Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Power Outages”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

Financing Microgrids in the Federal Sector

Recent high-impact events such as hurricanes and wildfires highlight the need for energy system resilience. One potential impact of these events is the loss of utility grid power to federal sites, negatively affecting the ability to carry out their missions. Depending on the need to sustain critical functions, it may be important to continue operations during an outage of the electric grid, or at least have power restored quickly after the event. One approach to addressing this need is through a microgrid. Microgrids can provide a more reliable solution than the traditional approach of using a backup generator at individual buildings. A microgrid can enhance a site’s electrical power system during normal operations, as well as provide reliable backup power to critical loads when electric utility power is interrupted. Many times, certain components of a microgrid (and potentially the entire system) can be justified economically and paid for out of energy savings or avoided costs. In cases where savings can cover the project costs, one of several privately financed procurement mechanisms may be used to implement the project. Procurement options available to all federal agencies include utility energy services contracts (UESC), energy savings performance contracts (ESPC), and utility services contracts (USC); other mechanisms such as a power purchase agreement (PPA), enhanced use lease (EUL), and utility privatization (UP) may also be useful to agencies that have the authority to use them. Implementing a microgrid in a comprehensive effort that also includes energy efficiency can provide an important savings component, while reducing power requirements for critical loads, thus reducing the cost of the microgrid and associated distributed energy resources (DER). However, it can be difficult to achieve enough savings and avoided costs to cover the entire microgrid system, so leveraging these avoided costs in combination with appropriated funds may be necessary to implement the full project. When a site is deciding if a microgrid is the best solution, activities early in the process include identifying critical loads and existing DERs, conversations with the local electric utility, and implementation options that work best for the agency and site. This paper explores procurement options and agreements that may be useful to federal agencies interested in implementing microgrids at their sites. Microgrid complexities, implementation considerations, and suggestions to get started are also discussed. This information will be most useful to agencies when they are exploring electric energy system resilience options and/or considering different procurement options to meet their needs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Financing Microgrids in the Federal Sector

Recent high-impact events such as hurricanes and wildfires highlight the need for energy system resilience. One potential impact of these events is the loss of utility grid power to federal sites, negatively affecting the ability to carry out their missions. Depending on the need to sustain critical functions, it may be important to continue operations during an outage of the electric grid, or at least have power restored quickly after the event. One approach to addressing this need is through a microgrid. Microgrids can provide a more reliable solution than the traditional approach of using a backup generator at individual buildings. A microgrid can enhance a site’s electrical power system during normal operations, as well as provide reliable backup power to critical loads when electric utility power is interrupted. Many times, certain components of a microgrid (and potentially the entire system) can be justified economically and paid for out of energy savings or avoided costs. In cases where savings can cover the project costs, one of several privately financed procurement mechanisms may be used to implement the project. However, it can be difficult to achieve enough savings and avoided costs to cover the entire microgrid system, so leveraging these avoided costs in combination with appropriated funds may be necessary to implement the full project. This paper explores procurement options and agreements that may be useful to federal agencies interested in implementing microgrids at their sites. Microgrid complexities, implementation considerations, and suggestions to get started are also discussed. This information will be most useful to agencies when they are exploring electric energy system resilience options and/or considering different procurement options to meet their needs.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Techno-Economic Analysis Using REopt for Community Solar on Multifamily Affordable Housing Properties [Slides]

Multifamily affordable housing (MFAH) providers can identify and prioritize properties in their portfolios for which community solar development is feasible by following portfolio screening steps in a process outlined by NREL. Once MFAH providers have identified the most feasible sites, they can conduct more detailed analyses for a select number of sites to assess how distributed energy resources such as solar plus storage can help them meet their goals. The step is completed using NREL's REopt (https://reopt.nrel.gov/tool), a free techno-economic optimization model that determines DER sizes and dispatch strategies that minimize the life cycle cost of energy at a site. This presentation describes how to perform this step using REopt to help MFAH providers answer questions such as: What size solar PV system will result in the most energy bill savings at this site? What size solar-plus-storage system would be needed to power critical loads through a utility grid outage? What is the financial impact of rate switching, net metering, and/or meter aggregation? What percentage of the site's load can be offset with renewable energy? What are the emissions benefits of this renewable generation?

14 SOLAR ENERGY↗

Building Resilience with Distributed Wind

Distributed wind has several properties that can increase resilience of local electric systems. One of the biggest benefits distributed wind provides is the ability to provide power locally without importing fuel and in areas where solar resources are not adequate. In this way, it can be used to offset fossil fuel consumption and support local backup power needs in the case of a wider grid outage. This fact sheet provides an overview of this and other ways that distributed wind supports resilience.

17 WIND ENERGY↗

AGGREGATE: dAta-driven modelinG preservinG contRollable dEr for outaGe mAnagemenT and rEsiliency (Final Report)

The AGGREGATE project team successfully developed and validated various modules for outage management. Brief summaries of each module are provided to showcase their strength for outage management and restoration for a distribution system with a high penetration of connected distribution energy resources (DERs). In recent years, inverter-based DERs have been widely deployed in distribution system. A most of behind-the-meter (BTM) solar power generation is not visible to the utility. The data-driven DER and load estimation modules are using machine learning (ML) and artificial intelligence (AI) to manage this issue, which provides an opportunity for distribution system operators (DSOs) to operate systems and make decisions in real-time for a distribution system with a high penetration of DERs deployed. Also, the estimated DER and true load can be further leveraged in network aggregation and cold-load pick up estimation for reducing the computing complexity and providing for fast restoration. After load demand and DER power generations have been estimated, the information will support topology and state estimation (SE). The topology estimation module demonstrated the viability of mixed integer linear programming (MILP) formulation to estimate the most likely operational radial topology and outage sections using power flow measurements, historical/estimated load and DERs data and smart meter ping measurements. Formulation includes continuous (power flow, load and DERs data) and binary measurements (smart meter ping measurements) in a single formulation. Errors in continuous data and binary data are modeled as normal distribution and Bernoulli distribution, respectively. In the future distribution grid, the power injection from controllable DERs will be essential for efficient and resilient grid operation. However, determining the optimal DER injections and restoration actions is dependent on knowledge of the system states. State estimation (SE), already the cornerstone of transmission energy management systems, will become commonplace in distribution management systems as more measurements become available from deployment of automated metering infrastructure (AMI). Observability analysis is the first step in SE, as it determines the sufficiency of the available measurements for accurately estimating the current system states. A new type of pseudo-measurement called a Correlational Measurement (CM) is introduced in this module, to enhance the observability of the system to enable more accurate SE. CMs encapsulate knowledge of correlation between demand patterns for similar classes of loads as well as injection patterns for same-technology renewable DERs. During grid contingency scenarios, DERs have been traditionally disconnected, without any fault ride-through capabilities. However, with new regulations and better technology, it is feasible for these resources to contribute to the grid’s restoration after an adverse event and hence enhance resilience. The controllability module proposes a two-step restoration scheme for the power system restoration process by leveraging additional degrees of freedom in power electronics interfaced DERs for mitigating voltage problems. In a resilience mode without the utility system, the distribution grid relies on DERs to serve critical load. In such a severe event with multiple faults on the distribution feeders, actuation of various protective devices (PDs) divides the distribution system into electrical islands. The undetected actuated PDs due to fault current contributions from DERs can delay the restoration process, thereby reducing the system resilience. The Advanced Outage Management (AOM) and the Advanced Feeder Restoration (AFR) modules developed in this project provide improved system resilience with multiple DERs. AOM identifies the faulted sections and actuated PDs in a distribution system with DERs by incorporating smart meter data. The most credible outage scenario including fault locations, PD actuations, and fault indicator (FI) failures is identified by a set of binary integer linear programming incorporating hypotheses. The AFR module serves to restore a distribution system with available energy resources taking into consideration the availability of utility sources and DERs. By partitioning the system into islands, critical load will be served with the available generation resources within islands based on the solution of a MILP. When the utility systems become available, the optimal path will be determined by a spanning tree search algorithm that reconnects these islands back to substations and restores the remaining load. The transmission and distribution (T&D) co-simulation module was used to validate the effect of a control action performed on the distribution side assets as it propagates to the transmission side. This ensures that the control action performed results in a feasible operating point on both the transmission and the distribution system. In addition to validation, the team used the T&D co-simulation module to demonstrate how distribution system assets can be used to mitigate issues on the transmission system. Specifically, the team demonstrated that appropriate switching operations on the distribution side can alleviate the line overload condition on the transmission side without causing new operational constraint violations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Accelerating Resilience of the Community through Holistic Engagement and use of Renewables (ARCHER) Planning Framework

The primary objective of the Accelerating Resilience of the Community through Holistic Engagement and Use of Renewables (ARCHER) initiative was to identify and incorporate the unique variations in energy burden, social vulnerability, living conditions, and access to essential services that differ across communities. By accounting for these localized factors—down to the neighborhood level—the project supports more targeted and effective investments in community resilience. The framework seeks to establish practical planning guidance, methods, and performance measures for community energy resilience, integrate community-level and electric utility system resilience planning, and assess its effectiveness through comparison with conventional and operational planning approaches. A key component of the project was its data exchange platform, which is used to evaluate and demonstrate the tools, methodologies, and planning approaches developed through ARCHER. This open-source platform enables developers and vendors of distribution and outage management systems to build upon the research by incorporating its concepts into their own tools and workflows. This capability is enabled by the transparent availability of data, functional requirements, and the underlying information model. The project yielded several important insights. First, meaningful engagement with communities is essential to achieving comprehensive resilience outcomes. Second, resilience planning is most effective when electric grid considerations and broader community needs are addressed in a coordinated manner. Third, the use of platforms that allow for real-time input from communities can enhance utility responsiveness during restoration activities. Fourth, a structured and systematic planning approach can successfully translate ARCHER concepts into practice. Fifth, the development of an integrated metric that reflects both grid performance and community impacts provides a more holistic basis for evaluating resilience. Finally, incorporating community engagement and equity considerations into grid operations is critical, particularly during severe weather events that result in extended outages.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Dataset for: Electric Vulnerability Index: Targeted Energy Storage Implementation Metric

Uninterrupted access to electricity is critical to the safety and security of American households. More frequent and extreme emergency events increase outages across the country, disproportionately impacting vulnerable communities that experience the most frequent and longest outages, are most sensitive to the loss of electric power, and have the least capacity to adapt to these conditions. This study devises a metric, the Electric Vulnerability Index (EVI), and validates this metric against the 2021 Winter Storm Uri in Texas. Though not ubiquitous, similar trends were observed between adjacent areas with higher EVI and those with higher outage rates from this storm. EVI is offered as a viable approach to quantify a population’s vulnerability to electric outages and maps that index across the continental United States to aid policymakers, advocates, and energy system stakeholders in the targeted deployment of resilience solutions, such as energy storage, to communities most in need. This dataset includes the geopackage file containing all relevant attributes used to generate the maps used in the accompanying paper.

Kerby, Jessica [Pacific Northwest National Laborat↗

Outage Forecast-Based Preventative Scheduling Model for Distribution System Resilience Enhancement

Distribution system resilience enhancement is an important topic to ensure customers have access to power supply during extreme events. In fact, certain weather-related extreme events can be predicted ahead of time. Therefore, it is important to investigate how to predict grid outages using extreme weather forecasts, and how outage predictions can be incorporated into distribution system resilience enhancement. In this paper, a preventative scheduling model for distribution systems is proposed. The model targets at allocating resources, especially mobile responsive resources such as mobile backup generators and mobile energy storage systems, to prepare for an extreme event in the day-ahead context. To achieve efficient resource allocation and scheduling, a machine learning-based outage prediction module is developed to predict vulnerable or risky segments of the distribution system based on historical operating records and extreme weather event forecast. By integrating the outage prediction results into the scheduling model, optimal resource allocation can be derived to help distribution systems prepare for an upcoming event and improve resilience performance. A real distribution feeder in North Carolina, U.S. is used in the case study to validate the proposed approach.

distributed energy resources↗

Power grid frequency prediction using spatiotemporal modeling

Understanding power system dynamics is essential for interarea oscillation analysis and the detection of grid instabilities. The FNET/GridEye is a GPS-synchronized wide-area frequency measurement network that provides an accurate picture of the normal real-time operational condition of the power system-dynamics, giving rise to new and intricate spatiotemporal patterns of power loads. We propose to model FNET/GridEye grid frequency data from the U.S. Eastern Interconnection with a spatiotemporal statistical model. We predict the frequency data at locations without observations, a critical need during disruption events where measurement data are inaccessible. Spatial information is accounted for either as neighboring measurements in the form of covariates or with a spatiotemporal correlation model captured by a latent Gaussian field. Finally, the proposed method is useful in estimating power system dynamic response from limited phasor measurements and holds promise for predicting instability that may lead to undesirable effects such as cascading outages.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Computationally Robust Line Outage Detection and Identification in Three-Phase Networks

Detection and identification of individual phase outages remains a challenging problem due to insufficient metering in three-phase unbalanced power networks. This problem was tackled for the transmission systems in our previous work as documented in [1]. In this paper, this work is extended to detect phase outages in three-phase unbalanced systems using only the sparse estimation method. In addition, further improvements are introduced to increase the estimation accuracy for the virtual power injections at the terminal buses of disconnected lines, once the disconnected line is identified by sparse estimation methods. Simulation results are provided to experimentally validate the increased accuracy in detecting phase outages while decreasing the computational time by using the proposed approach.

Sparse Estimation, Line Outage, Phase Outage, LASS↗

Project Profile: Hydrogen Fuel Cell Mobile Lighting Tower (HFCML)

NASA is committed to finding innovative solutions that improve the operational performance of ground support equipment while providing environment and cost benefits, as well. Through the Hydrogen Fuel Cell Mobile Lighting Tower (HFCML) project, NASA gained operational exposure to a novel application of high efficiency technologies. Traditionally, outdoor lighting and auxiliary power at security gates, launch viewing sites, fallback areas, outage support, and special events is provided by diesel generators with metal halide lights. Diesel generators inherently contribute to C02, NOx, particulate emissions, and are very noisy. In 2010, engineers from NASA's Technology Evaluation for Environmental Risk Mitigation Principal Center (TEERM) introduced KSC operations to a novel technology for outdoor lighting needs. Developed by a team led by Sandia National Laboratory (SNL), the technology pairs a 5kW hydrogen fuel cell with robust high efficiency plasma lights in a towable trailer. Increased efficiency, in both the fuel cell power source and lighting load, yields longer run times between fueling operations while providing greater auxiliary power. Because of the unit's quiet operation and no exhaust fumes, it is capable of being used indoors and in emergency situations, and meets the needs of all other operational roles for metal halide/diesel generators. The only discharge is some water and warm air. Environmental benefits include elimination of diesel particulate emissions and estimated 73% greenhouse gas emissions savings when the hydrogen source is natural gas (per GREET model). As the technology matures the costs could become competitive for the fuel cell units which are approximately 5 times diesel units. Initial operational . concerns included the hydrogen storage tanks and valves, lightning safety/grounding, and required operating and refueling procedures. TEERM facilitated technical information exchange (design drawings, technical standards, and operations manuals) necessary for KSC hydrogen system experts to approve use of the HFCML unit, including initiating the environmental checklist (i.e. exterior lighting waiver due to sea turtles), and development of operations and maintenance instructions. TEERM worked with SNL to establish a bailment agreement for KSC to utilize a Beta unit as part of normal Center Operations for a period of twelve months.

McLaughlin, Russell↗

Multi-Agent Graph-Attention Deep Reinforcement Learning for Post-Contingency Grid Emergency Voltage Control

Grid emergency voltage control (GEVC) is paramount in electric power systems to improve voltage stability and prevent cascading outages and blackouts in case of contingencies. While most deep reinforcement learning (DRL)-based paradigms perform single agents in a static environment, real-world agents for GEVC are expected to cooperate in a dynamically shifting grid. Moreover, due to high uncertainties from combinatory natures of various contingencies and load consumption, along with the complexity of dynamic grid operation, the data efficiency and control performance of the existing DRL-based methods are challenged. To address these limitations, we propose a multi-agent graph-attention (GATT)-based DRL algorithm for GEVC in multi-area power systems. Here, we develop graph convolutional network (GCN)-based agents for feature representation of the graph-structured voltages to improve the decision accuracy in a data-efficient manner. Furthermore, a cutting-edge attention mechanism concentrates on effective information sharing among multiple agents, synergizing different-sized subnetworks in the grid for cooperative learning. We address several key challenges in the existing DRL-based GEVC approaches, including low scalability and poor stability against high uncertainties. Test results in the IEEE benchmark system verify the advantages of the proposed method over several recent multi-agent DRL-based algorithms.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Hydropower Evaluation Framework for Wildfire Resilient Microgrids

This paper presents a framework for characterizing hydropower plants based on plant and site attributes, assessing their feasibility to function within microgrids during periods of wildfire-induced outages. A set of nine metrics is developed to assign scores to hydropower plants, considering their suitability for forming wildfire-resilient microgrids, their capability to operate within such microgrids, and their simulated performance during wildfire events. A comprehensive database is constructed, comparing hydropower plants according to their suitability and capability metrics. To evaluate the performance score of a specific hydropower plant, namely the Hills Creek plant situated in a wildfire-prone region of Oregon, a case study is conducted, simulating a wildfire scenario. The results of steady-state and dynamic simulations demonstrate that the Hills Creek hydropower plant can effectively provide crucial microgrid services and power nearby communities during a prolonged wildfire-related outages.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Real-time power management technique for microgrid with flexible boundaries

In order to diminish the impacts brought by high penetration of renewable energy on the reliability of distribution systems, some distribution networks (e.g. Chattanooga electric power board system) have deployed smart switches (SSs) to island some areas to mitigate outage losses. However, due to intermittency and sharply changing rate of renewable energy, it is likely to experience insufficient or excessive power for islanded areas. Therefore, a microgrid controller featured with flexible boundaries is proposed. With proposed microgrid controller, the microgrid can not only shrink or expand its boundaries according to current renewable energy supply, but also disconnect/connect to the main grid with a designated SS. Furthermore, to ensure the microgrid controller could obtain suitable boundaries on the time scale of seconds, a real-time power management technique with alternative generating algorithm is designed to generate all possible alternative boundaries and choose the optimal one, which is scalable to any topology. In addition, in order to maintain state of charge of batteries within a desirable range, anti-overcharge/discharge strategies are designed. Four comprehensive experiments verify that the implementation of the microgrid controllers can realise flexible boundaries and deal with sharply changing rate of renewable generation or load on the time scale of seconds.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Technology Maturation of Wireless Harsh Environment Sensors For Improved Condition Based Monitoring Of Coal Fired Power Generation

The overall goal of this project was to demonstrate and develop the usage of high-temperature (HT) harsh-environment (HE) wireless surface acoustic wave resonator (SAWR) sensor technology to promote reliable maintenance through condition-based maintenance (CBM) for field applications in harsh service conditions associated with power plant environments. The project aimed to advance the HT HE wireless SAWR sensor technology from TRL 5 to TRL 7. In addition to HT HE wireless temperature sensing, efforts were dedicated during this project to investigate, develop and increase the TRL from 3 to 5 for the following technologies: (a) HT HE strain sensors to address additional CBM monitoring needs, such as boiler tube mechanical / thermal stresses, which can provide early indications for boiler tube cracking and failure; and (b) HT aluminum nitride (AlN) and scandium aluminum nitride (ScAlN) based piezoelectric thin film fabrication and implementation of SAW sensors, with the goal of releasing the need to use single crystal piezoelectric materials for SAWRs and thus broaden possible technology applications to non-planar and harder to modify surfaces. To achieve the goals mentioned above, UMaine and its partner, Environetix Technologies Corporation, established partnerships with the following power plants: Longview Power (Maidsville, WV), a coal-fired power plant; Penobscot Energy Recovery Corp (PERC, Orrington, ME), a waste-to-energy power plant; and the UMaine Steam Plant (Orono, ME), an oil / natural gas power plant. To realize wireless HT HE SAWR sensor systems in these harsh service conditions, the University of Maine research team worked with Environetix and these power plants to define, design, fabricate, test and validate a mature prototype wireless temperature SAWR sensor system for boiler tube applications within the HT HE of the reheater pass damper chamber to directly and wirelessly monitor the temperature at eighteen independent boiler tube locations. The system included three levels, or “tiers”, of wireless communication to enable remote monitoring: Tier 1, the wireless link in the reheater pass damper chamber directly accessing the sensors on the boilers; Tier 2, the wireless local area network link, transmitting processed sensor information within the power plant to the Tier 3, a commercial wireless signal carrier company for secure remote data monitoring outside of the power plant. Regarding the wireless sensor system installed at Longview Power, temperature information from the boilers was continuously transmitted from the Longview boilers at Maidsville, WV, to Environetix headquarters, Orono, ME, over a 34 month period, when the system was finally decommissioned. Strain sensors and piezoelectric ScAlN thin film sensors were successfully installed on the exhaust duct at the UMaine Steam Power plant. The advances in wireless strain sensors and thin film piezoelectric film fabrication and testing were performed mostly in UMaine laboratories and field tested at the UMaine Steam Plant, due to its close proximity to UMaine/Environetix, access to the plant facility, and due to difficulties in accessing the other power plants during the COVID shut-down period. The project accomplished the TRL level increase of the targeted CBM technologies through the successful fabrication, installation, test, and validation of dedicated and commercial wireless sensor systems, utilizing the three different power plants. The outcomes of this project, including the wireless sensor data capability, are expected to yield an advance for CBM in harsh power plant environments. The reduction of maintenance costs, improved safety during plant operation, and increased power plant efficiency will lead to increased revenues (i.e., fewer forced outages) due to better process monitoring enabled by the wireless HT HE SAWR temperature sensor technology.

20 FOSSIL-FUELED POWER PLANTS↗

Co-optimization of nuclear reactor flexible power operation and maintenance scheduling

As flexible power operation of nuclear power plants becomes more attractive due to the reduction in fossil-fueled dispatchable generation on energy grids, finding optimal power production strategies that balance revenue generation with operational concerns becomes more complex. This article presents a general framework to aid operators in designing economically optimal long term dispatch strategies for nuclear power plants. The principal novelty is the linking of estimated system remaining useable life (RUL) to strategic operational decisions. It is shown that, depending on the relationship between the fixed costs from maintenance and the associated lost revenue from an outage, it can be economically optimal in the long term to delay a maintenance outage and not perform this alongside refueling. For a given relationship between power ramping and degradation, optimal strategies were found that discouraged load following in some situations while minimizing unnecessary maintenance. It is shown that heavy load following can cause maintenance and refueling outages to diverge due to their inverse relationships with respect to load following, potentially leading to a significant loss in capacity factor. As a result, this general framework can be applied to specific reactor dispatch allowing operators to adapt operational strategies as future grid conditions change.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Bonneville, Power Administration Timing System

Time is an integral part of the Bonneville Power Administration's (BPA) operational systems. Generation and power transfers are planned in advance. Utilities coordinate with each other by making these adjustments on a timed schedule. Price varies with demand, so billing is based on time. Outages for maintenance are scheduled to assure they do not interrupt reliable power delivery. Disturbance records are aligned with recorded timetags for analysis and comparison with related information. Advanced applications like traveling wave fault location and real-time phase measurement require continuous timing with high precision. Most of BPA is served by a Central Time System (CTS) at the Dittmer Control Center near Portland, OR. This system keeps time locally and supplies time to both the control center systems and field locations via a microwave signal. It is kept synchronized to national standard time and coordinated with interconnected utilities. It is the official BPA time. Powwer system control and operation is described, followed by a description of BPA timing systems including CTS, the Fault Location Acquisition Reporter, time dissemination, and phasor measurements. References are provided for further reading.

Martin, Kenneth E.↗