Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Optimal dispatch”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

Charging infrastructure access and operation to reduce the grid impacts of deep electric vehicle adoption

Electric vehicles will contribute to emissions reductions in the United States, but their charging may challenge electricity grid operations. We present a data-driven, realistic model of charging demand that captures the diverse charging behaviours of future adopters in the US Western Interconnection. We study charging control and infrastructure build-out as critical factors shaping charging load and evaluate grid impact under rapid electric vehicle adoption with a detailed economic dispatch model of 2035 generation. We find that peak net electricity demand increases by up to 25% with forecast adoption and by 50% in a stress test with full electrification. Locally optimized controls and high home charging can strain the grid. Shifting instead to uncontrolled, daytime charging can reduce storage requirements, excess non-fossil fuel generation, ramping and emissions. Our results urge policymakers to reflect generation-level impacts in utility rates and deploy charging infrastructure that promotes a shift from home to daytime charging.

33 ADVANCED PROPULSION SYSTEMS↗

Microgrid Energy Management System Integration with Advanced Distribution Management System

The Integrated Distribution Management System (IDMS) project was initiated to demonstrate the interactive operation of microgrid systems and the distribution systems with which they interconnect. The key technologies for this are the microgrid management system and the utility distribution management system. The IDMS project successfully demonstrated that a utility’s advanced distribution management system/distributed energy resources management system (ADMS/DERMS) could effectively manage microgrids to provide visibility and control functionalities as well as use the microgrid as a dispatchable resource to support the utility grid. The DERMS accomplishes this by determining active and reactive power needs at the point of common coupling (PCC) using advanced applications like volt/VAR watt optimization (VVWO) and load relief (LR) with the underlying core applications state estimation (SE) and load flow (LF). The ADMS/DERMS can use the microgrid as a resource to resolve and prevent violations in the grid and to optimize the operational working state of the grid. The IDMS project demonstrated that a utility-operated ADMS with embedded DERMS functionality can flexibly manage a variety of microgrids and other aggregated distributed energy resources (DER) in concert with the wider distribution grid. Microgrids can provide grid services in any number of different ways to meet the operational needs of the distribution utility. The manner of aggregation — microgrid or virtual power plant — is not necessarily relevant to the utility as long as the grid services from the aggregated DER are available and can be managed by its ADMS/DERMS for the stability and reliability of the grid. The IDMS project demonstrated this integrated ADMS concept by combining hardware/software-in-the-loop testing with commercial products from different vendors and a utility’s network model. The project integrated the Schneider Electric EcoStruxure™ ADMS with DERMS with the Schweitzer Engineering Laboratories (SEL) POWERMAX ® Microgrid Control System, and the simulated resources with energy company PECO’s model of a utility-owned microgrid, establishing an operational relationship in which the utility manages the operational functionality of a microgrid at the PCC and that provides the utility with the capability to control the comprehensive power system, inclusive of the macrogrid and microgrid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Hydrogen Energy Storage Integrated with a Combined Cycle Plant

A project is being developed that will build upon the existing infrastructure and resources at the Intermountain Power Project (IPP) site to provide reliable, dispatchable energy and to support the transmission of renewable energy resources while transitioning to an economical green energy future. The concept study depicted in this report outlines a techno-economic optimization to fulfill the demand for 30% vol hydrogen co-firing in the IPP 840 MW advanced class combined cycle power plant. In an initial step, a site assessment concluded the site has sufficient land available to co-locate a hydrogen production and storage facility. The team evaluated and defined a scalable concept that considered technology characteristics, including input and output models to be used for optimization purposes. The concept for the hydrogen production and storage system integrates multiple technologies, to determine system size and scalable approach, for each of the technologies evaluated, the team defined component and subcomponent sizes, minimum and maximum capacity, modularity, component utility consumption (electric, water), component flexibility and servicing, layout, and technology status, as well as technology alternatives. For hydrogen generation, the project considers Siemens Energy’s Silyzer-300 (S300) technology, a 17.5 MW modular Proton Exchange Membrane (PEM) electrolyzer. For the S300 configuration, the team determined that three S300 arrays, or approximately 1,000 kg/hr, per block would yield a compact block design. This configuration results in a fairly wide and flexible arrangement that fits well into the spaces available at the site. Therefore, the overall design approach is based on multiple identical blocks of 3 arrays to minimize engineering cost and optimize constructability. In parallel, a transmission screening study was conducted to determine any potential transmission constraints from the energy sources that could feed the hydrogen production equipment. The study results show that minimum transmission constraints would be encountered to deliver 400 MW renewable generation from southern California, or south-central Wyoming. At last, the techno-economic analysis concluded that a scenario that uses solar and wind power yields the lowest levelized cost of hydrogen (LCOH 2 ) production and the lowest cost per tonne of CO 2 reduced. In this optimized scenario, the hydrogen production plant was determined as 6,201 kg/hr and the hydrogen storage (underground cavern) was determined as 4,600 tonnes. The resulting capacity factor for the hydrogen production plant was 66.33% with 8,745 operating hours in one year. This techno-economic analysis provided various options for integrating hydrogen storage at the Intermountain Power Plant site to co-fire the CCPP units. The results provide insightful data about the magnitude of capacity needed and the economics of producing hydrogen and reducing CO 2 emissions.

08 HYDROGEN↗

An Efficient Power Flexibility Aggregation Framework via Coordinate Transformation and Chebyshev Centering Optimization

The large-scale integration of distributed energy resources (DERs) converts the role of a distribution system from a customer to a prosumer. In this context, the controllable DERs are expected to provide capacity support for the transmission system, which can be considered as power flexibility aggregation. Specifically, it is a process of controlling the power output of DERs to fulfill the desired capacity or flexibility. However, the power output of DERs as control variables is redundant. That is, a power flexibility command can be realized by multiple dispatch alternatives, which may hinder efficient design of control rules and flexibility evaluation schemes. Therefore, this paper introduces a conception of the artificial power flexibility controller to avoid the redundancy issue, which is a converted control variable after reconstructing the DER power region. Through this reconstruction, the DERs can be indirectly controlled by the proposed artificial power flexibility controller. In addition, a Chebyshev centering optimization model is developed to approximate the power flexibility region. At last, the proposed method is verified on an artificially-designed network with multiple DERs.

Chebyshev centering optimization↗

Agent-Based Coordination Scheme for PV Integration (ABC4PV)

Renewables and especially photovoltaics (PV) have benefitted significantly from a host of incentives and policies targeted toward enhanced integration and adoption of specific energy technologies. However, with the push to move forward into a subsidy-free market framework, behind-the-meter residential PV applications have generally struggled to retain their value (unlike utility scale and commercial projects) [1]. This project focused on developing control-theoretic solutions aimed at improving the integration and interaction of behind-the-meter residential PV with other distribution system assets (controllable and non-controllable) to enhance the integrated value of residential PV. To this end, a suite of decentralized control methodologies have been developed to enable effective coordination and control of behind-the-meter residential load customers’ PV, battery storage systems (BSS), controllable loads and other similar assets within a distribution feeder. This interaction aims at procuring energy savings and, thus, energy bill savings. The main source of savings is drawn from reducing the effect of demand charge pricing and is realized at the feeder level, assuming community level interaction and management among the aforementioned assets. Optimal control of the assets is implemented with a distributed optimization methodology, leveraging consensus-based algorithms. The results gathered from the optimal control simulations demonstrates that the savings can be duly achieved and the algorithm decision times (to dynamically control asset set points, for example) are fast. As for the overall efficiency of PV+BSS systems, to procure energy savings from curtailment of the demand charge pricing effects, the optimal control is set up so as to minimize the variance of the load for all customers, throughout a feeder and throughout time in a rolling horizon scheduling with model predictive control. The control takes into account inter-temporal electrochemical storage (battery) degradation costs: specifically, we have developed a long-term lifetime model for the BSS that weighs in the effect of the degradation factor in the dispatch formulations, thus, a considerable operating cost that affects energy decision making. The levelized cost of energy (LCOE – redefined for the purpose of quantifying asset integration effectiveness through the customers’ energy cost) is shown to be below the threshold set for the combined PV+BSS topology of $ 0.14/kWh for multiple cases of PV penetration all the way up to 50%, provided that a policy of shared ownership of and savings is in place. Further, the LCOE calculated for the case before the deployment PV+BSS systems is also achievable, i.e. the deployment of PV+BSS, if planned and scheduled optimally. will have no effect on customers’ energy costs. From the control methodology viewpoint, the developed consensus-based algorithms are shown to converge for a wide range of problem cases (spanning normal operating scenarios and contingencies), guaranteeing dispatch solutions under forecasting errors, communication break-downs and cyber-security attacks. The proposed control solutions are scalable and real-time implementable, with dispatch computations and device set-point updates converging in less than 2s in most practical instances of the above events.

14 SOLAR ENERGY↗

Energy Arbitrage: Comparison of Options for use with LWR Nuclear Power Plants

Arbitrage is the opportunistic buying and selling of a commodity during local pricing valleys and peaks respectively to maximize economic value. This report evaluates options for energy arbitrage integrated with existing light water reactor (LWR) nuclear power plants (NPPs) where nuclear energy could be stored in a variety of forms and later recovered to generate electrical power during periods when grid electricity demand and pricing are high. The forms of energy storage examined in this report include the potential value of batteries, hydrogen, and thermal energy storage for coupling with nuclear power. Various large demand response options are also analyzed, including the production of liquid nitrogen via air separation and liquefaction, liquefaction of hydrogen, compressed hydrogen, and the cryogenic capture of CO2. Demand response refers to dispatchable loads that can cycle up or down depending on-grid electricity demand to aid in balancing the grid. Large demand response options could dispatch to aid nuclear power stations in avoiding power turndowns by providing an alternate disposition for electrical energy by producing marketable products (e.g., liquid nitrogen, hydrogen, or captured CO2). Static conditions were chosen and analyzed in this report for each option. Dynamic operation or optimization of energy arbitrage or demand response are out of scope for this report. The analysis is based on storage systems with discharge capacities of 500 MW for which various durations of storage and costs of charging (electricity cost) are examined. While the value of thermal energy to an industrial user for flexible plant operations has been previously proven as a business case, this report evaluates costs of hydrogen energy storage and leading thermal energy storage options, and large demand response loads that could be integrated with LWRs in comparison to utility-scale battery storage for use of off-peak nuclear energy. Compilation of this information will be used by the Idaho National Laboratory (INL) RAVEN/HERON systems integration and economics tool to evaluate thermal energy dispatch to industrial users. Relative ranking of energy storage options was done using a levelized cost of storage (LCOS) metric which calculates a rough breakeven cost for the system, taking into account the capital and operating costs as well as the revenue from arbitrage. Table ES1 below shows the LCOS for each of the energy storage options considered. First, in the table, lithium iron (Fe) phosphate batteries are listed as the base case for comparison against the other options. Next is hydrogen storage where most of the hydrogen analyses assumed the hydrogen to be produced using solid oxide electrolytic cell (SOEC) high temperature steam electrolysis (HTSE). The others used existing models of polymer electrolyte membrane (PEM) low temperature electrolysis to produce hydrogen. HTSE performance parameters and costs were taken from existing INL models. Various means were assumed to convert the hydrogen to electricity, including PEM fuel cells (FCs) and a gas turbine mixed in a 30 vol% mixture with natural gas. Physical storage (pressure vessels) and geological storage (natural underground features) were used to store the hydrogen as noted. Geological storage is more economical, but the locations are limited because of the requirement for pre-existing geological formations that will support storage. Thermal energy storage (TES) options were also analyzed including electro-thermal energy storage (ETES) and four different liquid sensible heat TES storage media as noted (Hitec, Hitec XL, Therminol-66, and Dowtherm A). The ETES process considered was modified using existing public documentation on an Echogen process and uses a separate supercritical CO2 charge and discharge cycle with sand as the heat storage media.

25 ENERGY STORAGE↗

Model Formulations: Market clearing models, market design specifications, and dispatch simulation

This document provides various model formulations that will be implemented for the Energy Storage Participation Algorithm pilot competition (ESPA-Comp). This competition will assess the performance of different storage offer algorithms in terms of their ability to maximize the value of storage resources participating under various market designs that vary in the range of complexity of possible storage offers. The model formulations include a general market clearing optimization model and specification to implement it in various market designs. We provide specifications for three market designs to be tested in ESPA-Comp, which we call the two-settlement, multi-settlement, and rolling horizon forward markets. The market designs include different trading frequencies and offer formats. Storage resources participating in the market are provided with primitive values for the resource’s physical capabilities, and they are provided with a storage offer format that their algorithms will be tasked with populating. A detailed physical model is used to assess each storage resource’s ability to maintain its scheduled dispatch according to its state-of-charge, operating temperature, and power conversion efficiency.

25 ENERGY STORAGE↗

Techno-Economic Analysis of CSP Incorporating sCO2 Brayton Power Cycles: Trade-Off Between Cost and Performance

Concentrating solar power (CSP) plants, thanks to the implementation of cost-competitive thermal energy storage, represent a dispatchable zero-emission alternative to traditional fossil fuel power plants. Next generation solar towers are expected to adopt high temperature receivers (>700 degrees C) coupled to sCO2-based power blocks, which optimal design is generally pushed towards the maximum cycle efficiency, often neglecting the economic impact with the justification that the main share of the capital cost is represented by the heliostat field. As result, the scientific literature lacks in comprehensive studies on techno-economic evaluation of CSP+sCO2 power plants addressing the important correlation that exists between system cost and performances. This work provides a preliminary techno-economic analysis of a solar power tower comparing four different cycle configurations for the sCO2 power block. Results have been reported on a Pareto front, highlighting the tradeoff between the plant investment cost and the solar-to-electricity plant efficiency. The trends of the optimization variables and cycle results have been reported to give useful insights about proper assumptions for the sCO2 power block design. The recompressed cycle with intercooling resulted as the most promising configuration and it has been further analyzed through a comparison of different solutions on the Pareto front. The cost breakdown of the sCO2 power block has been reported to highlight which components have the greatest impact on the overall plant cost and how they vary along the optimal solutions front. Eventually, the optimization has been repeated introducing a correlation to compute the turbomachinery isentropic efficiencies, to investigate their effect on the techno- economic analysis.

concentrated solar power↗

Fast Tuning-Free Distributed Algorithm for Solving the Network-Constrained Economic Dispatch

With the increasing penetration of distributed energy resources (DERs) and their participation in the electricity market, it becomes more desirable to apply distributed algorithms for resource allocation in order to address the resulting computational and communicational challenges. Most of the existing distributed algorithms for solving the network-constrained economic dispatch (NCED) problem require the tuning of certain auxiliary parameters. As a result, the robustness of these algorithms against the varieties in DERs is greatly undermined. In this paper, a new distributed algorithm, optimality condition consensus (OCC), is proposed to solve the NCED problem by using distributed power flow (DPF) and ratio consensus as fundamental tools. It inherits the advantages of existing distributed algorithms for the NCED problem but removes the need for parameter tuning to improve performance in practice. In conclusion, the effectiveness of the proposed distributed algorithm in terms of efficiency, scalability, and robustness is demonstrated through detailed case studies.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Deep reinforcement learning based optimization for a tightly coupled nuclear renewable integrated energy system

New ways to integrate energy systems to maximize efficiency are being sought to meet carbon emissions goals. Nuclear-renewable integrated energy system (NR-IES) concepts are a leading solution that couples a nuclear power plant with renewable energy, hydrogen generation plants, and energy storage systems, such that thermal and electrical power are dispatchable to fulfill grid-flexibility requirements while also producing hydrogen and maximizing revenue. Here, this paper introduces a deep reinforcement learning (DRL)-based framework to address the complex decision-making tasks for NR-IES. The objective is to maximize revenue by generating and selling hydrogen and electricity simultaneously according to their time-varying prices while keeping the energy flow in the subsystems in balance. A Python-based simulator for a NR-IES concept has been developed to integrate with OpenAI Gym and Ray/RLlib to enable an efficient and flexible computational framework for DRL research and development. Three state-of-the-art DRL algorithms have been investigated, including two-delayed deep deterministic policy gradient (TD3), soft-actor critic (SAC), proximal policy optimization (PPO), to illustrate DRL’s superiority for controlling NR-IES by comparing it with a conventional control approach, particle swarm optimization (PSO). In this effort, PPO has shown more-stable performance and also better generalization capability than SAC and TD3. Comparisons with PSO have demonstrated that, on average, PPO can achieve 13.9% more mean episode returns from the training process and 29.4% more mean episode returns from the testing process when different hydrogen-production targets are applied.

08 HYDROGEN↗

Power System Recovery Coordinated with (Non-)Black-Start Generators

Power restoration is an urgent task after a black-out, and recovery efficiency is critical when quantifying system resilience. Multiple elements should be considered to restore the power system quickly and safely. This paper proposes a recovery model to solve a direct-current optimal power flow (DCOPF) based on mixed-integer linear programming (MILP). Since most of the generators cannot start independently, the interaction between black-start (BS) and non-black-start (NBS) generators must be modeled appropriately. The energization status of the NBS is coordinated with the recovery status of transmission lines, and both of them are modeled as binary variables. Also, only after an NBS unit receives the cranking power through connected transmission lines, will it be allowed to participate in the following system dispatch. The amount of cranking power is estimated as a fixed proportion to the maximum generation capacity. The proposed model is validated on several test systems, as well as a 1393-bus representation system of the Puerto Rican electric power grid. Test results demonstrate how the recovery of NBS units and damaged transmission lines can be optimized, resulting in an efficient and well-coordinated recovery procedure.

Zhao, Meng↗

A Vehicle-to-Grid planning framework incorporating electric vehicle user equilibrium and distribution network flexibility enhancement

The rapid surge in electric vehicle (EV) adoption, coupled with advancements in charging technologies, emphasizes the critical necessity for expanding EV recharging infrastructure. Simultaneously, the Distribution Network (DN) encounters escalating challenges in meeting charging demand during peak traffic periods. Consequently, there is a mounting demand for the deployment of innovative Vehicle-to-Grid (V2G) technologies to augment the DN’s flexibility in power dispatch and alleviate travel costs for EV users. Hence, this paper proposes an EV-user-equilibrium-(UE)-constrained V2G planning framework that enhances flexibility in the DN. The framework aims to ascertain the optimal placement and capacity of EV charging stations (EVCSs) and V2G charging piles within the Transportation Network (TN). It takes into account the equilibrium condition stemming from competitive EV charging and routing behaviors alongside the optimal expansion of DN energy resources to accommodate the electricity supplied by the V2G piles. This study commences by analyzing EV drivers’ travel decisions, considering the influence of charging and V2G pile locations and sizes. Subsequently, we tackle the Traffic Assignment Problem with User Equilibrium (TAP-UE) model to characterize the steady-state traffic flow distribution of EVs. Following this, we formulate the optimization model for the Coordinated Power and Transportation Network (CPTN), which encompasses the optimal expansion of DN facilities and traffic flow regulation under UE conditions. To mitigate the computational complexity associated with the V2G planning model, we introduce a series of linearization methods to obtain a manageable Mixed-Integer Linear Programming (MILP) solution. Finally, to validate the efficacy of our proposed planning framework, we apply it to two test systems, including a real-world case study. Through these case studies, we explore the necessity and potential benefits of V2G technologies.

24 POWER TRANSMISSION AND DISTRIBUTION↗

REopt Lite Overview & Training Exercise

This training exercise provides users with an introduction to and hands-on, interactive exploration of REopt Lite's capabilities. REopt Lite is a free, publicly available techno-economic optimization web tool for distributed energy systems, developed at the National Renewable Energy Laboratory (NREL). REopt Lite helps organizations evaluate the economic viability of grid-connected solar photovoltaics (PV), wind turbines, and battery storage; identify system sizes and battery dispatch strategies to minimize energy costs; and estimate how long a system can sustain critical load during a grid outage. The model is formulated as a mixed-integer linear program based in an underlying application programming interface (API) that is also free and publicly available. This training activity is structured as a group exercise. Participants split into eight groups and each group is assigned a different hypothetical site to model and assess the opportunity for solar PV + battery storage. Groups work together to develop results for their site and then re-convene to compare and discuss results, inputs/drivers of the analysis, and other factors impacting the decision-making process for behind-the-meter solar PV and battery storage.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Examining the Net Revenue and Downstream Flow Impact Trade-Offs for a Network of Cascading, Small-Scale Hydropower Facilities: Preprint

In this work, we used a price-taker model to investigate the trade-offs between net revenue and downstream flow impacts for a network of small, cascading hydro facilities. The network consisted of 36 facilities, each with a small amount of local storage (between 2 and 45 minutes). Generator sizes ranged between 0.5 and 1 MW, nominal, and the total capacity of the network was 33.5 MW. We used a multi-integer linear programing model to maximize the net revenue of the combined network subject to operating and environmental constraints. Net revenue optimizations relied on historic price data, and dry, typical, and wet years were studied to help ensure robustness. Energy and ancillary service sales were included in the net revenue calculations, and both unit commitment and dispatch simulations were performed. We found that limiting the downstream flows to ±50% of the river’s natural flows had a negligible impact on net revenues (<1% reduction), irrespective of hydrologic conditions, and even when downstream flows were limited to ±5%, net revenues were only impacted by 4%. These outcomes are significant because they demonstrate how an array of small-scale hydropower facilities can be operated to have minimal impact on natural stream flows—addressing a critical environmental concern.

downstream flow↗

Grid-Enhanced, Mobility-Integrated Network Infrastructures for Extreme Fast Charging (GEMINI-XFC)

GEMINI-XFC will use first-of-a-kind integrated high-fidelity grid and transport modeling to identify effective pathways for widespread electrification, to design and evaluate integrated vehicle-grid control schemes, and to optimize electric vehicle integration at a full regional scale with individual customer resolution. Control variables will include: Charging station design and planning (where and what kind of charging stations); EV route scheduling considering grid "status"; and Dispatch of behind-the-meter energy storage and legacy voltage control actuators (on-load tap changes, voltage regulators, capacitors).

DIRECT ENERGY CONVERSION,POWER TRANSMISSION AND DI↗

Flexibility Requirements for Energy Systems with Renewable Generation under Forecast Uncertainties

Energy systems with high fractions of renewable energy-based resources require adequate assets providing flexibility in electricity usage to maximize the benefits of renewable energy. In this paper, we provide an analytical approach to estimate the flexibility requirements of such energy systems, with forecast uncertainties in both demand and generation. Our analytical results show that even with forecast errors, the expected system operating cost decreases with an increase in the amount of flexibility capacity -- however, there is an inflection point, beyond which addition of further flexibility capacity does not reduce expected system cost any further. Additionally, an enumeration-based approach is presented to estimate the maximum flexibility capacity needed to optimize the operating cost. Numerical experiments conducted on a network-abstracted modified IEEE 30-bus system are used for empirical validation and gaining additional insights on the effect of prosumers' willingness to offer flexibility on the dispatch performance.

Bhattacharya, Saptarshi↗

Switching Device-Cognizant Sequential Distribution System Restoration

This paper presents an optimization framework for sequential reconfiguration using an assortment of switching devices and repair process in distribution system restoration. Compared to existing studies, this paper considers types, capabilities and operational limits of different switching devices, making it applicable in practice. We develop a novel multi-phase method to find the optimal sequential operation of various switching devices and repair faulted areas. We consider circuit breakers, reclosers, sectionalizers, load breaker switches, and fuses. The switching operation problem is decomposed into two mixed-integer linear programming (MILP) subproblems. The first subproblem determines the optimal network topology and estimates the number of steps to reach that topology, while the second subproblem generates a sequence of switching operations to coordinate the switches. For repairing the faults, we design an MILP model that dispatches repair crews to clear faults and replace melted fuses. After clearing a fault, we update the topology of the network by generating a new sequence of switching operations, and the process continues until all faults are cleared. To improve the computational efficiency, a network reduction algorithm is developed to group line sections, such that only switchable sections are present in the reduced network. The proposed method is validated on the IEEE 123-bus and 8500-bus systems.

distribution system↗