Life cycle cost modeling of conceptual space vehicles

This paper documents progress to date by the University of Dayton on the development of a life cycle cost model for use during the conceptual design of new launch vehicles and spacecraft. This research is being conducted under NASA Research Grant NAG-1-1327. This research effort changes the focus from that of the first two years in which a reliability and maintainability model was developed to the initial development of a life cycle cost model. Cost categories are initially patterned after NASA's three axis work breakdown structure consisting of a configuration axis (vehicle), a function axis, and a cost axis. The focus will be on operations and maintenance costs and other recurring costs. Secondary tasks performed concurrent with the development of the life cycle costing model include continual support and upgrade of the R&M model. The primary result of the completed research will be a methodology and a computer implementation of the methodology to provide for timely cost analysis in support of the conceptual design activities. The major objectives of this research are: to obtain and to develop improved methods for estimating manpower, spares, software and hardware costs, facilities costs, and other cost categories as identified by NASA personnel; to construct a life cycle cost model of a space transportation system for budget exercises and performance-cost trade-off analysis during the conceptual and development stages; to continue to support modifications and enhancements to the R&M model; and to continue to assist in the development of a simulation model to provide an integrated view of the operations and support of the proposed system.

Ebeling, Charles↗

Operations and support cost modeling of conceptual space vehicles

The University of Dayton is pleased to submit this annual report to the National Aeronautics and Space Administration (NASA) Langley Research Center which documents the development of an operations and support (O&S) cost model as part of a larger life cycle cost (LCC) structure. It is intended for use during the conceptual design of new launch vehicles and spacecraft. This research is being conducted under NASA Research Grant NAG-1-1327. This research effort changes the focus from that of the first two years in which a reliability and maintainability model was developed to the initial development of an operations and support life cycle cost model. Cost categories were initially patterned after NASA's three axis work breakdown structure consisting of a configuration axis (vehicle), a function axis, and a cost axis. A revised cost element structure (CES), which is currently under study by NASA, was used to established the basic cost elements used in the model. While the focus of the effort was on operations and maintenance costs and other recurring costs, the computerized model allowed for other cost categories such as RDT&E and production costs to be addressed. Secondary tasks performed concurrent with the development of the costing model included support and upgrades to the reliability and maintainability (R&M) model. The primary result of the current research has been a methodology and a computer implementation of the methodology to provide for timely operations and support cost analysis during the conceptual design activities.

Ebeling, Charles↗

Predicting Production Costs for Advanced Aerospace Vehicles

For early design concepts, the conventional approach to cost is normally some kind of parametric weight-based cost model. There is now ample evidence that this approach can be misleading and inaccurate. By the nature of its development, a parametric cost model requires historical data and is valid only if the new design is analogous to those for which the model was derived. Advanced aerospace vehicles have no historical production data and are nowhere near the vehicles of the past. Using an existing weight-based cost model would only lead to errors and distortions of the true production cost. This paper outlines the development of a process-based cost model in which the physical elements of the vehicle are soared according to a first-order dynamics model. This theoretical cost model, first advocated by early work at MIT, has been expanded to cover the basic structures of an advanced aerospace vehicle. Elemental costs based on the geometry of the design can be summed up to provide an overall estimation of the total production cost for a design configuration. This capability to directly link any design configuration to realistic cost estimation is a key requirement for high payoff MDO problems. Another important consideration in this paper is the handling of part or product complexity. Here the concept of cost modulus is introduced to take into account variability due to different materials, sizes, shapes, precision of fabrication, and equipment requirements. The most important implication of the development of the proposed process-based cost model is that different design configurations can now be quickly related to their cost estimates in a seamless calculation process easily implemented on any spreadsheet tool.

Bao, Han P.↗

Messaging with Cost-Optimized Interstellar Beacons

On Earth, how would we build galactic-scale beacons to attract the attention of extraterrestrials, as some have suggested we should do? From the point of view of expense to a builder on Earth, experience shows an optimum trade-off. This emerges by minimizing the cost of producing a desired power density at long range, which determines the maximum range of detectability of a transmitted signal. We derive general relations for cost-optimal aperture and power. For linear dependence of capital cost on transmitter power and antenna area, minimum capital cost occurs when the cost is equally divided between antenna gain and radiated power. For nonlinear power-law dependence, a similar simple division occurs. This is validated in cost data for many systems; industry uses this cost optimum as a rule of thumb. Costs of pulsed cost-efficient transmitters are estimated from these relations by using current cost parameters ($/W, $/sq m) as a basis. We show the scaling and give examples of such beacons. Galactic-scale beacons can be built for a few billion dollars with our present technology. Such beacons have narrow "searchlight" beams and short "dwell times" when the beacon would be seen by an alien observer in their sky. More-powerful beacons are more efficient and have economies of scale: cost scales only linearly with range R, not as R(exp 2), so number of stars radiated to increases as the square of cost. On a cost basis, they will likely transmit at higher microwave frequencies, -10 GHz. The natural corridor to broadcast is along the galactic radius or along the local spiral galactic arm we are in. A companion paper asks "If someone like us were to produce a beacon, how should we look for it?"

Benford, James↗

A Survey of Cost Estimating Methodologies for Distributed Spacecraft Missions

Satellite constellations present unique capabilities and opportunities to Earth orbiting and near-Earth scientific and communications missions, but also present new challenges to cost estimators. An effective and adaptive cost model is essential to successful mission design and implementation, and as Distributed Spacecraft Missions (DSM) become more common, cost estimating tools must become more representative of these types of designs. Existing cost models often focus on a single spacecraft and require extensive design knowledge to produce high fidelity estimates. Previous research has examined the shortcomings of existing cost practices as they pertain to the early stages of mission formulation, for both individual satellites and small satellite constellations. Recommendations have been made for how to improve the cost models for individual satellites one-at-a-time, but much of the complexity in constellation and DSM cost modeling arises from constellation systems level considerations that have not yet been examined. This paper constitutes a survey of the current state-of-the-art in cost estimating techniques with recommendations for improvements to increase the fidelity of future constellation cost estimates. To enable our investigation, we have developed a cost estimating tool for constellation missions. The development of this tool has revealed three high-priority weaknesses within existing parametric cost estimating capabilities as they pertain to DSM architectures: design iteration, integration and test, and mission operations. Within this paper we offer illustrative examples of these discrepancies and make preliminary recommendations for addressing them. DSM and satellite constellation missions are shifting the paradigm of space-based remote sensing, showing promise in the realms of Earth science, planetary observation, and various heliophysical applications. To fully reap the benefits of DSM technology, accurate and relevant cost estimating capabilities must exist; this paper offers insights critical to the future development and implementation of DSM cost estimating tools.

Towards a Multi-Variable Parametric Cost Model for Ground and Space Telescopes

Parametric cost models can be used by designers and project managers to perform relative cost comparisons between major architectural cost drivers and allow high-level design trades; enable cost-benefit analysis for technology development investment; and, provide a basis for estimating total project cost between related concepts. This paper hypothesizes a single model, based on published models and engineering intuition, for both ground and space telescopes: OTA Cost approximately (X) D(exp (1.75 +/- 0.05)) lambda(exp(-0.5 +/- 0.25) T(exp -0.25) e (exp (-0.04)Y). Specific findings include: space telescopes cost 50X to 100X more ground telescopes; diameter is the most important CER; cost is reduced by approximately 50% every 20 years (presumably because of technology advance and process improvements); and, for space telescopes, cost associated with wavelength performance is balanced by cost associated with operating temperature. Finally, duplication only reduces cost for the manufacture of identical systems (i.e. multiple aperture sparse arrays or interferometers). And, while duplication does reduce the cost of manufacturing the mirrors of segmented primary mirror, this cost savings does not appear to manifest itself in the final primary mirror assembly (presumably because the structure for a segmented mirror is more complicated than for a monolithic mirror).

Space Mirror Technology↗

A Survey of Cost Estimating Methodologies for Distributed Spacecraft Missions

Satellite constellations present unique capabilities and opportunities to Earth orbiting and near-Earth scientific and communications missions, but also present new challenges to cost estimators. An effective and adaptive cost model is essential to successful mission design and implementation, and as Distributed Spacecraft Missions (DSM) become more common, cost estimating tools must become more representative of these types of designs. Existing cost models often focus on a single spacecraft and require extensive design knowledge to produce high fidelity estimates. Previous research has examined the limitations of existing cost practices as they pertain to the early stages of mission formulation, for both individual satellites and small satellite constellations. Recommendations have been made for how to improve the cost models for individual satellites one-at-a-time, but much of the complexity in constellation and DSM cost modeling arises from constellation systems level considerations that have not yet been examined. This paper constitutes a survey of the current state-of-theart in cost estimating techniques with recommendations for improvements to increase the fidelity of future constellation cost estimates. To enable our investigation, we have developed a cost estimating tool for constellation missions. The development of this tool has revealed three high-priority shortcomings within existing parametric cost estimating capabilities as they pertain to DSM architectures: design iteration, integration and test, and mission operations. Within this paper we offer illustrative examples of these discrepancies and make preliminary recommendations for addressing them. DSM and satellite constellation missions are shifting the paradigm of space-based remote sensing, showing promise in the realms of Earth science, planetary observation, and various heliophysical applications. To fully reap the benefits of DSM technology, accurate and relevant cost estimating capabilities must exist; this paper offers insights critical to the future development and implementation of DSM cost estimating tools.

Foreman, Veronica L.↗

Land-Based Wind Plant Balance-of-System Cost Drivers and Sensitivities (Poster)

With Balance of System (BOS) costs contributing up to 30% of the installed capital cost, it is fundamental to understand the BOS costs for wind projects as well as potential cost trends for larger turbines. NREL developed a BOS model using project cost estimates developed by industry partners. Aspects of BOS covered include engineering and permitting, foundations for various wind turbines, transportation, civil work, and electrical arrays. The data introduce new scaling relationships for each BOS component to estimate cost as a function of turbine parameters and size, project parameters and size, and geographic characteristics. Based on the new BOS model, an analysis to understand the non‐turbine wind plant costs associated with turbine sizes ranging from 1-6 MW and wind plant sizes ranging from 100-1000 MW has been conducted. This analysis establishes a more robust baseline cost estimate, identifies the largest cost components of wind project BOS, and explores the sensitivity of the capital investment cost and the levelized cost of energy to permutations in each BOS cost element. This presentation shows results from the model that illustrate the potential impact of turbine size and project size on the cost of energy from US wind plants.

17 WIND ENERGY↗

Operating Strategies for Dispatchable PEM Electrolyzers that Enable Low-Cost Hydrogen Production

Hydrogen is a pathway to enabling decarbonization across multiple economic sectors that cannot be directly decarbonized with electricity including heat for industrial operations, medium- and heavy-duty transportation applications, long-duration energy storage, and as a feedstock for chemical synthesis. Producing hydrogen at low costs and carbon footprint is likely essential to economically decarbonize these otherwise "hard to decarbonize" sectors. Low-temperature polymer electrolyte membrane (PEM) electrolysis produces hydrogen from water and electricity and is a rapidly developing pathway towards making hydrogen at the scales required for decarbonization applications. The levelized cost of electrolytic hydrogen is dependent on the capital cost, efficiency, and durability of the electrolyzer system as well as the price of electricity supplied to the electrolyzer and the annual utilization of the electrolyzer (capacity factor). Electricity price and capacity factor depend on the source of energy that the system uses and impact other economic factors. Electricity price and capacity factor and the connections between other aspects of hydrogen production via PEM electrolyzers are the focus of this work. PEM electrolyzers have conventionally been operated at high capacity factors using electricity purchased from utilities with a constant price throughout the year. To achieve lower effective electricity prices, recent work has investigated opportunities for electrolyzers to purchase electricity in wholesale markets, where the cost of electricity varies hourly. This option can lead to lower electricity costs when the electrolyzer is a controllable load that ramps up and down rapidly and turns on and off frequently. This configuration and operating strategy capitalizes on times of low wholesale electricity prices and results in lower hydrogen levelized costs than constant operation due to reduced electricity costs even though the reduced capacity factor increases the cost of recovering the capital investment. Cycling on and off frequently also has implications for electrolyzer durability. An electrolyzer configuration where it is directly connected to renewable generation such as wind or solar, only running when the generator is producing energy, has similar implications on operating strategy, hydrogen levelized cost, capacity factor, and durability. This work provides insight into the relationships between dispatchable electrolyzer operating strategies and the cost of producing hydrogen from these systems, outlining strategies and opportunities to minimize production costs while minimizing operations that are likely to negatively impact system durability and efficiency. We find strategies that minimize electrolyzer cycling and the resulting durability impacts while increasing the hydrogen levelized cost only slightly above the minimum. We also find opportunities for batteries to minimize the number of cycles in systems directly connected to renewable generation. These findings outline key opportunities for future electrolyzer deployments and the synergistic benefits between electrolyzers and increased deployment of renewable energy generation like wind and solar. They also inform research and development that is reducing electrolyzer capital cost while managing durability impacts.

electricity markets↗

Offshore Wind Plant Balance-of-Station Cost Drivers and Sensitivities (Poster)

With Balance of System (BOS) costs contributing up to 70% of the installed capital cost, it is fundamental to understanding the BOS costs for offshore wind projects as well as potential cost trends for larger offshore turbines. NREL developed a BOS model using project cost estimates developed by GL Garrad Hassan. Aspects of BOS covered include engineering and permitting, ports and staging, transportation and installation, vessels, foundations, and electrical. The data introduce new scaling relationships for each BOS component to estimate cost as a function of turbine parameters and size, project parameters and size, and soil type. Based on the new BOS model, an analysis to understand the non-turbine costs associated with offshore turbine sizes ranging from 3 MW to 6 MW and offshore wind plant sizes ranging from 100 MW to 1000 MW has been conducted. This analysis establishes a more robust baseline cost estimate, identifies the largest cost components of offshore wind project BOS, and explores the sensitivity of the levelized cost of energy to permutations in each BOS cost element. This presentation shows results from the model that illustrates the potential impact of turbine size and project size on the cost of energy from US offshore wind plants.

17 WIND ENERGY↗

Do We Really Know how Much it Costs to Construct High Performance Buildings?

Understanding the cost of energy efficient construction is critical to decision makers in building design, code development, and energy analysis. How much does it cost to upgrade from R-13 to R-19 in a building wall? How much do low-e windows really cost? Can we put a dollar figure on commissioning? Answers to these questions have a fuzzy nature, based on educated guesses and industry lore. The response depends on location, perspective, bulk buying, and hand waving. This paper explores the development of a web tool intended to serve as a publicly available repository of building component costs. In 2011 the U.S. Department of Energy (DOE) funded the launch of a web tool called the Building Component Cost Community (BC3), dedicated to publishing building component costs from documented sources, actively gathering verifiable cost data from the users, and collecting feedback from a wide range of participants on the quality of the posted cost data. The updated BC3 database, available at http://bc3.pnnl.gov, went live on April 30, 2012. BC3 serves as the ultimate source of the energy-related component costs for DOE’s residential code development activities, including cost-effectiveness analyses. The paper discusses BC3 objectives, structure, functionality and the current content of the database. It aims to facilitate a dialog about the lack of verifiable transparent cost data, as well as introduce a web tool that helps to address the problem. The questions posed above will also be addressed by this paper, but they have to be resolved by the user community by providing feedback and cost data to the BC3 database, thus increasing transparency and removing information asymmetry.

building component cost, code requirements, IECC, ↗

Factors Impacting Decommissioning Costs - 13576

The Electric Power Research Institute (EPRI) studied United States experience with decommissioning cost estimates and the factors that impact the actual cost of decommissioning projects. This study gathered available estimated and actual decommissioning costs from eight nuclear power plants in the United States to understand the major components of decommissioning costs. Major costs categories for decommissioning a nuclear power plant are removal costs, radioactive waste costs, staffing costs, and other costs. The technical factors that impact the costs were analyzed based on the plants' decommissioning experiences. Detailed cost breakdowns by major projects and other cost categories from actual power plant decommissioning experiences will be presented. Such information will be useful in planning future decommissioning and designing new plants. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste processing cost recovery at Los Alamos National Laboratory--analysis and recommendations

Los Alamos National Laboratory is implementing full cost recovery for waste processing in fiscal year 2009 (FY2009), after a transition year in FY2008. Waste processing cost recovery has been implemented in various forms across the nuclear weapons complex and in corporate America. The fundamental reasoning of sending accurate price signals to waste generators is economically sound, and leads to waste minimization and reduced waste expense over time. However, Los Alamos faces significant implementation challenges because of its status as a government-owned, contractor-operated national scientific institution with a diverse suite of experimental and environmental cleanup activities, and the fact that this represents a fundamental change in how waste processing is viewed by the institution. This paper describes the issues involved during the transition to cost recovery and the ultimate selection of the business model. Of the six alternative cost recovery models evaluated, the business model chosen to be implemented in FY2009 is Recharge Plus Generators Pay Distributed Direct. Under this model, all generators who produce waste must pay a distributed direct share associated with their specific waste type to use a waste processing capability. This cost share is calculated using the distributed direct method on the fixed cost only, i.e., the fixed cost share is based on each program's forecast proportion of the total Los Alamos volume forecast of each waste type. (Fixed activities are those required to establish the waste processing capability, i.e., to make the process ready, permitted, certified, and prepared to handle the first unit ofwaste. Therefore, the fixed cost ends at the point just before waste begins 'to be processed. The activities to actually process the waste are considered variable.) The volume of waste actually sent for processing is charged a unit cost based solely on the variable cost of disposing of that waste. The total cost recovered each year is the total distributed direct shares from generators plus the unit cost times actual volumes processed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Cost of Radiotherapy Versus NSAID Administration for Prevention of Heterotopic Ossification After Total Hip Arthroplasty

Purpose: Heterotopic ossification (HO), or abnormal bone formation, is a common sequela of total hip arthroplasty. This abnormal bone can impair joint function and must be surgically removed to restore mobility. HO can be prevented by postoperative nonsteroidal anti-inflammatory drug (NSAID) use or radiotherapy (RT). NSAIDs are associated with multiple toxicities, including gastrointestinal bleeding. Although RT has been shown to be more efficacious than NSAIDs at preventing HO, its cost-effectiveness has been questioned. Methods and Materials: We performed an analysis of the cost of postoperative RT to the hip compared with NSAID administration, taking into account the costs of surgery for HO formation, treatment-induced morbidity, and productivity loss from missed work. The costs of RT, surgical revision, and treatment of gastrointestinal bleeding were estimated using the 2007 Medicare Fee Schedule and inpatient diagnosis-related group codes. The cost of lost wages was estimated using the 2006 median salary data from the U.S. Census Bureau. Results: The cost of administering RT was estimated at $899 vs. $20 for NSAID use. After accounting for the additional costs associated with revision total hip arthroplasty and gastrointestinal bleeding, the corresponding estimated costs were $1,208 vs. $930. Conclusion: If the costs associated with treatment failure and treatment-induced morbidity are considered, the cost of NSAIDs approaches that of RT. Other NSAID morbidities and quality-of-life differences that are difficult to quantify add to the cost of NSAIDs. These considerations have led us to recommend RT as the preferred modality for use in prophylaxis against HO after total hip arthroplasty, even when the cost is considered.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

So how much will it cost to build a nuke?

Trying to get a better understanding of the different estimates of the cost of nuclear power, Prof. Francois Leveque of Mines ParisTech and Marcelo Saguan of Microeconomix examined seven studies published since 2000. They examined levelized cost, which captures the cost of electricity generation from nuclear reactors over the entire life cycle, including initial investment costs, operations and maintenance costs, cost of fuel, cost of capital, and decommissioning. The results, in 2007 euro/MWh, vary from 18 to 80. Making matters worse, more recent studies show an upward trend: the average value for studies published in 2003--05 is about 43 euro/MWh, while those published in 2007--09 average 63 euro2007/MWh. One reason for the different results is different assumptions about the main cost drivers and how they may vary over time. With the advent of third-generation nuclear reactors, numbers in the range of $1,000/kW (approx. 750 euro/kW) were being tossed around, suggesting a $1 billion investment for a 1,000 MW plant. A 2003 MIT study assumed an overnight cost of 1,750 euro/kW, with later studies raising the numbers to 3,000 euro/kW (approx. US$ 4,500). In 2008, Progress Energy Florida put the price tag for 2 new reactors it is planning to build on the Gulf Coast of Florida at $14 billion with another $3 billion for transmission and related expenses. Likewise, Florida Power & Light figures it would cost $20 billion for 2 new reactors at its Turkey Point site in Florida. These higher cost estimates and significant uncertainties about the true costs pose serious challenges to the competitiveness of nuclear power.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Nature of innovations affecting photovoltaic system costs

Innovations improve technology costs through various kinds of engineering advancements, including changes to materials choices and device or process designs. Understanding how these innovations relate to cost change can reveal aspects of the process of technology evolution, yet developing such understanding is often not possible with a strictly quantitative approach due to data limitations. In this paper we develop a hybrid quantitative-qualitative framework for relating specific innovations to cost change by using the variables in a quantitative technology cost change model as an organizing principle. We demonstrate this framework by applying it to the cost decline in photovoltaic (PV) systems over the last five decades. This framework generates new understanding of a set of innovations that contributed to PV modules’ sustained cost decline and the more modest trends observed in balance-of-system (BOS) costs. The results show the great diversity of innovations that affected PV costs, drawing on wide-ranging fields of expertise within scientific research and practice. We find that there are differences in the characteristics of innovations that reduced the cost of PV modules compared to innovations influencing BOS costs. Numerous module innovations reduced costs by advancing manufacturing tools and processes that improved material quality. Many BOS innovations reduced costs through a combination of component design changes, integration, automation, digitalization, and standardization. Overall, most innovations in our sample affected PV hardware. However, some also target ‘soft technologies’ such as task durations through innovations like fast-track permitting, which require improved collaboration and process streamlining. This framework also provides insight into the nature of knowledge spillovers between technologies. Both module and BOS hardware innovations show the benefits of PV’s position within an ‘ecosystem’ of continuously advancing technologies in many industries, in particular semiconductors and electronics, and also point to the importance of public institutions for accelerating testing, permitting, and training.

14 SOLAR ENERGY↗

Accurately estimating and minimizing costs for the cellulosic biomass supply chain with statistical process control and the Taguchi Loss Function

This research focuses on the statistical evaluation of the feedstock attributes of the biomass supply chain and the estimation of attribute costs as a function of the feedstock variability. Challenges of using cellulosic feedstocks include the variability of feedstock quality (e.g., ash content and moisture content), which impacts the final cost of the manufactured product. Statistical Process Control (SPC), Taguchi Loss Function, and components of variance techniques were illustrated for quantifying cumulative variance in the biomass supply chain. Costs in the presence of cumulative variance were estimated for switchgrass (Panicum virgatum L.) and loblolly pine residues (Pinus taeda L.). Findings of the study indicated that additional costs from ash content variability in switchgrass increased the net cost by $\$19.15$ per dry tonne. Additional costs from densification due to particle size variation increased net cost by $\$11.59$ per dry tonne. Moisture content variation increased costs by $\$14.86$ per dry tonne. This would represent a 50 to 100% increase in costs due to variation based on a $\$60$ to $\$70$ per dry tonne manufactured product cost. This study illustrates that total costs may be considerably underestimated if the influence of variance for key factors in the supply chain and associated costs are not estimated.

59 BASIC BIOLOGICAL SCIENCES↗

Evaluation of the Total Cost of Ownership of Fuel Cell-Powered Material Handling Equipment

This report discusses an analysis of the total cost of ownership of fuel cell-powered and traditional battery-powered material handling equipment (MHE, or more typically 'forklifts'). A number of fuel cell MHE deployments have received funding support from the federal government. Using data from these government co-funded deployments, DOE's National Renewable Energy Laboratory (NREL) has been evaluating the performance of fuel cells in material handling applications. NREL has assessed the total cost of ownership of fuel cell MHE and compared it to the cost of ownership of traditional battery-powered MHE. As part of its cost of ownership assessment, NREL looked at a range of costs associated with MHE operation, including the capital costs of battery and fuel cell systems, the cost of supporting infrastructure, maintenance costs, warehouse space costs, and labor costs. Considering all these costs, NREL found that fuel cell MHE can have a lower overall cost of ownership than comparable battery-powered MHE.

25 ENERGY STORAGE↗