Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Permitting”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

County Land-Use Regulations for Solar Energy Development in Colorado

We present a survey of county-level policies on ground-mounted solar development across Colorado, including both solar-specific ordinances as well as general land-use code that might be applicable in counties without solar-specific policies. This report provides an accessible reference for stakeholders interested in identifying counties with particular regulations or in analyzing the diversity of regulations across Colorado. We defined a set of search criteria to find information on solar definitions and classifications, permitting processes, and use-specific requirements in each of Colorado's 64 counties. With those criteria, we reviewed relevant ordinances, land-use code, and comprehensive and master plans. If any uncertainties were identified, we contacted county officials for clarification. The findings are categorized and mapped to illustrate the distribution of key policies adopted across Colorado's counties on the following topics: solar definitions, solar siting policy documentation, categorization of PV systems for permitting, 1041 permitting, solar on agricultural land, panel height restrictions, fencing requirements, vegetation management, visual impacts, decommissioning plans, and financial assurance for decommissioning. Additionally, we identify and discuss policies that might impact the deployment of agrivoltaics, a dual land use combining both agriculture and solar on the same land, which might not fit neatly in existing zoning definitions and solar-specific regulations.

14 SOLAR ENERGY↗

SolarAPP+ Performance Review: Final Technical Report

The National Renewable Energy Laboratory (NREL) and its project partners have developed the novel Solar Automated Permit Processing plus (SolarAPP+) software platform that provides a flexible, web-based PV-permitting tool for residential systems that can be integrated with existing and complementary software platforms. The main objective of this research is to analyze the implementation of SolarAPP+. Analysis was conducted by identifying the benefits, tradeoffs, and overall performance of SolarAPP+, including achieving its goals of delivering automated, code compliant systems, influencing permitting cycle times, and improving application submittals and/or inspection performance. The NREL team published the results of this analysis in annual SolarAPP+ Performance Review technical reports.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Modeling Arctic boundary layer cloud streets at grey-zone resolutions

To better understand how model resolution affects the formation of Arctic boundary layer clouds, we investigated the influence of grid spacing on simulating cloud streets that occurred near Utqiagvik (formerly Barrow), Alaska on 2 May 2013 and were observed by the Moderate Resolution Imaging Spectroradiometer (MODIS). The Weather Research and Forecasting model was used to simulate the clouds using nested domains with increasingly fine resolution ranging from a horizontal grid spacing of 27 km in the boundary-layer-parameterized mesoscale domain to a grid spacing of 0.111 km in the large-eddy-permitting domain. We investigated the model-simulated mesoscale environment, horizontal and vertical cloud structures, boundary layer stability, and cloud properties, all of which were subsequently used to interpret the observed roll-cloud case. Increasing model resolution led to a transition from a more buoyant boundary layer to a more shear-driven turbulent boundary layer. The clouds were stratiform-like in the mesoscale domain, but as the model resolution increased, roll-like structures, aligned along the wind field, appeared with ever smaller wavelengths. A stronger vertical water vapor gradient occurred above the cloud layers with decreasing grid spacing. With fixed model grid spacing at 0.333 km, changing the model configuration from a boundary layer parameterization to a large-eddy-permitting scheme produced a more shear-driven and less unstable environment, a stronger vertical water vapor gradient below the cloud layers, and the wavelengths of the rolls decreased slightly. In this study, only the large-eddy-permitting simulation with gird spacing of 0.111 km was sufficient to model the observed roll clouds.

Lai, Hui-Wen↗

Quantifying CO 2 Plume Stabilization at Carbon Storage Projects, North Dakota, USA

This study presents an approach for quantifying when injected carbon dioxide (CO 2 ) stabilizes pursuant to carbon capture and storage (CCS) project permitting and site closure requirements. The distribution of mobile-phase CO 2 (CO 2 plume) will evolve within the storage reservoir during and after injection through both physical and chemical trapping mechanisms. CCS policies generally agree that the CO 2 plume’s migratory behavior in post-injection should demonstrate nonendangerment to the environment but do not provide specific guidance on how to meet the definition of plume stabilization, generating some uncertainty for operators. Plume stability herein means the CO 2 plume 1) changes size minimally and predictably in the storage reservoir such that it will not cross key boundaries identified in the permit and 2) does not pose a threat to human health, underground sources of drinking water (USDWs), and the environment because of lateral migration to areas where leakage pathways may exist. Published literature on plume metrics was reviewed to determine which metric(s) may be most appropriate for determining CO 2 plume stability. A technical approach that defines plume stabilization by estimating the rate of change in the geographic footprint of the CO 2 plume with respect to time was developed and illustrated using a case study from North Dakota, USA, as a proposed solution for CCS operators to apply at the project permitting stage. Any prospective CCS operator may benefit from using the same approach to inform the selection of pore space lease and monitoring areas and develop post-injection site care plans.

03 NATURAL GAS↗

Development and application of an environmental risk register for marine energy device and project developers

The marine energy industry is steadily advancing as more devices are deployed worldwide. However, several challenges and barriers remain, such as lingering uncertainty regarding the potential environmental effects of marine energy devices on marine animals, habitats, and ecosystems. Concerns have led to difficulty navigating permitting and consenting processes and receiving authorization to deploy devices in the marine environment, including extended timelines and costs. Based on existing risk registers, a novel marine energy environmental risk register was created to help the marine energy industry move beyond these barriers. This risk register aims to aid marine energy device and project developers identify and assess potential environmental risks early in device design or project planning, document and track potential environmental interactions, prioritize risks and determine risk responses, and make decisions throughout device or project development. It can also be used as a tool to assist in communicating with regulators and advisors during permitting processes and to inform stakeholder and community engagement efforts. This paper details the methods and process to develop a risk register specific to environmental effects of marine energy and describes two use cases (one for wave energy and another for tidal energy) to highlight example results. Due to the tool's novelty, the paper showcases its application for the marine energy industry and acknowledges limitations and possible future improvements. Overall, the environmental risk register shows promise to support marine energy developers when identifying, tracking, and addressing potential environmental risks and to help successfully navigate permitting and deploy marine energy devices responsibly.

Environmental effects↗

Jackson, L., Johnson, M.B., Latrach, A., Grimes, D., Martinez, C., and Mclaughlin, J.F., 2024, Multidisciplinary geotechnical data collection, curation, and analysis for conformity with the regulatory framework for geologic carbon storage in Wyoming, USA: Geological Society of America Abstracts with Programs. Vol. 56, No. 5, 2024, doi: 10.1130/abs/2024AM-405024

Title: Multidisciplinary Geotechnical Data Collection, Curation, and Analysis for Conformity with the Regulatory Framework for Geologic Carbon Storage in Wyoming, USA. Text: Construction and operation of wells for geologic sequestration of carbon dioxide necessitate that they are permitted under the Environmental Protection Agency’s Underground Injection Control Class VI requirements. Class VI wells conform to stringent requirements to ensure long-term safety and integrity of the storage site and the protection of Underground Sources of Drinking Water. Entities pursuing Class VI permitting must provide comprehensive geologic site characterization, including regional geologic structure and stratigraphy, aquifer information, reservoir and confining unit geomechanical properties, geochemical analyses, assessment of trapping capacity and mechanisms, and a variety of other of multidisciplinary geotechnical data. The Wyoming Class VI Site Characterization Database Project is focused on developing a geologic site characterization database of geotechnical information, which has been compiled and verified from established, public databases/entities and scientific literature to expedite Class VI permitting in Sweetwater County within the Greater Green River Basin of southern Wyoming. The preliminary suite of compiled data from 14,000 wells includes 8,000 wells with logs and 7,250 wells with formation tops, ~70 wells with core data (e.g., X-Ray diffraction, petrographic, and petrophysical data), ~2,500 water analyses, ~740 seismic events data, and ~520 bottom-hole temperature measurements. Future work on—and stemming from—this project will include new core analyses, calculation and interpolation of subsurface temperature gradients, mechanical earth models, geochemical simulations, storage capacity estimation, stratigraphic column generation and correlation, and construction of subsurface maps. Finally, this work will help to inspire and facilitate subsurface data compilation and curation beyond Sweetwater County, Wyoming.

42 ENGINEERING↗

A Bimodal Diagnostic Cloud Fraction Parameterization. Part II: Evaluation and Resolution Sensitivity

A wide range of approaches exists to account for subgrid cloud variability in regional simulations of the atmosphere. This paper addresses the following questions: 1) Is there still benefit in representing subgrid variability of cloud in convection-permitting simulations? 2) What is the sensitivity to the cloud fraction parameterization complexity? 3) Are current cloud fraction parameterizations scale-aware across convection-permitting resolutions? These questions are addressed for regional simulations of a 6-week observation campaign in the U.S. southern Great Plains. Particular attention is given to a new diagnostic cloud fraction scheme with a bimodal subgrid saturation-departure PDF, described in Part I. The model evaluation is performed using ground-based remote sensing synergies, satellite-based retrievals, and surface observations. It is shown that not using a cloud fraction parameterization results in underestimated cloud frequency and water content, even for stratocumulus. The use of a cloud fraction parameterization does not guarantee improved cloud property simulations, however. Diagnostic and prognostic cloud schemes with a symmetric subgrid saturation-departure PDF underestimate cloud fraction and cloud optical thickness, and hence overestimate surface shortwave radiation. These schemes require empirical bias-correction techniques to improve the cloud cover. The new cloud fraction parameterization, introduced in Part I, improves cloud cover, liquid water content, cloud-base height, optical thickness, and surface radiation compared to schemes reliant on a symmetric PDF. Furthermore, cloud parameterizations using turbulence-based, rather than prescribed constant subgrid variances, are shown to be more scale-aware across convection-permitting resolutions.

54 ENVIRONMENTAL SCIENCES↗

Monthly Sewer Monitoring Report for LLNL Livermore Site, April 2020

Lawrence Livermore National Laboratory (LLNL) collects effluent samples from its sewer outfall at the B196 Sewer Monitoring Station (SMS). Effluent flow-proportional composite samples are collected at the SMS on a daily (midnight-to-midnight), weekly (Thursday through Wednesday), and “monthly” (composited from daily) basis; effluent grab samples are also collected each month at that same location. Certified contract laboratories analyzes these compliance samples, and results (Tables 1–3) are used to establish LLNL compliance with the 2019–2020 Wastewater Discharge Permit (Permit 1250) granted by the City of Livermore Water Resources Division (WRD). Supplemental analyses for biochemical oxygen demand (BOD) and total suspended solids (TSS) are performed onsite and reported (Table 4) for the calculation and assessment of sewer service charges. Quarterly, effluent is sampled for metals (24-hour composite) and cyanide (grab sample) concentrations (mg/L). The results are presented in Table 5. In addition to the sampling noted above, the SMS continuously monitors LLNL sewage effluent in real-time for flow rate, pH, metals, and radioactivity. Standard measurement methods are used to monitor flow and pH to determine permit compliance. Unique nonstandard analytical methods monitor for the presence of metals and radioactivity using x-ray fluorescence (XRF) and gamma spectroscopy, respectively. If an anomalous condition is detected by the monitoring system, an alarm activates LLNL’s Sewer Diversion Facility (SDF) and Livermore Water Reclamation Plant (LWRP) operators are notified that a potential release has occurred.

54 ENVIRONMENTAL SCIENCES↗

Integrated Mid-Continent Stacked Carbon Storage Hub Project Phase II (Final Summary Report)

The Phase II Integrated Midcontinent Stacked Carbon Storage Hub (IMSCS-HUB) is part of the Carbon Storage Assurance Facility Enterprise (CarbonSAFE) established by the United States Department of Energy (DOE) National Energy Technology Laboratory (NETL). CarbonSAFE is phased to support the development of commercial-scale (50 million metric tonnes [Mt] over a 30-year period) carbon capture, utilization, and storage (CCUS) in the United States. The IMSCS-HUB study area comprises carbon dioxide (CO 2 ) sources in Iowa, Kansas, and Nebraska (the source corridor), and CO 2 sinks in Kansas and Nebraska (the storage corridor), representing the first large-scale project for the Midcontinent region. The stacked storage corridor is characterized by alternating sequences of deep saline formations, oil-bearing reservoirs, shale, and evaporite units that are conducive to vertically stacked CO 2 injection for geologic storage and enhanced oil recovery (EOR). Three sites within the IMSCS-HUB stacked storage corridor were evaluated in Phase II for commercial CCUS feasibility: one in southwest-central Nebraska, Sleepy Hollow Field (SHF), a second in southwestern Nebraska near Madrid (Madrid), and a third in southwestern Kansas, the Patterson Site (composed of the Patterson, Heinitz, Hartland, and Oslo fields). In Phase II, the team assessed the feasibility of storage complexes at the potential storage sites in Nebraska and Kansas to support a commercial-scale storage hub that integrates proven CO 2 capture technology and transport from nearby ethanol sources. Building on lessons learned from the DOE-NETL Regional Carbon Sequestration Partnerships (RCSPs), the Project Team has identified a clear strategy to meet DOE’s 2025 objective of commercial carbon capture and storage (CCS) implementation by developing a CO 2 market and infrastructure that relies on multiple ethanol-based CO 2 sources in the short term and the incorporation of multiple coal-fired power plant CO 2 sources when commercial capture is economically viable. The team also leveraged the updated 45Q tax credit to develop capture and transport infrastructure. Commercial-scale CCUS is feasible at two candidate storage sites studied, the Madrid, Nebraska Site and the Patterson Site in Kearny County, Kansas. The Sleepy Hollow Field in Nebraska was found to be an attractive candidate for stacked storage with CO 2 -EOR (Battelle 2020e). Outreach efforts facilitated engagement from industry, government, and research sectors (Battelle and GPI, 2020) and an outreach plan for future phases of the project was developed to address issues that are of concern in the IMSCS-HUB project area (Battelle, 2020f). All components of a CCUS project were determined to be feasible in the IMSCS-HUB region and Risk Mitigation Plan was developed and includes strategies to mitigate risks associated with each project component (Battelle, 2020j). A roadmap was developed to obtain the required UIC permits for an integrated CCUS project (Battelle, 2020k). The regional storage resource characterization demonstrated significant opportunity for commercial-scale projects in the IMSCS-HUB storage corridor with 577.4 Mt of stacked CO 2 storage capacity and the potential to produce 181.9 MMbbls of oil via EOR across 17 individual storage areas (Battelle and ARI, 2020). The pipeline assessment study found viable pipeline routes that connected 45Q-eligible ethanol plants, coal fired power plants, and other sources in the IMSCS-HUB corridor. The comprehensive results of subsurface characterization, modeling efforts, outreach assessment, and regulatory analysis from were integrated to develop a Detailed Commercial Development Plan for the IMSCS-HUB (Battelle, 2020n). Commercialization efforts will involve obtaining Class VI UIC permits, establishing and finalizing the pipeline route, and evaluating capture projects at participating CO 2 sources. Phases I and II of the IMSCS-HUB CarbonSAFE provide a strong foundation for safely, efficiently, and cost-effectively characterizing and permitting commercial-scale project sites in the region. The plan for implementation of commercial-scale CCUS projects in the IMSCS-HUB is aligned with the objectives of CarbonSAFE Phase III: Site Characterization and CO 2 Capture Assessment.

20 FOSSIL-FUELED POWER PLANTS↗

Solar Steam on Demand

INTRODUCTION: This Report summarizes the research and development project performed by Sunvapor and the subrecipient National Renewable Energy Laboratory (NREL) during the period of 10/01/2018-9/30/2021. The work was aimed at the economic integration of solar steam with an industrial process, and in particular, the advantages that a novel type of thermal energy storage and collector design could bring to the system. The completed work includes experimental research on the storage material, design of the collector, engineering of a complete solar steam plant, and economic analysis. The plant was, in the end, not constructed, due to COVID-19 impacts to the project host. PURPOSE: The purpose of the project was to test the hypothesis that a levelized cost of heat (LCOH) of 2¢/kWh delivered to a steam-consuming process, including energy discharged from storage, could be feasibly achieved. PROJECT OBJECTIVES: For Budget Period 1 our objectives were to engineer a prototype industrial solar steam generation system, and design and test a Latent Heat Energy Storage (LHES) lab-scale system. For Budget Period 2 our objectives were to construct and test the solar steam prototype plant, and to build and factory-test a full LHES module. For Budget Period 3 our objective was to integrate the storage module with the solar steam generator, show successful long duration energy tests of the combined system, and use the results to project the LCOH of delivered steam to a second-generation plant. PROJECT OUTCOMES: Various phase change materials (PCMs) for the LHES were tested for compatibility with industrial steam uses as measured by phase change temperature, stability of latent heat of fusion, and their corrosive effects on steel (the heat exchanger material). Two of these materials (sodium formate and sodium/ potassium) showed potential to meet the technical criteria. The estimated cost of a complete LHES module with these materials did not meet economic targets. The developmental collector design builds from previous work to exploit the potential cost advantages of a spaceframe of lumber construction. Design improvements were achieved in assembly efficiency and structural performance. A complete engineering package was completed for the solar steam system without storage that included the developmental as well as commercial arrays. The plant was permitted for construction. The storage CAPEX for a reference plant was estimate to be greater than $\$ 57$/kWh. The LCOH of the system without storage and with developmental collectors of lumber construction was projected to be 2¢/kWh, assuming a FCR of 8.2% over thirty years. PROJECT MILESTONES: The Milestones fully achieved in the first Budget Period includes obtaining a Letter of Intent from an industrial steam-consuming project host, issuance of a construction permit, and corrosion resistance. The Milestone that was partly achieved was the degradation in the latent heat of fusion. Milestones associated with Budget Periods 2 and 3, related to the construction and operation of the plant were not achieved as a result of the host shutting down the plant due to COVID-19 impacts. CONCLUSIONS: Sunvapor was able to secure an agreement with a host to build a fully engineered and permitted solar steam plant that met the host’s economic goals. As a basis for comparison, the solar field design was comprised of eight commercial collector arrays and one developmental Green Parabolic Trough Collector (GPTC) array. The projected LCOH with a solar field entirely populated with a second generation GPTC met the goal of 2¢/kWh. The experimental program concerning the PCM indicated the feasibility of meeting their technical requirements for industrial steam uses. The cost of the complete LHES exceeded its $\$ 14$/kWh target, and therefore the inclusion of LHES could not be economically justified. Due to COVID-19 impacts on the host, the solar steam plant was not constructed.

14 SOLAR ENERGY↗

Sewer System Management Plan

The Sandia National Laboratories is a multi-mission laboratory managed and operated by National Technology & Engineering Solutions of Sandia, LLC (NTESS), a wholly owned subsidiary of Honeywell International Inc., for the U.S. Department of Energy's National Nuclear Security Administration (DOE/NNSA) under contract DE-NA0003525. In 2008, a Notice of Intent (NOI) was filed for the Sandia National Laboratories, California (SNL/CA) facility to be covered under the State Water Resources Control Board (SWRCB) Order No. 2006-0003-DWQ Statewide General Waste Discharge Requirements (WDR) for Sanitary Sewer Systems (General Permit) and was issued the WDID No. 2SSO11605. The General Permit requires a proactive approach to reduce the number and frequency of sanitary sewer overflows (SSOs) within the State. Provision D.11 of the General Permit requires the development and implementation of a written Sewer System Management Plan (SSMP). This SSMP is prepared according to the mandatory elements required by Provision D.13 and D.14, as well as the schedule for a population less than 2,500 as outlined in Provision D.15.

42 ENGINEERING↗

Industrial Stormwater Pollution Prevention Plan (SWPPP) for SNL/CA Reporting Year 2022-2023

The Sandia National Laboratories, California (SNL/CA) site comprises approximately 410 acres and is located in the eastern portion of Livermore, Alameda County, California. The property is owned by the United States Department of Energy and is being managed and operated by National Technology & Engineering Solutions of Sandia, LLC. The facility location is shown on the Site Map(s) in Appendix A. This Stormwater Pollution Prevention Plan (SWPPP) is designed to comply with California’s General Permit for Stormwater Discharges Associated with Industrial Activities (General Permit) Order No. 2015-0122-DWQ (NPDES No. CAS000001) issued by the State Water Resources Control Board (State Water Board) (Ref. 6.1). This SWPPP has been prepared following the SWPPP Template provided on the California Stormwater Quality Association Stormwater Best Management Practice Handbook Portal: Industrial and Commercial (CASQA 2014). In accordance with the General Permit, Section X.A, this SWPPP contains the following required elements: Facility Name and Contact Information; Site Map; List of Significant Industrial Materials; Description of Potential Pollution Sources; Assessment of Potential Pollutant Sources; Minimum BMPs; Advanced BMPs, if applicable; Monitoring Implementation Plan (MIP); Annual Comprehensive Facility Compliance Evaluation (Annual Evaluation); and, Date that SWPPP was Initially Prepared and the Date of Each SWPPP Amendment, if Applicable.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste Compliance and Tracking System (WCATS) Version 3 Requirements Document

This document describes the end-user requirements for the Waste Compliance and Tracking System (WCATS) project in accordance with the WCATS Software Quality Management Plan, EPC-WMP-WCATSPLAN-001. The WCATS application shall support the generation, characterization, processing, and shipment of LANL radioactive, hazardous, and industrial waste. Regulatory drivers include RCRA hazardous waste, DOT shipping, NNSA nuclear material control and accountability, DOE nuclear safety, TSDF permit, and transuranic waste certification requirements. The system will utilize a task-based architecture that supports the spectrum of treatment, storage, disposal, administrative, and characterization based unit operations necessary to manage waste from cradle to grave. The application design shall readily accommodate new facilities, processes, workflow, signature requirements, and so forth, via end-user established metadata. WCATS will provide support for representing waste storage and disposal facilities, buildings, rooms, and grid layouts (x, y, z) to support waste and radioactive material inventory management. Nuclear material at risk (MAR), DOE hazard rating (e.g., Category II facility) compliance per DOE-STD-1027, and permit inventory requirements will be configurable for any storage or disposal facility, or waste operation, and the system will automatically evaluate and enforce those requirements. In addition, the application will support the characterization and management of the entire range of hazardous and radioactive wastes (TRU, MTRU, LLW, MLLW, hazardous waste, etc.) that might be colocated or processed at a permitted facility. Some capabilities not found in traditional systems include user-defined tank systems for liquid waste, user-defined work paths (i.e., sequence of operations), and an equipment subsystem for tracking the calibration, maintenance, and inspection of tools used to process waste, such as torque wrenches, scales, pH probes, etc. The application incorporates a desktop and mobile user interface as shown in Figure 1. The mobile interface supports field operations, such as waste item characterization, intra-facility transfers, internal and external audits, and shipment preparation and receipt.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Final Technical Report

Statement of the problem or situation that is being addressed in your application. The DOE and its national laboratories developed the Home Energy Score™ (HES) to encourage homeowners to improve their energy performance, lower costs and to share energy information through the MLS listing, appraisal, and financing channels. While the HES is an instrumental tool, it is currently underutilized and consists of technical, structural and sector barriers which need to be addressed in order to scale and many energy efficiency contractors are understandably overwhelmed by the added time and effort and lack of incentive to sell and deliver deep retrofit projects while simultaneously meeting the DOE HES program requirements; consequently, contractors may decide to forgo participation. Home Energy Rating System (HERS) Raters have the opportunity to play the critical Assessor role in producing a Home Energy Score (HES); this role has immense potential but currently is unfulfilled. Lastly, while utilities are interested in their customer base achieving greater energy efficiency, especially to help offset growing residential loads in states like California that are accelerating electrification, utilities do not have access to the market actors who are on the front line of influence to homeowners or review and approve their permits: HERS Raters, assessors, contractors and building departments. General statement of how this problem is being addressed: ConSol will integrate the Home Energy Score™ (HES) to its State of California, approved home energy rating services (HERS) platform (CHEERS) to develop a single tool for contractors nationwide to assess, record and install recommended cost, energy, and emissions saving measures to the 140 million single-family homes throughout the U.S. and 14 million homes in California (CHEERS+HES). The CHEERS high fidelity energy code permitting data will be integrated with HES for simple, accurate, easy-to-use home energy estimation and analysis and will directly gain access to the retrofit and renovations markets with the same upgraded platform. This innovative project will assist the utilities in supporting existing homes in their jurisdictions with HES and develop measures to improve energy efficiency and reduce emissions. How is this problem being addressed? What is the overall project approach? In effort to expand the Home Energy Score™ (HES) by increasing the use of aggregable home energy asset data, ConSol proposes to integrate the DOE HES via Application Programming Interface (API) to its State of California approved home energy rating services platform (CHEERS). Once the CHEERS platform and HES are integrated (CHEERS+HES), this enhanced platform will be instantly available and actively deployed via Phase 1 pilot to HERS Raters, assessors and contractors in California to market-test the solution, understand the rate of adoption and identify opportunities for improvement prior to scaling nationally. The CHEERS high fidelity energy code permitting data will be integrated with HES for simple, accurate, easy-to-use home energy estimation and analysis and will directly gain access to the retrofit and renovations markets with the same upgraded platform. This innovative project will assist the building industry and homeowners with an easy-to-use assessment if energy and carbon impacts of existing homes, and assist the utilities in supporting existing homes in their jurisdictions with HES to improve energy efficiency and reduce emissions. What is to be done in Phase I? During Phase I of this proposed project, ConSol will (1) design software architecture that links CHEERS to the Home Energy ScoreTM via API, (2) solicit partnership from one or more California utilities for a regional pilot, (3) test the new software with its HERS Raters and contractor network in the partnership utility jurisdiction, (4) launch a pilot version of the newly developed software with HERS Raters and contractors in the utility territory, and (5) explore California’s GoGreen energy efficiency homeowner lending program in parallel with the pilot. Commercial Applications and Other Benefits. Summarize the future applications or public benefits if the project is carried over into Phase II or Phase III and beyond. The CHEERS+HES commercialized product will be ready for national market scale following a successful Phase 1 performance. The CHEERS+HES adoption is estimated to reach a 5% adoption growth rate versus the 110,000 baseline, starting in Year 1 after Phase I completion, and continuing each year. As a direct benefit to the DOE, CHEERS will set a goal of 100,000 Home Energy Score assessments for existing home alterations within the first 10 years following Phase 1 performance. The technical benefits of this proposed project include the harmonized, automated, and seamless integration of the DOE HES into the widely used and market leading California energy registry, CHEERS. The social benefits include the aggregate energy, cost and GHG savings by allowing the broader public streamlined access to the CHEERS+HES measurement and the energy efficiency recommended measures that may result. Key Words: Home Energy ScoreTM (HES); Application Programming Interface (API); Home Energy Rating Services (HERS); HERS Raters; contractors; assessors; existing homes, energy asset data; cost, energy, and emissions saving measures; energy code (Title 24) compliance; document repository; utilities; pilot; newly developed software; energy efficiency; homeowner. Summary for Members of Congress: The DOE Home Energy Score™ (HES) is a tool to encourage homeowners to improve their energy performance, lower costs and share energy information but is underutilized and consists of barriers which need to be addressed in order to scale. In effort to expand the HES, CHEERS, Inc. will integrate the HES to its State of California, approved home energy rating services (HERS) platform (CHEERS) to develop a single tool for contractors nationwide to assess, record and install recommended cost, energy, and emissions saving measures to the 140 million single-family homes throughout the U.S. and 14 million homes in California.

Application Programming Interface (API)↗

Radioisotope Analysis of Wastewater from Livermore Site Retention Tanks by Gel Laboratory Gross Alpha, Gross Beta and Tritium Sampling Method

Lawrence Livermore National Laboratory discharged approximately 4.4% of the City of Livermore’s total wastewater in 2022 (LLNL’s Annual Site Environmental Report, Chapter 5, 2022). This volume includes wastewater from Sandia National Laboratories (SNL) and some process wastewater from Site 300. Due to the high volume and constituents of the discharge, LLNL works alongside the City of Livermore under permit #1250, requiring wastewater generated to be monitored and sampled in accordance with permit limits. Process wastewater, from buildings with the highest risk to sewer, is collected by wastewater retention tanks throughout the Livermore Site and sampled prior to discharge. Domestic wastewater directly discharges to sanitary sewer. To maintain permit requirements and ensure proper wastewater discharge practices, an internal wastewater audit was conducted during the summer of 2023. Current wastewater practices, regulatory knowledge and risk management across various Livermore Site buildings were evaluated. Workspaces connected to a wastewater retention tank and sanitary sewer drains were major focus areas. Data collected from walk-throughs prompted further evaluation as many practices were reported to be done based on historical usage. A table of concerns was created to showcase reasons for auditing and proceeding action. An analysis of current and historical retention tank usage throughout LLNL Livermore Site buildings with radioisotope results over a 5-year period from 2019 to 2024, was done to assess building trends and any significant changes throughout the 5-year period. Analytes evaluated were Gross Alpha, Gross Beta and Tritium (GABT) of eleven buildings at the Livermore Site, posing the highest risk to sanitary sewer for radioisotopes.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

July 2023 Monthly Sewer Monitoring Report

The Sandia National Laboratories, in California (Sandia/CA) is a research and development facility, owned by the U.S. Department of Energy’s National Nuclear Security Administration agency (DOE/NNSA). The laboratory is located in the City of Livermore (the City) and is comprised of approximately 410 acres. The Sandia/CA facility is operated by National Technology and Engineering Solutions of Sandia, LLC (NTESS) under a contract with the DOE/NNSA. The DOE/ NNSA’s Sandia Field Office (SFO) oversees the operations of the site. North of the Sandia/CA facility is the Lawrence Livermore National Laboratory (LLNL), in which Sandia/CA’s sewer system combines with before discharging to the City’s Publicly Owned Treatment Works (POTW) for final treatment and processing. The City’s POTW authorizes the wastewater discharge from Sandia/CA via the assigned Wastewater Discharge Permit #1251 (the Permit), which is issued to the DOE/NNSA’s main office for Sandia National Laboratories, located in New Mexico (Sandia/NM). The Permit requires the submittal of this Monthly Sewer Monitoring Report to the City by the twenty-fifth day of each month.

99 GENERAL AND MISCELLANEOUS↗

Monthly Sewer Monitoring Report for June 2023

The Sandia National Laboratories, in California (Sandia/CA) is a research and development facility, owned by the U.S. Department of Energy’s National Nuclear Security Administration agency (DOE/NNSA). The laboratory is located in the City of Livermore (the City) and is comprised of approximately 410 acres. The Sandia/CA facility is operated by National Technology and Engineering Solutions of Sandia, LLC (NTESS) under a contract with the DOE/NNSA. The DOE/ NNSA’s Sandia Field Office (SFO) oversees the operations of the site. North of the Sandia/CA facility is the Lawrence Livermore National Laboratory (LLNL), in which Sandia/CA’s sewer system combines with before discharging to the City’s Publicly Owned Treatment Works (POTW) for final treatment and processing. The City’s POTW authorizes the wastewater discharge from Sandia/CA via the assigned Wastewater Discharge Permit #1251 (the Permit), which is issued to the DOE/NNSA’s main office for Sandia National Laboratories, located in New Mexico (Sandia/NM). The Permit requires the submittal of this Monthly Sewer Monitoring Report to the City by the twenty-fifth day of each month.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Monthly Sewer Monitoring Report for March 2023

The Sandia National Laboratories, in California (Sandia/CA) is a research and development facility, owned by the U.S. Department of Energy’s National Nuclear Security Administration agency (DOE/NNSA). The laboratory is located in the City of Livermore (the City) and is comprised of approximately 410 acres. The Sandia/CA facility is operated by National Technology and Engineering Solutions of Sandia, LLC (NTESS) under a contract with the DOE/NNSA. The DOE/ NNSA’s Sandia Field Office (SFO) oversees the operations of the site. North of the Sandia/CA facility is the Lawrence Livermore National Laboratory (LLNL), in which Sandia/CA’s sewer system combines with before discharging to the City’s Publicly Owned Treatment Works (POTW) for final treatment and processing. The City’s POTW authorizes the wastewater discharge from Sandia/CA via the assigned Wastewater Discharge Permit #1251 (the Permit), which is issued to the DOE/NNSA’s main office for Sandia National Laboratories, located in New Mexico (Sandia/NM). The Permit requires the submittal of this Monthly Sewer Monitoring Report to the City by the twenty-fifth day of each month.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗