Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Draft Requirements”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

Lightweight Bulldozer Attachment for Construction and Excavation on the Lunar Surface

A lightweight bulldozer blade prototype has been designed and built to be used as an excavation implement in conjunction with the NASA Chariot lunar mobility platform prototype. The combined system was then used in a variety of field tests in order to characterize structural loads, excavation performance and learn about the operational behavior of lunar excavation in geotechnical lunar simulants. The purpose of this effort was to evaluate the feasibility of lunar excavation for site preparation at a planned NASA lunar outpost. Once the feasibility has been determined then the technology will become available as a candidate element in the NASA Lunar Surface Systems Architecture. In addition to NASA experimental testing of the LANCE blade, NASA engineers completed analytical work on the expected draft forces using classical soil mechanics methods. The Colorado School of Mines (CSM) team utilized finite element analysis (FEA) to study the interaction between the cutting edge of the LANCE blade and the surface of soil. FEA was also used to examine various load cases and their effect on the lightweight structure of the LANCE blade. Overall it has been determined that a lunar bulldozer blade is a viable technology for lunar outpost site preparation, but further work is required to characterize the behavior in 1/6th G and actual lunar regolith in a vacuum lunar environment.

Mueller, Robert↗

NRC Perspectives on Waste Incidental to Reprocessing Consultations and Monitoring - 13398

Section 3116 of the Ronald W. Reagan National Defense Authorization Act for Fiscal Year 2005 (NDAA) requires the U.S. Department of Energy (DOE) to consult with the U.S. Nuclear Regulatory Commission (NRC) for certain non-high level waste (HLW) determinations. The NDAA also requires NRC to monitor DOE's disposal actions related to those determinations to assess compliance with NRC regulations in 10 CFR Part 61, Subpart C. The NDAA applies to DOE activities that will remain within the States of South Carolina and Idaho. DOE has chosen to, under DOE Order 435.1, engage in consultation with NRC for similar activities in the State of Washington and New York, however, the NRC has no monitoring responsibilities. In 2007, the NRC developed a draft Final Report for Interim Use entitled, NUREG-1854: NRC Staff Guidance for Activities Related to U.S. Department of Energy Waste Determinations. Since the law was enacted, the DOE and NRC have consulted on three waste determinations within the affected States: (1) the Saltstone Disposal Facility at the Savannah River Site (SRS) within the State of South Carolina in 2005, (2) the INTEC Tank Farm at the Idaho National Laboratory within the State of Idaho in 2006, and (3) the F Tank Farm at SRS in 2011. After the end of consultation and issuance by DOE of the final waste determination, monitoring began at each of these sites, including the development of monitoring plans. In addition to the NDAA sites, DOE has requested NRC consultation support on both individual tanks and the entire C Tank Farm at the Hanford Nuclear Reservation in the State of Washington. DOE also requested consultation of waste determinations performed on the melter and related feed tanks at the West Valley site in New York that would be disposed offsite. In the next few years, NRC and DOE will consult on the last of the NDAA waste determinations for a while, the H Tank Farm waste determination at SRS. DOE may identify other activities in the future but largely NRC's role will change from doing both consultation and monitoring to being focused on monitoring activities within NDAA. DOE has identified other activities at the Hanford Nuclear Reservation that would continue consultation activities but outside of the NDAA in the future. During the past seven years of consultations and monitoring a number of lessons learned about the process, communication issues, and technical guidance have been identified. With the change in focus from reviewing initial performance assessments and draft waste determinations to long-term monitoring (e.g., individual waste tank closure, at F Tank Farm or complete tank farm closure at INTEC expected in the near future), the NRC is going to revise and update its guidance over the next few years to reflect the lessons learned and the change in focus. In addition to the lessons learned, improvements in the guidance will have to account possible rule and guidance changes underway within Part 61. This paper will discuss the initial plans, approaches, and time lines to revise the guidance within NUREG-1854, including opportunities for public involvement. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sustaining Thermal Protection Systems Needed for Uranus Probes

Summary: Achieving Uranus in-situ science objectives through deploying probes in the atmosphere requires thermal protection systems capable of withstanding extreme entry environments. NASA’s 3-D Woven based thermal protection systems (TPS), developed specifically to meet this challenge, are mature, efficient, and capable of withstanding such entry. These science-enabling capabilities need to be sustained, otherwise mission implementation risk may increase to the point that the mission is untenable. The heatshield technology has been developed in concert with industry, and manufacturing processes have been technology transferred. Current technology readiness does not guarantee future availability. Sustainment requires maintaining expertise within NASA as well as ensuring that proven industrial expertise and capabilities will be readily available in the future. A constant awareness and risk assessment followed by risk mitigation are required. The scientific community needs to be aware of these challenges. It needs to engage NASA to ensure these capabilities will be available when needed. As was the case with the atrophy of heritage carbon phenolic that led to developing the 3-D Woven capabilities, our vigilance is again needed to sustain these enabling TPS capabilities for Uranus and for other missions. Background: NASA invested in and developed Heatshield for Extreme Entry Environment Technology (HEEET) TPS that was matured to TRL 6 in 2019 as a tiled system with seams and gap-fillers. Manufacturing readiness included development of specialized looms, molding, and infusion processes using commercial partners. In support of the Mars Sample Return mission, a single-layer, seamless, single-piece variant referred to as 3MDCP (3-D woven Mid-Density Carbon-Phenolic) was developed and is limited to a 1.3m maximum diameter scale due to weaving width limitations of 80”. Molding techniques developed to transform a flat, 2”-thick 3-D woven preform into a sphere-cone shape prior to phenolic resin infusion has been demonstrated. A team at NASA Ames is currently working with industry to demonstrate infusion at full-scale. By 2026, 3MDCP will be at a high level of maturity in technical, manufacturing, and integration readiness as well as material characterization. HEEET and 3MDCP for Uranus Entry: Several system studies have evaluated and baselined 3-D Woven TPS for Uranus entry, both HEEET as well as 3MDCP. If the aeroshell carrying the descent probe is 1.3m or less, then 3MDCP is a very capable and the most mass-efficient choice. If the aeroshell is bigger than 1.3m diameter, then HEEET can meet the mission need as it allows for an aeroshell of any diameter. HEEET and 3MDCP are capable of Saturn in-situ science missions prioritized in the New Frontiers-5 draft Announcement of Opportunity (AO) and if Saturn is the mission of choice, there is a pathway for sustaining the capability. Capability Sustainment: Given NASA’s current budgetary constraints, the postponement of the next New Frontiers AO to no earlier than 2026 and the unknown delay in starting the UOP flagship effort point to potential gap years for the HEEET and 3MDCP capabilities. The first step in capability sustainment is to understand the risks as they emerge, assess those risks, and develop plans to mitigate them. Keeping the science community, who are interested in UOP as well as the larger Giant Planet missions, informed of the emerging challenges requires continuous risk assessment/mitigation. Without these steps, atrophy is more likely within the industrial partners with which NASA has partnered. This presentation will provide more details as well as steps NASA can take to minimize the impact to the UOP mission.

Ethiraj Venkatapathy↗

DRAFT: Accident Tolerant Fuels Draft Implementation Plan

The ATF Implementation Plan integrates DOE’s objectives and goals with the national laboratory’s expertise and infrastructure in support of the technology development by three industry partners. DOE’s plan is to develop advanced LWR fuels with enhanced accident tolerance in response to the Congressional request and to install a lead fuel assembly containing accident tolerant fuel technology in a U.S. commercial nuclear power plant by 2022. DOE has three contracts in place with each of the principle US commercial nuclear fuel vendors in support of ATF research and development, AREVA Services LLC, General Electric, and Westinghouse LLC. The purpose of the ATF Implementation Plan is to describe the technology development and progress required to insert one (or possible two) concepts as a LFR or LFA in a commercial LWR by 2022. In particular, this document shows the integration between the functional documents guiding ATF development and provides a rough order of magnitude estimate of the required budget from FY2016 through FY2022. It is expected that after FY2022, the needed budget request would significantly decrease as works transitions from Phase 2 to Phase 3, corresponding to a decrease in DOE project responsibility and an increase in industry responsibility and associated funding support.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Probabilistic Seismic Hazard Assessment for Iraq

Probabilistic Seismic Hazard Assessments (PSHA) form the basis for most contemporary seismic provisions in building codes around the world. The current building code of Iraq was published in 1997. An update to this edition is in the process of being released. However, there are no national PSHA studies in Iraq for the new building code to refer to for seismic loading in terms of spectral accelerations. As an interim solution, the new draft building code was considering to refer to PSHA results produced in the late 1990s as part of the Global Seismic Hazard Assessment Program (GSHAP; Giardini et al., 1999). However these results are: a) more than 15 years outdated, b) PGA-based only, necessitating rough conversion factors to calculate spectral accelerations at 0.3s and 1.0s for seismic design, and c) at a probability level of 10% chance of exceedance in 50 years, not the 2% that the building code requires. Hence there is a pressing need for a new, updated PSHA for Iraq.

58 GEOSCIENCES↗

Use of Operating Agreements and Energy Storage to Reduce Photovoltaic Interconnection Costs: Technical and Economic Analysis

This report presents an analytical methodology to identify alternative options to manage interconnection costs and streamline interconnection timelines for distribution system-connected photovoltaic (PV) systems not co-located with load. Specifically, the report details the methodology and results of an analysis that: 1. Identifies potential grid violations that would be induced by a PV system requesting interconnection to a distribution circuit; 2. Identifies multiple technically viable options for mitigating the potential violations, including infrastructure upgrades, downsizing the PV system size, curtailment of PV, and addition of battery energy storage; 3. Defines the required technical operating parameters of the system in order to mitigate all potential violations (the "Operating Envelope"); 4. Compares the economics of each option, from the PV developer's perspective. The analysis supports the ongoing evolution of interconnection standards for combined PV and energy storage systems by providing a methodology to define allowable maximum export limits during each hour. The methodology presented could be used by utilities as part of the interconnection study process, to inform negotiations with DER developers and the drafting of mutually acceptable interconnection agreements. The resulting technical operating parameters could be included as part of the interconnection service agreement (ISA) between the system owner and the utility company. The companion report to this analysis, Gill et al. (2022), details the envisioned framework for the implementation of the technical operating parameters.

14 SOLAR ENERGY↗

Proceedings of the 2004 High Spatial Resolution Commercial Imagery Workshop

Topics covered include: NASA Applied Sciences Program; USGS Land Remote Sensing: Overview; QuickBird System Status and Product Overview; ORBIMAGE Overview; IKONOS 2004 Calibration and Validation Status; OrbView-3 Spatial Characterization; On-Orbit Modulation Transfer Function (MTF) Measurement of QuickBird; Spatial Resolution Characterization for QuickBird Image Products 2003-2004 Season; Image Quality Evaluation of QuickBird Super Resolution and Revisit of IKONOS: Civil and Commercial Application Project (CCAP); On-Orbit System MTF Measurement; QuickBird Post Launch Geopositional Characterization Update; OrbView-3 Geometric Calibration and Geopositional Accuracy; Geopositional Statistical Methods; QuickBird and OrbView-3 Geopositional Accuracy Assessment; Initial On-Orbit Spatial Resolution Characterization of OrbView-3 Panchromatic Images; Laboratory Measurement of Bidirectional Reflectance of Radiometric Tarps; Stennis Space Center Verification and Validation Capabilities; Joint Agency Commercial Imagery Evaluation (JACIE) Team; Adjacency Effects in High Resolution Imagery; Effect of Pulse Width vs. GSD on MTF Estimation; Camera and Sensor Calibration at the USGS; QuickBird Geometric Verification; Comparison of MODTRAN to Heritage-based Results in Vicarious Calibration at University of Arizona; Using Remotely Sensed Imagery to Determine Impervious Surface in Sioux Falls, South Dakota; Estimating Sub-Pixel Proportions of Sagebrush with a Regression Tree; How Do YOU Use the National Land Cover Dataset?; The National Map Hazards Data Distribution System; Recording a Troubled World; What Does This-Have to Do with This?; When Can a Picture Save a Thousand Homes?; InSAR Studies of Alaska Volcanoes; Earth Observing-1 (EO-1) Data Products; Improving Access to the USGS Aerial Film Collections: High Resolution Scanners; Improving Access to the USGS Aerial Film Collections: Phoenix Digitizing System Product Distribution; System and Product Characterization: Issues Approach; Innovative Approaches to Analysis of Lidar Data for the National Map; Changes in Imperviousness near Military Installations; Geopositional Accuracy Evaluations of QuickBird and OrbView-3: Civil and Commercial Applications Project (CCAP); Geometric Accuracy Assessment: OrbView ORTHO Products; QuickBird Radiometric Calibration Update; OrbView-3 Radiometric Calibration; QuickBird Radiometric Characterization; NASA Radiometric Characterization; Establishing and Verifying the Traceability of Remote-Sensing Measurements to International Standards; QuickBird Applications; Airport Mapping and Perpetual Monitoring Using IKONOS; OrbView-3 Relative Accuracy Results and Impacts on Exploitation and Accuracy Improvement; Using Remotely Sensed Imagery to Determine Impervious Surface in Sioux Falls, South Dakota; Applying High-Resolution Satellite Imagery and Remotely Sensed Data to Local Government Applications: Sioux Falls, South Dakota; Automatic Co-Registration of QuickBird Data for Change Detection Applications; Developing Coastal Surface Roughness Maps Using ASTER and QuickBird Data Sources; Automated, Near-Real Time Cloud and Cloud Shadow Detection in High Resolution VNIR Imagery; Science Applications of High Resolution Imagery at the USGS EROS Data Center; Draft Plan for Characterizing Commercial Data Products in Support of Earth Science Research; Atmospheric Correction Prototype Algorithm for High Spatial Resolution Multispectral Earth Observing Imaging Systems; Determining Regional Arctic Tundra Carbon Exchange: A Bottom-Up Approach; Using IKONOS Imagery to Assess Impervious Surface Area, Riparian Buffers and Stream Health in the Mid-Atlantic Region; Commercial Remote Sensing Space Policy Civil Implementation Update; USGS Commercial Remote Sensing Data Contracts (CRSDC); and Commercial Remote Sensing Space Policy (CRSSP): Civil Near-Term Requirements Collection Update.

Source record↗

In Situ Disposal to Optimize Decommissioning Waste Management - 17455

Cavendish Fluor Partnership (CFP) is teaming with the UK government's Nuclear Decommissioning Authority (NDA) to explore opportunities for onsite disposal of structures and wastes from decommissioning of twelve Magnox nuclear sites. CFP is piloting implementation of draft guidance issued by the Environmental Agency (EA), Scottish Environmental Protection Agency (SEPA) and Natural Resources Wales (NRW) designed to optimise management of wastes generated in closing nuclear sites positioned across Scotland, Wales and England. Where it can be demonstrated to be the best overall solution for people and the environment, on-site / in situ disposal as an option for optimising waste management could save millions of pounds sterling in the overall costs for site closure as opposed to previous plans that required retrieval, packaging, transportation and offsite disposal of all radioactive wastes generated during site decommissioning. The UK government's Department for Business, Energy and Industrial Strategy (BEIS), NDA, and UK regulators are consulting with stakeholders on a proposal to amend legislation and enable better, more proportionate regulation of nuclear sites in the final stages of decommissioning and clean-up. Practical application of existing UK legislation typically means removing most, if not all, radioactive waste and residual contamination from the nuclear licensed site for disposal or management elsewhere, irrespective of any wider health and safety, social, environmental or economic considerations. Proposed changes to legislation would give greater weight to the environment agencies' guidance and provide for a more sustainable approach where optimization could include on-site/in situ disposal solutions and early opportunities to reuse land with appropriate regulatory oversight. Recent characterization activities at two reactor sites have identified areas of sub-grade low level contamination in structures and soil around used fuel ponds. CFP, a partnership of UK-based Cavendish Nuclear Limited and US-based Fluor Corporation, has initiated preliminary site modelling that indicates much of this material, including significant volumes of sub-grade structures would be conducive for in situ disposal under the new proposed guidance. Based on Fluor experience with similar decommissioning projects at US Department of Energy sites, CFP will look to leverage in situ disposal to optimise decommissioning waste management and consequently optimise overall facility decommissioning strategies. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Getting Beyond Yucca Mountain - 12305

The U.S. Department of Energy has terminated the Yucca Mountain repository project. The U.S. Nuclear Regulatory Commission has indefinitely suspended the Yucca Mountain licensing proceeding. The presidentially-appointed Blue Ribbon Commission (BRC) on America's Nuclear Future is preparing a report, due in January 2012, to the Secretary of Energy on recommendations for a new national nuclear waste management and disposal program. The BRC Draft Report published in July 2011 provides a compelling critique of the past three decades failed efforts in the United States to site storage and disposal facilities for spent nuclear fuel (SNF) and high-level radioactive waste (HLW). However, the BRC Draft Report fails to provide detailed guidance on how to implement an alternative, successful approach to facility site selection. The comments submitted to the BRC by the State of Nevada Agency for Nuclear Projects provide useful details on how the US national nuclear waste program can get beyond the failed Yucca Mountain repository project. A detailed siting process, consisting of legislative elements, procedural elements, and 'rules' for volunteer sites, could meet the objectives of the BRC and the Western Governors Association (WGA), while promoting and protecting the interests of potential host states. The recent termination of the proposed Yucca Mountain repository provides both an opportunity and a need to re-examine the United States' nuclear waste management program. The BRC Draft Report published in July 2011 provides a compelling critique of the past three decades failed efforts in the United States to site storage and disposal facilities for SNF and HLW. It is anticipated that the BRC Final report in January 2012 will recommend a new general course of action, but there will likely continue to be a need for detailed guidance on how to implement an alternative, successful approach to facility site selection. Getting the nation's nuclear waste program back on track requires, among other things, new principles for siting-principles based on partnership between the federal implementing agency and prospective host states. These principles apply to the task of developing an integrated waste management strategy, to interactions between the federal government and prospective host states for consolidated storage and disposal facilities, and to the logistically and politically complicated task of transportation system design. Lessons from the past 25 years, in combination with fundamental parameters of the nuclear waste management task in the US, suggest new principles for partnership outlined in this paper. These principles will work better if well-grounded and firm guidelines are set out beforehand and if the challenge of maintaining competence, transparency and integrity in the new organization is treated as a problem to be addressed rather than a result to be expected. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

U.S. department of energy safety design strategy review and approval beyond critical decision 3 for the high-level waste facility - 15525

The Waste Treatment and Immobilization Plant (WTP) in Hanford, Washington, is the nation's largest environmental remediation construction project. In 2012, at the WTP's High-Level Waste (HLW) Facility, the U.S. Department of Energy (DOE), Office of River Protection (ORP) restricted construction work at the Hazard Category 2 nuclear facility because of unresolved technical issues associated with the facility and of misalignment of the design and nuclear safety basis. By 2013, as additional issues were discovered, ORP limited HLW design and procurement activities. Addressing the technical issues and the misalignment of the design basis with the Preliminary Documented Safety Analysis (PDSA) is a priority for ORP. A proposal was developed to use the concept of a safety design strategy (SDS), as documented in DOE-STD-1189-2008, Integration of Safety into the Design Process, as a planning mechanism to support facility design and PDSA alignment. The standard provides the processes to develop an SDS that will ensure safety is integrated into design early in the project, by the start of preliminary design. Ultimately, as design progresses, an SDS is intended to support development of the project's PDSA. However, in this unique case, the HLW Facility design and construction phase has progressed beyond Critical Decision 3 and DOE-STD-1189-2008 was issued in 2008; 6 years after ORP approved the first WTP PDSA. In July 2013, ORP and the contractor recognized that the unresolved technical issues and design - safety basis misalignment should be addressed through a renewed look at nuclear safety requirements, and agreed that developing an SDS tailored to the criteria in DOE-STD-1189-2008 provided the best path forward to better integrate design and safety. Development of the SDS for the HLW Facility was one of many goals ORP established in a plan that describes how ORP will determine whether, and under what conditions, the contractor should be authorized to proceed with production engineering, procurement, and construction activities for the HLW Facility. Over the next several months, the contractor developed the draft SDS, identifying design basis accidents and control strategies for those accidents. ORP monitored progress and, when appropriate, provided recommendations. In April 2014, the contractor provided a draft SDS to ORP for initial review by an independent DOE Review Team. The Review Team was comprised of representatives from nuclear safety, criticality safety, engineering, fire protection, the Office of Environmental Management, the Assistant Manager WTP, and the DOE Chief of Nuclear Safety. A unique draft document review and interactive review process, facilitated through work sessions and continuous communication with the contractor, culminated in the development of 147 technical comments on topics varying from SDS implementation to hydrogen deflagration in vessels. Comment resolution sought to improve project clarity, delineation of control strategies, and, holistically, facilitate integration of safety into design in the SDS, as it will guide the restart of the HLW Facility production engineering and limited procurement and construction activities. All comments were resolved in support of a contractor submission of the final SDS to ORP at the end of June 2014. Successful resolution of these comments was achieved by continuing the real-time response and incorporation interaction with the contractor to ensure that mutual objectives were satisfied. The response times were facilitated through telephone, E-mail, and a shared file server accessible to contractor and DOE reviewers across the DOE complex. As a measure of success of this process, the Safety Basis Approval Authority (ORP Manager) and the WTP Federal Project Director approved the SDS on August 1, 2014, with no conditions of approval. DOE and the contractor recognized that it would be difficult to implement the SDS without changes to the existing contractor's engineering and nuclear safety processes. Accordingly, the contractor developed or revised a significant number of engineering and nuclear safety plans and procedures to implement the SDS into the design process. Over the coming year, the contractor will conduct a gap analysis between the SDS and the presently approved PDSA to incorporate the design basis accidents and preferred control strategies developed from the SDS into the PDSA. In addition, ORP will conduct an assessment of the contractor's implementation of the SDS into the design process at the appropriate stage of implementation, within 6 to 12 months of approval. Although the SDS was developed late in the HLW project timeline, the document will facilitate alignment of design and the safety basis, and is a key step in the return to full production engineering for the HLW Facility. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

USABILITY EXTENSION OF THE ŠKODA VPVR/M CASK FOR TRANSPORTING IRRADIATED FUEL ASSEMBLIES

New abstract from the final version being submitted now: This paper discusses the evolution and enhanced usability of the ŠKODA VPVR/M cask for the transport of irradiated fuel assemblies, particularly within the context of the demand for the delivery of newly appearing irradiated HEU fuel types for which the cask did not yet have a license to transport. Over time, the cask’s internal basket construction has demonstrated notable adaptability to accommodate various exotic HEU fuel types from research reactors of differing origins. The paper outlines sever-al custom internal baskets developed for specific fuel types, including those from Belarus and Serbia, as well as from Georgia, Uzbekistan, and MNSR cores, as well as a recently designed basket for MTR and TRIGA assemblies. The findings high-light the high flexibility and adaptability of the cask, supported by successful rede-signs and licensing efforts, underscoring its value for the safe and secure transport of nuclear material. Old abstract from the draft version that was already approved: The Russian Research Reactor Fuel Return (RRRFR) program, since its inception, has continuously used the ŠKODA VPVR/M Cask fleet designed for the repatriation of irradiated highly enriched uranium (HEU) fuel. As the program progressed (from shut-down and a quasi-abandoned reactor, and/or as it began to include fuels of Chinese and US origin), new challenges emerged for the transport Cask. These were fuel types that had not yet been licensed for the Cask. Although these requirements did not arise during the design of the basic ŠKODA VPVR/M Cask, as revealed by the retrospective analyses, the Internal Basket of the ŠKODA VPVR/M Cask gives a high degree of flexibility to accommodate additional fuel types. This paper provides a brief overview of the ŠKODA VPVR/M Cask, which holds a B(U) type license, and introduces the different types of Internal Baskets that have already been licensed to transport so-called exotic irradiated HEU fuel types, in addition to the original license. The paper presents a new Internal Basket design for accommodating MTR-type and TRIGA-type irradiated HEU fuel assemblies. This includes a detailed presentation of the design basis and the new MTR-TRIGA Internal Basket, as well as the licensing matters of the package under the name ŠKODA MTR-TRIGA Cask, and the conformity test (dry- and wet-run) operations made to verify compliance with the new Internal Basket. Then, as a summary, the usage record for the Cask fleet is presented, and finally, the paper concludes with the consolidated experiences gained during the utilization of the ŠKODA VPVR/M Cask fleet, emphasizing the high degree of Cask flexibility ensured by the Internal Basket’s construction.

42 - ENGINEERING↗

Training program to prepare the U.S. DOE laboratories for the entry into force of the protocol additional to the agreement between the United States of America and the International Atomic Energy Agency for the application of safeguards in the United

In 2008, a joint team from Brookhaven National Laboratory (BNL) and Los Alamos National Laboratory (LANL) consisting of specialists in training IAEA inspectors in the use of complementary access activities formulated a training program to prepare the U.S DOE laboratories for the entry into force of the U.S. Additional Protocol. Since the U.S. Additional Protocol would allow for IAEA access to the DOE laboratories under the aegis of complementary access activities, the DOE laboratories would need to prepare for such visits. The goal of the training was to ensure that the DOE laboratories would successfully host an IAEA complementary access. In doing so, the labs must be able to provide the IAEA with the information that the IAEA would need to resolve its questions about the U.S. Declaration and declared activities at the lab, and also protect certain equities, as provided under the U.S. Additional Protocol Article 1.b and c. which set forth a 'National Security Exclusion.' This 'NSE' states that the AP provisions apply within the United States 'excluding only instances where its application would result in access by the Agency to activities with direct national security significance to the United States or to location or information associated with such activities.' These activities are referred to collectively as DNSS-direct national security significance. Furthermore, the U.S. has a specific right to employ managed access, without prejudice to the right under Article 1.b, in connection with activities of DNSS. The provisions in Articles 1.b and 1.c are unique to the U.S. AP, and are additional to the more general right, under Article 7, to use managed access to protect from disclosure proprietary and/or proliferation-sensitive information, and to meet safety and security requirements, that is incorporated directly from the Model Additional Protocol. The BNL-LANL team performed training at Lawrence Livermore National Laboratory, Idaho National Laboratory, and Oak Ridge National Laboratory to cover the situations that these labs, which respectively represent nuclear weapons labs, nuclear energy labs, and science labs and environmental management sites, would encounter during a complementary access. Each of the three labs hosted a mock complementary access activity, which included mock inspectors from the BNL-LANL team. In addition to reviewing the draft declarations from each of the host labs, the BNL-LANL team conducted open source research in a manner similar to what IAEA inspectors would do to research the activities at a location and prepare questions for the location to answer and that would be the focus of a complementary access. The host labs and other labs attending the training found the training to be extremely useful and helpful in making sure that each lab's Additional Protocol team had made correct declarations of nuclear activities, had properly trained staff ready to host and answer IAEA inquiries, and would implement managed access during a complementary access that would provide access by the IAEA team to resolve questions or inconsistencies about a particular declaration and still protect the information addressed by Articles 1 and 7 of the U.S. AP.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Building America Best Practices Series, Volume 10: Retrofit Techniques and Technologies: Air Sealing

This report was prepared by PNNL for the U.S. Department of Energy Building America Program. The report provides information to home owners who want to make their existing homes more energy efficient by sealing leaks in the building envelope (ceiling, walls, and floors) that let in drafts and let conditioned air escape. The report provides descriptions of 19 key areas of the home where air sealing can improve home performance and energy efficiency. The report includes suggestions on how to find a qualified weatherization or home performance contractor, what to expect in a home energy audit, opportune times for performing air sealing, and what safety and health concerns to be aware of. The report describes some basic building science concepts and topics related to air sealing including ventilation, diagnostic tools, and code requirements. The report will be available for free download from the DOE Building America website. It is a suitable consumer education tool for home performance and weatherization contractors to share with customers to describe the process and value of home energy retrofits.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Scaling Theory for Pulsed Jet Mixed Vessels, Sparging, and Cyclic Feed Transport Systems for Slurries

This document is a previously unpublished work based on a draft report prepared by Pacific Northwest National Laboratory (PNNL) for the Hanford Waste Treatment and Immobilization Plant (WTP) in 2012. Work on the report stopped when WTP’s approach to testing changed. PNNL is issuing a modified version of the document a year later to preserve and disseminate the valuable technical work that was completed. This document establishes technical bases for evaluating the mixing performance of Waste Treatment Plant (WTP) pretreatment process tanks based on data from less-than-full-scale testing, relative to specified mixing requirements. The technical bases include the fluid mechanics affecting mixing for specified vessel configurations, operating parameters, and simulant properties. They address scaling vessel physical performance, simulant physical performance, and “scaling down” the operating conditions at full scale to define test conditions at reduced scale and “scaling up” the test results at reduced scale to predict the performance at full scale. Essentially, this document addresses the following questions: • Why and how can the mixing behaviors in a smaller vessel represent those in a larger vessel? • What information is needed to address the first question? • How should the information be used to predict mixing performance in WTP? The design of Large Scale Integrated Testing (LSIT) is being addressed in other, complementary documents.

non-Newtonian↗

FHR Generic Design Criteria

The purpose of this document is to provide an initial, focused reference to the safety characteristics of and a licensing approach for Fluoride-Salt-Cooled High-Temperature Reactors (FHRs). The document does not contain details of particular reactor designs nor does it attempt to identify or classify either design basis or beyond design basis accidents. Further, this document is an initial attempt by a small set of subject matter experts to document the safety and licensing characteristics of FHRs for a larger audience. The document is intended to help in setting the safety and licensing research, development, and demonstration path forward. Input from a wider audience, further technical developments, and additional study will be required to develop a consensus position on the safety and licensing characteristics of FHRs. This document begins with a brief overview of the attributes of FHRs and then a general description of their anticipated safety performance. Following this, an overview of the US nuclear power plant approval process is provided that includes both test and power reactors, as well as the role of safety standards in the approval process. The document next describes a General Design Criteria (GDC) - based approach to licensing an FHR and provides an initial draft set of FHR GDCs. The document concludes with a description of a path forward toward developing an FHR safety standard that can support both a test and power reactor licensing process.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

FHR Generic Design Criteria

The purpose of this document is to provide an initial, focused reference to the safety characteristics of and a licensing approach for Fluoride-Salt-Cooled High-Temperature Reactors (FHRs). The document does not contain details of particular reactor designs nor does it attempt to identify or classify either design basis or beyond design basis accidents. Further, this document is an initial attempt by a small set of subject matter experts to document the safety and licensing characteristics of FHRs for a larger audience. The document is intended to help in setting the safety and licensing research, development, and demonstration path forward. Input from a wider audience, further technical developments, and additional study will be required to develop a consensus position on the safety and licensing characteristics of FHRs. This document begins with a brief overview of the attributes of FHRs and then a general description of their anticipated safety performance. Following this, an overview of the US nuclear power plant approval process is provided that includes both test and power reactors, as well as the role of safety standards in the approval process. The document next describes a General Design Criteria (GDC)–based approach to licensing an FHR and provides an initial draft set of FHR GDCs. The document concludes with a description of a path forward toward developing an FHR safety standard that can support both a test and power reactor licensing process.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Critical biogeochemical functions in the subsurface are associated with bacteria from new phyla and little studied lineages

Nitrogen, sulfur and carbon fluxes in the terrestrial subsurface are determined by the intersecting activities of microbial community members, yet the organisms responsible are largely unknown. Metagenomic methods can identify organisms and functions, but genome recovery is often precluded by data complexity. To address this limitation, we developed subsampling assembly methods to re-construct high-quality draft genomes from complex samples. Here, we applied these methods to evaluate the interlinked roles of the most abundant organisms in biogeochemical cycling in the aquifer sediment. Community proteomics confirmed these activities. The eight most abundant organisms belong to novel lineages, and two represent phyla with no previously sequenced genome. Four organisms are predicted to fix carbon via the Calvin Benson Bassham, Wood Ljungdahl or 3-hydroxyproprionate/4-hydroxybutarate pathways. The profiled organisms are involved in the network of denitrification, dissimilatory nitrate reduction to ammonia, ammonia oxidation and sulfate reduction/oxidation, and require substrates supplied by other community members. An ammonium-oxidizing Thaumarchaeote is the most abundant community member, despite low ammonium concentrations in the groundwater. Finally, this organism likely benefits from two other relatively abundant organisms capable of producing ammonium from nitrate, which is abundant in the groundwater. Overall, dominant members of the microbial community are interconnected through exchange of geochemical resources.

60 APPLIED LIFE SCIENCES↗

High Temperature Reactor Research and Development Roadmap, Draft for Public Comment

Nuclear power provides clean, reliable energy, contributing about 20 percent of the electricity generated in the United States. It supplies approximately 60 percent of our non-greenhouse-gas emitting power, making it our nation’s single largest contributor of carbon-free electricity. This vital component of the U.S. energy portfolio avoids hundreds of millions of tons of carbon dioxide emissions each year and supports hundreds of thousands of U.S. jobs, and yet is facing unprecedented challenges. Complex market factors, falling alternative generation costs and lower electricity demand forecasts have made operating nuclear power plants uneconomical in some parts of the country. The industry is confronting premature shut downs, a lack of new plants in the pipeline, profound market challenges and intense financing requirements. However, none of these challenges reflect a reduced need for this reliable and clean source of baseload power. Our nation’s nuclear sector urgently needs to adjust to these challenges to ensure continued availability of this vital national energy resource. The Department of Energy and its national laboratories are aggressively working to revive, revitalize, and expand U.S. nuclear energy capacity. We are advancing nuclear energy technologies through targeted early-stage investments to ensure a strong domestic industry now and into the future. By leveraging public-private partnerships and the national laboratory system, we are developing an advanced nuclear infrastructure, encouraging a resilient supply chain, and promoting a strong nuclear pipeline. A key element of this effort is to support the recent and rapid expansion in innovative advanced reactor development already being led by the U.S. nuclear industry. Advanced reactors, particularly non-light water reactor concepts, offer the potential for significant improvements to safety, economics and environmental performance, to help sustain and expand the availability of nuclear power as a clean, reliable and secure power source for our nation. As part of this strategy, the Department of Energy commissioned the development of technology roadmaps for advanced non-light-water reactor concepts. The starting point for the roadmaps is the technical readiness assessment performed as part of an advanced test and demonstration reactor study released in 2016 [ ]. The roadmaps show the Research and Development (R&D) needed to support demonstration of advanced reactor concepts, for either engineering demonstration or commercial demonstration depending on concept maturity, by 2035. The starting point for the roadmaps is the technical readiness assessment performed as part of an advanced test and demonstration reactor study released in 2016. The roadmaps were developed based on a review of technical reports and vendor literature summarizing the technical maturity of each concept and the outstanding R&D needs. Tasks for specific systems were highlighted on the basis of time and resources needed to complete the tasks and the importance of the system to the performance of the reactor concept. The roadmaps are intended to be generic (i.e., not specific to a particular vendor’s design); however, features of the General Atomics Energy Multiplier Module were included to provide specific examples for illuminating needed R&D tasks to be conducted in support of demonstration in the near future.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗