Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “December 2010”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

Pacific decadal oscillation causes fewer near-equatorial cyclones in the North Indian Ocean

Tropical cyclones do not form easily near the equator but can intensify rapidly, leaving little time for preparation. We investigate the number of near-equatorial (originating between 5°N and 11°N) tropical cyclones over the north Indian Ocean during post-monsoon season (October to December) over the past 60 years. The study reveals a marked 43% decline in the number of such cyclones in recent decades (1981–2010) compared to earlier (1951–1980). Here, we show this decline in tropical cyclone frequency is primarily due to the weakened low-level vorticity modulated by the Pacific Decadal Oscillation (PDO) and increased vertical wind shear. In the presence of low-latitude basin-wide warming and a favorable phase of the PDO, both the intensity and frequency of such cyclones are expected to increase. Such dramatic and unique changes in tropical cyclonic activity due to the interplay between natural variability and climate change call for appropriate planning and mitigation strategies.

54 ENVIRONMENTAL SCIENCES↗

MAGNETIC FLUX CONSERVATION IN THE HELIOSHEATH

Voyager 1(V1) and Voyager 2(V2) have observed heliosheath plasma since 2005 December and 2007 August, respectively. The observed speed profiles are very different at the two spacecrafts. Speeds at V1 decreased to zero in 2010 while the average speed at V2 is a constant 150 km s{sup -1} with the direction rotating tailward. The magnetic flux is expected to be constant in these heliosheath flows. We show that the flux is constant at V2 but decreases by an order of magnitude at V1, even after accounting for divergence of the flows and changes in the solar field. If reconnection were responsible for this decrease, the magnetic field would lose 70% of its free energy to reconnection and the energy density released would be 0.6 eV cm{sup -3}.

79 ASTRONOMY AND ASTROPHYSICS↗

Energy Zones Study: A Comprehensive Web-Based Mapping Tool to Identify and Analyze Clean Energy Zones in the Eastern Interconnection

This report describes the work conducted in support of the Eastern Interconnection States’ Planning Council (EISPC) Energy Zones Study and the development of the Energy Zones Mapping Tool performed by a team of experts from three National Laboratories. The multi-laboratory effort was led by Argonne National Laboratory (Argonne), in collaboration with the National Renewable Energy Laboratory (NREL) and Oak Ridge National Laboratory (ORNL). In June 2009, the U.S. Department of Energy (DOE) and the National Energy Technology Laboratory published Funding Opportunity Announcement FOA-0000068, which invited applications for interconnection-level analysis and planning. In December 2009, the Eastern Interconnection Planning Collaborative (EIPC) and the EISPC were selected as two award recipients for the Eastern Interconnection. Subsequently, in 2010, DOE issued Research Call RC-BM-2010 to DOE’s Federal Laboratories to provide research support and assistance to FOA-0000068 awardees on a variety of key subjects. Argonne was selected as the lead laboratory to provide support to EISPC in developing a methodology and a mapping tool for identifying potential clean energy zones in the Eastern Interconnection. In developing the EISPC Energy Zones Mapping Tool (EZ Mapping Tool), Argonne, NREL, and ORNL closely collaborated with the EISPC Energy Zones Work Group which coordinated the work on the Energy Zones Study. The main product of the Energy Zones Study is the EZ Mapping Tool, which is a web-based decision support system that allows users to locate areas with high suitability for clean power generation in the U.S. portion of the Eastern Interconnection. The mapping tool includes 9 clean (low- or no-carbon) energy resource categories and 29 types of clean energy technologies. The EZ Mapping Tool contains an extensive geographic information system database and allows the user to apply a flexible modeling approach for the identification and analysis of potential energy zones and is publicly available at http://eispctools.anl.gov. In addition to enabling EISPC members and other stakeholders to identify areas with a high concentration of clean energy resources that could provide significant power generation in the future, another objective of the study was to promote open and transparent collaboration among state-level energy planning and regulatory agencies and to foster consistent and coordinated direction for regional and interconnection-level electricity analyses and planning. Funding for the project was provided by DOE’s Office of Electricity Delivery and Energy Reliability (DOE/OE) under the American Recovery and Reinvestment Act. Page

24 POWER TRANSMISSION AND DISTRIBUTION↗

SECARB Collect Data via Logging, Testing, and Sampling and Distribute to Project Team

Data collection was conducted from Phase III Project start date with completion of the NEPA review in Spring for 2009, through an intense characterization period during well drilling in the summer of 2009, to the start of injection December 1, 2009. During the early stages of injection, data collection was very intense. With staff onsite on 24 hour shifts until January, 2010. Detailed data collection was completed episodically during 2010, with an high injection rate in a tracer study completed during the spring of 2010, and then a repeat seismic survey with borehole gravity, VSP, cross-well and sonic logging conducted during the fall of 2010. By the report date at the end of 2011, data had been compiled and distributed to the team for analysis.

54 ENVIRONMENTAL SCIENCES↗

Establishment of Small Wind Regional Test Centers: Preprint

The rapid growth of the small wind turbine (SWT) market is attracting numerous entrants. Small wind turbine purchasers now have many options but often lack information (such as third-party certification) to select a quality turbine. Most SWTs do not have third-party certification due to the expense and difficulty of the certification process. Until recently, the only SWT certification bodies were in Europe. In North America, testing has been limited to a small number of U.S. Department of Energy (DOE) subsidized tests conducted at the National Wind Technology Center (NWTC) under the ongoing Independent Testing Project. Within the past few years, the DOE, National Renewable Energy Lab (NREL), and some states have worked with the North American SWT industry to create a SWT certification infrastructure. The goal is to increase the number of certified turbines and gain greater consumer confidence in SWT technology. The American Wind Energy Association (AWEA) released the AWEA Small Wind Turbine Performance and Safety Standard (AWEA Standard 9.1 - 2009) in December 2009. The Small Wind Certification Council (SWCC), a North American certification body, began accepting applications for certification to the AWEA standard in February 2010. To reduce certification testing costs, DOE/NREL is providing financial and technical assistance for an initial round of tests at four SWT test sites which were selected via a competitive solicitation. The four organizations selected are Windward Engineering (Utah), The Alternative Energy Institute at West Texas A&M (Texas), a consortium consisting of Kansas State University and Colby Community College (Kansas), and Intertek (New York). Each organization will test two small wind turbines as part of their respective subcontract with DOE/NREL. The testing results will be made publically available. The goal is to establish a lower-cost U.S. small wind testing capability that will lead to increased SWT certification.

17 WIND ENERGY↗

Establishment of Small Wind Regional Test Centers

The rapid growth of the small wind turbine (SWT) market is attracting numerous entrants. Small wind turbine purchasers now have many options, but often lack information (such as third-party certification) to select a quality turbine. Most SWTs do not have third-party certification due to the expense and difficulty of the certification process. Until recently, the only SWT certification bodies were in Europe. In North America, testing has been limited to a small number of U.S. Department of Energy (DOE) subsidized tests conducted at the National Renewable Energy Laboratory's (NREL) National Wind Technology Center (NWTC) under the ongoing Independent Testing Project. During the past few years, DOE, the National Renewable Energy Laboratory (NREL), and some states have worked with the North American SWT industry to create a SWT certification infrastructure. The goal is to increase the number of certified turbines and gain greater consumer confidence in SWT technology. The American Wind Energy Association (AWEA) released the AWEA Small Wind Turbine Performance and Safety Standard, AWEA Standard 9.1 - 2009, in December 2009. The Small Wind Certification Council (SWCC) and Intertek, North American SWT certification bodies, began accepting applications for certification to the AWEA standard in 2010. To reduce certification testing costs, DOE and NREL are providing financial and technical assistance for an initial round of tests at four SWT test sites, which were selected through a competitive solicitation. The four organizations selected are Windward Engineering (Utah), The Alternative Energy Institute at West Texas A and M (Texas), a consortium consisting of Kansas State University and Colby Community College (Kansas), and Intertek (New York). Each organization will test two small wind turbines as part of their respective subcontracts with DOE and NREL. The testing results will be made publically available. The goal is to establish a lower-cost U.S. small wind testing capability that will lead to increased SWT certification. Turbine installation is ongoing. Testing began in early 2011 and is scheduled to conclude in mid-late 2012.

17 WIND ENERGY↗

Summary of Calcine Disposal Development Using Hot Isostatic Pressing

Battelle Energy Alliance, LLC, has demonstrated the effectiveness of the hot isostatic press (HIP) process for treatment of hazardous high-level waste known as calcine that is stored at the Idaho Nuclear Technology and Engineering Center (INTEC) at Idaho National Laboratory. HIP trials performed with simulated calcines at Idaho National Laboratory’s Materials and Fuels Complex and an Australian Nuclear Science and Technology Organization facility from 2007 to 2010 produced a dense, monolithic waste form with increased chemical durability and effective (storage) volume reductions of ~10 to ~70% compared to granular calcine forms. In December 2009, the U.S. Department of Energy signed an amended Record of Decision selecting HIP technology as the treatment method for the 4,400 m3 of granular zirconia and alumina calcine stored at INTEC. Testing showed that HIP treatment reduces the risks associated with radioactive and hazardous constituent release, post-production handling, and long-term (repository) storage of calcines and would result in estimated storage cost savings in the billions of dollars. Battelle Energy Alliance has the ability to complete pilot-scale HIP processing of INTEC calcine, which is the next necessary step in implementing HIP processing as a calcine treatment method.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Progress Updates for the Hanford Waste Treatment and Immobilization Plant Project - 17275

The Waste Treatment and Immobilization Plant (WTP) Project is vital to the U.S. Department of Energy's (DOE) mission to cleanup radioactive waste at the Hanford Site, located in southeastern Washington State. The overall WTP Project objective is to design, build, and commission the facilities and systems that will treat and immobilize approximately 211 983 m{sup 3} (56 million gallons) of radioactive waste stored in Hanford's 177 underground storage tanks. The combination of technologies in the WTP makes it a first-of-a-kind facility at a scale larger than ever built for radioactive waste processing. In 2012, DOE suspended production work on the WTP's Pretreatment (PT) Facility and to a lesser degree the High-Level Waste (HLW) Facility because of unresolved technical issues associated with those facilities. DOE is proceeding with its approach to complete the WTP Project in phases, which includes the following principal actions: - Completing construction of the Low-Activity Waste (LAW) Facility, Balance of Facilities (BOF), and Analytical Laboratory (LAB), collectively known as LBL; - Implementing a direct-feed low-activity waste (DFLAW) process to treat low-activity waste independent of the PT Facility; - Completing the design and construction of the HLW Facility; - Resolving the technical issues associated with the PT Facility; - Completing all WTP facilities to enable integrated WTP operations. In March 2016, a federal judge amended the 2010 Consent Decree, establishing revised milestone dates for the Hanford WTP that generally align with DOE's plans for completing the WTP facilities in sequence. In December 2016, DOE executed a contract modification and approved a change to the project's performance baseline to complete the LBL facilities and incorporate modifications needed to accommodate direct feed of low-activity waste to the LAW Facility. The contract modification and revised performance baseline support completion of hot commissioning of the WTP facilities needed for DFLAW operations no later than December 31, 2023. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Study of movement of the western and central belts of Peninsular Malaysia using GPS data analysis

Since the large earthquakes in Sumatera and Nias, there were some tremors incidents at Bukit Tinggi. Therefore, a study on the earth’s crust movement and the effects of the earthquake in Indonesia on the tectonic blocks of Peninsular Malaysia have been carried out using GPS data analysis. GPS data from five MyRTKnet stations within Peninsular Malaysia have been analyzed to monitor the movement of two major tectonic blocks of Peninsular Malaysia which are the western belt represented by the Behrang (BEHR) and UPM Serdang (UPMS) stations and the central belt represented by Bentong (BENT), Jerantut (JRNT) and Temerloh (TLOH) stations. GPS data recorded from 2005 to 2010 were analysed based on horizontal and vertical displacements of the respective stations by using Trimble Business Centre (TBC) software. Based on the results of accumulated displacements of recorded GPS data from January 2006 to December 2013, it shows that the western belt which represented by UPMS has shifted 0.096m towards northwest with changes of ellipsoidal height of +0.030m while the central belt which represented by TLOH has shifted 0.080m towards northwest with changes of ellipsoidal height of −0.015m. Meanwhile, BENT station which is located on the Bentong-Raub suture zone turns to its original position as well as JRNT station. However, BEHR station which are located in western belt do not show any movements. All of these movements may be due to the influence of reactive faults in the stations area stimulated by several large earthquakes that occurred in 2005 to 2010. Study on using the GPS data analysis and combine with integrated geophysical methods are necessary to understand in detail about the tectonic evolution of Peninsular Malaysia.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Moisture Monitoring at Area G, Technical Area 54, Los Alamos National Laboratory, 2016 Status Report

Hydrological characterization and moisture monitoring activities provide data required for evaluating the transport of subsurface contaminants in the unsaturated and saturated zones beneath Area G, and for the Area G Performance Assessment and Composite Analysis. These activities have been ongoing at Area G, Technical Area 54 of the Los Alamos National Laboratory since waste disposal operations began in 1957. This report summarizes the hydrological characterization and moisture monitoring activities conducted at Area G. It includes moisture monitoring data collected from 1986 through 2016 from numerous boreholes and access tubes with neutron moisture meters, as well as data collected by automated dataloggers for water content measurement sensors installed in a waste disposal pit cover, and buried beneath the floor of a waste disposal pit. This report is an update of a nearly identical report by Levitt et al., (2015) that summarized data collected through early 2015; this report includes additional moisture monitoring data collected at Pit 31 and the Pit 38 extension through December, 2016. It also includes information from the Jennings and French (2009) moisture monitoring report and includes all data from Jennings and French (2009) and the Draft 2010 Addendum moisture monitoring report (Jennings and French, 2010). For the 2015 version of this report, all neutron logging data, including neutron probe calibrations, were investigated for quality and pedigree. Some data were recalculated using more defensible calibration data. Therefore, some water content profiles are different from those in the Jennings and French (2009) report. All of that information is repeated in this report for completeness. Monitoring and characterization data generally indicate that some areas of the Area G vadose zone are consistent with undisturbed conditions, with water contents of less than five percent by volume in the top two layers of the Bandelier tuff at Area G. These data also indicate that other areas of the vadose zone are affected by waste disposal activities that have been ongoing at Area G since 1957, a period of nearly 60 years. In some areas, water content profiles indicate increases in water content to depths of tens of meters, especially in areas covered by asphalt and structures.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hubble Space Telescope Servicing Mission 3A

The Hubble Space Telescope's purpose is to spend 20 years probing the farthest and faintest reaches of the cosmos. Crucial to fulfilling this objective is a series of on-orbit servicing missions. Hubble was placed in orbit on April 25, 1990, by the shuttle Discovery and subsequent servicing followed in December 1993 and February 1997. The third in the series of planned servicing missions for the Hubble Space Telescope was scheduled for June 2000. This third Servicing Mission has been separated into two flights. The first of these flights, Servicing Mission 3A, is scheduled for December 1999, and the second, Servicing Mission 3B, is scheduled for 2001. The fourth Servicing Mission is scheduled for 2003 with a "close-out" Mission in 2010. Three instruments are currently in active scientific use on Hubble - the Wide Field and Planetary Camera 2, the Space Telescope Imaging Spectrograph, and Fine Guidance Sensor I R, which has been designated as the prime FGS for astrometric science. Other instrument bays are occupied by the Near Infrared Camera and Multi-Object Spectrometer (NICMOS), which is now dormant due to the depletion of its solid nitrogen cryogen, the Faint Object Camera, which has been decommissioned, and the corrective optical device called COSTAR, which is no longer needed.

Source record↗

FERMI GAMMA-RAY SPACE TELESCOPE OBSERVATIONS OF THE GAMMA-RAY OUTBURST FROM 3C454.3 IN NOVEMBER 2010

The flat-spectrum radio quasar 3C454.3 underwent an extraordinary 5 day {gamma}-ray outburst in 2010 November when the daily flux measured with the Fermi Large Area Telescope (LAT) at photon energies E > 100 MeV reached (66 {+-} 2) x 10{sup -6} photons cm{sup -2} s{sup -1}. This is a factor of three higher than its previous maximum flux recorded in 2009 December and {approx}> 5 times brighter than the Vela pulsar, which is normally the brightest source in the {gamma}-ray sky. The 3 hr peak flux was (85 {+-} 5)x10{sup -6} photons cm{sup -2} s{sup -1}, corresponding to an apparent isotropic luminosity of (2.1 {+-} 0.2)x10{sup 50} erg s{sup -1}, the highest ever recorded for a blazar. In this Letter, we investigate the features of this exceptional event in the {gamma}-ray band of the Fermi-LAT. In contrast to previous flares of the same source observed with the Fermi-LAT, clear spectral changes are observed during the flare.

79 ASTRONOMY AND ASTROPHYSICS↗

Progress Updates for the Hanford Waste Treatment and Immobilization Plant Project - 18327

The Waste Treatment and Immobilization Plant (WTP) Project is vital to the U.S. Department of Energy's (DOE) mission to cleanup radioactive waste at the Hanford Site, located in southeastern Washington State. The overall WTP Project objective is to design, build, and commission the facilities and systems that will treat and immobilize approximately 56 million gallons of radioactive waste stored in Hanford's 177 underground storage tanks. The combination of technologies in the WTP makes it a first-of-a-kind facility at a scale larger than ever, built for radioactive waste processing. DOE is proceeding with its approach to complete the WTP Project in phases, which includes the following principal actions: - Completing construction of the Low-Activity Waste (LAW) Facility, Balance of Facilities (BOF), and Analytical Laboratory (LAB) (collectively referred to as LBL); - Implementing a direct-feed low-activity waste (DFLAW) process to treat low-activity waste independent of the Pretreatment (PT) Facility; - Resolving the technical issues associated with primarily the PT Facility; - Completing the design and construction of the High-Level Waste (HLW) and PT facilities to enable integrated WTP operations. In March 2016, a federal judge amended the 2010 Consent Decree 1 completion milestones for the Hanford WTP, which generally aligns with DOE's plans for completing the WTP facilities in sequence: - Complete LAW Facility hot commissioning: December 31, 2023; - Complete HLW Facility hot commissioning: December 31, 2033; - Complete PT Facility hot commissioning: December 31, 2033; - Achieve initial plant operations for the WTP: December 31, 2036. Having established milestones for completing the WTP facilities has enabled DOE to formally implement its plans for completing the WTP facilities in sequence, starting with the LAW Facility. In December 2016, DOE executed a contract modification and approved a change to the project's performance baseline to complete the LBL facilities and incorporate modifications needed to allow direct feed of low-activity waste to the LAW Facility. Significant progress has been made toward completing the design, construction, and planning for commissioning of the facilities needed to enable the DFLAW operations to commence as early as January 2022. In 2012, DOE partially suspended production work on the WTP's PT Facility and to a lesser degree the HLW Facility because of unresolved technical issues associated with those facilities. In September 2017, DOE acknowledged the WTP contractor had met all the criteria for full resumption of engineering, procurement, and construction (EPC) activities for the HLW Facility. By December 2017, DOE had completed the actions needed to resolve the six of the eight primary technical issues associated with the PT Facility, with the remaining two issues expected to be resolved in the first quarter of 2018. Although significant progress has been made to prepare for resuming production activities for the HLW and PT facilities, DOE has made the decision to constrain EPC work on those facilities in the near term based on DOE's higher priority of completing the WTP facilities needed to begin DFLAW operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Launch Complex 34, SWMU Cc054 2021 DNAPL Source Zone Operations, Maintenance, and Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ) and Hot Spot 6 (HS 6) Air Sparge (AS) System presents the results of Year 12 operation of the hydraulic containment (HC) Interim Measure (IM), the results of performance monitoring direct-push technology (DPT) sampling and monitoring well sampling conducted in the DSZ, and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. Site-wide biennial LTM sampling was not conducted during this reporting period and is scheduled to be conducted in December 2022. The timeframe for activities documented in this PMR extends from April 1, 2021 to March 31, 2022. LC34 has been designated Solid Waste Management Unit CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act Corrective Action Program. The objective of the HC IM at LC34 is to contain the DSZ and deep dissolved-phase trichloroethene (TCE) high concentration plume via operation of a hydraulic containment system (HCS). The pre-IM design 300 micrograms per liter (μg/L) TCE groundwater contour was used to establish the deep zone capture area for deep recovery wells, and the shallow zone capture area was defined by the DSZ. The system began operating in 2010, and in 2015, the system was expanded to provide HC for areas within the 300 μg/L TCE groundwater isocontours of HS 3 and 4. In 2018 and 2019, an investigation was conducted to re-characterize the DSZ, which included investigating TCE mass in Layer 7. This data was subsequently used to optimize the pumping rates of the HCS to more adequately capture residual contaminant mass. The operational period for Year 12 of the HCS was from April 1, 2021 to March 31, 2022. Operational runtime for the system was 94 percent during Year 12, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2022, a total of 285,712,801 gallons of groundwater containing 84,933 pounds of VOCs have been removed by the HCS. Influent concentrations of TCE have decreased since startup from approximately 280,000 µg/L (January 2010) to 12,000 µg/L (March 2022). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in December 2021 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events in 2017, 2018, 2019, and 2020. Full vertical profile sampling was completed at each DPT from 8 to 98 ft bls, at 5 foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 µg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations at depths ranging from 8 to 98 ft bls. An overall increasing trend of TCE concentrations was observed in DPT samples during this reporting period, which may be due to several recovery wells that were turned off during the AS Pilot Study in the DSZ that operated from July 2021 to February 2022 (documented separately from this report). The maximum TCE concentration in 2021 was 15,400,000 µg/L in the 58 ft bls depth interval at DPT597 (previous maximum result in 2020 was 1,690,000 at 48 ft bls at DPT596). During the 2021 DPT event, the overall majority of TCE contamination was identified in the 58 ft bls interval (below Layer 4), where in the previous year the majority of mass was observed in Layer 4. This trend appears to indicate continued mass discharge from Layer 4 (fine-grained unit). In addition to DPT sampling, monitoring well samples were collected from deep wells in the DSZ area (Layers 7 and 8) to verify vertical delineation. All monitoring well results were non-detect or below cleanup levels, with exception of one well (IW0162, screened 105 to 115 ft bls, which is below the existing recovery well capture zone) where TCE was identified above cleanup target levels. The HS 6 AS system remained operational during the reporting period covered under this report. The HS 6 AS IM was initiated in 2018 with 160 AS wells, and expanded in 2019 with an additional 140 AS wells. Quarterly performance monitoring was reduced to semi-annual prior to this operational period. The results of the HS 6 system operation and semi-annual performance monitoring are summarized in this report. Semi-annual monitoring results collected in April and October 2021 show concentrations of contaminants of concern (cis-1,2-dichloroethene, trans-1,2- dichloroethene, and vinyl chloride) are generally decreasing and not impacting the surface water drainage canal, indicating the HS 6 IM is meeting objectives. Overall, the tasks associated with Year 12 operation of the HC IM and operation of the HS 6 AS IM were performed in accordance with the recommendations of the 2020 LC34 (Year 11) Operations, Maintenance, and Monitoring Report for DNAPL Source Zone, Site Wide LongTerm Monitoring, and Hot Spot 6 Air Sparging System PMR (NASA, 2021c). Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives.

trichloroethene↗

Reporting Quality of Randomized, Controlled Trials Evaluating Combined Chemoradiotherapy in Nasopharyngeal Carcinoma

Purpose: To comprehensively assess the reporting quality of randomized, controlled trials (RCTs) in nasopharyngeal carcinoma (NPC), and to identify significant predictors of quality. Methods and Materials: Two investigators searched MEDLINE and EMBASE for RCTs published between January 1988 and December 2015 that assessed the effect of combined chemoradiotherapy for NPC. The overall quality of each report was assessed using a 28-point overall quality score (OQS) based on the 2010 Consolidated Standards of Reporting Trials (CONSORT) statement. To provide baseline data for further evaluation, we also investigated the reporting quality of certain important issues in detail, including key methodologic items (allocation concealment, blinding, intention-to-treat principle), endpoints, follow-up, subgroup analyses, and adverse events. Results: We retrieved 24 relevant RCTs including 6591 patients. Median 2010 OQS was 15.5 (range, 10-24). Half of the items in the 2010 OQS were poorly reported in at least 40% of trials. Multivariable regression models revealed that publication after 2010 and high impact factor were significant predictors of improved 2010 OQS. Additionally, many issues that we consider significant were not reported adequately. Conclusions: Despite publication of the CONSORT statement more than a decade ago, overall reporting quality for RCTs in NPC was unsatisfactory. Additionally, substantial selectivity and heterogeneity exists in reporting of certain crucial issues. This survey provides the first prompt for NPC trial investigators to improve reporting quality according to the CONSORT statement; increased scrutiny and diligence by editors and peer reviewers is also required.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

In Situ Observation of Growth Dynamics in DECLIC Directional Solidification Insert Onboard ISS: DSI-R Flight Campaign

The study of solidification microstructure formation is of utmost importance for materials design and processing, as solid-liquid interface patterns largely govern mechanical and physical properties. Pattern selection occurs under dynamic conditions of growth in which the initial morphological instability evolves nonlinearly and undergoes a reorganization process. The dynamic and nonlinear nature of this instability renders in situ observation of the interface an invaluable tool to gain knowledge on the time-evolution of the interface pattern. Transparent organic analogs, which solidify like metallic alloys, allow direct visualization of interface dynamics. Extensive ground-based studies of both metallic and organic bulk samples have established the presence of significant convection during solidification processes that alters the formation of interfacial microstructures. A reduced-gravity environment is therefore mandatory for fluid flow elimination in bulk samples. In the framework of the CNES project MISOL3D (MIcrostrutures de SOLidification 3D) and the NASA projects DSIP (Dynamical Selection of 3D Interface Patterns), SPADES (SPAtiotemporal Evolution of three-dimensional DEndritic array Structures) and CAMUS (ComputAtional Studies of MicrostrUcture Formation During Alloy Solidification in Microgravity), we participated in the development of the Directional Solidification Insert (DSI) of the DEvice for the study of Critical Liquids and Crystallization (DECLIC). The DECLIC-DSI is dedicated to in situ and real-time characterization of solid-liquid interface patterns during directional solidification of transparent alloys in diffusive transport regime. Between April 2010 and March 2011, the first ISS campaign (DSI) explored the entire range of microstructures resulting in unprecedented observations. A second campaign (DSI-R), performed between October 2017 and December 2018, in which the insert contained an alloy of higher solute concentration, allowed to complete the benchmark database. The increase of solute concentration resulted in well-developed dendritic patterns at lower velocities (lower interface curvature and larger tip radius). The microstructure resulting from dendritic growth is dominant in metallurgy so that it is fundamental to understand the mechanisms of its formation. The main aims of this experimental campaign are to understand: the mechanisms of the cell to dendrite transition, the fundamental mechanisms of sidebranching formation, the dependence of dendrite tip shapes on growth conditions, the interaction of primary array and secondary sidebranches, and the influence of subgrain boundaries on the spatiotemporal organization of the array structure. Preparation, analysis and interpretation of the experiments performed onboard ISS are considerably enhanced by experiments performed on ground using thin-samples (Pr. Trivedi’s group) and phase-field simulations of microstructure formation in a diffuse growth regime (Pr. Karma’s group). In this summary, we will present an initial assessment of the results obtained during the DSI-R campaign. Nomenclature Vp: pulling velocity G: thermal gradient L: solidified length rtip: tip curvature radius Acronyms/Abbreviations CADMOS: Centre d'Aide au Développement des activités en Micro-pesanteur et des Opérations Spatiales CNES: Centre National d’Études Spatiales DECLIC: Device for the study of Critical LIquids and Crystallization DSI: Directional Solidification Insert DSI-R: Directional Solidification Insert - Refurbish ISS: International Space Station NASA: National Aeronautics and Space Administration PF: phase-field SCN: Succinonitrile 3D: three-dimensional

Mota, F.L.↗

RISING FROM THE ASHES: MID-INFRARED RE-BRIGHTENING OF THE IMPOSTOR SN 2010da IN NGC 300

We present multi-epoch mid-infrared (IR) photometry and the optical discovery observations of the “impostor” supernova (SN) 2010da in NGC 300 using new and archival Spitzer Space Telescope images and ground-based observatories. The mid-infrared counterpart of SN 2010da was detected as Spitzer Infrared Intensive Transient Survey (SPIRITS) 14bme in the SPIRITS, an ongoing systematic search for IR transients. Before erupting on 2010 May 24, the SN 2010da progenitor exhibited a constant mid-IR flux at 3.6 and only a slight ∼10% decrease at 4.5 μ m between 2003 November and 2007 December. A sharp increase in the 3.6 μ m flux followed by a rapid decrease measured ∼150 days before and ∼80 days after the initial outburst, respectively, reveal a mid-IR counterpart to the coincident optical and high luminosity X-ray outbursts. At late times, after the outburst (∼2000 days), the 3.6 and 4.5 μ m emission increased to over a factor of two times the progenitor flux and is currently observed (as of 2016 Feb) to be fading, but still above the progenitor flux. We attribute the re-brightening mid-IR emission to continued dust production and increasing luminosity of the surviving system associated with SN 2010da. We analyze the evolution of the dust temperature ( T {sub d} ∼ 700–1000 K), mass ( M {sub d} ∼ 0.5–3.8 × 10{sup −7} M {sub ⊙}), luminosity ( L {sub IR} ∼ 1.3–3.5 × 10{sup 4} L {sub ⊙}), and the equilibrium temperature radius ( R {sub eq} ∼ 6.4–12.2 au) in order to resolve the nature of SN 2010da. We address the leading interpretation of SN 2010da as an eruption from a luminous blue variable high-mass X-ray binary (HMXB) system. We propose that SN 2010da is instead a supergiant (sg)B[e]-HMXB based on similar luminosities and dust masses exhibited by two other known sgB[e]-HMXB systems. Additionally, the SN 2010da progenitor occupies a similar region on a mid-IR color–magnitude diagram (CMD) with known sgB[e] stars in the Large Magellanic Cloud. The lower limit estimated for the orbital eccentricity of the sgB[e]-HMXB ( e > 0.82) from X-ray luminosity measurements is high compared to known sgHMXBs and supports the claim that SN 2010da may be associated with a newly formed HMXB system.

79 ASTRONOMY AND ASTROPHYSICS↗

Acoustic Imaging Evaluation of Juvenile Salmonid Behavior in the Immediate Forebay of the Water Temperature Control Tower at Cougar Dam, 2010

This report presents the results of an evaluation of juvenile Chinook salmon (Oncorhynchus tshawytscha) behavior at Cougar Dam on the south fork of the McKenzie River in Oregon in 2010. The study was conducted by the Pacific Northwest National Laboratory for the U.S. Army Corps of Engineers (USACE). The overall goal of the study was to characterize juvenile salmonid behavior and movement patterns in the immediate forebay of the Water Temperature Control (WTC) tower of the dam for USACE and fisheries resource managers use in making decisions about bioengineering designs for long-term structures and/or operations to facilitate safe downstream passage for juvenile salmonids. We collected acoustic imaging (Dual-Frequency Identification Sonar; DIDSON) data from March 1, 2010, through January 31, 2011. Juvenile salmonids (hereafter, called 'fish') were present in the immediate forebay of the WTC tower throughout the study. Fish abundance index was low in early spring (<200 fish per sample-day), increased in late April, and peaked on May 19 (6,039 fish). A second peak was observed on June 6 (2904 fish). Fish abundance index decreased in early June and remained low in the summer months (<100 fish per sample-day). During the fall and winter, fish numbers varied with a peak on November 10 (1881 fish) and a minimum on December 7 (12 fish). A second, smaller, peak occurred on December 22 (607 fish). A univariate statistical analysis indicated fish abundance index (log10-transformed) was significantly (P<0.05) positively correlated with forebay elevation, velocity over the WTC tower intake gate weirs, and river flows into the reservoir. A subsequent multiple regression analysis resulted in a model (R2=0.70) predicting fish abundance (log-transformed index values) using two independent variables of mean forebay elevation and the log10 of the forebay elevation range. From the approximate fish length measurements made using the DIDSON imaging software, the average fish length during early spring 2010 was 214 ± 86 mm (standard deviation). From May through early November, the average fish length remained relatively consistent (132 ± 54 mm), after which average lengths increased to 295 ± 148 mm for mid-November though early December. From mid-December through January the average fish length decreased to 151 76 mm. Milling in front of the WTC tower was the most common fish behavior observed throughout the study period. Traversing along the front of the tower, east-to-west and west-to-east, was the next common behavior. The percentage of fish events showing movement from the forebay to the tower or from the tower to the forebay was generally low throughout the spring, summer, and early fall (0 to 30% for both directions combined, March through early November). From mid-November 2010 through the end of the study (January 31, 2011), the combined percentages of fish moving into and out of the tower were higher (25 to 70%) than during previous months of the study. Schooling behavior was most distinct in the spring. Schooling events were present in 30 to 96% of the fish events during that period, with a peak on May 19. Schooling events were also present in the summer, but at lower numbers. With the exception of some schooling in mid-December, few to no schooling events were observed in the fall and winter months. Diel distributions for schooling fish during spring and fall months indicate schooling was concentrated during daylight hours and no schooling was observed at night. However, in December, schooling occurred at night, after midnight, and during daylight hours. Predator activity, most likely bull trout or rainbow trout according to a USACE biologist, was observed during late spring, when fish abundance index and schooling were highest for the year, and again in the fall months when fish events increased from a summer low. No predator activity was observed in the summer, and little activity occurred during the winter months.

54 ENVIRONMENTAL SCIENCES↗