Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Contingency Analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

ISS Contingency Attitude Control Recovery Method for Loss of Automatic Thruster Control

In this paper, the attitude control issues associated with International Space Station (ISS) loss of automatic thruster control capability are discussed and methods for attitude control recovery are presented. This scenario was experienced recently during Shuttle mission STS-117 and ISS Stage 13A in June 2007 when the Russian GN&C computers, which command the ISS thrusters, failed. Without automatic propulsive attitude control, the ISS would not be able to regain attitude control after the Orbiter undocked. The core issues associated with recovering long-term attitude control using CMGs are described as well as the systems engineering analysis to identify recovery options. It is shown that the recovery method can be separated into a procedure for rate damping to a safe harbor gravity gradient stable orientation and a capability to maneuver the vehicle to the necessary initial conditions for long term attitude hold. A manual control option using Soyuz and Progress vehicle thrusters is investigated for rate damping and maneuvers. The issues with implementing such an option are presented and the key issue of closed-loop stability is addressed. A new non-propulsive alternative to thruster control, Zero Propellant Maneuver (ZPM) attitude control method is introduced and its rate damping and maneuver performance evaluated. It is shown that ZPM can meet the tight attitude and rate error tolerances needed for long term attitude control. A combination of manual thruster rate damping to a safe harbor attitude followed by a ZPM to Stage long term attitude control orientation was selected by the Anomaly Resolution Team as the alternate attitude control method for such a contingency.

Bedrossian, Nazareth↗

Analysis of AP1000 Small-Break Loss-of-Coolant Accident Using Reactor Transient Simulator

The Westinghouse Electric Company’s Advanced Passive Reactor (AP1000) is characterized by the incorporation of passive safety systems (PSSs) designed to ensure core cooling during transient events. The assessment of PSSs requires evaluation of their performance through a combination of experiments and simulations employing various thermal-hydraulic codes. In addition, detailed evaluation of PSSs for a specific reactor system transient analysis such as loss-of-coolant-accident analysis supports understanding representative integral effects test facility development and the further evolution model development and assessment process. Developing a reactor system code is a complex and time-consuming process that requires significant engineering expertise and effort. It can take several months to even years to complete in the early stages of reactor system design and analysis. However, this process can be expedited through the use of transient simulator models for similar reactor systems, which can be used for lesson learning and training purposes. This study uses the Personal Computer Transient Analyzer (PCTRAN) code. The main advantage of PCTRAN is its ease of use and ability to run faster than real time. This study presents the results obtained for a small-break loss-of-coolant accident (SBLOCA) for two breaks using the full version (licensed) of PCTRAN. The purpose of this investigation is to evaluate the overall system behavior during the postulated SBLOCA event as well as assess the capability of the PCTRAN code to reproduce the system response during transient events. The obtained results were compared with the Westinghouse NOTRUMP system code. The PCTRAN code proved to be reliable in predicting the qualitative behavior of the system in both transient cases. As for the system response, it was found that it is contingent on the activation time of the PSSs. The differences in reactor coolant system pressure between the two codes were attributed to the critical flow model and simplification of mass and energy balance. Despite PCTRAN’s limitations, it can still provide a reasonable prediction of various reactor parameters such as pressure, mass flow rate, and void fraction during a SBLOCA scenario. It is worth noting that PCTRAN currently employs a bulk approach similar to that of the Modular Accident Analysis Program (MAAP) and MELCOR codes. However, the upcoming version of PCTRAN will include an artificial intelligence–based detection and accident prevention system, as well as different models for different reactor components. Consequently, PCTRAN has the potential to be upgraded to match the system thermal-hydraulic codes of the U.S. Nuclear Regulatory Commission and become more widely used in cybersecurity to safeguard nuclear power plants from cyberattacks.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Exploration Extra-Vehicular Mobility Unit (xEMU) Composite Hard Upper Torso (CHUT) Development

The xEMU is the Exploration Mobility Unity or space suit designed for microgravity (cislunar and low earth orbit (LEO)) and lunar surface operations. This suit design allows crewmembers to perform extravehicular exploration, science, construction, maintenance, and contingency operations while unattached to a vehicle for life support in pressure and thermal environments that exceed human capability. The xEMU provides life support, environmental protection, and communications capabilities to the EVA crewmember while allowing sufficient mobility and visibility to perform dexterous EVA tasks. The effort documented in this paper, addressed the design, analysis, manufacturing, full-scale test article testing and validation for a Composite Hard Upper Torso(CHUT)unit. Design and analysis of the CHUT was based on measured B-basis properties of the selected S-glass/epoxy composite, and established final geometry, composite layup and interface details that met requirements. A complete manufacturing and assembly protocol was established for the CHUT starting from composite layup in the tool, to final assembly of all interface metal hardware prior to delivery to NASA for suit integration. Full-scale CHUT test articles underwent static and fatigue pressure testing (2 lifetimes), impact testing at critical stress locations for tool drop/microgravity scenarios, followed by post-impact fatigue testing. Effect of manufacturing defects was evaluated by manufacturing a full-scale CHUT with 0.375”/0.5” defects at critical stress locations, followed by static and life-cycle fatigue testing. In all cases, the CHUT design met or exceeded mass, structural, interface and functional requirements. Two (2) complete CHUT articles were delivered to NASA for full-scale suit integration and testing.

spacesuit↗

Composite Hard Upper Torso (CHUT) for xEMU Space Suit

The xEMU is the Exploration Mobility Unity or space suit designed for microgravity (cislunar and low earth orbit (LEO)) and lunar surface operations. This suit design allows crewmembers to perform extravehicular exploration, science, construction, maintenance, and contingency operations while unattached to a vehicle for life support in pressure and thermal environments that exceed human capability. The xEMU provides life support, environmental protection, and communications capabilities to the EVA crewmember while allowing sufficient mobility and visibility to perform dexterous EVA tasks. The effort documented in this paper, addressed the design, analysis, manufacturing, full-scale test article testing and validation for a Composite Hard Upper Torso(CHUT)unit. Design and analysis of the CHUT was based on measured B-basis properties of the selected S-glass/epoxy composite, and established final geometry, composite layup and interface details that met requirements. A complete manufacturing and assembly protocol was established for the CHUT starting from composite layup in the tool, to final assembly of all interface metal hardware prior to delivery to NASA for suit integration. Full-scale CHUT test articles underwent static and fatigue pressure testing (2 lifetimes), impact testing at critical stress locations for tool drop/microgravity scenarios, followed by post-impact fatigue testing. Effect of manufacturing defects was evaluated by manufacturing a full-scale CHUT with 0.375”/0.5” defects at critical stress locations, followed by static and life-cycle fatigue testing. In all cases, the CHUT design met or exceeded mass, structural, interface and functional requirements. Two (2) complete CHUT articles were delivered to NASA for full-scale suit integration and testing.

spacesuit↗

SOYUZ escape trajectory analysis from Space Station Freedom

It has been proposed to utilize the Russian built SOYUZ as an assured crew return vehicle (ACRV) for Space Station Freedom. Three departure directions (nadir, zenith, minus velocity) are evaluated to determine escape path clearances. In addition, the effects of the following parameters were also evaluated: delta-V magnitude, configuration dependent ballistic coefficients, atmospheric density, Freedom attitude control, and canted docking adaptors. The primary factor influencing the escape trajectory was station contingency attitude rate. The nadir and zenith departures were preferable to minus velocity. The impact of atmospheric density and relative ballistic coefficients was minimal.

Heck, Michael L.↗

Data recovery via covert cognizance for unattended operational resilience

One of the important premises of unattended operation, a highly promoted characteristic of fission batteries and advanced microreactors, is the ability to automate the analysis of sensors data used in support of operational monitoring and control. Here, to meet this vision, this work proposes a new monitoring and data recovery paradigm to ensure resilience against data corruption which may be the result of malicious intrusion into the reactor operational network. This is paramount to ensure 100% availability under contingency scenarios such as cyberattacks. In support of this vision, earlier work has presented the concept of covert cognizance and demonstrated its mathematical ability to identify and embed cognizance parameters under the noise-dominated null space of the sensors data. This work extends this concept and applies it in real-time to demonstrate three key characteristics: zero-impact, zero-observability, and data recovery, where the first characteristic is to ensure no impact on operation, the second is immunity to discovery by pattern recognition techniques, and the third is to allow recovery of corrupt or falsified data. Recognizing that fission batteries are designed to operate under steady state most of the time, we elect to employ a small modular reactor model under transient operational conditions to demonstrate the operational resilience enabled by the covert cognizance paradigm. Specifically, the PI controller is augmented with the covert cognizance modules to develop self-awareness and enable automatic data recovery. The developed modules are expected to be equally applicable to a wide range of advanced reactor technologies relying on full or partial unattended control.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Revisiting Parabolic Trough Concentrators for Industrial Process Heat in the United States

After significant interest in the 1970s, but relatively few deployments, the use of concentrating solar collectors for thermal applications, including enhanced oil recovery, desalination, and industrial process heat (IPH), is again increasing in global interest. In particular, recent advances in collector design and manufacturing have led to reduced cost per square meter of aperture area. In this study, analysis of a modern parabolic trough that is suited for use in small solar IPH (SIPH) applications predicts that the installed solar field cost can be as low as $170/m2. A slightly higher cost of $200/m2 is estimated for facilities typical of a SIPH plant size. Full project costs will include additional costs for contingency, piping and heat exchanger interface, and project indirect costs. The cost for solar-generated heat by SIPH is quantified by defining the levelized cost of heat (LCOH). California offers a favorable environment for SIPH given its good insolation, gas prices typically higher than the national average, and policies promoting solar-thermal deployment. Given historically low gas prices, competing with natural gas remains the primary challenge to deployment. However, this study finds that the solar LCOH for many regions in California is lower than the LCOH from natural gas, using a representative installed solar hardware price and the average price for industrial natural gas in California. Lastly, modification are in progress to the parabolic trough model within NREL's System Advisor Model (SAM) to allow users to more easily predict performance for these steam-generation applications.

14 SOLAR ENERGY↗

A Co-Simulation Framework for Steady-State Analyses of Multiple Droop-based MTdc Grids in Continental-Scale Systems

The growing scale and complexity of planning continental hybrid ac and multi-terminal dc (MTdc) systems require scalable steady-state modeling and analysis approaches not currently available in commercial tools. This paper presents a comprehensive multi-fidelity model-conversion framework that enables the efficient transition of MTdc grid models from production cost modeling (PCM) and approximated ac power flow to detailed ac–MTdc power flow for large-scale planning studies. The core of this framework is a scalable co-simulation approach that, for the first time, enables power flow analysis in continental-scale ac–MTdc systems. It seamlessly couples commercial ac solvers with a detailed MTdc grid model that incorporates droop-based control and current-limiting strategies of multiple meshed MTdc grids. Leveraging this capability, an evaluation framework to systematically assess and compare different MTdc power redispatch strategies under ac and dc contingencies is introduced. The proposed framework and algorithm are evaluated using a combined Western and Eastern Interconnection system with 11 MTdc grids of various sizes, showing a coherent transition from PCM to detailed ac–MTdc power flow and improved system performance in voltage regulation and line overload mitigation following typical contingencies.

Nguyen, Quan H.↗

Deployment and retrieval mechanism redesigned for Spartan spacecraft on the STS

The Spartan Release Engage Mechanism (REM) is a system designed to restrain the Spartan spacecraft during Space Transportation System (STS) launch and landing. The mechanism is designed to allow deployment and retrieval of the Spartan free flyer spacecraft from the shuttle payload bay. Because current Spartan spacecraft payloads are much heavier than payloads intended for the original REM, an extensive redesign, analysis, and test program was necessary. Also, increased emphasis on safety in the post-Challenger era prompted a reevaluation of possible failures. Much of the design effort focused on improving the latch mechanism gearbox. Key concerns were effective gear lubrication, thermal gradients at the gearbox mounts, operation at thermal extremes, and gear-train failure contingencies. Increased concern for reliability led to the design of an Extra Vehicular Activity (EVA) backup latch system.

Galloway, Greg↗

The Air Quality Monitor “Benzene” Anomaly: Ground Testing and On-going Effects

The International Space Station (ISS) Air Quality Monitors (AQMs) have provided targeted in-flight analysis of volatile organic compounds (VOCs) in the ISS atmosphere since early 2013. During their initial half decade of use covering multiple sets of units, the AQMs performed well, meeting their validation criteria and showing excellent accuracy compared to archival samples. In addition to routine environmental monitoring, the AQMs have also been used during a number of contingency situations and investigations related to Environmental Control and Life Support Systems (ECLSS). These include a potential ammonia leak, increases in atmospheric ethanol, and efforts to locate potential sources of polydimethylsiloxanes that lead to the production of dimethylsilanediol (DMSD) in the US Water Processor Assembly (WPA). As the fleet of AQMs has aged, several issues have arisen. These have ranged from pervasive problems on electronics boards to loss of sensitivity due to operating in an elevated CO2 environment. The most notable issue encountered during on-orbit operations was incorrect identification of compounds. This initially occurred in mid-2020, when AQM1 reported the presence of benzene. While the AQM team questioned the validity of these results, the concentration of the “benzene” continued to increase and eventually exceeded the 30- and 180-day Spacecraft Maximum Allowable Concentration (SMAC). This led to wide-ranging efforts by a number of groups aimed at understanding the situation and identifying the source of the “benzene.” AQM1 failed after being relocated to the Russian Segment as part of the investigation, and the unit was returned for evaluation. When archive samples collected while the AQM was measuring elevated benzene showed no detectable benzene, the focus of the investigation shifted to determining the cause of the false positive readings. Here, we will discuss the results of this investigation by the AQM team, potential causes of the interference, and subsequent reporting of AQM1 results.

W T Wallace↗

The Air Quality Monitor “Benzene” Anomaly: Ground Testing and On-going Effects

The International Space Station (ISS) Air Quality Monitors (AQMs) have provided targeted in-flight analysis of volatile organic compounds (VOCs) in the ISS atmosphere since early 2013. During their initial half decade of use covering multiple sets of units, the AQMs performed well, meeting their validation criteria and showing excellent accuracy compared to archival samples. In addition to routine environmental monitoring, the AQMs have also been used during a number of contingency situations and investigations related to Environmental Control and Life Support Systems (ECLSS). These include a potential ammonia leak, increases in atmospheric ethanol, and efforts to locate potential sources of polydimethylsiloxanes that lead to the production of dimethylsilanediol (DMSD) in the US Water Processor Assembly (WPA). As the fleet of AQMs has aged, several issues have arisen. These have ranged from pervasive problems on electronics boards to loss of sensitivity due to operating in an elevated CO2 environment. The most notable issue encountered during on-orbit operations was incorrect identification of compounds. This initially occurred in mid-2020, when AQM1 reported the presence of benzene. While the AQM team questioned the validity of these results, the concentration of the “benzene” continued to increase and eventually exceeded the 30- and 180-day Spacecraft Maximum Allowable Concentration (SMAC). This led to wide-ranging efforts by a number of groups aimed at understanding the situation and identifying the source of the “benzene.” AQM1 failed after being relocated to the Russian Segment as part of the investigation, and the unit was returned for evaluation. When archive samples collected while the AQM was measuring elevated benzene showed no detectable benzene, the focus of the investigation shifted to determining the cause of the false positive readings. Here, we will discuss the results of this investigation by the AQM team, potential causes of the interference, and subsequent reporting of AQM1 results.

W T Wallace↗

The Air Quality Monitor “Benzene” Anomaly: Ground Testing and On-going Effects

The International Space Station (ISS) Air Quality Monitors (AQMs) have provided targeted in-flight analysis of volatile organic compounds (VOCs) in the ISS atmosphere since early 2013. During their initial half decade of use covering multiple sets of units, the AQMs performed well, meeting their validation criteria and showing excellent accuracy compared to archival samples. In addition to routine environmental monitoring, the AQMs have also been used during a number of contingency situations and investigations related to Environmental Control and Life Support Systems (ECLSS). These include a potential ammonia leak, increases in atmospheric ethanol, and efforts to locate potential sources of polydimethylsiloxanes that lead to the production of dimethylsilanediol (DMSD) in the US Water Processor Assembly (WPA). As the fleet of AQMs has aged, several issues have arisen. These have ranged from pervasive problems on electronics boards to loss of sensitivity due to operating in an elevated CO2 environment. The most notable issue encountered during on-orbit operations was incorrect identification of compounds. This initially occurred in mid-2020, when AQM1 reported the presence of benzene. While the AQM team questioned the validity of these results, the concentration of the “benzene” continued to increase and eventually exceeded the 30- and 180-day Spacecraft Maximum Allowable Concentration (SMAC). This led to wide-ranging efforts by a number of groups aimed at understanding the situation and identifying the source of the “benzene.” AQM1 failed after being relocated to the Russian Segment as part of the investigation, and the unit was returned for evaluation. When archive samples collected while the AQM was measuring elevated benzene showed no detectable benzene, the focus of the investigation shifted to determining the cause of the false positive readings. Here, we will discuss the results of this investigation by the AQM team, potential causes of the interference, and subsequent reporting of AQM1 results.

William T Wallace↗

NASA CEV On-Orbit GN&C Analysis

The Orion spacecraft orbit GN&C system will be required to perform both ISS servicing missions and Lunar sortie and outpost crew transportation. While certain aspects of these two missions are complementary, the two missions are also distinct in many ways. Common between the missions is a Low Earth Orbit (LEO) rendezvous, one with the ISS And the other with the LSAM/EDS stack prior to trans-lunar insertion. The lunar missions will additionally require Orion to perform orbit maintenance in LLO, perform contingency lunar orbit operations including RPOD with the LSAM, perform the TEI maneuver sequence, and execute the trans-Earth cruise. The NASA-led team developed a reference configuration orbit GN&C system capable of executing all of these activities with the same navigation sensor suite and control effectors while fully meeting the requirements being developed for System Requirements Review in advance of prime contractor selection. This paper will present an overview of the analyses performed to support system trade studies, demonstrate the feasibility of the NASA reference configuration, and validate the Orion system requirements. These analyses include linear covariance techniques, 3-DOF Monte Carlo simulations, 6-DOF Monte Carlo simulations, and analytical evaluations of GN&C systems performed by the NASA-led Orion team to characterize the sensitivities of Orion s various missions and assess the unique challenges of each. The first part of this paper will describe the trade studies that were performed in order to characterize the RPOD system performance for both the ISS and the lunar missions including development of an RPOD operations concept, RPOD trajectories, contingency scenarios, docking mechanism and associated contact conditions, post-contact thrust issues, relative navigation sensors, relative navigation sensor target infrastructure. The paper will also discuss concepts for both manually-piloted and automatically executed scenarios, as well as the remotely-piloted contingency scenario in LLO. The second part of the paper will discuss the analyses performed for lunar and cislunar GN&C performance including the accuracy of the post-insertion lunar orbit, the ability of Orion to hit a particular Earth return entry corridor, attitude control solutions for long-duration surface operations, and autonomous navigation in support of TEI without ground tracking.

DSouza, Chris↗

Early Artemis Surface Navigation: Challenges, Approaches, and Opportunities

The early Artemis missions represent the return of humanity to the surface of the Moon and provide opportunities for meeting early science and exploration goals. Position, Navigation, and Timing (PNT) capabilities are a fundamental element and inform operational design, flight rules, and the ability to meet these. This paper provides an overview of the needs, potential implementations, challenges, and concepts of operations in the initial human surface missions, Artemis III and IV. These early excursions are a crucial learning opportunity to gain more experience in the actual operational environment for Artemis V and beyond where exploration objectives and complexity increases. As part of the study, the team defined a threshold performance navigation requirement (including position and orientation) to meet crew safe return and assessed a breadth of navigation approaches that could be deployed to augment the crew’s baseline navigation capability. Data was collected in terms of size, mass, power, operational constraints, environment constraints, interface, and performance to define the technical metrics. Given these, the trade team conducted polling among the various Artemis Campaign elements to capture preference, integration challenges, and operational impacts. These were used to develop weightings and inform a ranked order of solutions across each of the early missions. The results of the study recommended augmenting the initial orientation capability with additional navigation sensors to provide coarse position and heading information to the crew to enable a safe contingency walk-back when out of video range. The team identified opportunities for embedding this hardware in future scenarios to provide an integrated solution. With the deployment of the LunaNet’s Lunar Augmented Navigation System, the crew will be able to maintain accurate real-time navigation knowledge with minimal physical impacts. Discussion of future testing and continued analysis is included in this paper. These forward plans and long-term architecture systems will enable a powerful navigation approach for orbiting and surface users, enabling a high level of scientific return and crew safety.

Evan Anzalone↗

Early Artemis Surface Navigation: Challenges, Approaches, and Opportunities

The early Artemis missions represent the return of humanity to the surface of the Moon and provide opportunities for meeting early science and exploration goals. Position, Navigation, and Timing (PNT) capabilities are a fundamental element and inform operational design, flight rules, and the ability to meet these. This paper provides an overview of the needs, potential implementations, challenges, and concepts of operations in the initial human surface missions, Artemis III and IV. These early excursions are a crucial learning opportunity to gain more experience in the actual operational environment for Artemis V and beyond where exploration objectives and complexity increases. As part of the study, the team defined a threshold performance navigation requirement (including position and orientation) to meet crew safe return and assessed a breadth of navigation approaches that could be deployed to augment the crew’s baseline navigation capability. Data was collected in terms of size, mass, power, operational constraints, environment constraints, interface, and performance to define the technical metrics. Given these, the trade team conducted polling among the various Artemis Campaign elements to capture preference, integration challenges, and operational impacts. These were used to develop weightings and inform a ranked order of solutions across each of the early missions. The results of the study recommended augmenting the initial orientation capability with additional navigation sensors to provide coarse position and heading information to the crew to enable a safe contingency walk-back when out of video range. The team identified opportunities for embedding this hardware in future scenarios to provide an integrated solution. With the deployment of the LunaNet’s Lunar Augmented Navigation System, the crew will be able to maintain accurate real-time navigation knowledge with minimal physical impacts. Discussion of future testing and continued analysis is included in this paper. These forward plans and long-term architecture systems will enable a powerful navigation approach for orbiting and surface users, enabling a high level of scientific return and crew safety.

Evan Anzalone↗

Large-scale simulation-based parametric analysis of an optimal precooling strategy for demand flexibility in a commercial office building

Achieving success with grid-interactive efficient buildings (GEBs) is closely tied to the utilization of flexible loads. A valuable strategy involves the implementation of precooling techniques before high-demand events, such as peak hours, by adjusting zone air temperature setpoints. This leads to a reduction in thermal loads and peak electricity demand during these times, as the building’s thermal mass stores and subsequently releases thermal energy. However, the effectiveness of the pre-cooling optimization is highly contingent on specific conditions such as building thermal properties, weather conditions, utility rate structure, HVAC equipment sizing, etc. Therefore, investigating the impacts of these condition-specific factors is crucial, especially when considering precooling strategies that utilize thermal mass in commercial buildings. In this paper, we first devised a novel heuristic control approach that incorporates parameterized optimal precooling thermostat schedules to enhance demand flexibility in a commercial office building. Subsequently, we conducted a thorough performance evaluation of this control strategy. Here, the optimal thermostat schedule was parameterized using three optimization variables: the precooling start time, the precooling end time, and the precooling temperature setpoint. Utilizing the DOE medium-sized office building as the virtual testbed, we showed that the parameterized schedule effectively approximates model predictive control and requires drastically reduced computational overhead. In addition, we investigated the impact of different influencing factors on the optimal precooling strategy. These factors include building thermal mass, outdoor air conditions, and energy price profiles. Using high-performance computing, we simulated a total of 225 scenarios, consisting of three levels of thermal mass, five typical outdoor air temperature profiles, and fifteen time-of-use price plans. The results demonstrate that optimal thermostat scheduling could save substantial energy cost in medium-sized office buildings with heavy thermal mass but with some energy penalty. Although the potential for cost savings is lower in buildings with low and medium thermal mass, the energy penalty remains consistent in all three thermal mass scenarios. The study also highlights the need to account for zone diversity and recognize that a one-size-fits-all-zone setpoint schedule may not be suitable for all zones and can lead to unnecessary energy wastage. Furthermore, the results highlight that while outdoor air conditions play a role in cost and energy performance, the cooling load exerts a more immediate and substantial influence on cost savings in precooling strategies. Although cost savings are comparable under certain conditions with the same cooling load, observed deviations in energy penalty indicate potential disparities in the efficiency of the HVAC system during the load-shifting process. In addition, the duration of peak pricing and the ratio between peak and off-peak times exhibit clear correlations with cost savings and energy consumption, aligning with intuitive expectations. These findings offer valuable insights for optimizing precooling strategies in office buildings.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Risk Management for Human Support Technology Development

NASA requires continuous risk management for all programs and projects. The risk management process identifies risks, analyzes their impact, prioritizes them, develops and carries out plans to mitigate or accept them, tracks risks and mitigation plans, and communicates and documents risk information. Project risk management is driven by the project goal and is performed by the entire team. Risk management begins early in the formulation phase with initial risk identification and development of a risk management plan and continues throughout the project life cycle. This paper describes the risk management approach that is suggested for use in NASA's Human Support Technology Development. The first step in risk management is to identify the detailed technical and programmatic risks specific to a project. Each individual risk should be described in detail. The identified risks are summarized in a complete risk list. Risk analysis provides estimates of the likelihood and the qualitative impact of a risk. The likelihood and impact of the risk are used to define its priority location in the risk matrix. The approaches for responding to risk are either to mitigate it by eliminating or reducing the effect or likelihood of a risk, to accept it with a documented rationale and contingency plan, or to research or monitor the risk, The Human Support Technology Development program includes many projects with independently achievable goals. Each project must do independent risk management, considering all its risks together and trading them against performance, budget, and schedule. Since the program can succeed even if some projects fail, the program risk has a complex dependence on the individual project risks.

jones, Harry↗

Expert system support for HST operations

An expert system is being developed to support vehicle anomaly diagnosis for the Hubble Space Telescope (HST). Following a study of safemode entry analyses, a prototype system was developed which reads engineering telemetry formats, and when a safemode event is detected, extracts telemetry from the downlink and writes it into a knowledge base for more detailed analyses. The prototype then summarizes vehicle events (limits exceeded, specific failures). This prototype, the Telemetry Analysis Logic for Operations Support (TALOS) uses the Lockheed Expert System (LES) shell, and includes over 1600 facts, 230 rules, and 27 goals. Although considered a prototype, it is already an operationally useful system. The history leading into the TALOS prototype will be discussed, an overview of the present TALOS system will be presented, and the role of the TALOS system in contingency planning will be delineated.

Cruse, Bryant↗