Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Energy Intake”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

370 records · Page 21

Health Hazards of Exposures to Radioiodine

Iodine is a chemical element with atomic number 53. Iodine-127 is stable (non-radioactive) and commonly found in nature. Elemental iodine is a purple-colored solid at room temperature and pressure, but spontaneously sublimates (turns into vapor). Iodine is an essential element for life, and is required for proper functioning of the thyroid. Iodine is present in many foods, and is readily absorbed by the body and concentrated in the thyroid gland. A fraction of iodine ingested or inhaled is rapidly removed by the kidneys. The rest of the inhaled or ingested iodine is absorbed the by thyroid and retained for many months. Iodine has a biological half-life of approximately 120 days in health individuals. The biological half-life can be shorter in individuals with hyperthyroidism, and longer in individuals with hypothyroidism. Iodine has a number of radioactive isotopes, most of which have relatively short half-lives (days or weeks). Short half-life iodine isotopes are useful for a variety of medical applications, including imaging and cancer therapy. For example, Iodine-123 (half-life 13 hours) is commonly used for medical imaging of the thyroid, while iodine-131 (half-life 8 days) is used for suppressing thyroid function in individuals with hyperthyroidism or ablating (killing) thyroid cells to treat thyroid cancer. Iodine-125 (half-life 59 days) is produced in nuclear reactors, and has medical uses. Although iodine-125 can be used for thyroid imaging, Iodine-123 is more commonly used for that purpose because of its shorter half-life and higher-energy emissions. Iodine-125 is more commonly used for cancer treatment, and can be processed into small metal pellets (seeds) inserted directly into a tumor. Iodine-125 emits low-energy x-rays which can kill tumor cells and generally cannot escape the tumor, sparing other tissues. Medical iodine for imaging or treatment is typically administered orally in the form a pill or liquid solution. A typical adult thyroid scan using iodine-123 involves having the patient swallow between one and four 0.1 millicuries pills, with the exact dose dependent on the patient’s weight. This results in a whole-body committed effective dose of 80 – 320 mrem, and a thyroid equivalent dose of 1443 – 5772 mrem. Note that the whole-body effective dose relates to the overall cancer risk, while the larger equivalent dose to the thyroid only indicates that most of this risk is the result of exposure to the thyroid. These doses are considered safe, although the procedure is not recommended for pregnant or breastfeeding women. In contrast, the quantities of iodine-131 used for treatment of hyperthyroidism and thyroid cancers are much higher. For treatment of hyperthyroidism, 4 – 10 millicuries are administered, while for thyroid cancer the administration can range from 50 – 150 millicuries of I-131. In addition to medical exposures, large populations were exposed to radioiodine as result of the atomic bombings of Hiroshima and Nagasaki in Japan, and the Chernobyl nuclear accident. These populations have been carefully followed for many years to assess the effect of their radiation exposures on cancer risk. As a result, a great deal is known about the cancer risks associated with radioiodine exposure. Because iodine is concentrated in the thyroid, the principal risk of exposure to radioiodine is thyroid cancer. Children have the highest risk of thyroid cancer after exposure to radioactive iodine. According to a large study of Japanese atomic bomb survivors, an effective dose of one Sievert (100,000 mrem) has been observed to increase the risk of thyroid cancer by a factor of 9.5 in children aged zero to nine years old, by a factor of 3 in children aged 10 to 19 years old, and by barely detectable amounts in adults. Another way of quantifying the risk from radioiodine exposure is from risk coefficients, which provide the risk per unit intake of radionuclides in terms of both morbidity (any cancer) and mortality (death). Both morbidity (risk of cancer) and mortality (death) risks are shown in the table below. Note that because thyroid cancer is almost never fatal, the morbidity coefficients are much larger than the mortality coefficients.

61 RADIATION PROTECTION AND DOSIMETRY↗

A Comparison of Power Take-Off Architectures for Wave-Powered Reverse Osmosis Desalination of Seawater with Co-Production of Electricity

Several power take-off (PTO) architectures for wave-powered reverse osmosis (RO) desalination of seawater are introduced and compared based on the annual average freshwater production and the size of the components, which strongly relate to the costs of the system. The set of architectures compared includes a novel series-type PTO architecture not previously considered. These seawater hydraulic PTO architectures are composed of a WEC-driven pump, an RO module, an intake charge pump driven by an electric motor, and a hydraulic motor driving an electric generator for electric power production. This study is performed using an efficient two-way coupled steady-state model for the average performance of the system in a given sea state, including freshwater permeate production, electric power production, and electric power consumption. A multi-objective design problem is formulated for the purposes of this comparative study, with the objectives of maximizing annual freshwater production, minimizing the displacement of the WEC-driven pump, and minimizing the installed RO membrane area. This establishes a framework for comparison in the absence of a mature techno-economic model. The requirement that the system produces enough electric power to meet its consumption is applied as a constraint on the operation of the system. The oscillating wave surge converter Oyster 1 is assumed as the WEC. Weights on performance of the system in a given sea state are based on historical data from Humboldt Bay, CA. This study finds that (1) architectures in a series configuration allow for a reduction in the WEC-driven pump size of 59–92% compared to prior work, (2) varying the displacement of the WEC-driven pump between sea conditions does not provide any significant advantage in performance, and (3) varying the active RO membrane area between sea condition offers improvements between 7% and 41% in each design objective.

Energy & Fuels↗

Suppression of longitudinal losses in a gas-dynamic trap by using an ambipolar mirror

The efficiency of utilizing ambipolar mirrors for suppression of longitudinal losses of particles and energy in a gas-dynamic trap (GDT) was investigated. An additional relatively small axisymmetric mirror cell was installed in one of the facility ends. Hydrogen or deuterium atomic beams with an energy of 22 keV and equivalent current density of up to 1 A/cm{sup 2} were injected into the additional cell at an angle of 90{sup o} to the facility axis. Trapping of the beams with a total power of 800 kW by the plasma in the additional cell leads to the formation of a hot ion population with an anisotropic velocity distribution, a mean energy of 13 keV, and a density of up to 4.5 x 10{sup 13} cm{sup -3}. It is shown that the confinement of hot ions in the additional cell is determined by classical processes, such as charge exchange on the beam atoms and collisional deceleration by electrons, in spite of the onset of Alfven ion-cyclotron instability at fast ion densities higher than 2.5 x 10{sup 13} cm{sup -3}. The effect of ambipolar confinement manifests itself in that, at hot ion densities higher than 3 x 10{sup 13} cm{sup -3}, the flux density of ions escaping from the trap in the mode with beam injection decreases fivefold as compared to that without injection. In this case, the density of the Maxwellian plasma component in the central cell is about 2.5 x 10{sup 13} cm{sup -3}. The efficiency of suppression of longitudinal particle losses by the ambipolar mirror substantially exceeds estimates obtained for both collisional (gas-dynamic) and collisionless (adiabatic) confinement modes. Qualitatively, this is because, in the GDT experiments, the mode of warm plasma confinement is transitional between the gas-dynamic and adiabatic modes and the use of an ambipolar mirror facilitates a transition from the lossy gas-dynamic mode into a nearly adiabatic one.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Materials-Enabled High-Efficiency (MEHE) Heavy-Duty Diesel Engines

The purpose of this Cooperative Research and Development Agreement (CRADA) between UTBattelle, Inc. and Caterpillar, Inc. was to improve diesel engine efficiency by incorporating advanced materials to enable higher combustion pressures and temperatures necessary for improved combustion. The project scope also included novel materials for use in advanced components and designs associated with waste-heat recovery and other concepts for improved thermal efficiency. Caterpillar initially provided ORNL with a 2004 Tier 2 C15 ACERT diesel engine (designed for on-highway use) and two 600 hp motoring dynamometers. The first year of the CRADA effort was focused on establishing a heavy-duty experimental engine research cell. First year activities included procuring, installing and commissioning the cell infrastructure. Infrastructure components consisted of intake air handling system, water tower, exhaust handling system, and cell air conditioning. Other necessary infrastructure items included the fuel delivery system and bottled gas handling to support the analytical instrumentation. The second year of the CRADA focused on commissioning the dynamometer system to enable engine experimentation. In addition to the requirements associated with the dynamometer controller, the electrical system needed a power factor correction system to maintain continuity with the electrical grid. During the second year the engine was instrumented and baseline operated to confirm performance and commission the dynamometer. The engine performance was mapped and modeled according to requirements provided by Caterpillar. This activity was further supported by a Work-for-Others project from Caterpillar to evaluate a proprietary modeling system. A second Work-for-Others activity was performed to evaluate a novel turbocharger design. This project was highly successful and may lead to new turbocharger designs for Caterpillar heavy-duty diesel engines. During the third (and final) year of the CRADA, a novel valve material was evaluated to assess high temperature performance and durability. A series of prototype valves, composed of a unique nickel-alloy was placed in the engine head. The engine was aggressively operated using a transient test cycle for 200 hours. The valve recession was periodically measured to determine valve performance. Upon completion of the test the valves were removed and returned to Caterpillar for additional assessment. Industrial in-kind support was available throughout the project period. Review of the status and research results were carried out on a regular basis (meetings and telecons) which included direction for future work activities. A significant portion of the industrial support was in the form of information exchange and technical consultation.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Evaluation of a Fish Passage Site in the Walla Walla River Basin, 2009 Annual Report : September 2008 - August 2009.

In 2009, Pacific Northwest National Laboratory (PNNL) evaluated the Touchet Consolidated Facility to determine if it is designed, constructed, operated, and maintained to effectively provide juvenile salmonids with safe passage past the diversion and back to the Touchet River. Completed in 2008, the Touchet Consolidated Facility combined two irrigation diversions with an existing intake for the Touchet Acclimation Facility. The consolidated facility includes a separate fish screen and intake for each user, a pool and chute fishway, and an adult fish trap. The fish screens portions of the facility were evaluated on April 20, 2009, using underwater videography, acoustic Doppler velocimeter measurements, and visual observations while water was diverted to the acclimation facility alone and again as water was diverted to the irrigation system and pond together. The facility is in good condition and is well maintained, although water velocities within the site do not meet the criteria set by the National Marine Fisheries Service (NMFS). Approach velocities above 0.4 ft/s at the upstream end of the facility and decreases in sweep velocity toward the bypass are likely caused by the proximity of the upstream screen to the spill over stoplogs that control flow at the upstream end of the forebay. We recommend working with Touchet Acclimation Facility staff to try different configurations and heights of forebay stoplogs while PNNL staff measure water velocities, allowing real-time monitoring of changes in approach and sweep velocities resulting from the configuration changes. It may be possible to bring approach and sweep velocities more in line with the NMFS criteria for juvenile fish screens. We also recommend evaluating the facility later in the year when river levels are low and the irrigation district is the only water user. During the site visit, it was noted that the upstream end of the fishway has relatively closely spaced louvers that point downstream. During higher river levels such as on April 20, the orientation of the louvers causes a headloss of up to 1 ft or more. Fish must maneuver through this hydraulic jump and between the louvers. The Washington Department of Fish and Wildlife is considering alternatives to this configuration; if needed, we would be available to offer technical assistance.

13 HYDRO ENERGY↗

Effects of molecular structure on oxidation reactivity of cyclic hydrocarbons: Experimental observations and conformational analysis

This work concerns the pre-ignition reactivity of cyclic hydrocarbons and its dependence on cyclic structures. In the first part, global reactivity of five cyclic hydrocarbons, methylcyclopentane (MCP), cyclohexane (CH), methylcyclohexane (MCH), decahydronaphthalene (decalin), and 1,2,3,4-tetrahydronaphthalene (tetralin), whose detailed product analyses were recently reported [Y. Yang, A.L. Boehman, Proc. Combust. Inst. 32(1) (2009) 419-426; Y. Yang, A.L. Boehman, Combust. Flame 157(3) (2010) 495-505], were compared over a range of compression ratio and intake temperature in a motored engine. Molecular structure exerts a profound effect on low temperature oxidation reactivity. Decalin is the most reactive compound whose extent of oxidation increases monotonically with increasing temperature and pressure. MCH shows higher low temperature reactivity than CH, and both show distinct negative temperature coefficient behavior. MCP and tetralin exhibit little low temperature reaction before critical conditions are reached for autoignition. In the second part, conformational analysis is conducted to understand how molecular structures affect the low temperature oxidative reactivity, in particular the (1,5) H-shift of fuel peroxy radicals (ROO{yields}{sup (1,5)}QOOH), the key step in low temperature chain branching. In comparison with open-chain structures, cyclic structures significantly reduce the total number of hydrogens that can be abstracted in the (1,5) H-shift. This is because the (1,5) H-shift of a cyclohexylperoxy radical requires both the peroxy group and the to-be-abstracted hydrogen locate at an axial position on the cyclohexane ring. The total number of available hydrogens in decalin, MCH, CH, and tetralin is 14, 11, 6, and 4, respectively. Also important is the number of hydrogens available for the (1,5) isomerization of a given peroxy group, i.e., the degeneracy of the (1,5) H-shift. Degeneracy in (1,5) H-shift for decalin, MCH, CH, and tetralin is {proportional_to}3, 2-3, 2, and 1, respectively. These numbers are in accord with the relative reactivity observed for these compounds. The higher reactivity of MCH relative to CH also results from the equatorial preference of the methyl group which forces the peroxy group to stay at an axial position and facilitates (1,5) H-shift. The last argument is confirmed by quantum mechanical calculations. (author)

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Hydroacoustic Evaluation of Juvenile Salmonid Passage and Distribution at Lookout Point Dam, 2010

Pacific Northwest National Laboratory evaluated juvenile salmonid passage and distribution at Lookout Point Dam (LOP) on the Middle Fork Willamette River for the U.S. Army Corps of Engineers, Portland District (USACE), to provide data to support decisions on long-term measures to enhance downstream passage at LOP and others dams in USACE's Willamette Valley Project. This study was conducted in response to the listing of Upper Willamette River Spring Chinook salmon (Oncorhynchus tshawytscha) and Upper Willamette River steelhead (O. mykiss) as threatened under the Endangered Species Act. We conducted a hydroacoustic evaluation of juvenile salmonid passage and distribution at LOP during February 2010 through January 2011. Findings from this 1 year of study should be applied carefully because annual variation can be expected due to variability in adult salmon escapement, egg-to-fry and fry-to-smolt survival rates, reservoir rearing and predation, dam operations, and weather. Fish passage rates for smolt-size fish (> ~90 mm and < 300 mm) were highest during December-January and lowest in mid-summer through early fall. Passage peaks were also evident in early spring, early summer, and late fall. During the entire study period, an estimated total of 142,463 fish ± 4,444 (95% confidence interval) smolt-size fish passed through turbine penstock intakes. Of this total, 84% passed during December-January. Run timing for small-size fish (~65-90 mm) peaked (702 fish) on December 18. Diel periodicity of smolt-size fish showing crepuscular peaks was evident in fish passage into turbine penstock intakes. Relatively few fish passed into the Regulating Outlets (ROs) when they were open in summer (2 fish/d) and winter (8 fish/d). Overall, when the ROs were open, RO efficiency (RO passage divided by total project passage) was 0.004. In linear regression analyses, daily fish passage (turbines and ROs combined) for smolt-size fish was significantly related to project discharge (P<0.001). This relationship was positive, but there was no relationship between total project passage and forebay elevation (P=0.48) or forebay elevation delta, i.e., day-to-day change in forebay elevation (P=0.16). In multiple regression analyses, a relatively parsimonious model was selected that predicted the observed data well. The multiple regression model indicates a positive trend between expected daily fish passage and each of the three variables in the model-Julian day, log(discharge), and log(abs(forebay delta)); i.e., as any of the environmental variables increase, expected daily fish passage increases. For vertical distribution of fish at the face of the dam, fish were surface-oriented with 62%-80% occurring above 10 m deep. The highest percentage of fish (30%-60%) was found between 5-10-m-deep. During spring and summer, mean target strengths for the analysis periods ranged from -44.2 to -42.1 dB. These values are indicative of yearling-sized juvenile salmon. In contrast, mean target strengths in fall and winter were about -49.0 dB, which are representative of subyearling-sized fish. The high-resolution spatial and temporal data reported herein provide detailed information about vertical, horizontal, diel, daily, and seasonal fish passage rates and distributions at LOP from March 2010 through January 2011. This information will support management decisions on design and development of surface passage and collection devices to help restore Chinook salmon populations in the Middle Fork Willamette River watershed above LOP.

13 HYDRO ENERGY↗

Numerical Analysis of Fuel Effects on Advanced Compression Ignition Using a Cooperative Fuel Research Engine Computational Fluid Dynamics Model

Growing environmental concerns and demand for a better fuel economy are driving forces that motivate the research for more advanced engines. Multi-mode combustion strategies have gained attention for their potential to provide high thermal efficiency and low emissions for light-duty applications. These strategies target optimizing the engine performance by correlating different combustion modes to load operating conditions. The extension from boosted spark ignition (SI) mode at high loads to advanced compression ignition (ACI) mode at low loads can be achieved by increasing the compression ratio and utilizing intake air heating. Further, in order to enable an accurate control of intake charge condition for ACI mode and rapid mode-switches, it is essential to gain fundamental insights into the autoignition process. Within the scope of ACI, homogeneous charge compression ignition (HCCI) mode is of significant interest. It is known for its potential benefits, operation at low fuel consumption, low NOx, and particulate matter (PM) emissions. In the present work, a virtual Cooperative Fuel Research (CFR) engine model is used to analyze fuel effects on ACI combustion. In particular, the effect of fuel octane sensitivity (S) (at constant Research Octane Number (RON)) on autoignition propensity is assessed under beyond-RON (BRON) and beyond-MON (BMON) ACI conditions. The three-dimensional CFR engine computational fluid dynamics (CFD) model employs a finite-rate chemistry approach with a multi-zone binning strategy to capture autoignition. Two binary blends with Research Octane Number (RON) of 90 are chosen for this study: primary reference fuel (PRF) with S = 0 and toluene–heptane (TH) blend with S = 10.8, representing paraffinic and aromatic gasoline surrogates. Reduced mechanisms for these blends are generated from a detailed gasoline surrogate kinetic mechanism. Simulation results with the reduced mechanisms are validated against experimental data from an in-house CFR engine, with respect to in-cylinder pressure, heat release rate, and combustion phasing. Thereafter, the sensitivity of combustion behavior to ACI operating condition (BRON versus BMON), air-fuel ratio (λ = 2 and 3), and engine speed (600 and 900 rpm) is analyzed for both fuels. It is shown that the sensitivity of a fuel’s autoignition characteristics to λ and engine speed significantly differs at BRON and BMON conditions. Moreover, this sensitivity is found to vary among fuels, despite the same RON. It is also observed that the presence of low-temperature heat release (LTHR) under BRON condition leads to more sequential autoignition and longer combustion duration than BMON condition. Finally, the study indicates that the octane index (OI) fails to capture the trend in the variation of autoignition propensity with S under the BMON condition.

33 ADVANCED PROPULSION SYSTEMS↗

Cle Elum Supplementation and Research Facility : Monthly Progress Report November 2008.

FISH PRODUCTION: Final shocking of eggs was finished in the incubation. Egg enumeration for the 2008 brood was completed and the eggs are being incubated in 38 degree Fahrenheit chilled water. Don Larsen of NOAA made a request of eggs for research purposes and was able to acquire supplemental line eggs 10,555. Estimated density at the time of ponding in Mid-March of 2009 is approximately 43,869 fry per raceway after calculating an average fry loss of 2%. The end of the month totals for the 2007 brood reports 773,807 juveniles on hand with an overall average of 31.4 fish per pound. Tagging continues on the 2007 brood and is on pace to wrap up in early December. FISH CULTURE: Ponds are cleaned as needed and due to the colder water temperatures, the feeding frequency has been changed to three days a week. All ponds are sampled at the end of the month. Growth for production fish are adjusted accordingly as temperature dictates feeding levels. Torrential rain on the 12th turned the Yakima River extremely turbid. Fish tagging operations were halted and the ensuing conditions at the facility intake screens became a concern. Water flow to the wet well became restricted so the decision was made to shut the surface water (river) pumps down and turn on well pumps No.1, No.4 and No.6 to run water to the facility head box. This operation continued for twenty-four hours at which point normal operations were optimal and fish tagging resumed, although the river didn't clear up enough to feed the fish until the 17th. WATER PRODUCTION: The current combined well and river water supply to the complex is 14,822 gallons/minute. Well No.2 is pumping water at a rate of 530 gallons per minute. All four river pumps are in operation and pumping 14,292 gallons/minute. ACCLIMATION SITES: Cle Elum staff has been working to prep the acclimation sites for the upcoming fish transfer before the snow falls. Thermographs at each site are changed weekly. AMB Tools performed routine maintenance on the compressor and Brown and Jackson pumped out the septic tank at the Jack Creek acclimation site. VEHICLE MAINTENANCE: Snow tires are now on all vehicles and snow blowers were installed on the John Deere tractor and lawn tractor. The snowplow was also installed on the Ford one ton. The four Snowmobiles were serviced by Yamaha Jacks of Ellensburg. MAINTENANCE BUILDING MAINTENANCE: Clean up occurs on Fridays of each week. HATCHERY BUILDING MAINTENANCE: Water has been turned on to vertical incubator islands one and two. After eggs were transferred to vertical stacks cleaning of troughs began. WDFW crew inventoried eggs from isolettes and then transferred them to the vertical incubators. RIVER PUMP STATION MAINTENANCE: All four pumps are in operation and supplying the facility with 14,292 gallons/minute of water to rearing ponds. WELL FIELD MAINTENANCE: Well pumps No.1, No.4 and No.6 were turned on to supplement water flow to the facility as mentioned previously. Well No.5 was powered up but a winterizing valve malfunction wouldn't allow operation, we are currently working on it at this time. Well No.2 is pumping 530 gallons per minute and supplies well water to incubation and chiller. The pumps meter is recorded weekly. Test holes are monitored weekly and results are faxed to CH2MHILL afterward. SAFETY AND TRAINING: Ice melt and sand bags are popular items at the facility this month as freezing temperatures cause ground to become slippery and hazardous. GROUNDS: Van Alden's Plumbing installed a new commode in resident house No.411 and also inspected a plumbing problem at resident No.1131. Cle Elum staff along with WDFW staff worked to locate the spawning channel building back to the position it was at to have Greg Wallace of Wallace Electric hook electricity back up to the spawning shed. MEETINGS AND TOURS: Charlie attended a policy meeting at Cle Elum on the 18th. The Internal projects annual review took place at Cle Elum on the 19th and 20th. Bill Bosch continues to visit monthly to incorporate data into the YKFP data base. PERSONNEL: IHS employees traveled to Cle Elum to administer flu shots to YN staffers and families as well as WDFW staffers.

13 HYDRO ENERGY↗

Cle Elum Supplementation and Research Facility : Monthly Progress Report : December 1, 2008 - December 31, 2008.

FISH PRODUCTION: Brood year 2008 production and experimental hatchery & supplemental crossed eggs continue to be incubated and chilled water at 380 Fahrenheit for the month. Temperature units are {approx}960 TU's at the end of the month. Hatching was observed at {approx}900 temperature units (TU's). The 2007 Brood year (BY) has approximately 773,477 juveniles on hand at the end of December, averaging 30.6 fish per pound. Fish tagging operations wrapped up on the 5th. Transportation of fish to acclimation sites is tentatively scheduled to begin January 12th. FISH CULTURE: Production pond cleaning continues on a weekly basis, and feeding continues to be performed two days per week due to the colder river water temperatures. Eggs in the incubation continue to be tempered in 38 degree water and temperature units recorded daily. On the 20th the river became too inclement for normal operations as the intake screens were covered with ice, at that time we shutdown two river pumps and turned on wells four and six to get 6,825 gallons of water. This was the operation at the facility for twenty-four hours at which point we were able to get back to normal operations. WATER PRODUCTION: The current combined well and river water supply to the complex is 14,756 gallons/min. The river pumps are supplying 13,571 gallons per minute. Well pumps No.2 and No.4 are operating and supplying 1,185 gallons/min. More on well pumps in the well field maintenance section of this report. ACCLIMATION SITES: Preparation of acclimation sites for fish transfer was the main focus for the month of December. Each week thermographs that record water temperature have the data disc changed at the acclimations sites. Ford Excavation with assistance from YKFP maintenance has started clearing snow out of the Easton acclimation site. VEHICLE MAINTENANCE: The snowmobiles were taken in to have annual maintenance performed. The full-size John Deere tractor needed and was taken to Barnet Implement in Yakima. The tractor needed a new clutch installed and was picked up on the 31st. SHOP BUILDING MAINTENANCE: On the 12th the facility domestic water hydro pneumatic tank and its system malfunctioned. The problem persisted and had to be dealt with multiple times; first it caused the tank to over flow and floods the shop. Wallace Electric was called and after extensive monitoring of the tank, compressor and electrical operations an electrical relay switch was replaced. Weekly cleaning and tool inventory continues to be a priority. The shop is home to our liberation truck along with fish transfer equipment, fish pump and seine nets. ELECTRICAL BUILDING MAINTENANCE: The large generator is located in the electrical building and is checked daily for routine inspections. HATCHERY BUILDING MAINTENANCE: The incubation building is being used to clean and repair isolation buckets, egg incubation baskets and troughs. An experiment involving remote site incubators (RSI's) continued through the month. Chad Stockton, WDFW, records flows and monitors emergence of fry on a daily basis. Chad is working with Steve S. and Curt K. on the RSI's research along with spawning channel fry emergence. RIVERWATER COOLING FACILITY: The one pump in operation in this building is checked daily during our routine inspections, the variable pump is supplying water to the artificial spawning channel. RIVER PUMP STATION MAINTENANCE: All four river pumps are in operation and pumping {approx}13,571 gallons/min to the facility. The building is cleaned monthly and the air burst system is cycled daily during the morning checks. The crew continued weekly changing of the graph paper on the river temperature thermograph throughout the month, continuing this activity as part of the daily checks routine. WELL FIELD MAINTENANCE: Wells No.1 and No.4 were in operation and supplying 1,185 gallons/minute to the facility and incubation building. Weekly test well readings are recorded and sent via fax to CH2MHILL. Also weekly well meter readings are recorded. Well No.5 had been determined to have a faulty drain valve while trying to operate the pump for emergency water usage. It was determined that water was not able to drain and began to flow out from the test hole (TH9). Charlie and Simon pumped out the remaining water from the test hole prior to replacing the valve. The valve was subsequently dug up, replaced and tested for operation. SAFETY AND TRAINING: The winter season has approached and conditions can be hazardous as Cle Elum staff stress safety while working and preparing acclimation sites for upcoming fish transfer. Some examples include wearing proper clothing, extra caution while driving and plowing snow. GROUNDS: Linda Lamebull of fisheries and personnel from Tribal Purchasing came to the hatchery to inventory two way radios.

13 HYDRO ENERGY↗