Post-Closure Inspection and Monitoring Report for Surface Corrective Action Unit 417 at the Central Nevada Test Area, Nevada, Site
This report documents the biennial postclosure site inspections conducted in June 2018 at the surface Corrective Action Unit (CA U) 417 at the Central Nevada Test Area, Nevada, Site. The UC-I, UC-3, and UC-4 sites are inspected every 2 years, in accordance with the Post-Closure Monitoring Plan provided in the CAU 417 Closure Report published in 2001. The requirements for postclosure monitoring have been modified over the years through negotiations with the Nevada Division of Environmental Protection (NDEP). Modifications were documented through three separate Records of Technical Change to the Closure Report, which were approved by NDEP in 2003, 2011, and 2015. The UC-1, UC-3, and UC-4 sites were all observed as being in good condition during the 2018 inspections. A few minor cracks on the UC-1 Central Mud Pit cover were repaired during the UC- I inspection. A concrete monument at the northeast corner of Mud Pit U3E at the UC-3 site had some damage near the top of the monument, but the damage has not impacted the functionality of the monument or survey pin on top of the monument. No issues were identified at the UC-4 site. No maintenance or additional repair activities are recommended at the UC-1, UC-3, and UC-4 sites.