a wind turbine's performance, a direct comparison on power outputs is always confounded by the stochastic effect of weather inputs. It is therefore crucial to control for the weather and environmental influence. Toward that objective, our study proposes an energy decomposition approach. We start with comparing the change in the total energy production and refer to the change in total energy as delta energy. On this delta energy, we apply our decomposition method, which is to separate the portion of energy change due to weather effects from that due to the turbine itself. We derive a set of mathematical relationships allowing us to perform this decomposition and examine the credibility and robustness of the proposed decomposition approach through extensive cross‐validation and case studies. We then apply the decomposition approach to Supervisory Control and Data Acquisition data associated with several wind turbines to which leading‐edge protection was carried out. Our study shows that the leading‐edge protection applied on blades may cause a small decline to the power production efficiency in the short term, although we expect the leading‐edge protection to benefit the blade's reliability in the long term.

17 WIND ENERGY↗

Orbital performance of communication satellite microwave power amplifiers (MPAs)

This paper presents background data on the performance of microwave power amplifiers (MPAs) used as transmitters in currently operating commercial communication satellites. Specifically aspects of two competing MPA types are discussed. These are well known TWTA (travelling wave tube amplifier) and the SSPA (solid state power amplifier). Extensive in-orbit data has been collected from over 2000 MPAs in 1991 and 1993. The study in 1991 invovlved 75 S/C (spacecraft) covering 463 S/C years. The 1993 'second-look' study encompassed a slightly different population of 72 S/C with 497 S/C years of operation. A surprising result of both studies was that SSPAs, although quite reliable, did not achieve the reliability of TWTAs were one-third more reliable in the 1993 study. This was at C-band with comparable power amplifiers, e.g. 6-16W of RF output power and similar gains. Data at K(sub u)-band is for TWTAs only since there are no SSPAs in the current S/C inventory. The other complementary result was that the projected failure rates used as S/C payload design guidelines were, on average, somewhat higher for TWTAs than the actual failure rates uncovered by this study. SSPA rates were as projected.

Strauss, R.↗

Implementation Plan for Combined Heat and Power Systems VOLTTRON Controller: Performance Monitoring and Real-Time Commissioning Algorithm Verification

Building-integrated cooling, heating, and power (CHP) systems are more efficient than conventional systems at providing local power and thermal energy, and favorable fuel prices are bound to spur their increased adoption. However, to realize the full benefit of the CHP systems, we must ensure persistence of energy efficient operations. Much of the inefficiency in the current building operations can be eliminated by use of automated performance monitoring (PM), real-time commissioning verification (CxV) and automated fault detection and diagnostic (AFDD) tools. Automation can help system operators make intelligent decisions. Remote and continuous monitoring of system conditions and performance will enable better management and integration of CHP with existing building systems. Continuous PM, real-time CxV, and AFDD could alleviate burdens for operations staff, enhance operations and maintenance (O&M), and improve reliability of building and CHP systems. To address the O&M challenges and to provide a means to maximize the rate-of-return of building-integrated CHP systems, the Building Technologies Office (BTO) within the U.S. Department of Energy’s (DOE’s) Office of Energy Efficiency and Renewable Energy (EERE) initiated a project to design, develop, and field test a VOLTTRON™-based supervisory controller and associated open-source algorithms. These algorithms will ensure real-time optimal operation of a building-integrated CHP system, support electric grid reliability, and lead to achieving the goal of clean, efficient, reliable, and affordable next-generation integrated energy system. Previous report listed the components for which PM, real-time CxV, and AFDD algorithms will be developed, how the algorithms will be tested, and the metrics that will be used to validate the algorithms and their ease of deployment. Deployment of these algorithms in the field will result in a reduction in energy consumption of between 10% and 20% (for both CHP and conventional building systems). This report builds upon the previous report by detailing the process by which PNNL will implement performance monitoring and real-time commissioning algorithms for CHP systems in conjunction with the use of the VOLTTRON CHP economic dispatch agent in host facilities.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

OPALCO - Decatur Island Solar and Energy Storage Project: An Assessment of Battery Technical Performance

Orcas Power & Light Cooperative (OPALCO) is a member-owned, nonprofit cooperative utility that provides energy services to approximately 11,200 customers across 20 islands in San Juan County, Washington. OPALCO’s mostly hydroelectric power is generated by Bonneville Power Administration and delivered to the islands by submarine cables. In 2016, as part of the second round of funding from the Washington state Clean Energy Fund, OPALCO received a $1 million matching grant to support a project that deployed a 504-kW LG community photovoltaic (PV) system in combination with a 1 MW/2 MWh lithium-iron-phosphate battery energy storage system (BESS) on Decatur Island, Washington. The Decatur Island Substation is essential to ensuring reliable energy for the residents of the San Juan Islands as it is the point of interconnection with the mainland transmission system. The BESS, in combination with the community solar array, will deliver an innovative method to both defer the costly upgrade of the transmission system and allow for other high-value applications intended to benefit the utility and its customers. In 2018, Pacific Northwest National Laboratory (PNNL) completed a preliminary economic assessment for several identified use cases in collaboration with OPALCO. Between August 2021 and May 2022, extensive testing was conducted, and the results were used to assess the technical performance of the BESS subjected to actual field operations. Both reference performance and use case tests were performed: (a) Reference performance tests assess the general technical capabilities of the BESS, such as energy capacity, round-trip efficiency (RTE), ramp rate, and signal tracking capability. These are the first tests performed (baseline) and are repeated after use case tests (post cycle). A standardized U.S. Department of Energy (DOE) energy storage performance protocol was used to characterize the BESS, including representative duty cycle profiles, test procedure guidance, and calculation guidance for determining key characteristics. (b) Use case tests examine the performance of the BESS for specific use cases using duty cycles developed by PNNL in collaboration with OPALCO. Four use cases were selected for testing: 1) demand charge reduction, 2) load shaping, 3) outage mitigation, and 4) transmission deferral. The use case duty cycles were developed based on utility and site-specific characteristics in addition to the technical characteristics and physical capabilities of the BESS. Use case tests were performed between the baseline and post cycle tests. This report describes the BESS and its components, presents testing and performance analysis results, and shares key insights and lessons learned from this project. Outcomes of the tests and analyses will help OPALCO understand the performance of the Decatur Island BESS in its current state and design appropriate operational strategies for this and other BESSs over the long term.

14 SOLAR ENERGY↗

Powered Flight Design and Reconstructed Performance Summary for the Mars Science Laboratory Mission

The Powered Flight segment of Mars Science Laboratory's (MSL) Entry, Descent, and Landing (EDL) system extends from backshell separation through landing. This segment is responsible for removing the final 0.1% of the kinetic energy dissipated during EDL and culminating with the successful touchdown of the rover on the surface of Mars. Many challenges exist in the Powered Flight segment: extraction of Powered Descent Vehicle from the backshell, performing a 300m divert maneuver to avoid the backshell and parachute, slowing the descent from 85 m/s to 0.75 m/s and successfully lowering the rover on a 7.5m bridle beneath the rocket-powered Descent Stage and gently placing it on the surface using the Sky Crane Maneuver. Finally, the nearly-spent Descent Stage must execute a Flyaway maneuver to ensure surface impact a safe distance from the Rover. This paper provides an overview of the powered flight design, key features, and event timeline. It also summarizes Curiosity's as flown performance on the night of August 5th as reconstructed by the flight team.

Mars Science Laboratory (MSL)↗

The mariner 9 power subsystem design and flight performance

The design and flight performance of the Mariner Mars 1971 power subsystem are presented. Mariner 9 was the first spacecraft to orbit another planet, and some of the power management techniques employed to support an orbital mission far from earth with marginal sunlight for its photovoltaic-battery power source are described. The performance of its nickel-cadmium battery during repetitive sun occultation phases of the mission, and the results of unique tests in flight to assess the performance capability of its solar array are reported.

Josephs, R. H.↗

Performance of a Brayton power system with a space type radiator

Test results of an experimental investigation to measure Brayton engine performance while operating at the sink temperatures of a typical low earth orbit are presented. The results indicate that the radiator area was slightly oversized. The steady state and transient responses of the power system to the sink temperatures in orbit were measured. During the orbital operation, the engine did not reach the steady state operation of either sun or shade conditions. The alternator power variation during orbit was + or - 4 percent from its mean value of 9.3 kilowatts.

Nussle, R. C.↗

SPS pilot signal design and power transponder analysis, volume 2, phase 3

The problem of pilot signal parameter optimization and the related problem of power transponder performance analysis for the Solar Power Satellite reference phase control system are addressed. Signal and interference models were established to enable specifications of the front end filters including both the notch filter and the antenna frequency response. A simulation program package was developed to be included in SOLARSIM to perform tradeoffs of system parameters based on minimizing the phase error for the pilot phase extraction. An analytical model that characterizes the overall power transponder operation was developed. From this model, the effects of different phase noise disturbance sources that contribute to phase variations at the output of the power transponders were studied and quantified. Results indicate that it is feasible to hold the antenna array phase error to less than one degree per power module for the type of disturbances modeled.

Lindsey, W. C.↗

Hubble Space Telescope electrical power system model

This paper describes one of the most comprehensive models ever developed for a spacecraft electrical power system (EPS). The model was developed for the Hubble Space Telescope (HST) to evaluate vehicle power system performance and to assist in scheduling maintenance and refurbishment missions by providing data needed to forecast EPS power and energy margins for the mission phases being planned. The EPS model requires a specific mission phase description as the input driver and uses a high granularity database to produce a multi-orbit power system performance report. The EPS model accurately predicts the power system response to various mission timelines over the entire operational life of the spacecraft.

Baggett, Randy↗

Skylab technology electrical power system

The solar array/battery power systems for the Skylab vehicle were designed to operate in a solar inertial pointing mode to provide power continuously to the Skylab. Questions of power management are considered, taking into account difficulties caused by the reduction in power system performance due to the effects of structural failure occurring during the launching process. The performance of the solar array of the Apollo Telescope Mount Power System is discussed along with the Orbital Workshop solar array performance and the Airlock Module power conditioning group performance. A list is presented of a number of items which have been identified during mission monitoring and are recommended for electrical power system concepts, designs, and operation for future spacecraft.

Woosley, A. P.↗

Cognitive Aging as a Human Factor: Effects of Age on Human Performance

Nuclear power plant (NPP) control room operators must make ongoing computations and decisions that maximize production and ensure safety, which places a high cognitive burden on the operators. How cognitions such as attention, visuospatial ability, and working memory interact with socio-technical systems to achieve optimal operations is well studied. However, there is an absence of research that examines how cognitive functioning within the NPP control room environment is moderated by developmental aging processes. This is of critical importance because different types of cognitive actions are known to develop and peak at different times across the adult life span, and it is becoming increasingly clear that there is no age at which all cognitive faculties operate at maximum capacity. Thus, given that NPPs are experiencing an aging workforce, it is vital to identify how mission critical cognitions change with age. This paper reviews implications of aging on reactor operators in the current and new fleet. We highlight lessons that can be learned from state-of-the-art human factors research that considers aging, lessons from the large cognitive aging literature, and lessons from aging workers in other industries that use sophisticated socio-technical systems, such as aviation. We also consider the important subject of aging effects versus expertise and present preliminary data that support the premise that age of operator is linked to effective and efficient operations but that this relationship may be moderated by level of operations expertise. In conclusion, we apply these lessons to future considerations for aging research in current nuclear operations and with the advent of advanced modernized control rooms.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Analysis and Performance of a 12-Pulse High Power Regulator

Under work being performed to upgrade the 20 Kilowatt CW uplink transmitters of the NASA Deep Space Network (DSN), the high voltage regulator has been revisited in order to optimize its performance (long-term stability and regulation), and enhance field reliability.

power regulation high voltage power supply Klystro↗

A Pulsar-Inspired Timing Framework for Power System: Optimization and Performance Evaluation

Due to their excellent stability, neutron pulsar stars are considered promising candidate timing sources for power system applications. However, the complexity of pulsar signals necessitates advanced processing algorithms to provide accurate timing references. This paper presents the foundational framework for pulsar signal processing, serving as the basis for further optimization. To enhance the timing accuracy and computation efficiency in pulsar period searches, three algorithms are proposed as the initial optimization step: wavelet de-noising, fast folding, and cross-correlation for profile evaluation. Wavelet de-noising improves signal-to-noise ratio (SNR) by 36%–70%. Fast folding reduces computation time from hundreds of seconds to mere milliseconds. Cross-correlation works better than traditional SNR-based methods by effectively identifying the optimal period. The performance of the proposed algorithms is evaluated using observation data from telescopes. Together, these algorithms significantly improve pulsar timing performance, reducing the error of the Pulse Per Second (PPS) signal from hundreds to tens of microseconds.

Wu, Ori [ORNL] (ORCID:0000000326723410)↗