Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Mars Rovers”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

Processing of Mars Exploration Rover Imagery for Science and Operations Planning

The twin Mars Exploration Rovers (MER) delivered an unprecedented array of image sensors to the Mars surface. These cameras were essential for operations, science, and public engagement. The Multimission Image Processing Laboratory (MIPL) at the Jet Propulsion Laboratory was responsible for the first-order processing of all of the images returned by these cameras. This processing included reconstruction of the original images, systematic and ad hoc generation of a wide variety of products derived from those images, and delivery of the data to a variety of customers, within tight time constraints. A combination of automated and manual processes was developed to meet these requirements, with significant inheritance from prior missions. This paper describes the image products generated by MIPL for MER and the processes used to produce and deliver them.

Instruments↗

Mars Exploration Rover: thermal design is a system engineering activity

The Mars Exploration Rovers (MER), were launched in June and July of 2003, repsectively and successfully landed on Mars in early and late January of 2004, repectively. The flight system architecture implemented many successful features of the Mars Pathfinder (MPF) system: A cruise stage that transported an entry vehicle that housed the Lander, which in turn, used airbags to cushion the Rover during the landing event.

lessons learned↗

Ten-Meter Scale Topography and Roughness of Mars Exploration Rovers Landing Sites and Martian Polar Regions

The Mars Orbiter Camera (MOC) has been operating on board of the Mars Global Surveyor (MGS) spacecraft since 1998. It consists of three cameras - Red and Blue Wide Angle cameras (FOV=140 deg.) and Narrow Angle camera (FOV=0.44 deg.). The Wide Angle camera allows surface resolution down to 230 m/pixel and the Narrow Angle camera - down to 1.5 m/pixel. This work is a continuation of the project, which we have reported previously. Since then we have refined and improved our stereo correlation algorithm and have processed many more stereo pairs. We will discuss results of our stereo pair analysis located in the Mars Exploration rovers (MER) landing sites and address feasibility of recovering topography from stereo pairs (especially in the polar regions), taken during MGS 'Relay-16' mode.

Ivanov, Anton B.↗

Aeolian Processes at the Mars Exploration Rover Opportunity Landing Site

The traverse of the Mars Exploration Rover Opportunity across its Meridiani Planum landing site has shown that wind has affected regolith by creating drifts, dunes, and ubiquitous ripples, by sorting grains during aeolian transport, by forming bright wind streaks downwind from craters seen from orbit, and by eroding rock with abrading, wind-blown material. Pre-landing orbiter observations showed bright and dark streaks tapering away from craters on the Meridiani plains. Further analysis of orbiter images shows that major dust storms can cause bright streak orientations in the area to alternate between NW and SE, implying bright wind streak materials encountered by Opportunity are transient, potentially mobilized deposits. Opportunity performed the first in situ investigation of a martian wind streak, focusing on a bright patch of material just outside the rim of Eagle crater. Data from Pancam, the Miniature Thermal Emission Spectrometer (Mini-TES), the Alpha-Particle X-Ray Spectrometer (APXS), and the Mossbauer spectrometer either are consistent with or permit an air fall dust interpretation. We conclude that air fall dust, deposited in the partial wind shadow of Eagle crater, is responsible for the bright streak seen from orbit, consistent with models involving patchy, discontinuous deposits of air fall dust distributed behind obstacles during periods of atmospheric thermal stability during major dust storms.

Sullivan, R.↗

Two Years of Chemical Sampling on Meridiani Planum by the Alpha Particle X-Ray Spectrometer Onboard the Mars Exploration Rover Opportunity

For over two terrestrial years, the Mars Exploration Rover Opportunity has been exploring the martian surface at Meridiani Planum using the Athena instrument payload [1], including the Alpha Particle X-Ray Spectrometer (APXS). The APXS has a small sensor head that is mounted on the robotic arm of the rover. The chemistry, mineralogy and morphology of selected samples were investigated by the APXS along with the Moessbauer Spectrometer (MB) and the Microscopic Imager (MI). The Rock Abrasion Tool (RAT) provided the possibility to dust and/or abrade rock surfaces down to several millimeters to expose fresh material for analysis. We report here on APXS data gathered along the nearly 6-kilometers long traverse in craters and plains of Meridiani.

Bruckner, J.↗

Mars Exploration Rover airbag landing loads testing and analsysis

This paper presents a summary of the testing and analysis used to quantify the expected airbag landing loads for the Mars Exploration Rovers. The airbag drop test setup, lander instrumentation, and the test data reduction method are discussed in order to provide an understanding of the empirical loads. A set of limiting cases that bound the empirical data are developed for use in finite element modeling of the lander and rover models.

modeling↗

The Challenges of Designing the Rocker-Bogie Suspension for the Mars Exploration Rover

Over the past decade, the rocker-bogie suspension design has become a proven mobility application known for its superior vehicle stability and obstacle-climbing capability. Following several technology and research rover implementations, the system was successfully flown as part of Mars Pathfinder s Sojourner rover. When the Mars Exploration Rover (MER) Project was first proposed, the use of a rocker-bogie suspension was the obvious choice due to its extensive heritage. The challenge posed by MER was to design a lightweight rocker-bogie suspension that would permit the mobility to stow within the limited space available and deploy into a configuration that the rover could then safely use to egress from the lander and explore the Martian surface. This paper will describe how the MER rocker-bogie suspension subsystem was able to meet these conflicting design requirements while highlighting the variety of deployment and latch mechanisms employed in the design.

Harrington, Brian D.↗

The challenges of designing the rocker-bogie suspension for the Mars Exploration Rover

Over the past decade, the rocker-bogie suspension design has become a proven mobility application known for its superior vehicle stability and obstacle-climbing capability. Following several technology and research rover implementations, the system was successfully flown as part of Mars Pathfinder's Sojourner rover. When the Mars Exploration Rover (MER) Project was first proposed, the use of a rocker-bogie suspension was the obvious choice due to its extensive heritage. The challenge posed by MER was to design a lightweight rocker-bogie suspension that would permit the mobility to stow within the limited space available and deploy into a configuration that the rover could then safely use to egress from the lander and explore the Martian surface. This paper will describe how the MER rocker-bogie suspension subsystem was able to meet these conflicting design requirements while highlighting the variety of deployment and latch mechanisms employed in the design.

Voorhees, Chris↗

MAPGEN: Mixed-Initiative Activity Planning for the Mars Exploration Rover Mission

This document describes the Mixed initiative Activity Plan Generation system MAPGEN. This system is one of the critical tools in the Mars Exploration Rover mission surface operations, where it is used to build activity plans for each of the rovers, each Martian day. The MAPGEN system combines an existing tool for activity plan editing and resource modeling, with an advanced constraint-based reasoning and planning framework. The constraint-based planning component provides active constraint and rule enforcement, automated planning capabilities, and a variety of tools and functions that are useful for building activity plans in an interactive fashion. In this demonstration, we will show the capabilities of the system and demonstrate how the system has been used in actual Mars rover operations. In contrast to the demonstration given at ICAPS 03, significant improvement have been made to the system. These include various additional capabilities that are based on automated reasoning and planning techniques, as well as a new Constraint Editor support tool. The Constraint Editor (CE) as part of the process for generating these command loads, the MAPGEN tool provides engineers and scientists an intelligent activity planning tool that allows them to more effectively generate complex plans that maximize the science return each day. The key to the effectiveness of the MAPGEN tool is an underlying constraint-based planning and reasoning engine.

Ai-Chang, Mitchell↗

Mission Operations of the Mars Exploration Rovers

A document describes a system of processes involved in planning, commanding, and monitoring operations of the rovers Spirit and Opportunity of the Mars Exploration Rover mission. The system is designed to minimize command turnaround time, given that inherent uncertainties in terrain conditions and in successful completion of planned landed spacecraft motions preclude planning of some spacecraft activities until the results of prior activities are known by the ground-based operations team. The processes are partitioned into those (designated as tactical) that must be tied to the Martian clock and those (designated strategic) that can, without loss, be completed in a more leisurely fashion. The tactical processes include assessment of downlinked data, refinement and validation of activity plans, sequencing of commands, and integration and validation of sequences. Strategic processes include communications planning and generation of long-term activity plans. The primary benefit of this partition is to enable the tactical portion of the team to focus solely on tasks that contribute directly to meeting the deadlines for commanding the rover s each sol (1 sol = 1 Martian day) - achieving a turnaround time of 18 hours or less, while facilitating strategic team interactions with other organizations that do not work on a Mars time schedule.

Bass, Deborah↗

Mars Exploration Rovers orbit determination filter strategy

The successful delivery of the Mars Exploration Rover (MER) landers to well within the boundaries of their surface target areas in January of 2004 was the culmination of years of orbit determination analysis. The process began with a careful consideration of the filter parameters used for pre-launch covariance studies, and continued with the refinement of the filter after launch based on operational experience. At the same time, tools were developed to run a plethora of variations around the nominal filter and analyze the results in ways that had never been previously attempted for an interplanetary mission. In addition to achieving sub-kilometer Mars-relative orbit determination knowledge, the filter strategy and process detected unexpected error sources, while at the same time proving robust by indicating thecorrect solution. Consequently, MER orbit determination set a new standard for interplanetary navigation.

Mars Exploration Rover (MER)↗

MAPGEN : mixed initiative planning and scheduling for the Mars '03 MER mission

The Mars Exploration Rovers Mars '03 mission is one of NASA's most ambitious science missions to date. The rovers will be launched in the summer of 2003 with each rover carrying instruments to conduct remote and in-situ observation to elucidate the planet's past climate, water activity, and habitability. Science is the primary driver of MER and, as a consequence, making best use of the scientific instruments, within the available resources, is a crucial aspect of the mission. To address this critically, the MER project has selected MAPGEN (Mixed-Initiative Activity Plan GENerator) as an activity planning tool. MAPGEN combines two exiting systems, each with a strong heritage: APGEN the Activity Planning tool from the Jet Propulsion Laboratory and the Europs Planning/Scheduling system from NASA Ames Research Center. This paper discusses the issues arising from combining these tools in the context of this mission.

planning and scheduling↗

Ground testing of the Li-ion batteries in support of JPL's 2003 Mars Exploration Rover Mission

In early 2004, JPL successfully landed two Rovers, named Spirit and Opportunity, on the surface of Mars after traveling > 300 million miles over a 6-7 month period. In order to operate for extended duration on the surface of Mars, both Rovers are equipped with rechargeable Lithium-ion batteries, which were designed to aid in the launch, correct anomalies during cruise, and support surface operations in conjunction with a triple-junction deployable solar arrays. The requirements of the Lithium-ion battery include the ability to provide power at least 90 sols on the surface of Mars, operate over a wide temperature range (-20(deg)C to +4O(deg)C), withstand long storage periods (e.g., cruise period), operate in an inverted position, and support high currents (e.g., firing pyro events). In order to determine the viability of meeting these requirements, ground testing was performed on a Rover Battery Assembly Unit (RBAU), consisting of two 8-cell 8 Ah lithium-ion batteries connected in parallel. The RBAU upon which the performance testing was performed is nearly identical to the batteries incorporated into the two Rovers currently on Mars. The testing performed includes, (a) performing initial characterization tests (discharge capacity at different temperatures), (b) simulating the launch conditions, (c) simulating the cruise phase conditions (including trajectory corrections), (d) simulating the entry, decent, and landing pulse load profile (if required to support the pyros) (e) simulating the Mars surface operation mission simulation conditions, as well as, (f) assessing performance capacity loss and impedance characteristics as a function of temperature and life. As will be discussed, the lithium-ion batteries (fabricated by LithiodYardney, Inc.) were demonstrated to far exceed the requirements defined by the mission, and are projected to support an extended mission (> 2 years) with margin to spare.

Li-ion batteries↗

A comparison of energy conversion systems for meeting the power requirements of manned rover for Mars missions

Several types of conversion systems of interest for a nuclear Mars manned application are examined, including: free-piston Stirling engines (FPSE), He/Xe closed Brayton cycle (CBC), CO2 open Brayton, and SiGe/GaP thermoelectric systems. Optimization studies were conducted to determine the impact of the conversion system on the overall mass of the nuclear power system and the mobility power requirement of the rover vehicle. The results of an analysis of a manned Mars rover equipped with a nuclear reactor power system show that the free-piston Stirling engine and the He/Xe closed Brayton cycle are the best available options for minimizing the overall mass and electric power requirements of the rover vehicle. While the current development of Brayton technology is further advanced than that of FPSE, the FPSE could provide approximately 13.5 percent lower mass than the He/Xe closed Brayton system. Results show that a specific mass of 160 is achievable with FPSE, for which the mass of the radiation shield (2.8 tons) is about half that for He/Xe CBC (5 tons).

El-Genk, Mohamed S.↗

High Gain Antenna Gimbal for the 2003-2004 Mars Exploration Rover Program

The High Gain Antenna Assemblies built for the 2003-2004 Mars Exploration Rover (MER) missions provide the primary communication link for the Rovers once they arrive on Mars. The High Gain Antenna Gimbal (HGAG) portion of the assembly is a two-axis gimbal that provides the structural support, pointing, and tracking for the High Gain Antenna (HGA). The MER mission requirements provided some unique design challenges for the HGAG. This paper describes all the major subsystems of the HGAG that were developed to meet these challenges, and the requirements that drove their design.

Sokol, Jeff↗

An Ontology for Requesting Distant Robotic Action: A Case Study in Naming and Action Identification for Planning on the Mars Exploration Rover Mission

This paper focuses on the development and use of the abbreviated names as well as an emergent ontology associated with making requests for action of a distant robotic rover during the 2003-2004 NASA Mars Exploration Rover (MER) mission, run by the Jet Propulsion Laboratory. The infancy of the domain of Martian telerobotic science, in which specialists request work from a rover moving through the landscape, as well as the need to consider the interdisciplinary teams involved in the work required an empirical approach. The formulation of this ontology is grounded in human behavior and work practice. The purpose of this paper is to identify general issues for an ontology of action (specifically for requests for action), while maintaining sensitivity to the users, tools and the work system within a specific technical domain. We found that this ontology of action must take into account a dynamic environment, changing in response to the movement of the rover, changes on the rover itself, as well as be responsive to the purposeful intent of the science requestors. Analysis of MER mission events demonstrates that the work practice and even robotic tool usage changes over time. Therefore, an ontology must adapt and represent both incremental change and revolutionary change, and the ontology can never be more than a partial agreement on the conceptualizations involved. Although examined in a rather unique technical domain, the general issues pertain to the control of any complex, distributed work system as well as the archival record of its accomplishments.

Wales, Roxana C.↗

Antenna Designs for the Mars Exploration Rovers (MER) Spacecraft, Lander, and Rover

This presentation focuses on the design of antennas for the Mars Exploration Rovers (MER). Specific topics covered include: MER spacecraft architecture, the evolution of an antenna system, MER cruise stage antennas, antenna stacks, the heat-shield/back shell antenna, and lander and rover antennas. Additionally, the mission's science objectives are reviewed.

antennas↗