Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Operations and Maintenance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

Lunar lander configuration study and parametric performance analysis

Future Lunar exploration plans will call for delivery of significant mounts or cargo to provide for crew habitation, surface tansportation, and scientific exploration activities. Minimization of costly surface based infrastructure is in large part directly related to the design of the cargo delivery/landing craft. This study focused on evaluating Lunar lander concepts from a logistics oriented perspective, and outlines the approach used in the development of a preferred configuration, sets forth the benefits derived from its utilization and describes the missions and system considered. Results indicate that only direct-to-surface downloading of payloads provides for unassisted cargo removal operations imperative to efficient and low risk site buildup, including the emplacement of Space Station derivative surface habitat modules, immediate cargo jettison for both descent abort and emergency surface ascent essential to piloted missions carrying cargo, and short habitat egress/ingress paths necessary to productive surface work tours for crew members carrying hand held experiments, tools and other bulky articles. Accommodating cargo in a position underneath the vehicles structural frame, landing craft described herein eliminate altogether the necessity for dedicated surface based off-loading vehicles, the operations and maintenance associated with their operation, and the precipitous ladder climbs to and from the surface that are inherent to traditional designs. Parametric evaluations illustrate performance and mass variation with respect to mission requirements.

Donahue, Benjamin B.↗

Chapter 14 - Reliability of Wind Turbines

The global wind energy industry has grown at a fast pace during the past half-decade. Advancements from design and manufacturing to operation and maintenance have led to reduced capital and maintenance costs, which make wind power an indispensable source for a comprehensive solution to global electricity needs. Once wind turbines are installed, the opportunity to lower wind power costs is mainly through improved operation and maintenance practices. Modern wind turbines are equipped with tens or hundreds of measurement channels and are generating an abundance of data, with lot of efforts being put into data analysis by both the research community and the industry. One type of analysis is through the exploration of reliability engineering methods based on readily available data or maintenance records collected at typical wind power plants. If adopted and conducted appropriately, these analyses can quickly save operation and maintenance costs in a potentially impactful manner. The wind industry has adopted this discipline more broadly in recent years. This chapter discusses wind turbine reliability by highlighting the methodology of reliability engineering life data analysis. It first briefly discusses the fundamentals of wind turbine reliability and the current industry status. Then, the reliability engineering method for life analysis, including data collection, model development, and forecasting, is presented in detail and illustrated through two case studies. The chapter concludes with some remarks on potential opportunities to improve wind turbine reliability. An owner and operator's perspective is taken and mechanical components are used to exemplify the potential benefits of reliability engineering analysis to improve wind turbine reliability and availability.

database↗

SMART: Situated Multimodal Advanced Real-time Trainer

We have begun work on an intelligent support tool (SMART) for operating and maintenance procedures. This work extends McDonnell Douglas's recent success in developing electronic job aids for onboard applications. SMART is based on advanced AI technology that derives the sequential, situational, operational, and temporal views of operating and maintenance procedures from a single internal representation of the procedures. SMART guides the astronauts through detailed operating and maintenance procedures. It also helps the astronauts decide when and how it is safe to deviate from the established procedures. SMART's user interface presents the sequential and procedural views of the procedures to the astronauts. The views are supplemented with vivid color graphics of internal system functions, digitized photographs of flight hardware, and full-motion video. SMART also allows the astronauts to keep their own personal notes attached to a procedure. SMART will be delivered on portable hand-held systems. SMART provides highly descriptive, realistic, 'hands-on' training which is available 'on-demand' wherever and whenever it it needed.

Desrosiers, Stephen↗

Impacts of turbine and plant upsizing on the levelized cost of energy for offshore wind

Turbine and plant upsizing are major trends in offshore wind deployment, although the quantitative impact on project costs has not been well-characterized. The uncertain value of continued wind turbine and project growth limits the ability of the supply chain to prepare for future technology trends, leading to challenges in the realization of larger projects. This analysis explores the levelized cost of energy impacts of turbine ratings between 6 and 20 MW and plant capacities between 250 and 2,500 MW for fixed-bottom offshore wind using techno-economic cost models for foundation, electrical, installation, and operation and maintenance costs, along with annual energy production. We consider a nominal set of technology assumptions for all scenarios to isolate economies of size and scale without additional benefits from decreasing turbine capital costs, quantity discounts for larger projects, or optimized technology solutions. These results indicate that using a 20-MW wind turbine in a 2,500-MW power plant array can reduce the levelized cost of energy by over 23% relative to the global average turbine and plant size installed in 2019; primarily because of reductions in the balance-of-system and operation and maintenance costs. We also identify improved installation vessels, optimized export systems, and novel operation and maintenance strategies as additional cost reduction opportunities. These results suggest that upsizing represents a significant cost reduction opportunity for offshore wind energy and will continue to be a main factor in shaping the future of the sector.

17 WIND ENERGY↗

Reusable Rocket Engine Operability Modeling and Analysis

This paper describes the methodology, model, input data, and analysis results of a reusable launch vehicle engine operability study conducted with the goal of supporting design from an operations perspective. Paralleling performance analyses in schedule and method, this requires the use of metrics in a validated operations model useful for design, sensitivity, and trade studies. Operations analysis in this view is one of several design functions. An operations concept was developed given an engine concept and the predicted operations and maintenance processes incorporated into simulation models. Historical operations data at a level of detail suitable to model objectives were collected, analyzed, and formatted for use with the models, the simulations were run, and results collected and presented. The input data used included scheduled and unscheduled timeline and resource information collected into a Space Transportation System (STS) Space Shuttle Main Engine (SSME) historical launch operations database. Results reflect upon the importance not only of reliable hardware but upon operations and corrective maintenance process improvements.

Christenson, R. L.↗

Uncrewed Lunar Surface Operations and Support Activities

Sustained human presence on the surface of the Moon and future missions to Mars require increased independence from surface crews and Earth-based mission control to operate efficiently, safely, and reliably. The time for surface crews to perform tasks will be limited. Extravehicular activities by surface personnel are burdensome and time-consuming, even when a continuous human presence on the surface occurs. Identifying and balancing human/automation roles and tasks and infusing automation and autonomy practices early in a system’s lifecycle will be essential to achieve mission objectives. Among these objectives are attaining a sustained human presence, improving performance and mission effectiveness, reducing operations and maintenance (O&M) costs, and ensuring operations that are robust to communication delays. To achieve these objectives, an operational shift toward increased automation and autonomy with less reliance on humans is needed. Uncrewed lunar surface operations and support activities occur when surface crews are not present or are independent of surface crew timeline activities requiring no surface crew oversight or intervention. These uncrewed surface opportunities can also be planned to minimize crew workload that avoids routine maintenance and support tasks, thus maximizing crew exploration time. Uncrewed preparations such as staging and prepositioning equipment and materials before the crew arrives could improve crew task efficiency. Additional opportunities exist to conduct uncrewed science, exploration, and utilization. Uncrewed surface architecture functions can include science and exploration; habitation; launch and landing support; surface communication and navigation; surface power generation and distribution; human surface mobility; lifting, handling, manipulating; excavation, construction, and site preparation; logistics management; maintenance and repair; surface resource utilization; integrated site operations and shared support services (e.g., site scheduling/prioritization, dust mitigation/contamination control, and surface safety). Early robotic lunar surface campaigns will provide information on the availability of resources, such as oxygen and water, and demonstrate surface-based technologies. After the Artemis III human lunar return mission, a series of landers will deliver surface systems, cargo, supplies, science packages, spare parts, and commodities. A balance of crewed and uncrewed surface operations will enable a sustained lunar surface presence at the South Pole of the Moon at a site that will be known as the Artemis Base Camp (ABC). It is envisioned that base camp operations on and around the Moon will then help prepare for the mission durations and activities needed to support the first human mission to Mars. Before long-duration crew missions to the base camp can occur, the necessary surface infrastructure will be pre-deployed and verified operational. Surface assets will be teleoperated and remotely managed from Earth. Additionally, robotic and short-duration crewed missions to the ABC will ensure the site’s merit to achieve long-term science objectives, availability of usable resources, and that terrain, seasonal variations, and illumination conditions are acceptable. ABC will consist of different areas where specific functions and services are rendered, including: • Launch and Landing Area • Habitation Area • Power Production Area • Resource Areas Launch and Landing Area—The launch and landing area will support associated functions for the arrival and departure of vehicles, such as crewed landing and ascent and uncrewed cargo deliveries and offloading. It will evolve from an unimproved site at the beginning of the exploration campaign to a more sustainable landing and launch area that can support repeated arrivals and departures. Initial uncrewed Lunar Terrain Vehicle (LTV) surface operations may include emplacement of navigation beacons and communication equipment, real-time video and photography of landing/liftoff events, and element repositioning, such as portable utility power (PUP) (applicable for other landed assets at other areas). Site preparations, such as surface leveling, soil compaction, and berm/path construction, may be needed for a more sustainable launch and landing area capable of accommodating vehicles that are increasingly more reusable and reduce the effects of plume surface interactions and ejecta impacts on nearby surface assets. During the ABC missions, cargo and logistics will be delivered to the lunar surface via robotic cargo landers before the crew arrives. These shipments, which can arrive in pressurized logistics carriers, will deliver the logistics necessary to support a crewed mission and include items such as food, water, equipment spares, etc. Providing the capability to retrieve, offload, and transport the logistics closer to the ABC site before the arrival of the crew will increase the overall efficiency of crew operations once they arrive. In the sustained phase of exploration, other supporting services may be needed, such as lander propellant servicing, surface power services, commodity refreshes, and additional inspection, maintenance, and repair capabilities, to sustain a cadence of extended personnel stays and cargo arrivals and departures. Habitation Area—Uncrewed support to surface habitation could involve supporting activation and pre-entry operations of the habitat while the crew is in orbit at the Gateway outpost preparing for a surface landing. Surface Habitat (SH) uncrewed operations may include bringing the cabin environment to a habitable temperature and air mix and activating other critical crew support systems. Potential crop production uncrewed tasks in the SH could also include autonomous watering and tending. Additionally, when the crew departs, the SH enters dormancy for the long period of uncrewed operation. A logistical staging area could also be collocated near the SH. If so, staging operations for crew supplies, waste re-location, and recycling operations may be opportunities for uncrewed operations. Power Production Area—The Fission Surface Power (FSP) element and its supporting distribution equipment provide power to surface elements as needed across the ABC to supplement day-to-day operations and survive lunar nights. Uncrewed support of this power system includes any initial LTV-assisted deployments of cables and other distributed equipment, associated electrical connections, and system testing and activation operations. Robotically performing some inspections, maintenance, or repair tasks on the power distribution equipment could reduce the surface crew workload. Resource Area— Uncrewed resource prospecting, mapping, and characterizing possible resource sites is likely to be time-consuming and represents an opportunity for uncrewed operations between crewed missions. Uncrewed mobile equipment operations will be needed in the extreme environments of permanently shadowed locations where resource extractions occur. As In-Situ Resource Utilization (ISRU) pilot plant operations begin, uncrewed surface support activities with available mobile and portable assets (LTV, PUP, etc.) will better support these operations. Any produced commodities can be stored at a centralized storage location for future use. Also associated with these operations is the use of mobile robotic excavators for resource acquisition and robotic/autonomous regolith processing. The waste tailings generated during excavation and regolith processing would also need to be transported and deposited at a dedicated location. Surface assets will continue operating between crew visits to maintain surface capabilities, conduct lunar surface science, technology demonstrations, and public outreach opportunities. Additionally, certain sustaining tasks that would consume valuable crew time could be performed before crew arrival, or after their departure. This capability may offer more affordable options to construct, activate, test, and maintain a broad set of surface assets. Telerobotically operated human surface mobility systems, such as the LTV and Pressurized Rover (PR), can be utilized for various tasks. Surface environmental conditions pose a distinct challenge for all these activities. Surface illumination and localized shadows are one such factor. Night-survival operations could consist of thermal management, battery pre-charging, and load shedding. Some surface systems may hibernate through the night and then awake and continue nominal operations. Uncrewed mobile assets may use a more adaptive approach to optimize their power and operations; one method is to follow the sunlight. Night-survival operations may be initiated remotely by teleoperation, automated, or accomplished by supervised autonomous operation. The ability to pre-deploy and control remote assets in orbit or on Mars before the arrival of the mission crew is a key capability that can be simulated on the moon. The base camp provides a venue where these advanced operational concepts, technologies, and autonomous methods and techniques, including the incorporation of time delays to simulate Earth-Mars latency can be replicated to help buy down future Mars mission risks. This paper will examine the evolution of uncrewed lunar surface operations and support activities. It will also discuss the lunar surface environmental conditions (thermal, lighting, terrain, topography, communications) along with the challenges they pose on uncrewed surface operations, and the performance of these activities with limited to minimal human interaction and/or teleoperation. Since lunar missions include Mars mission analogs, such investigation provides the framework for future uncrewed Mars mission support.

Mark E Lewis↗

Developing a Fleet Standardization Index for Airline Planning

Quantifying subjective aspects is a difficult task that requires a great dedication of time from researchers and analysts. Nevertheless, one of the main objectives of it is to pave the way for a better understanding of the focused aspects. Fleet standardization is one of these subjective aspects that is extremely difficult to mm into numbers. Although, it is of great importance to know the benefits that may come with a higher level of standardization for airlines, which may be economical advantages, maintenance facilitation and others. A more standardized fleet may represent lower costs of operations and maintenance facilitation and others. A more standardized fleet may represent lower costs of operations and maintenance plus a much better planning of routes and flights. This study presents the first step on developing an index, hereto called "Fleet Standardization Index" or FSI (or IPF in Portuguese, for "Indice de Padronizacao de Frotas"), that will allow senior airline planners to compare different fleets and also simulate some results from maintaining or renewing their fleets. Although being a preliminary study, the results obtained may already be tested to compare different fleets (different airlines) and also analyze some possible impacts of a fleet renewal before it takes place. Therefore, the main objective of this paper is to introduce the proposed IPF index and to demonstrate that it is inversely proportional to the number of different airplane models, engines and other equipment, such as avionics.

deBorgesPan, Alexis George↗

Smart Sensors' Role in Integrated System Health Management

During the last decade, there has been a major effort in the aerospace industry to reduce the cost per pond of payload and become competitive in the international market. Competition from Europe, Japan, and China has reduced this cost to almost a third from 1990 to 2000. This cost has leveled in recent years to an average price of around $12,000/pound of payload. One of NASA's goals is to promote the development of technologies to reduce this cost by a factor of 10 or more Exploration of space, specially manned exploration missions, involves very complex launch and flight vehicles, associated ground support systems, and extensive human support during all phases of the mission. When considering the Space Shuttle Program, we can see that vehicle and ground support systems' processing, operation, and maintenance represent a large percentage of the program cost and time. Reducing operating, processing and maintenance costs will greatly reduce the cost of Exploration programs. The Integrated System Health Management (ISHM) concept is one of the technologies that will help reduce these operating, processing and maintenance costs. ISHM is an integrated health monitoring system applicable to both flight and ground systems. It automatically and autonomously acquires information from sensors and actuators and processes that information using the ISHM-embedded knowledge. As a result, it establishes the health of the system based on the acquired information and its prior knowledge. When this concept is fully implemented, ISHM systems shall be able to perform failure prediction and remediation before actual hard failures occurs, preventing its costly consequences. Data sources, sensors, and their associated data acquisition systems, constitute the foundation of the system. A smart sensing architecture is required to support the acquisition of reliable, high quality data, required by the ISHM. A thorough definition of the smart sensor architectures, their embedded diagnostic agents, and communication protocols need to be established and standardized to allow the embedding and exchange of health information among sensors and ISHM. This workshop is aimed to foster the exchange of ideas and lessons learned between government, industry and academia to aid in the establishment of ISHM (and smart sensors) standards and guidelines as well as to identify present technology gaps that will have to be overcome to successfully achieve this goal.

Perotti, Jose M.↗

Deep Space Station (DSS-13) automation demonstration

The data base collected during a six month demonstration of an automated Deep Space Station (DSS 13) run unattended and remotely controlled is summarized. During this period, DSS 13 received spacecraft telemetry data from Voyager, Pioneers 10 and 11, and Helios projects. Corrective and preventive maintenance are reported by subsystem including the traditional subsystems and those subsystems added for the automation demonstration. Operations and maintenance data for a comparable manned Deep Space Station (DSS 11) are also presented for comparison. The data suggests that unattended operations may reduce maintenance manhours in addition to reducing operator manhours. Corrective maintenance for the unmanned station was about one third of the manned station, and preventive maintenance was about one half.

Remer, D. S.↗

CERF: IM3 Projected Western US Power Plant Locations

Overview The Capacity Expansion Regional Feasibility (CERF) model is an open-source geospatial python package that provides new power plant locations at a 1km resolution. The model ingests U.S. state or regional-scale electricity system capacity expansion plans, such as those produced by the Global Change Analysis Model (GCAM-USA), and identifies feasible, site-specific locations for individual new power plants (renewable and non-renewable). CERF combines high-resolution geospatial suitability analyses with an economic algorithm that selects individual plant siting locations based on grid interconnection costs and the locational marginal value of new generation. The model incorporates a wide range of dynamic constraints and opportunities, such as protected lands, population density, existing infrastructure, and water availability. This dataset provides CERF power plant siting results for IM3 Phase 2 simulations across eight different scenarios for the Western US through 2055. The scenarios include combinations of two Shared Socioeconomic Pathways (SSP3 and SSP5) with four high-resolution climate projections specific to the United States (see, https://tgw-data.msdlive.org/). These climate projections include "hotter" and "cooler" variants for two Representative Concentration Pathways (RCP4.5 and RCP8.5). The resulting eight simulations are: rcp45cooler_ssp3 rcp45cooler_ssp5 rcp45hotter_ssp3 rcp45hotter_ssp5 rcp85cooler_ssp3 rcp85cooler_ssp5 rcp85hotter_ssp3 rcp85hotter_ssp5 CERF siting results in this dataset correspond to capacity expansion plans in the GCAM-USA IM3 Phase 2 simulation data and are available for each of the above scenarios. Data Details Temporal Range: 2015-2055 in 5-year timesteps. Note that 2015 is the experiment base year and 2020 and beyond represent model simulation years. Spatial Range: Plant locations are provided for the eleven states in the Western US including Arizona, California, Colorado, Idaho, Montana, New Mexico, Nevada, Oregon, Utah, Washington, and Wyoming. Spatial Resolution: 1 km-squared, provided in x and y coordinates Geospatial Projection: Albers Equal Area Conic (ESRI:102003) File Type: csv The dataset contains subdirectories for each of the eight scenarios described in the overview. Each scenario folder contains two subfolders with the following information: 1. Power Plant Data This directory contains a single .csv file of power plant locations for both pre-existing (non-CERF sited plants in operation in 2015) and new (CERF-sited) power plants across the temporal range along with additional CERF model output parameters for CERF-sited plants. Plant with a siting year earlier than 2020 correspond to facilities that are operational leading into the first timestep CERF simulation. For a more detailed description of CERF model output parameters, see the CERF model documentation. Note that the cerf_plant_id parameter is unique within each scenario file but not across scenario files. Parameter Descriptions scenario - Name of scenario cerf_plant_id - Unique siting identifier cerf_sited - If True, indicates that plant was sited by CERF model. If False, indicates pre-existing facility region_name - Name of region (state) tech_id - Technology ID tech_name - Full generation technology name inclusive of cooling type (if applicable) and additional characteristics tech_simple - Simplified generation technology type unit_size_mw - Power plant unit size (MW) xcoord - X coordinate in the default CRS (meters) ycoord - Y coordinate in the default CRS (meters) index - Index position in the flattend 2D array buffer_in_km - Exclusion buffer around site (km) sited_year - Year of siting retirement_year - Year of retirement lmp_zone - Locational marginal price (LMP) zone ID locational_marginal_price_usd_per_mwh - Locational marginal price ($/MWh) generation_mwh_per_year - Generation output (MWh/yr) operating_cost_usd_per_year - Cost of plant operations ($/yr) net_operational_value - Net operational value based on LMP and and operating costs ($/yr) interconnection_cost - Cost of interconnection for transmission & gas pipeline (if applicable) net_locational_cost -- Difference of interconnection cost and operating value ($/yr) capacity_factor_fraction - Capacity factor (fraction) carbon_capture_rate_fraction - Carbon capture rate (fraction) fuel_co2_content_tons_per_btu - Fuel CO2 content (tons/Btu) fuel_price_usd_per_mmbtu - Fuel price ($/MMBtu) fuel_price_esc_rate_fraction - Fuel price escalation rate (fraction) heat_rate_btu_per_kWh - Heat rate (Btu/kWh) lifetime_yrs - Technology lifetime for annuity (years) operational_life_yrs - Operational lifetime for retirement (years) variable_om_usd_per_mwh - Variable operation and maintenance costs of yearly capacity use ($/MWh) variable_om_esc_rate_fraction - Variable operation and maintenance costs escalation rate (fraction) carbon_tax_usd_per_ton - Carbon tax ($/ton) carbon_tax_esc_rate_fraction - Carbon tax escalation rate (fraction) 2. Storage Data This directory contains information on new and pre-existing energy storage facilities operational in each timestep along with various storage operational parameters. The 2015 timestep provides pre-existing energy storage data and corresponds with facilities that are operational leading into the first model simulation timestep. Note that coordinates in the storage files correspond to the interconnection point on the grid (substation location), not individual energy storage locations. Energy storage is added in a cumulative process at each given interconnection point. That is, each individual file provides the total operational storage capacity interconnected to the specified substation for the given timestep, inclusive of previously installed storage at that location and new storage installed in that timestep at that location. Parameters scenario - Name of scenario timestep - Simulation timestep name - Unique storage identifier s_typ - Type of energy storage technology (battery or pumped storage hydro) s_node - Node ID of interconnecting substation xcoord - X coordinate in the default CRS (meters) ycoord - Y coordinate in the default CRS (meters) charge_rate - Maximum charge rate (power capacity) of storage system (MW) discharge_rate - Maximum discharge rate (power capacity) of storage system (MW) duration - Duration of storage system (hours) max_SoC - Allowed maximum state of charge (energy capacity) of storage system (MWh) min_SoC -Allowed minimum state of charge (energy capacity) of storage system (MWh) charge_eff - Efficiency of charge (fraction between 0 and 1) discharge_eff - Efficiency of discharge (fraction between 0 and 1) Acknowledgment IM3 is a multi-institutional effort led by Pacific Northwest National Laboratory and supported by the U.S. Department of Energy's Office of Science as part of research in MultiSector Dynamics, Earth and Environmental Systems Modeling Program.

CERF↗

Demonstration and Evaluation of an Advanced Integrated Operations Concept for Hybrid Control Rooms

The U.S. nuclear industry has an urgent need to reduce operations and maintenance costs to remain economically competitive in today’s energy market. Measures to improve efficiency in operations will need to leverage technology in a way that safely transforms how plants are operated. This work describes the Evaluation of an integrated operations concept that draws together data from existing Instrumentation and Control (I&C) infrastructure, upgraded I&C systems, new sensors, and field technologies such as computer-based procedures to provide operators with centralized, streamlined instructions. The concept was developed to allow for an operator to remotely supervise many plant activities and to dramatically streamline plant operations and maintenance. This describes the methods, results, and design recommendations for the concept based on an operator workshop to evaluate the concept.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Motivation and Design of the OCPP Security Service

Pacific Northwest National Laboratory is conducting in-depth research aimed at exploring how zero trust security principles can be effectively applied to electric vehicle charging infrastructure. This investigation seeks to enhance the resilience and reliability of these systems against cyber threats, ensuring secure and uninterrupted access to charging services for electric vehicle users and electric supply. Zero trust is a security concept centered on the belief that system operators should not automatically trust users or systems based on their location, whether inside or outside the organization, but instead must verify everything trying to connect to their systems before granting access. A key aspect of the project is to demonstrate and validate zero trust approaches targeted to electric vehicle (EV) charging infrastructure. It has been observed that both open-source and commercial solutions often overlook the specific protocols employed in managing EV charging stations and proceeded with a general, protocol-agnostic approach. While these strategies effectively block non-authorized routes to the charging infrastructure, they do not tackle the situations where attackers may exploit legitimate access channels, such as the inattentive operator model posited by the Idaho National Laboratory. To address this gap, this paper proposes and discusses a new security service targeted to the Open Charge Point Protocol (OCPP), which is the de facto protocol for the management of charging stations and serves a critical role in the broader adoption of electric vehicles. The design and architecture of the proposed OCPP security service are discussed in detail, outlining how it aims to safeguard charging station management system (CSMS) functions. The service is particularly important in scenarios where the charging station operator (CSO), responsible for the maintenance and operation of charging stations, and the charging network provider (CNP), which manages the charging network's accessibility and billing, are separate entities. This distinction is crucial because CSOs and CNPs often have different priorities, objectives, and operational responsibilities, which may not always align perfectly. For instance, a CSO might prioritize uptime and customer satisfaction, while a CNP might focus on maximizing revenue and network utilization. Such misalignment can create security vulnerabilities, as each entity might implement different policies and standards, potentially leaving gaps in the overall security posture.

33 ADVANCED PROPULSION SYSTEMS↗

Installation package for a solar-heating system

Installation package for solar-powered hot-air system contains such information as operation and maintenance manuals, hardware brochures, schematics, operating mode descriptions, and drawings.

Source record↗

Navigation network operational considerations

The development of the philosphy necessary for the initial operations costing of the three candidate navigation network designs is described. The effect of the need to minimize costs upon the operations and maintenance concepts, the simplification of operations by adopting the very long base interferometry principle as a basis for the scenarios, and the estimation of the annual load factor based upon an assumed mission set are detailed.

Hird, E.↗

Summary of LO2/Ethanol OMS/RCS Technology and Advanced Development 99-2744

NASA is pursuing non-toxic propellant technologies applicable to RLV and Space Shuttle orbital maneuvering system (OMS) and reaction control system (RCS). The primary objectives of making advancements in an OMS/RCS system are improved safety, reliability, and reduced operations and maintenance cost, while meeting basic operational and performance requirements. An OMS/RCS has a high degree of direct interaction with the vehicle and crew and requires subsystem and components that are compatible with integration into the vehicle with regard to external mold-line, power, and thermal control. In July 1997, a Phase I effort for the technology and advanced development of an upgrade of the space shuttle was conducted to define the system architecture, propellant tank, feed system, RCS thrusters, and OMS engine. Phase I of the project ran from July 1997 to October 1998. Phase II is currently being planned for the development and test of full-scale prototype of the system in 1999 and 2000. The choice of pressure-fed liquid oxygen (LO2) and ethanol is the result of numerous trade studies conducted from 1980 to 1996. Liquid oxygen and ethanol are clean burning, high-density propellants that provide a high degree of commonality with other spacecraft subsystems including life support, power, and thermal control, and with future human exploration and development of space missions. The key to this pressure-fed system is the use of subcooled liquid oxygen at 350 psia. In this approach, there is 80 degrees R of subcooling, which means that boil-off will not occur until the temperature has risen 80 R. The sub-cooling results naturally from loading propellants at 163 R, which is the saturation temperature at 14.7 psia, and then pressurizing to 350 psia on the launch pad. Thermal insulation and conditioning techniques are then used to limit the LO2 temperature to 185 R maximum, and maintain the sub-cooling. The other key is the wide temperature range of ethanol, -173 F to +300 F, which can provide heat to gasify liquid oxygen or provide a good coolant.

Curtis, Leslie A.↗

Development and Test of High Temperature Surface Acoustic Wave Gas Sensors

The demand for sensors in hostile environments, such as power plant environments, aerospace environments, oil and gas extraction, and high-temperature metallurgy environments, has risen over the past decades in a continuous attempt to increase process control, improve energy and process efficiency in production, reduce operational and maintenance costs, increase safety, and perform condition-based maintenance in equipment and structures operating in high-temperature harsh-environment conditions. The increased reliability, improved performance, and development of new sensors and networks with a multitude of components, especially wireless networks, are the target for operation in harsh environments. Gas sensors, in particular H2 sensors, operating above 200 C are required in the instrumentation, process control and general safety of a number of industries including coal, natural gas, and nuclear power generation facilities, the aerospace and automotive industries, metallurgical production and defense-related applications. The surface acoustic wave (SAW) platform is a particularly promising option for high-temperature, harsh-environment gas sensing applications since the platform exhibits advantages, such as battery-free and wireless operation, small size, possibility for scale production using well-developed technologies from the semiconductor industry, and low cost of installation and operation. In this work, one-port SAW resonators (SAWRs) operating along five different orientations on a commercially available langasite (LGS) wafer employing Pt-Al2O3 electrodes and reflectors were designed, fabricated, and used as high-temperature H2 sensors. Two of the selected orientations were predicted and confirmed to have temperature-compensated operation above 150 C. A gas sensor test setup was developed, capable of gas cycling between N2, O2 and N2/H2 mixtures under extended high-temperature periods (up to 650 C for over 20 hours). Thin film Pt-Al2O3 was used as the electrode material for the transducers and reflectors capable of high-temperature operation, and also as H2 sensing film. In addition, yttria-stabilized zirconia (YSZ) thin films with Pt decoration were tested as sensing films aimed to enhance the SAWR sensor response to H2. The SAW devices were monitored in excess of 1700 hours in real-time during gas cycling sequences up to 600 C, leading to the following findings: i) the Pt-Al2O3 electrodes performed better for H2 sensing than the Pt-decorated YSZ sensing film, showing as much as 50% higher frequency variation response in the 200 C to 400 C range; ii) different crystallographic orientations operating on the same LGS wafer experienced different responses to H2 exposures up to 500 C; iii) the surface oxidation state of the SAWR sensors was shown to have an important impact on subsequent H2 exposure responses. In addition, a sensor system employing two LGS SAWRs, aligned along two different orientations, has been developed to simultaneously determine H2 presence and temperature. Finally, wireless interrogation of a SAWR sensor was successful within the gas cycling test fixture, and successful wireless H2 detection was achieved above 400 C.

Ayes Moncada, Armando↗

Accelerating Simulation for High-Fidelity PV Inverter System Reliability Assessment with High-Performance Computing

The overall cost of photovoltaic (PV) systems has shown a downward trend during the last decade; however, PV inverter failures account for the highest cost of operation and maintenance. To address this, reliability tools with powerful computation and better accuracy are required for the lifetime prediction and degradation evaluation of PV inverters. This paper proposes an event-driven parallel computing-based simulator. The proposed simulator applies high-performance computing techniques and other accessory optimization techniques-including cluster merging, adaptive model updates, and steady-state identification-to make reliability assessments for PV inverters under given input mission profiles and operating conditions with high efficiency and high fidelity. The main idea of the simulator and its workflow are introduced. Then, a demo PV inverter system simulator is implemented, and the speedup of the total simulations of the switching model reaches 123.03 times.

high-performance computing↗