Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Control and Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

Method and system for redundancy management of distributed and recoverable digital control system

A method and system for redundancy management is provided for a distributed and recoverable digital control system. The method uses unique redundancy management techniques to achieve recovery and restoration of redundant elements to full operation in an asynchronous environment. The system includes a first computing unit comprising a pair of redundant computational lanes for generating redundant control commands. One or more internal monitors detect data errors in the control commands, and provide a recovery trigger to the first computing unit. A second redundant computing unit provides the same features as the first computing unit. A first actuator control unit is configured to provide blending and monitoring of the control commands from the first and second computing units, and to provide a recovery trigger to each of the first and second computing units. A second actuator control unit provides the same features as the first actuator control unit.

Stange, Kent↗

An Evaluation of Controller and Pilot Performance, Workload and Acceptability under a NextGen Concept for Dynamic Weather Adapted Arrival Routing

In todays terminal operations, controller workload increases and throughput decreases when fixed standard terminal arrival routes (STARs) are impacted by storms. To circumvent this operational constraint, Prete, Krozel, Mitchell, Kim and Zou (2008) proposed to use automation to dynamically adapt arrival and departure routing based on weather predictions. The present study examined this proposal in the context of a NextGen trajectory-based operation concept, focusing on the acceptability and its effect on the controllers ability to manage traffic flows. Six controllers and twelve transport pilots participated in a human-in-the-loop simulation of arrival operations into Louisville International Airport with interval management requirements. Three types of routing structures were used: Static STARs (similar to current routing, which require the trajectories of individual aircraft to be modified to avoid the weather), Dynamic routing (automated adaptive routing around weather), and Dynamic Adjusted routing (automated adaptive routing around weather with aircraft entry time adjusted to account for differences in route length). Spacing Responsibility, whether responsibility for interval management resided with the controllers (as today), or resided with the pilot (who used a flight deck based automated spacing algorithm), was also manipulated. Dynamic routing as a whole was rated superior to static routing, especially by pilots, both in terms of workload reduction and flight path safety. A downside of using dynamic routing was that the paths flown in the dynamic conditions tended to be somewhat longer than the paths flown in the static condition.

Johnson, Walter W.↗

Survey of piloting factors in V/STOL aircraft with implications for flight control system design

Flight control system design factors involved for pilot workload relief are identified. Major contributors to pilot workload include configuration management and control and aircraft stability and response qualities. A digital fly by wire stability augmentation, configuration management, and configuration control system is suggested for reduction of pilot workload during takeoff, hovering, and approach.

Ringland, R. F.↗

Extended performance solar electric propulsion thrust system design

A thrust system design has been established for an extended performance technology, 6.4 kW, 4800 sec specific impulse ion thruster. The configuration is comprised of ten thrusters configured with a power management and control subsystem in a modular thrust system design. The system design approach is an adaptation of that previously established for the baseline technology 2.7 kW, 3000 sec specific impulse ion thruster. The power management and control subsystem design includes a combination of individual electronics for each thruster and a set of electronics with redundancy that are common to all thrusters. The thermal dissipation from all electronics is removed with a common heat pipe/radiator assembly.

Cake, J. E.↗

Air Traffic Controller Acceptability of Unmanned Aircraft System Detect-and-Avoid Thresholds

A human-in-the-loop experiment was conducted with 15 retired air traffic controllers to investigate two research questions: (a) what procedures are appropriate for the use of unmanned aircraft system (UAS) detect-and-avoid systems, and (b) how long in advance of a predicted close encounter should pilots request or execute a separation maneuver. The controller participants managed a busy Oakland air route traffic control sector with mixed commercial/general aviation and manned/UAS traffic, providing separation services, miles-in-trail restrictions and issuing traffic advisories. Controllers filled out post-scenario and post-simulation questionnaires, and metrics were collected on the acceptability of procedural options and temporal thresholds. The states of aircraft were also recorded when controllers issued traffic advisories. Subjective feedback indicated a strong preference for pilots to request maneuvers to remain well clear from intruder aircraft rather than deviate from their IFR clearance. Controllers also reported that maneuvering at 120 seconds until closest point of approach (CPA) was too early; maneuvers executed with less than 90 seconds until CPA were more acceptable. The magnitudes of the requested maneuvers were frequently judged to be too large, indicating a possible discrepancy between the quantitative UAS well clear standard and the one employed subjectively by manned pilots. The ranges between pairs of aircraft and the times to CPA at which traffic advisories were issued were used to construct empirical probability distributions of those metrics. Given these distributions, we propose that UAS pilots wait until an intruder aircraft is approximately 80 seconds to CPA or 6 nmi away before requesting a maneuver, and maneuver immediately if the intruder is within 60 seconds and 4 nmi. These thresholds should make the use of UAS detect and avoid systems compatible with current airspace procedures and controller expectations.

unmanned aircraft systems↗

Project Management Using Modern Guidance, Navigation and Control Theory

Implementing guidance, navigation, and control (GN&C) theory principles and applying them to the human element of project management and control is not a new concept. As both the literature on the subject and the real-world applications are neither readily available nor comprehensive with regard to how such principles might be applied, this paper has been written to educate the project manager on the "laws of physics" of his or her project (not to teach a GN&C engineer how to become a project manager) and to provide an intuitive, mathematical explanation as to the control and behavior of projects. This paper will also address how the fundamental principles of modern GN&C were applied to the National Aeronautics and Space Administration's (NASA) Constellation Program (CxP) space suit project, ensuring the project was managed within cost, schedule, and budget. A project that is akin to a physical system can be modeled and managed using the same over arching principles of GN&C that would be used if that project were a complex vehicle, a complex system(s), or complex software with time-varying processes (at times nonlinear) containing multiple data inputs of varying accuracy and a range of operating points. The classic GN&C theory approach could thus be applied to small, well-defined projects; yet when working with larger, multiyear projects necessitating multiple organizational structures, numerous external influences, and a multitude of diverse resources, modern GN&C principles are required to model and manage the project. The fundamental principles of a GN&C system incorporate these basic concepts: State, Behavior, Feedback Control, Navigation, Guidance and Planning Logic systems. The State of a system defines the aspects of the system that can change over time; e.g., position, velocity, acceleration, coordinate-based attitude, and temperature, etc. The Behavior of the system focuses more on what changes are possible within the system; this is denoted in the state of the system. The behavior of a system, as captured in the system modeling, when properly done will aid in accurately predicting future system performance. The Feedback Control system understands the state and behavior of the system and uses feedback to adjust control inputs into the system. The feedback, which is the right arm of the Control system, allows change to be affected in the overall system; it therefore is important to not only correctly identify the system feedback inputs, but also the system response to the feedback inputs. The Navigation system takes multiple data inputs and based on a priori knowledge of the inputs, develops a statistically based weighting of the inputs and measurements to determine the system's state. Guidance and Planning Logic of the system, complete with an understanding of where the system is (provided by the Navigation system), will in turn determine where the system needs to be and how to get it there. With any system/project, it is critical that the objective of the system/project be clearly defined -- not only to plan but to measure performance and to aid in guiding the system or the project. The system principles discussed above, which can be and have been applied to the current CxP space suit development project, can also be mapped to real-world constituents, thus allowing project managers to apply systems theories that are well defined in engineering and mathematics to a discipline (i.e., Project Management) that historically has been based in personal experience and intuition. This mapping of GN&C theory to Project Management will, in turn, permit a direct, methodical approach to Project Management, planning and control providing a tool to help predict (and guide) performance and an understanding of the project constraints, how the project can be controlled, and the impacts to external influences and inputs. This approach, to a project manager, flows down to the three bottom-line variables of cost, schedule, and scope ando the needed control of these three variables to successfully perform and complete a project.

Hill, Terry R.↗

Guidance and Control Software Project Data - Volume 4: Configuration Management and Quality Assurance Documents

The Guidance and Control Software (GCS) project was the last in a series of software reliability studies conducted at Langley Research Center between 1977 and 1994. The technical results of the GCS project were recorded after the experiment was completed. Some of the support documentation produced as part of the experiment, however, is serving an unexpected role far beyond its original project context. Some of the software used as part of the GCS project was developed to conform to the RTCA/DO-178B software standard, "Software Considerations in Airborne Systems and Equipment Certification," used in the civil aviation industry. That standard requires extensive documentation throughout the software development life cycle, including plans, software requirements, design and source code, verification cases and results, and configuration management and quality control data. The project documentation that includes this information is open for public scrutiny without the legal or safety implications associated with comparable data from an avionics manufacturer. This public availability has afforded an opportunity to use the GCS project documents for DO-178B training. This report provides a brief overview of the GCS project, describes the 4-volume set of documents and the role they are playing in training, and includes configuration management and quality assurance documents from the GCS project. Volume 4 contains six appendices: A. Software Accomplishment Summary for the Guidance and Control Software Project; B. Software Configuration Index for the Guidance and Control Software Project; C. Configuration Management Records for the Guidance and Control Software Project; D. Software Quality Assurance Records for the Guidance and Control Software Project; E. Problem Report for the Pluto Implementation of the Guidance and Control Software Project; and F. Support Documentation Change Reports for the Guidance and Control Software Project.

Hayhurst, Kelly J.↗

Vista goes online: Decision-analytic systems for real-time decision-making in mission control

The Vista project has centered on the use of decision-theoretic approaches for managing the display of critical information relevant to real-time operations decisions. The Vista-I project originally developed a prototype of these approaches for managing flight control displays in the Space Shuttle Mission Control Center (MCC). The follow-on Vista-II project integrated these approaches in a workstation program which currently is being certified for use in the MCC. To our knowledge, this will be the first application of automated decision-theoretic reasoning techniques for real-time spacecraft operations. We shall describe the development and capabilities of the Vista-II system, and provide an overview of the use of decision-theoretic reasoning techniques to the problems of managing the complexity of flight controller displays. We discuss the relevance of the Vista techniques within the MCC decision-making environment, focusing on the problems of detecting and diagnosing spacecraft electromechanical subsystems component failures with limited information, and the problem of determining what control actions should be taken in high-stakes, time-critical situations in response to a diagnosis performed under uncertainty. Finally, we shall outline our current research directions for follow-on projects.

Barry, Matthew↗

Integrated Optimization of Powertrain Energy Management and Vehicle Motion Control for Autonomous Hybrid Electric Vehicles

Hybrid Electric Vehicles (HEVs) and autonomous vehicles have been widely studied recently for on-road transportation. In the study of autonomous HEVs, the control of the vehicle's external dynamics and powertrain dynamics are often treated separately. Optimizing these two problems together can significantly improve fuel economy. In this paper, an autonomous HEV following a leader is considered. First, the augmented model to integrate the abovementioned dynamics is presented. Second, the optimization problem is defined to find the optimum fuel consumption of the follower in pursuit of a leader in a drive cycle. A customized control strategy based on Approximate Dynamic Programming (ADP) is then explored in which the optimal cost-to-go at each time step is approximated using neural networks. Also, the accuracy of the optimization solution is enhanced by applying the concept of the reachable sets. At last, three case studies show that the examined integrated control strategy outperforms the one with the separated optimization method by an additional 7.4%, 4.6%, and 11.8% improvement in fuel consumption, respectively.

33 ADVANCED PROPULSION SYSTEMS↗

A data management system for weight control and design-to-cost

The definition of the mass properties data of aircraft changed on a daily basis as do design details of the aircraft. This dynamic nature of the definition has generally encouraged those responsible for the data to update the data on a weekly or monthly basis. The by-product of these infrequent updates was the requirement of manual records to maintain daily activity. The development of WAVES changed the approach to management of mass properties data. WAVES has given the ability to update the data on a daily basis thereby eliminating the need for manual records. WAVES has demonstrated that a software product can support a data management system for engineering data.

Bryant, J. C.↗

Data coverage assessment on neural network based digital twins for autonomous control system

We report in a recently developed Nearly Autonomous Management and Control (NAMAC) system, neural networks (NNs) are used to develop digital twins for diagnosis (DT-Ds). However, NNs are not usually considered extrapolation models and may result in large errors if they are applied to unseen data outside the training data (uncovered). In this study, we propose a data coverage assessment (DCA) to determine if the NN-based DT-Ds are extrapolated based on their epistemic uncertainty. The uncertainty quantification algorithms and uncertainty thresholds are selected based on the confusion matrix of classifying evaluation data into covered or uncovered data. To demonstrate the adaptability of the proposed framework, we applied it to a basic feedforward neural network and a more advanced recurrent neural network based on a more nonlinear database. Case studies show that the proposed framework can distinguish unseen data for both basic and advanced applications with proper uncertainty quantification algorithms and thresholds.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Integrated model of G189A and Aspen-plus for the transient modeling of extravehicular activity atmospheric control systems

A computerized modeling tool, under development for the transient modeling of an extravehicular activity atmospheric control subsystem is described. This subsystem includes the astronaut, temperature control, moisture control, CO2 removal, and oxygen make-up components. Trade studies evaluating competing components and subsystems to guide the selection and development of hardware for lunar and Martian missions will use this modeling tool. The integrated modeling tool uses the Advanced System for Process Engineering (ASPEN) to accomplish pseudosteady-state simulations, and the general environmental thermal control and life support program (G189A) to manage overall control of the run and transient input output, as well as transient modeling computations and database functions. Flow charts and flow diagrams are included.

Kolodney, Matthew↗

G2 Autonomous Control for Cryogenic Delivery Systems

The Independent System Health Management-Autonomous Control (ISHM-AC) application development for cryogenic delivery systems is intended to create an expert system that will require minimal operator involvement and ultimately allow for complete autonomy when fueling a space vehicle in the time prior to launch. The G2-Autonomous Control project is the development of a model, simulation, and ultimately a working application that will control and monitor the cryogenic fluid delivery to a rocket for testing purposes. To develop this application, the project is using the programming language/environment Gensym G2. The environment is an all-inclusive application that allows development, testing, modeling, and finally operation of the unique application through graphical and programmatic methods. We have learned G2 through training classes and subsequent application development, and are now in the process of building the application that will soon be used to test on cryogenic loading equipment here at the Kennedy Space Center Cryogenics Test Laboratory (CTL). The G2 ISHM-AC application will bring with it a safer and more efficient propellant loading system for the future launches at Kennedy Space Center and eventually mobile launches from all over the world.

cryogenic fluids↗

Impact of ATD-2 Tools on Human Factors Metrics at Charlotte Douglas International Airport

New decision support tools were introduced at Charlotte Douglas International Airport (CLT) as part of NASA’s Air Traffic Demonstration 2 (ATD-2) project. ATD-2 is based on concepts which enable integrated arrival, departures, and surface (IADS) operations in a metroplex environment. Metrics on environmental benefits from ATD-2’s surface metering at CLT have shown impressive reductions in fuel consumption and CO2 emissions. Questions have remained on 1) the human factors impact of these new ATD-2 tools and surface metering and 2) the users’ perceptions of how these tools affect operations. To address these questions, post-bank surveys were designed for the four types of users of the new tools at CLT: Ramp Controllers, Ramp Managers, Tower Traffic Management Coordinators (TMCs) and Terminal Radar Approach Control (TRACON) TMCs. These surveys were administered during five-day blocks at three different times. Three types of banks were compared: No ATD-2 tool use, ATD-2 tool use, and ATD-2 use plus surface metering. Results indicate that higher workload or decreased situation awareness was not significantly associated with ATD-2 tool use more than no ATD-2 tool use--in fact for many users the opposite was true. Also, acceptability and operational efficiency measures indicate that the users did not perceive that banks with ATD-2 tools were significantly less acceptable or less efficient than banks without ATD-2 tools.

Airspace Technology Demonstration 2↗

Impact of ATD-2 Tools on Human Factor Metrics at Charlotte Douglas International Airport

New decision support tools were introduced at Charlotte Douglas International Airport (CLT) as part of NASA’s Air Traffic Demonstration 2 (ATD-2) project. ATD-2 is based on concepts which enable integrated arrival, departures, and surface (IADS) operations in a metroplex environment. Metrics on environmental benefits from ATD-2’s surface metering at CLT have shown impressive reductions in fuel consumption and CO2 emissions. Questions have remained on 1) the human factors impact of these new ATD-2 tools and surface metering and 2) the users’ perceptions of how these tools affect operations. To address these questions, post-bank surveys were designed for the four types of users of the new tools at CLT: Ramp Controllers, Ramp Managers, Tower Traffic Management Coordinators (TMCs) and Terminal Radar Approach Control (TRACON) TMCs. These surveys were administered during five-day blocks at three different times. Three types of banks were compared: No ATD-2 tool use, ATD-2 tool use, and ATD-2 use plus surface metering. Results indicate that higher workload or decreased situation awareness was not significantly associated with ATD-2 tool use more than no ATD-2 tool use--in fact for many users the opposite was true. Also, acceptability and operational efficiency measures indicate that the users did not perceive that banks with ATD-2 tools were significantly less acceptable or less efficient than banks without ATD-2 tools.

Bonny K Parke↗

A new approach to data management and its impact on frequency control requirements

A new approach to data management consisting of spacecraft and data/information autonomy and its impact on frequency control requirements is presented. An autonomous spacecraft is capable of functioning without external intervention for up to 72 hr by enabling the sensors to make observations, maintaining its health and safety, and by using logical safety modes when anomalies occur. Data/information are made autonomous by associating all relevant ancillary data such as time, position, attitude, and sensor identification with the data/information record of an event onboard the spacecraft. This record is so constructed that the record of the event can be physically identified in a complete and self-contained record that is independent of all other data. All data within a packet will be time tagged to the needed accuracy, and the time markings from packet to packet will be coherent to a UTC time scale.

Blanchard, D. L.↗

AGGREGATE: dAta-driven modelinG preservinG contRollable dEr for outaGe mAnagemenT and rEsiliency (Final Report)

The AGGREGATE project team successfully developed and validated various modules for outage management. Brief summaries of each module are provided to showcase their strength for outage management and restoration for a distribution system with a high penetration of connected distribution energy resources (DERs). In recent years, inverter-based DERs have been widely deployed in distribution system. A most of behind-the-meter (BTM) solar power generation is not visible to the utility. The data-driven DER and load estimation modules are using machine learning (ML) and artificial intelligence (AI) to manage this issue, which provides an opportunity for distribution system operators (DSOs) to operate systems and make decisions in real-time for a distribution system with a high penetration of DERs deployed. Also, the estimated DER and true load can be further leveraged in network aggregation and cold-load pick up estimation for reducing the computing complexity and providing for fast restoration. After load demand and DER power generations have been estimated, the information will support topology and state estimation (SE). The topology estimation module demonstrated the viability of mixed integer linear programming (MILP) formulation to estimate the most likely operational radial topology and outage sections using power flow measurements, historical/estimated load and DERs data and smart meter ping measurements. Formulation includes continuous (power flow, load and DERs data) and binary measurements (smart meter ping measurements) in a single formulation. Errors in continuous data and binary data are modeled as normal distribution and Bernoulli distribution, respectively. In the future distribution grid, the power injection from controllable DERs will be essential for efficient and resilient grid operation. However, determining the optimal DER injections and restoration actions is dependent on knowledge of the system states. State estimation (SE), already the cornerstone of transmission energy management systems, will become commonplace in distribution management systems as more measurements become available from deployment of automated metering infrastructure (AMI). Observability analysis is the first step in SE, as it determines the sufficiency of the available measurements for accurately estimating the current system states. A new type of pseudo-measurement called a Correlational Measurement (CM) is introduced in this module, to enhance the observability of the system to enable more accurate SE. CMs encapsulate knowledge of correlation between demand patterns for similar classes of loads as well as injection patterns for same-technology renewable DERs. During grid contingency scenarios, DERs have been traditionally disconnected, without any fault ride-through capabilities. However, with new regulations and better technology, it is feasible for these resources to contribute to the grid’s restoration after an adverse event and hence enhance resilience. The controllability module proposes a two-step restoration scheme for the power system restoration process by leveraging additional degrees of freedom in power electronics interfaced DERs for mitigating voltage problems. In a resilience mode without the utility system, the distribution grid relies on DERs to serve critical load. In such a severe event with multiple faults on the distribution feeders, actuation of various protective devices (PDs) divides the distribution system into electrical islands. The undetected actuated PDs due to fault current contributions from DERs can delay the restoration process, thereby reducing the system resilience. The Advanced Outage Management (AOM) and the Advanced Feeder Restoration (AFR) modules developed in this project provide improved system resilience with multiple DERs. AOM identifies the faulted sections and actuated PDs in a distribution system with DERs by incorporating smart meter data. The most credible outage scenario including fault locations, PD actuations, and fault indicator (FI) failures is identified by a set of binary integer linear programming incorporating hypotheses. The AFR module serves to restore a distribution system with available energy resources taking into consideration the availability of utility sources and DERs. By partitioning the system into islands, critical load will be served with the available generation resources within islands based on the solution of a MILP. When the utility systems become available, the optimal path will be determined by a spanning tree search algorithm that reconnects these islands back to substations and restores the remaining load. The transmission and distribution (T&D) co-simulation module was used to validate the effect of a control action performed on the distribution side assets as it propagates to the transmission side. This ensures that the control action performed results in a feasible operating point on both the transmission and the distribution system. In addition to validation, the team used the T&D co-simulation module to demonstrate how distribution system assets can be used to mitigate issues on the transmission system. Specifically, the team demonstrated that appropriate switching operations on the distribution side can alleviate the line overload condition on the transmission side without causing new operational constraint violations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Image-based solar estimates

An example device is configured to determine, based on a sky image of a portion of sky over a power distribution network and using a convolutional neural network (CNN)-based image regression model, an estimated global horizontal irradiance (GHI) value and manage or control the power distribution network using the estimated GHI value. The device may also be configured to determine, based on GHI values and aggregate load values for at least a portion of the power distribution network, using a Bayesian Structural Time Series model, an estimated photovoltaic power output value for the at least a portion of the power distribution network. The device may manage or control the power distribution network using the estimated photovoltaic power output value.

Bernstein, Andrey↗