Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Crew Transportation System”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

Operational Modal Analysis of the Artemis I Dynamic Rollout Test and Wet Dress Rehearsal

NASA has developed an expendable heavy lift launch vehicle capability, the Space Launch System (SLS), to support lunar and deep space exploration. The uncrewed Artemis I was the first flight of this new launch vehicle and tested critical systems for the upcoming crewed Artemis II flight to the moon. Accelerations were recorded at a multitude of locations on Artemis, the Mobile Launcher (ML), and the Crawler Transporter (CT)during the rollout of Artemis I from the Vehicle Assembly Building (VAB) to Launch Pad 39B March 2022 and is referred to as the Artemis I Dynamic Rollout Test (DRT). While Artemis I was at Launch Pad 39B, the Wet Dress Rehearsal (WDR) was performed to demonstrate launch readiness and acceleration measurements were also recorded. Finally, Artemis I rolled back from Launch Pad 39B to the VAB in April 2022, where acceleration measurements were also recorded and is referred to as the rollback portion of DRT. Because the forces during rollout and at the launch pad acting on Artemis I, the ML, and the CT are not directly measurable, Operational Modal Analysis (OMA) techniques, instead of traditional Experimental Modal Analysis (EMA) techniques, were used to identify modal characteristics. The OMA analysis of DRT and WDR directly builds upon the lessons learned from the OMA analysis of an earlier rollout of the ML from the VAB. DRT and WDR dynamic characteristics will be used to support SLS Integrated Modal Test finite element model correlation efforts and Exploration Ground System ML and CT finite element model verification and validation, which are part of the Building Block approach the Space Launch System program has implemented. The dynamic characteristics extracted from DRT as well as the rollout acceleration time histories themselves will be used in the development of generic rollout forcing functions that will provide refined estimates of the Artemis IV rollout forces, which will have the heavier and larger SLS Block 1B launch vehicle and Mobile Launcher 2 (ML-2). This paper briefly describes Artemis I, the ML, and the CT physical characteristics, DRT rollout/rollback and WDR data collection, the challenges in implementing OMA techniques due in part to the CT harmonics, and how these challenges were overcome to obtain the Artemis I DRT configuration and WDR configuration modal characteristics.

Apollo↗

Operational Modal Analysis of the Artemis I Dynamic Rollout Test and Wet Dress Rehearsal

NASA has developed an expendable heavy lift launch vehicle capability, the Space Launch System (SLS), to support lunar and deep space exploration. The uncrewed Artemis I was the first flight of this new launch vehicle and tested critical systems for the upcoming crewed Artemis II flight to the moon. Accelerations were recorded at a multitude of locations on Artemis, the Mobile Launcher (ML), and the Crawler Transporter (CT)during the rollout of Artemis I from the Vehicle Assembly Building (VAB) to Launch Pad 39B March 2022 and is referred to as the Artemis I Dynamic Rollout Test (DRT). While Artemis I was at Launch Pad 39B, the Wet Dress Rehearsal (WDR) was performed to demonstrate launch readiness and acceleration measurements were also recorded. Finally, Artemis I rolled back from Launch Pad 39B to the VAB in April 2022, where acceleration measurements were also recorded and is referred to as the rollback portion of DRT. Because the forces during rollout and at the launch pad acting on Artemis I, the ML, and the CT are not directly measurable, Operational Modal Analysis (OMA) techniques, instead of traditional Experimental Modal Analysis (EMA) techniques, were used to identify modal characteristics. The OMA analysis of DRT and WDR directly builds upon the lessons learned from the OMA analysis of an earlier rollout of the ML from the VAB. DRT and WDR dynamic characteristics will be used to support SLS Integrated Modal Test finite element model correlation efforts and Exploration Ground System ML and CT finite element model verification and validation, which are part of the Building Block approach the Space Launch System program has implemented. The dynamic characteristics extracted from DRT as well as the rollout acceleration time histories themselves will be used in the development of generic rollout forcing functions that will provide refined estimates of the Artemis IV rollout forces, which will have the heavier and larger SLS Block 1B launch vehicle and Mobile Launcher 2 (ML-2). This paper briefly describes Artemis I, the ML, and the CT physical characteristics, DRT rollout/rollback and WDR data collection, the challenges in implementing OMA techniques due in part to the CT harmonics, and how these challenges were overcome to obtain the Artemis I DRT configuration and WDR configuration modal characteristics.

Apollo↗

An Exploratory Study of Runway Arrival Procedures: Time Based Arrival and Self-Spacing

The ability of a flight crew to deliver their aircraft to its arrival runway on time is important to the overall efficiency of the National Airspace System (NAS). Over the past several years, the NAS has been stressed almost to its limits resulting in problems such as airport congestion, flight delay, and flight cancellation to reach levels that have never been seen before in the NAS. It is predicted that this situation will worsen by the year 2025, due to an anticipated increase in air traffic operations to one-and-a-half to three times its current level. Improved arrival efficiency, in terms of both capacity and environmental impact, is an important part of improving NAS operations. One way to improve the arrival performance of an aircraft is to enable the flight crew to precisely deliver their aircraft to a specified point at either a specified time or specified interval relative to another aircraft. This gives the flight crew more control to make the necessary adjustments to their aircraft s performance with less tactical control from the controller; it may also decrease the controller s workload. Two approaches to precise time navigation have been proposed: Time-Based Arrivals (e.g., required times of arrival) and Self-Spacing. Time-Based Arrivals make use of an aircraft s Flight Management System (FMS) to deliver the aircraft to the runway threshold at a given time. Self-Spacing enables the flight crew to achieve an ATC assigned spacing goals at the runway threshold relative to another aircraft. The Joint Planning and Development Office (JPDO), a multi-agency initiative established to plan and coordinate the development of the Next Generation Air Transportation System (NextGen), has asked for data for both of these concepts to facilitate future research and development. This paper provides a first look at the delivery performance of these two concepts under various initial and environmental conditions in an air traffic simulation environment.

Houston, Vincent E.↗

Gateway Program Status and Overview

This paper provides an overview and status of Gateway, which will be an outpost orbiting the Moon that provides vital support for a sustainable, long-term human return to the lunar surface and a steppingstone to Mars as part of the Artemis program. Gateway is a destination for deep space crew expeditions and science investigations, as well as a port for deep space transportation – for landers en route to the lunar surface or spacecraft embarking to destinations beyond the Earth-Moon system. The National Aeronautics and Space Administration (NASA) leads the Program and serves as the integrator of the spaceflight capabilities and contributions of U.S. commercial partners and international partners to develop Gateway. This paper will provide an overview of each component of Gateway: The Power and Propulsion Element, the Habitation and Logistics Outpost; Deep Space Logistics; the International Habitation module; External Robotics System; European System Providing Refueling, Infrastructure and Telecommunications; an Airlock; and Exploration ExtraVehicular Activity (xEVA). Expanding on the successful partnership that has provided over 20 years of continuous crew operations in low-Earth orbit on ISS, Gateway is an evolution of this extraordinary partnership that leverages the capabilities of each partner to expand humankind’s sustained exploration deeper into the cosmos. Highlighting the international program with participation from multiple international partners, this paper will also provide a status of Gateway multilateral governance structure and international agreements.

Gateway↗

Aerospace vehicle water-waste management

The collection and disposal of human wastes, such as urine and feces, in a spacecraft environment are performed in an aesthetic and reliable manner to prevent degradation of crew performance. The waste management system controls, transfers, and processes materials such as feces, emesis, food residues, used expendables, and other wastes. The requirements, collection, transport, and waste processing are described.

Pecoraro, J. N.↗

The 1987-1988 advanced space design projects: Results from the fall semester of 1987 and the spring semester of 1988

Students in Aerospace Engineering (ASE) and Mechanical Engineering (ME) at the University of Texas at Austin completed eight separate design projects under the sponsorship of the NASA/USRA Advanced Space Design Program. During the Fall semester of 1987, ASE and ME students worked on various aspects of a 'bootstrap' lunar base. ASE students concentrated on the overall definition of the base while the ME team designed a convertible lunar lander lower stage. Six design projects were executed during the spring semester of 1988. Aerospace engineering students designed a fast Mars mission crew transfer vehicle, an Earth-orbiting transportation node to support the lunar base, a lunar base construction shack/initial habitat vehicle, and carried out a systems assessment aimed at arresting ozone depletion in the Earth's atmosphere. The ME students designed a lunar surface personnel navigation system and investigated radiation shielding structures for a lunar base. The design objectives, a summary of the results, and selected comments are given concerning each of the projects. Due to the number of projects completed, the reader should refer to the text of the final project reports for additional and detailed information.

Source record↗

Structures for the 3rd Generation Reusable Concept Vehicle

A major goal of NASA is to create an advance space transportation system that provides a safe, affordable highway through the air and into space. The long-term plans are to reduce the risk of crew loss to 1 in 1,000,000 missions and reduce the cost of Low-Earth Orbit by a factor of 100 from today's costs. A third generation reusable concept vehicle (RCV) was developed to assess technologies required to meet NASA's space access goals. The vehicle will launch from Cape Kennedy carrying a 25,000 lb. payload to the International Space Station (ISS). The system is an air breathing launch vehicle (ABLV) hypersonic lifting body with rockets and uses triple point hydrogen and liquid oxygen propellant. The focus of this paper is on the structural concepts and analysis methods used in developing the third generation reusable launch vehicle (RLV). Member sizes, concepts and material selections will be discussed as well as analysis methods used in optimizing the structure. Analysis based on the HyperSizer structural sizing software will be discussed. Design trades required to optimize structural weight will be presented.

Hrinda, Glenn A.↗

Gateway Program Status and Overview

This paper provides an overview and status of the Gateway, which will be an outpost orbiting the Moon that provides vital support for a sustainable, long-term human return to the lunar surface and a steppingstone to Mars as part of the Artemis program. Gateway is a destination for deep space crew expeditions and science investigations, as well as a port for deep space transportation – for landers en route to the lunar surface or spacecraft embarking to destinations beyond the Earth-Moon system. The National Aeronautics and Space Administration (NASA) leads the Program and serves as the integrator of the spaceflight capabilities and contributions of U.S. commercial partners and international partners to develop the Gateway. This paper will provide an overview of each component of the Gateway: The Power and Propulsion Element, the Habitation and Logistics Outpost; Deep Space Logistics; the International Habitation module; External Robotics System; European System Providing Refueling, Infrastructure and Telecommunications; an Airlock; and Exploration ExtraVehicular Activity (xEVA). Expanding on the successful partnership that has provided over 20 years of continuous crew operations in low-Earth orbit on ISS, the Gateway is an evolution of this extraordinary partnership that leverages the capabilities of each partner to expand humankind’s sustained exploration deeper into the cosmos. Highlighting the international program with participation from multiple international partners, this paper will also provide a status of the Gateway multilateral governance structure and international agreements.

Gateway↗

The NASA Commercial Crew Program (CCP) Shared Assurance Model for Safety

NASA established the Commercial Crew Program in order to provide human access to the International Space Station and low earth orbit via the commercial (nongovernmental) sector. A particular challenge to NASA is how to determine the commercial provider's transportation system complies with Programmatic safety requirements while at the same time allowing the provider the flexibility to demonstrate compliance. This will be accomplished through the use of Shared Assurance and Risk Based Assessment by NASA thus shifting more responsibility to the Provider. This model will be the focus of this presentation.

Programmatic safety requirements↗

Summary of a Crew-Centered Flight Deck Design Philosophy for High-Speed Civil Transport (HSCT) Aircraft

Past flight deck design practices used within the U.S. commercial transport aircraft industry have been highly successful in producing safe and efficient aircraft. However, recent advances in automation have changed the way pilots operate aircraft, and these changes make it necessary to reconsider overall flight deck design. Automated systems have become more complex and numerous, and often their inner functioning is partially or fully opaque to the flight crew. Recent accidents and incidents involving autoflight system mode awareness Dornheim, 1995) are an example. This increase in complexity raises pilot concerns about the trustworthiness of automation, and makes it difficult for the crew to be aware of all the intricacies of operation that may impact safe flight. While pilots remain ultimately responsible for mission success, performance of flight deck tasks has been more widely distributed across human and automated resources. Advances in sensor and data integration technologies now make far more information available than may be prudent to present to the flight crew.

Palmer, Michael T.↗

Mission Planning and Trajectory Design of Roundtrip Mars Transfers

NASA’s Exploration Systems Development Mission Directorate has been evaluating architecture concepts that can deliver crew and cargo to Mars vicinity and return the crew safely back to Earth. A series of trade studies and sensitivity analyses are performed to explore the trade space in an effort to inform the decision of the transportation architecture for future human missions to Mars. This paper documents the tools and methods used to perform mission scans for systems that use high-thrust propulsion and provides discussion on some interesting challenges for the roundtrip transportation architecture. Results for the reference trajectories from the current analysis cycle are presented.

Mars↗

Mission Planning and Trajectory Design of Roundtrip Mars Transfers

NASA’s Exploration Systems Development Mission Directorate has been evaluating architecture concepts that can deliver crew and cargo to Mars vicinity and return the crew safely back to Earth. A series of trade studies and sensitivity analyses are performed to explore the trade space in an effort to inform the decision of the transportation architecture for future human missions to Mars. This paper documents the tools and methods used to perform mission scans for systems that use high-thrust propulsion and provides discussion on some interesting challenges for the roundtrip transportation architecture. Results for the reference trajectories from the current analysis cycle are presented.

Mars↗

Hybrid Transportation System Integrated Trajectory Design and Optimization for Mars Landing Site Accessibility

NASA’s Mars Study Capability Team continues the agency’s efforts to study and refine the nation’s plan to field a sustainable human Mars campaign. One of the primary open issues left unanswered during previous analysis cycles was the uncertainty of the impact to the vehicle performance requirement to deliver crew and cargo to the same landing site across multiple mission opportunities. The Mars Study Capability Team has recently developed an integrated trajectory optimization and system closure model to solve the complex interplanetary trajectory optimization using both low-thrust and high-thrust maneuvers. This paper demonstrates the capability of this new integrated trajectory design and optimization method as it applies to the landing site accessibility problem for the Hybrid transportation architecture. The results showed that the current vehicle is capable of reaching up to +20 degree latitude and down to -20 degree latitude in every mission opportunity from 2033 to 2052. However, reaching latitudes beyond +/- 20 required more propellant than the spacecraft is currently designed to carry for many of the mission opportunities.

Chai, Patrick R.↗

Manned transportation systems design considerations

Manned transportation mission and programmatic requirements and how they affect spacecraft size, mass and complexity are presented. Some of these requirements include fundamental issues such as the degree of separation of cargo and people, abort requirements and the issue of man rating. Attention is given to design considerations, crew size and mission requirements, payloads, crew physiologic considerations, and a vehicle health monitoring and emergency detection system.

Teixeira, Charles↗

The NASA Commercial Crew Program (CCP) Mission Assurance Process

In 2010, NASA established the Commercial Crew Program in order to provide human access to the International Space Station and low earth orbit via the commercial (non-governmental) sector. A particular challenge to NASA has been how to determine the commercial providers transportation system complies with Programmatic safety requirements. The process used in this determination is the Safety Technical Review Board which reviews and approves provider submitted Hazard Reports. One significant product of the review is a set of hazard control verifications. In past NASA programs, 100 percent of these safety critical verifications were typically confirmed by NASA. The traditional Safety and Mission Assurance (SMA) model does not support the nature of the Commercial Crew Program. To that end, NASA SMA is implementing a Risk Based Assurance (RBA) process to determine which hazard control verifications require NASA authentication. Additionally, a Shared Assurance Model is also being developed to efficiently use the available resources to execute the verifications. This paper will describe the evolution of the CCP Mission Assurance process from the beginning of the Program to its current incarnation. Topics to be covered include a short history of the CCP; the development of the Programmatic mission assurance requirements; the current safety review process; a description of the RBA process and its products and ending with a description of the Shared Assurance Model.

Commercial Crew Program↗

J-2X: Progress on the Ares Upper Stage Engine

NASA's Vision for Exploration requires a safe, reliable, affordable upper stage engine to power the Ares I Crew Launch Vehicle (CLV) and the Ares V Cargo Launch Vehicle (CaLV). The J-2X engine epitomizes NASA's philosophy of employing legacy knowledge, heritage hardware, and commonality to carry the next generation of explorers into low-Earth orbit and out into the solar system. As envisioned by the Exploration Systems Architecture Study (ESAS), the reference lunar mission would begin by launching the Ares V into orbit with the Earth Departure Stage (EDS) transporting the Lunar Surface Access Module (LSAM), followed by the Ares I, carrying the Orion Crew Exploration Vehicle, which would rendezvous with the EDS/LSAM before beginning its journey to the Moon.

Byrd, Thomas D.↗

Orbiting Depot and Reusable Lander for Lunar Transportation

A document describes a conceptual transportation system that would support exploratory visits by humans to locations dispersed across the surface of the Moon and provide transport of humans and cargo to sustain one or more permanent Lunar outpost. The system architecture reflects requirements to (1) minimize the amount of vehicle hardware that must be expended while maintaining high performance margins and (2) take advantage of emerging capabilities to produce propellants on the Moon while also enabling efficient operation using propellants transported from Earth. The system would include reusable single- stage lander spacecraft and a depot in a low orbit around the Moon. Each lander would have descent, landing, and ascent capabilities. A crew-taxi version of the lander would carry a pressurized crew module; a cargo version could carry a variety of cargo containers. The depot would serve as a facility for storage and for refueling with propellants delivered from Earth or propellants produced on the Moon. The depot could receive propellants and cargo sent from Earth on a variety of spacecraft. The depot could provide power and orbit maintenance for crew vehicles from Earth and could serve as a safe haven for lunar crews pending transport back to Earth.

Petro, Andrew↗

Lunar surface vehicle evolution - FY89-90 NASA studies

A return to the moon in the first decade of the next century, as called for by President Bush in his July 20, 1989 speech, will challenge the talents of the engineers and designers faced for the first time with the task of designing elements and systems for a 'permanent' extraterrestrial outpost. The set of surface vehicles for such a permanent outpost will require not only rovers for crew and science package transport, but autonomous rovers for site surveying and remote science, construction vehicles for outpost set-up and mining vehicles for using the resources of the moon to benefit the outpost. Studies conducted in FY 1989, including those supporting NASA's 90-day Study activity, and others continuing throughout FY 1990 are defining the lunar surface vehicle set in increasing detail. This paper describes recent work performed by NASA's Jet Propulsion Laboratory and Johnson Space Center, as well as by other supporting NASA installations in the definition of the lunar vehicle set. Classification of vehicle functions and mission requirements are first examined, and vehicle characteristics and reference designs are synthesized. The paper concludes with a discussion of current work and future goals.

Connolly, John F.↗