Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Consequence Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

Airborne Conflict Management within Confined Airspace in a Piloted Simulation of DAG-TM Autonomous Aircraft Operations

A human-in-the-loop experiment was performed at the NASA Langley Research Center to study the feasibility of Distributed Air/Ground Traffic Management (DAG-TM) autonomous aircraft operations in highly constrained airspace. The airspace was constrained by a pair of special use airspace (SUA) regions on either side of the pilot s planned route. The available airspace was further varied by changing the separation standard for lateral separation between 3 nm and 5 nm. The pilot had to maneuver through the corridor between the SUA s, avoid other traffic and meet flow management constraints. Traffic flow management (TFM) constraints were imposed as a required time of arrival and crossing altitude at an en route fix. This is a follow-up study to work presented at the 4th USA/Europe Air Traffic Management R&D Seminar in December 2001. Nearly all of the pilots were able to meet their TFM constraints while maintaining adequate separation from other traffic. In only 3 out of 59 runs were the pilots unable to meet their required time of arrival. Two loss of separation cases are studied and it is found that the pilots need conflict prevention information presented in a clearer manner. No degradation of performance or safety was seen between the wide and narrow corridors. Although this was not a thorough study of the consequences of reducing the en route lateral separation, nothing was found that would refute the feasibility of reducing the separation requirement from 5 nm to 3 nm. The creation of additional, second-generation conflicts is also investigated. Two resolution methods were offered to the pilots: strategic and tactical. The strategic method is a closed-loop alteration to the Flight Management System (FMS) active route that considers other traffic as well as TFM constraints. The tactical resolutions are short-term resolutions that leave avoiding other traffic conflicts and meeting the TFM constraints to the pilot. Those that made use of the strategic tools avoided additional conflicts, whereas, those making tactical maneuvers often caused additional conflicts. Many of these second-generation conflicts could be avoided by improved conflict prevention tools that clearly present to the pilot which maneuver choices will result in a conflict-free path. These results, together with previously reported studies, continue to support the feasibility of autonomous aircraft operations.

Barmore, Bryan↗

Contractor and Government: Teamwork and Commitment

The assigned topic, "Contractor and Government: Teamwork and Commitment," is a subject about vitally interested. The successes of the U.S. space program were built on such teamwork and commitment. It seems only a short time ago that man's role in space was an unknown quantity. In rapid succession, however, the flights of Shepard, Glenn, and Armstrong demonstrated man's capability to live and travel in space. Consequently, we no longer live with the same awe of space. The success of these joint industry-NASA efforts in achieving our Nation's space goals testifies to the validity of our team's past commitment, management expertise, communications techniques, and teamwork over a period of 25 years. Today, however, We are at the beginning of a new era in space.

Griffin, Gerald D.↗

Method for Tracking and Communicating Aggregate Risk Through the Use of Model-Based Systems Engineering (MBSE) Tools

Large, complex projects can identify a significant number and variety of risks, throughout the project life cycle. These risks are analyzed, mitigated, closed or accepted as independent uncertainties. Once closed or accepted, it is easy for projects to lose awareness of their impact. In reality, each of these risks contributes some amount to the overall risk posture of the project. The ability to track and effectively communicate this aggregate risk has represented a challenge to project management. There have been previous attempts to create a schema to communicate the aggregate effect of risks, without notable success. Most of these attempts have centered on some additive metric derived from the scoring of likelihood and consequence values. This, in and of itself, is a logical approach, but all too often the scores were then aggregated to a level where all context was lost. One weakness has been a lack of attempt to create linkages or logical groups of the risks upon which useful aggregation could then occur. The overall move to model-based (systems) engineering (MBSE) has opened up a vast frontier of opportunities to better integrate all project data. MBSE provides an underlying layer that links data items to each other. Objectives link to requirements, which then link to functions, functions to physical architecture items, and so on, as far down as projects want to model. While it started with a focus on modeling requirements based on things like use cases, efforts are now underway to integrate safety and mission assurance (S&MA) information and analyses, such as risks. This effort, called Model Based Mission Assurance (MBMA), is yielding models that are more useful and are a more accurate representations of the systems. MBSE models, with this ability to link related items, provide a new means of tracking and communicating aggregate risks. In the proposed method, risks are added into the models as distinct items, having attributes that communicate a scoring derived from the likelihood and consequence values as charted on the standard NASA 5x5 risk matrix. Like earlier efforts, each box in the 5x5 has an associated scoring, which may include both a current score and potential post-mitigation/control score. The risk items are then linked to elements of the model, such as system objectives/goals, requirements, functions, or physical architecture items, with "Risk to" relationships. These risks will then be communicated by use of reports generated from the model, detailing all risks and/or hazards linked to model elements. These reports can include aggregate impacts, including a current scoring and potential future state scoring based on the planned mitigations and/or controls. These reports will show all risks, open, accepted, and closed, linked to project objectives or requirements. When run as part of an upcoming risk acceptance discussion, these reports will serve to remind the team of all previous risks that relate to the effected portion of the system. When included as part of periodic program or project reviews, risk reviews, and safety reviews, this method can improve the overall understanding of the system's true risk posture. This proposed method takes full advantage of the advances that modern modeling techniques provide, with a minimal investment of additional time. Utilizing the model environment also enables a near constant access to current state of aggregate risks.

model based mission assurance↗

2020 I.F._Wickizer_New CE Tool for MDC_Final Report

Our team surveyed available products and found no readily-available/U.S. commercial or Agency products which supported our envisioned workflow for the Mission Design Center and the concurrent engineering (CE) process we use. Therefore, we sought to create our own CE tool. Changes in agency policy during the performance period allowed us to shift direction and instead adapt our previous legacy tool (Atlas) to include the collaboration features we sorely needed. Atlas relied upon databases for its back-end data management. Poseidon, the work proposed under this effort, was also intended to leverage from that previous back end (in part). However, in May 2021, EUSO announced that “SBU/CUI Information Can Now Be Shared/Stored Within O365 Without Encryption.” Consequently, we made the decision to use O365 in place of our back end. This change provides for version history, collaborative simultaneous editing, and other collaboration tools agency-wide that were previously unavailable with the old database architecture. The new Atlas O365 has more flexibility and capability for users. It’s now easier for users to switch between using the tool for concurrent engineering and individual subsystem engineering. A version was delivered for concurrent engineering of small satellite missions; so far, it has been used successfully on the Aeolus MDC study. Atlas O365 will facilitate the design and assessment of Small Satellite Missions at low Concept Maturity Level at Ames. Feasibility assessments on mission concepts still at a low CML permit strategic planning and decision-making efforts at the center level about which concepts should be pursued and proposed.

concurrent engineering↗

Developing Standards for AI/ML Systems in Civil Aviation: Challenges and Barriers

The inability to establish appropriate assurance methods for AI/ML components in safety critical systems leaves us unable to effectively manage the risks and benefits of such systems. It drives cost of development for systems with AI/ML components uneconomically high, it delays the adoption of systems with AI/ML components at scale, and it can result in catastrophic consequences in terms of the safety of systems with AI/ML components. In this presentation we will explore what constitutes sufficient scientific-based evidence to substantiate a safety claim related to an AI/ML component performing a safety-critical function.

AI/ML Standards↗

An ODE-Fitting Approach to Estimate Critical Aircraft Performance Parameters for Trajectory Prediction

Ground-based decision support tools (DST) in air traffic management (ATM) typically perform trajectory prediction based on aircraft performance model (APM) parameters, but some or all of these parameters might not be readily available. In particular, the three critical parameters required for trajectory prediction are the thrust setting, drag coefficients, and takeoff weight of the aircraft. Unfortunately, these parameters are coupled and appear together in physics-based kinetic models. Past approaches utilize data from a specific phase of flight (climb, level flight or descent), where one or more of the parameters are assumed to be known and estimate the remaining unknown parameters. This approach introduces bias/errors and also does not extend to scenarios where all of the above parameters are not known with sufficient accuracy. This paper is the first of its kind to propose a generalized framework for simultaneous estimation of all three critical APM parameters (thrust, drag, and mass). The proposed approach utilizes data from both the climb and descent phases and fits the ordinary differential equation for altitude in each phase using historical trajectory data available from radar tracks or ADS-B. The approach yields a set of optimized APM parameters that are best suited to fit each historical flight record. The methodology is applied on on sample flights from three different aircraft types, and the results demonstrate low fit error and consequently will yield a high level of prediction accuracy.

trajectory prediction↗

Evaluating Process Effectiveness to Reduce Risk

It is well documented that government agencies do not have the same incentive as the private sector to focus on process effectiveness and continual improvement of those processes. It is also well documented whenever government agencies fail to deliver efficient, effective, consistent, and fair services to the citizens. In spite of the various "reinventing government" and "effectiveness initiatives" of the past decades, and in spite of the efforts on the part of many agencies to improve, government in general still lags behind industry in creating a culture of effective processes and systems. While the tragic events that unfolded recently in Flint, Michigan, teach us that running government "like a business" does not always take the needs of the citizenry into account, there are many lessons and techniques from the private sector that government agencies can use to improve. The incentive to improve, while mandated by various administrations1, needs to come from within the workforce, in order to effectively take root. The best, most effective incentive is to reduce, control or eliminate risk. Government agencies face some of the same risks as the private sector, while some are unique. While ISO 310002 has been around since 2009, risk has taken on increased visibility within the private sector with the advent of the emphasis on risk-based thinking in ISO 9001:20153. The relationship between risk-based thinking and effective processes is simple and direct. Those processes that are well thought out and standardized (i.e. Plan-Do-Check-Act), will have taken into account the applicable policy, statutory, regulatory, safety, quality and technical parameters, which may not occur to someone performing the process with minimal experience or training; and thus protect the employees, the public and the agency from statutory and regulatory violations; delay in providing services; non-delivery of services; harm to public or employee safety and health; cost overruns; breaches in security; loss of confidence in government; failure of publicly funded projects; damage to the environment; ethics violations, and the list goes on; with local, national and even international consequences. The Plan-Do-Check-Act process, also known as the "process approach" can be used at any time to establish and standardize a process, and it can also be used to check periodically for "process creep" (i.e., informal, unauthorized changes that have occurred over time), any necessary updates and improvements. While ISO 9001 compliance is not mandated for all government agencies, if interpreted correctly, it can be useful in establishing a framework and implementing effective management systems and processes.4 Another method that can be used to evaluate effectiveness is the scorecard definitions in Mallory's Process Management Standard5 as a basis for evaluating work on the process level on effective, and continuously improved and improving processes. With processes on the lower end of the scale, agencies are vulnerable to a great many risks, with employees and managers making up many of the rules as they go, leading to the above listed negative results. Without clear guidance for nominal operations, off-nominal situations can, and do, increase the likelihood of chaos. In an increasingly technical environment, with inter-agency communication and collaboration becoming the norm, agencies need to come to grips with the fact that processes can become rapidly outdated, and that the technical community should take on an increased role in the maturation of the agency's processes. Industry has long known that effective processes are also efficient, and process improvement methods such as Kaizen, Lean, Six Sigma, 5S, and mistake proofing lead to increased productivity, improved quality, and decreased cost. Again, government agencies have different concerns, but inefficiencies and mistakes can have dire and wide reaching consequences for the public that they serve. While no one goes to work planning to cause harm, it is up to agencies to establish upper level systems, which make establishment and compliance with processes possible. Again, Mallory provides us with a Systems Management Standard6, similar to the Process Management Standard, with a scale of 0-5 for systems effectiveness and maturity. Deming determined that "eighty-five percent of the reasons for failure are deficiencies in the systems and process rather than the employee. The role of management is to change the process rather than badgering individual employees to do better." 7 It is not just the working level employees who need effective processes, but the mid-and upper level managers as well. A disciplined management culture sets the tone for the employees, aids both routine and off-nominal decision-making, and incorporates risk -based thinking into the systems and processes as a matter of normal activity. Figure 1, illustrates the relationship between ineffective and effective processes and risk, through the use of the "stoplight" colors that are commonly used to show serious situations (red), situations which may be improving or deteriorating depending on trends (yellow), and situations that are under control and continuously improved (green).

Shepherd, Christena C.↗

Safety Basis Compliant Flexible Operations [Capstone Project]

Compliant nuclear operations must be weighed against the radiological risk to the worker, public, and the environment. This project set out to look at one facility at Los Alamos National Laboratory (LANL or the Laboratory) and compare the risk with the operational restrictions associated with the Technical Safety Requirements (TSRs). The hope was to identify controls that could be reduced or simplified while maintaining compliance with 10 CFR 830, Nuclear Safety Management. This would result in increasing facility operational flexibility and efficiency. Controls were identified to be simplified or eliminated based on risk. This identification was initially envisioned from the perspective of reanalysis of the accident and hazard analysis consequences. Additionally, it was envisioned that fire testing could show that the consequences of a fire are not as dramatic as analyzed. Specific facility controls were identified that cause operational inefficiencies. Based on data collection, two controls were identified for further evaluation. The first control was combustible loading within the waste storage buildings, and the second control is related to the seismic power cutoff switch. In evaluating the combustible loading control, the thought is that the fire suppression system (FSS) provides adequate protection and the combustible loading controls do not need elevation to a TSR control. The FSS, along with the Fire Protection Program, would provide protection to prevent a fire from impacting large amounts of stored waste material. The seismic switch was more of a challenge. When reviewing the facility operation, it was determined that the facility does not operate anywhere near the established material-at-risk (MAR – radioactive material) limits. By adjusting these limits, a reduced consequence could be achieved and hence, a significant risk reduction achieved. A new operating mode would be used to achieve this reduction. A reduced MAR limit was successfully used as a test case for snow removal during this project. This project expands on that trial case as related to combustible loading and the seismic power cutoff switch TSRs. This will increase the efficiency of operations with reduced TSR controls while reducing overall facility risk. This is a win-win situation for Triad National Security, LLC (Triad) and the U.S. Department of Energy (DOE). Due to schedule and budgetary constraints, not all envisioned work scope was accomplished. However, it is maintained in this report for future efforts.

61 RADIATION PROTECTION AND DOSIMETRY↗

2009 Space Shuttle Probabilistic Risk Assessment Overview

Loss of a Space Shuttle during flight has severe consequences, including loss of a significant national asset; loss of national confidence and pride; and, most importantly, loss of human life. The Shuttle Probabilistic Risk Assessment (SPRA) is used to identify risk contributors and their significance; thus, assisting management in determining how to reduce risk. In 2006, an overview of the SPRA Iteration 2.1 was presented at PSAM 8 [1]. Like all successful PRAs, the SPRA is a living PRA and has undergone revisions since PSAM 8. The latest revision to the SPRA is Iteration 3. 1, and it will not be the last as the Shuttle program progresses and more is learned. This paper discusses the SPRA scope, overall methodology, and results, as well as provides risk insights. The scope, assumptions, uncertainties, and limitations of this assessment provide risk-informed perspective to aid management s decision-making process. In addition, this paper compares the Iteration 3.1 analysis and results to the Iteration 2.1 analysis and results presented at PSAM 8.

Hamlin, Teri L.↗

Systemic Risk

Systemic risk is the name given to impacts that spread within and across systems and sectors (e.g. ecosystems, health, infrastructure and the food sector) via the movements of people, goods, capital and information within and across boundaries (e.g. regions, countries and continents). The spread of these impacts can lead to potentially existential consequences and system collapse across a range of time horizons. Globalization contributes to systemic risk affecting people worldwide. The impacts of climate change or COVID-19 show how the challenges of addressing systemic risk go beyond conventional risk management and governance. Critical system interdependencies, amplified by underlying vulnerabilities, highlight that there is a growing need to better understand cascading impacts, systemic risks and the possible political (governance) and societal responses. This includes improving our understanding of the root causes of systemic risk, both biophysical and socio-economic, and related information needs. Addressing contemporary challenges in terms of systemic risk requires integrating different systems perspectives and fostering system thinking, while implementing key intergovernmental agendas, such as the Paris Agreement, the Sendai Framework for Disaster Risk Reduction and the Sustainable Development Goals.

systemic risk↗

Soil Carbon Saturation: What Do We Really Know?

Managing soils to increase organic carbon storage presents a potential opportunity to mitigate and adapt to global change challenges, while providing numerous co-benefits and ecosystem services. However, soils differ widely in their potential for carbon sequestration, and knowledge of biophysical limits to carbon accumulation may aid in informing priority regions. Consequently, there is great interest in assessing whether soils exhibit a maximum capacity for storing organic carbon, particularly within organo–mineral associations given the finite nature of reactive minerals in a soil. While the concept of soil carbon saturation has existed for over 25 years, recent studies have argued for and against its importance. Here, we summarize the conceptual understanding of soil carbon saturation at both micro- and macro-scales, define key terminology, and address common concerns and misconceptions. We review methods used to quantify soil carbon saturation, highlighting the theory and potential caveats of each approach. Critically, we explore the utility of the principles of soil carbon saturation for informing carbon accumulation, vulnerability to loss, and representations in process-based models. We highlight key knowledge gaps and propose next steps for furthering our mechanistic understanding of soil carbon saturation and its implications for soil management.

Environmental sciences↗

Identification of Error Patterns in Terminal-Area ATC Communications

Advancing air traffic management technologies have enabled a greater number of aircraft to use the same airspace more effectively. As aircraft separations are reduced and final approaches are more finely timed, there is less room for error. The present study examined 122 terminal-area, loss-of-separation and procedure violation incidents reported to the Aviation Safety Reporting System (ASRS) by air traffic controllers. Narrative description codes were used for the incidents for type of violation, contributing factors, recovery strategies, and consequences. Usually multiple errors occurred prior to the violation. Error sequences were analyzed and common patterns of errors were identified. In half of the incidents, errors were noticed in time to correct mistakes. Of these, almost 43% committed additional errors during the recovery attempt. This analysis shows that redundancies in the present air traffic control system may not be sufficient to support large increases in traffic density. Error prevention and design considerations for air traffic management systems are discussed.

Quinn, Cheryl↗

Effects of Galactic Irradiation on Thermal and Electronic Transport in Tungsten

The impact of irradiation on the thermal and electronic properties of materials is a persistent puzzle, particularly defect formation at the atomic and nanoscales. This work examines the nanoscale effects of low-energy irradiation on tungsten (W), focusing on defect-induced modifications to thermal and electronic transport. Using the site-projected thermal conductivity (SPTC) method [A. Gautam et al. PSS-RRL, 2400306, 2024], bulk and twin-grain boundary W with vacancy defects based on the Norgett–Robinson–Torrens displacements per atom model is analyzed. SPTC provides a detailed prediction of postcascade spatial thermal conductivity distribution. Electronic conductivity activity is estimated using the “N 2 method” [K. Nepal et al. Carbon, 119711, 2025] to explore the consequences of vacancies and grain boundaries, highlighting the defect-dependent nature of charge transport behavior. These findings offer high-resolution insights into irradiation-driven transport phenomena, with implications for space-exposed materials and nanoscale thermal/electronic management.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Bridge Seismic Screening Tool (BSST), Version 2.0

The Regional Resiliency Assessment Program (RRAP) is a cooperative assessment of specific critical infrastructure within a designated geographic area and a regional analysis of the surrounding infrastructure that addresses a range of infrastructure resilience issues that could have regionally and nationally significant consequences. In 2018, DHS’s Cybersecurity and Infrastructure Security Agency (CISA) sponsored the Oregon Transportation Systems RRAP project in coordination with the Office of the Governor (under the oversight of the state resilience officer), the Oregon Office of Emergency Management (OEM), the Oregon Department of Transportation (ODOT), and other regional stakeholders (CISA 2021). This project focuses on assessing the impacts of a Cascadia Subduction Zone (CSZ) earthquake on state transportation systems and, in particular, how those impacts may affect the ability of emergency response efforts to move supplies into the region. The intended outcome of this analysis is the prioritization of transportation routes and modes for additional planning, investment, hardening, or other activities to enhance their resilience—and therefore, to enhance their ability to support response and recovery efforts following a CSZ earthquake. An important part of this transportation system-level assessment has been to assess the seismic vulnerability of the state highway system. In doing so, the RRAP project team used the Bridge Seismic Screening Tool (BSST) to assess, at a system-level, the potential impacts that a CSZ earthquake could have on state highway bridges (Bergerson et al. 2019).1 Argonne National Laboratory (Argonne), in collaboration with the Washington State Department of Transportation (WSDOT), originally developed the BSST as part of the 2017 Washington State Transportation Systems RRAP project, a sister project to the 2018 Oregon Transportation Systems RRAP project. Argonne updated the BSST during this more recent project in Oregon based on feedback from stakeholders and subject matter experts (SMEs) on the original version of the tool. The first step in the BSST is to assess the seismic vulnerability of roadway bridges following a CSZ earthquake to determine a projected or potential damage state. Damage states then help determine approximate reopening times for bridge crossings.2 This document provides details on the BSST methodology, the implementation of that tool to analyze the projected damage incurred in a CSZ earthquake scenario, and the determination of corresponding reopening times of interstate, state highway, and local bridges following such an event.

58 GEOSCIENCES↗

Design of Hypothetical Processes for the Production of 131 I and 99 Mo from Activation Targets

For over six decades, medical isotope production has been a high-priority focus of many research reactors across the globe. The majority of these isotopes were produced using highly-enriched uranium (HEU) or low enriched uranium (LEU) – delivering millions of doses of diagnostic and therapeutic isotopes. As a consequence of this production, however, six decades of isotope production has resulted in massive quantities of spent uranium material worldwide with no known disposition pathway creating growing proliferation concerns. Supported by the National Nuclear Security Administration’s (NNSA) Material Management and Minimization (M3) program, there has been increased focus in the production of high-priority isotopes without special nuclear materials or without uranium altogether. Isotope production via activation can potentially fulfill regional isotope demands – particularly in under-developed regions without access to isotope supply chains. The benefits of this approach would be a reduction in uranium proliferation risks, less special nuclear material wastes, and reduced risk of supply disruption in the likely event that major isotope producers will again go off-line as has happened in recent years due to a number of factors.

07 ISOTOPE AND RADIATION SOURCES↗

Compositional Variation Tests on DuraMelter 100 with LAW Sub-Envelope B1 Feed in Support of the LAW Pilot Melter, VSL-02R62N0-5, Rev. 0 (May 2003)

The principal objective of the DM100 tests was to demonstrate the robustness of the vitrification process with respect to feed and glass compositional changes resulting from variations in the simulant-to-additive ratio. The DM100-WV unit was selected for these tests; this melter was used for all of the Part B 1 tests on LAW Envelopes A, B, and C sulfate incorporation that were used to support the subsequent tests on the Pilot Melter as well as for the more recent LAW Sub-Envelope Al, A2, A3 and Cl tests. The same melter was selected for the present tests in order to maintain comparisons between the data sets. In addition, the somewhat smaller glass volume for the same melt surface area as compared to the DM100-BL melter means that more glass turnovers are achieved for a given test duration. The DM100 tests used nominal feed and feed with a 15% surplus in waste simulant. Previous Pilot Melter tests on Envelope A with 10% variations (but with sulfate removal) showed significant impacts on glass production rates that were ultimately corrected by adjustments in the sugar additions. Consequently, robustness with respect to throughput as well as sulfate tolerance are important motivations for these tests.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The SGI/Cray T3E: Experiences and Insights

The NASA Goddard Space Flight Center is home to the fifth most powerful supercomputer in the world, a 1024 processor SGI/Cray T3E-600. The original 512 processor system was placed at Goddard in March, 1997 as part of a cooperative agreement between the High Performance Computing and Communications Program's Earth and Space Sciences Project (ESS) and SGI/Cray Research. The goal of this system is to facilitate achievement of the Project milestones of 10, 50 and 100 GFLOPS sustained performance on selected Earth and space science application codes. The additional 512 processors were purchased in March, 1998 by the NASA Earth Science Enterprise for the NASA Seasonal to Interannual Prediction Project (NSIPP). These two "halves" still operate as a single system, and must satisfy the unique requirements of both aforementioned groups, as well as guest researchers from the Earth, space, microgravity, manned space flight and aeronautics communities. Few large scalable parallel systems are configured for capability computing, so models are hard to find. This unique environment has created a challenging system administration task, and has yielded some insights into the supercomputing needs of the various NASA Enterprises, as well as insights into the strengths and weaknesses of the T3E architecture and software. The T3E is a distributed memory system in which the processing elements (PE's) are connected by a low latency, high bandwidth bidirectional 3-D torus. Due to the focus on high speed communication between PE's, the T3E requires PE's to be allocated contiguously per job. Further, jobs will only execute on the user specified number of PE's and PE timesharing is possible but impractical. With a highly varied job mix in both size and runtime of jobs, the resulting scenario is PE fragmentation and an inability to achieve near 100% utilization. SGI/Cray has provided several scheduling and configuration tools to minimize the impact of fragmentation. These tools include PScheD (the political scheduler), GRM (the global resource manager) and NQE (the Network Queuing Environment). Features and impact of these tools will be discussed, as will resulting performance and utilization data. As a distributed memory system, the T3E is designed to be programmed through explicit message passing. Consequently, certain assumptions related to code design are made by the operating system (UNICOS/mk) and its scheduling tools. With the exception of HPF, which does run on the T3E, however poorly, alternative programming styles have the potential to impact the T3E in unexpected and undesirable ways. Several examples will be presented (preceeded with the disclaimer, "Don't try this at home! Violators will be prosecuted!")

Bernard, Lisa Hamet↗

A Direct Ammonia Fuel Cell with a KOH-Free Anode Feed Generating 180 mW cm −2 at 120 °C

The motivations to operate the direct ammonia fuel cell (DAFC) with no addition of aqueous base, include facilitated fuel management and prevention of corrosion and shunt currents in the DAFC stack. We describe here a polymer electrolyte DAFC, operating at a cell temperature (T cell ) of 120 °C on ammonia and water alone as anode feed, that demonstrated peak power of 180 mW cm −2 —a record for this type of fuel cell. We offer a detailed analysis of polarization curves recorded for PE-DAFCs in the T cell range of 60 °C–120 °C, allowing to estimate the effects of KOH-free operation on the ionic and faradaic resistances, R i and R F , that determine together the value of R app , CL – an , the apparent resistance of the anode catalyst layer. The latter resistance drops ten times between 60 °C and 120 °C as result mainly of the drop in R F . Consequently, DAFC performance at T cell > 100 °C improves substantially, including the cell performance on a KOH-free anode feed. The demsontrated performance levels reported here for KOH-free DAFCs support further development of this type of ammonia/air fuel cells.

Achrai, Ben↗