Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Checkout”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

Telemetry test system

Telemetry system for rapid checkout for space tracking and data acquisition network

TRACKING↗

Solid state thermostat has integral probe and circuitry

Compact, reliable thermostat provides a temperature readout signal and a continuous temperature-control output for temperature monitoring by automatic checkout equipment or telemetry systems. It employs a solid state circuit in a housing rigidly attached to a thermistor probe.

Source record↗

Device serves as hinge and electrical connector for circuit boards

Hinge makes both sides of electrical circuit boards readily accessible for component checkout and servicing. The hinge permits mounting of two circuit boards and incorporates connectors to maintain continuous electrical contact between the components on both boards.

Bethel, P. G.↗

System monitors discrete computer inputs

Computer system monitors inputs from checkout devices. The comparing, addressing, and controlling functions are performed in the I/O unit. This leaves the computer main frame free to handle memory, access priority, and interrupt instructions.

Burns, J. J.↗

Ground support equipment

Telemetry and command checkout equipment, environmental simulation facilities, and ground support handling fixtures for Relay I satellite

RELAY I SATELLITE↗

Space flight operations

Space flight operations - launch site, deep space instrumentation facility, operations complex, launch site, communications facility, and checkout facility

SPACE FLIGHT↗

Saturn antenna systems, SA-5, Volume 3

Saturn I /SA-5/ antenna system - checkout procedures for altimeter antenna, Azusa antenna radar antenna, and Mistram antenna system

SATURN I /SA-5/ LAUNCH VEHICLE↗

Orbital tube flare for tubing connectors

Marshall engineering personnel have developed and are now refining a new and unique method of mechanically flaring tubing. The system eliminates the use of the conventional split backing die which is used with most tube-flaring equipment. The Marshall-developed tool is adapted for use on standard Leonard 3-CP-HD flaring machines. The stationary split backing die is replaced in function with a die ring, whose i.d.-surface rolls or orbits around the o.d. of the tube flare zone. An i.d.-flaring cone moves axially and forces the metal against the rolling die to form the flare. Major advantages of this system are the elimination of flash, or split die marks, on the back angle of the flare, and improved flare-surface finishes, permitting more uniform sealing characteristics and improvements of the total geometric configuration of the flare as required by the MSFC specification MC-146. The Orbital Adapter system of tooling is currently being used to manufacture flared tube hardware for the Saturn V S-IO space launch vehicle at MSFC, for the Agena space launch vehicle (used for the Gemini project) at Lockheed, Sunnyvale, for LEM checkout equipment for Grumman, and for the Saturn S-IV-B space launch vehicle by Douglas Aircraft Company. Several other aerospace firms are evaluating the system for possible incorporation on their tube flaring requirements. Marshall engineers are now concentrating their efforts on refining and reducing the total cost of the overall system.

Tubing↗

Digital events evaluator

Real time digital event evaluator description for Saturn launch vehicle checkout

SATURN LAUNCH VEHICLE↗

Program computes single-point failures in critical system designs

Computer program analyzes the designs of critical systems that will either prove the design is free of single-point failures or detect each member of the population of single-point failures inherent in a system design. This program should find application in the checkout of redundant circuits and digital systems.

Brown, W. R.↗

Phase plane displays detect incipient failure in servo system testing

Computer based data conditioning and display technique detects incipient failure in servo system testing, for use in prelaunch checkout of complex nonlinear servomechanisms. These phase plane displays enable identification of, on line, unusual or abnormal servo responses which can be displayed compactly in the time domain on a cathode ray tube.

Affenito, F. J.↗