Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “CLOSURES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

Determining the Release of Radionuclides from SRS Tank 12H Waste Residual Solids Following Tank Closure

Eight High Level Waste (HLW) tanks used to store radioactive waste slurries have been emptied and closed at the Savannah River Site (SRS). Performance Analyses (PA) modeling of the release of radionuclides from residual waste solids in these tanks into the environment over extended time periods indicated the most likely risk drivers for environmental contamination. Radionuclide leaching studies were desired to provide additional information regarding the residual waste solubility assumptions used in the models. This report serves to provide equilibrium solubility data for several radionuclides identified as risk drivers and adds to the database of solubility values reported in the previous analogous study with Tank 18F solids. Pore water leaching studies were conducted on actual SRS Tank 12H residual waste solids to support Liquid Waste tank closure efforts and closed tank Performance Analyses. Tank 12H was exposed to extensive mechanical cleaning, caustic aluminum dissolution, and oxalic acid chemical cleaning prior to closure. The methodology utilized for leach testing was developed during previous testing. Slurries of tank residual solids and grout-representative solids in simulated grout pore water solutions (based on SRS groundwater compositions) with pH and E h values expected during the aging of the closed waste tank were produced. The soluble concentrations of selected radionuclides were analyzed versus time to confirm equilibrium conditions were achieved. These are the first leach studies conducted on waste tank residuals exposed to these cleaning conditions.

Eh↗

CY2018 Annual Closure Monitoring Report for Corrective Action Unit 98, Frenchman Flat, Underground Test Area, Nevada National Security Site, Nevada (January 2018–December 2018, Revision 1)

Corrective Action Unit (CAU) 98: Frenchman Flat on the Nevada National Security Site was the location of 10 underground nuclear tests. CAU 98 underwent a series of investigations and actions in accordance with the Federal Facility Agreement and Consent Order to assess contamination of groundwater by radionuclides from the tests. A Closure Report completed that process in 2016 and called for long-term monitoring, use restrictions (URs), and institutional controls to protect the public and environment from potential exposure to contaminated groundwater. Three types of monitoring are performed for CAU 98: water quality, water level, and institutional control. These are monitored to determine whether the URs remain protective of human health and the environment, and to ensure that the regulatory boundary objectives are being met. Monitoring data will be used in the future, once multiple years of data are available, to evaluate consistency with the groundwater flow and contaminant transport models because the contaminant boundaries calculated with the models are the primary basis of the UR boundaries. Six wells were sampled for water-quality monitoring in 2018. Contaminants of concern were detected only in the two source/plume wells already known to contain contamination as a result of a radionuclide migration experiment. Tritium concentrations in both of these wells, RNM-2S and UE-5n, remain above the Safe Drinking Water Act maximum contaminant level of 20,000 picocuries per liter but declined in 2018 as compared to measurements in 2017. All other contaminants of concern are below the minimum detection level plus analytical error. The water-level monitoring network includes 16 wells. Depth to water measured in 2018 is generally consistent with recent measurements for all wells. Many wells continue to exhibit a long-term downward trend in water level, despite small increases in measured water levels in 2018. The sharp 2016 decline in water level in Well ER-5-3-2 remains unexplained, with the lower level persisting through 2018. Rising water-level trends continue to be observed in two relatively deep wells (ER-5-3 deep piezometer and ER-5-4-2), and also in former supply Well WW-5A. The current supply wells exhibit relatively erratic water levels associated with pumping activities. Institutional control monitoring confirmed the URs are recorded in U.S. Department of Energy and U.S. Air Force land management systems, and that no activities within Frenchman Flat basin are occurring that could potentially affect the contaminant boundaries. Survey of groundwater resources in basins surrounding Frenchman Flat similarly identify no current or pending development that would indicate the need to increase monitoring activities or would otherwise cause concern for the closure decision. The URs continue to prevent exposure of the public, workers, and the environment to contaminants of concern by preventing use of potentially contaminated groundwater.

54 ENVIRONMENTAL SCIENCES↗

Calendar Year 2022 Post-Closure Monitoring Letter Report (Rev. 1)

This letter serves as the annual post-closure letter for Corrective Action Unit 98, Frenchman Flat; CAU 97, Yucca Flat/Climax Mine; and CAU 99, Rainier Mesa/Shoshone Mountain for calendar year 2022. This letter will discuss the post-closure monitoring activities that occurred during CY 2022, identify any triggers reached, and summarize water usage on the Nevada National Security Site (NNSS) and surrounding hydrographic basins at the three CAUs.

54 ENVIRONMENTAL SCIENCES↗

Final Calendar Year 2024 Post-Closure Monitoring Letter, Revision 1 with ROTC-1

This letter serves as the annual post-closure letter for Corrective Action Unit (CAU) 98, Frenchman Flat (FF); CAU 97, Yucca Flat/Climax Mine (YF/CM); and CAU 99, Rainier Mesa/Shoshone Mountain (RM/SM) for calendar year (CY) 2024. This letter will discuss the post-closure monitoring activities that occurred during CY 2024, identify any triggers reached, and summarize water usage on the Nevada National Security Site (NNSS) and surrounding hydrographic basins at the three CAUs.

54 ENVIRONMENTAL SCIENCES↗

Submittal of The Final Calendar Year (Cy) 2025 Post-Closure Monitoring Letter Report, Nevada National Security Site, Nevada, Revision 1, April 2026

This letter serves as the annual post-closure letter for CAU 98, Frenchman Flat; CAU 97, Yucca Flat/Climax Mine; and CAU 99, Rainier Mesa/Shoshone Mountain for calendar year 2025. This letter will discuss the post-closure monitoring activities that occurred during CY 2025, identify any triggers reached, and summarize water usage on the Nevada National Security Site and surrounding hydrographic basins at the three CAUs.

54 ENVIRONMENTAL SCIENCES↗

Non-Resource Conservation and Recovery Act Corrective Action Unit (CAU) Post-Closure Inspection Report, Nevada National Security Site, Nevada For Calendar Year 2025

This report includes visual inspection results, descriptions of maintenance and repair activities, and recommendations for CY 2025 for use restrictions (URs) at corrective action sites (CASs) located on the Nevada National Security Site and on the Nevada Test and Training Range (NTTR) that are accessed through the NNSS Main Gate. This document is arranged by project activity (i.e., Industrial Sites, Soils, and Defense Threat Reduction Agency [DTRA]); then by corrective action unit (CAU); and then by CAS. Post-closure UR inspections are performed on an annual basis, unless as noted in text. Post-closure UR inspections verify the condition of physical controls required by each UR, which may include the following activities: • Visual verification of the legibility of signs • Visual inspection of fencing, signs, monuments, and/or markers for indications of wear • Visual inspection of soil covers for indications of subsidence, erosion, or unauthorized use Deficiencies in UR requirements that were identified during CY 2024 inspections and not addressed in the CY 2024 report are addressed in this CY 2025 report.

54 ENVIRONMENTAL SCIENCES↗

Post-Closure Inspection Report for the Tonopah Test Range and Nevada Test and Training Range, Nevada, For Calendar Year 2019, Revision 0

This report provides the results of the annual post-closure use restriction (UR) inspections at the closed corrective action sites (CASs) located on the Tonopah Test Range (TTR) and Nevada Test and Training Range (NTTR) that are accessed through the TTR/NTTR main gate. This report covers post-closure UR inspections for calendar year 2019, and includes visual inspections and repair activities completed at the following corrective action units (CAUs): • CAU 400, Bomblet Pit and Five Points Landfill (TTR) • CAU 407, Roller Coaster RadSafe Area (TTR) • CAU 424, Area 3 Landfill Complexes (TTR) • CAU 453, Area 9 UXO Landfill (TTR) • CAU 487, Thunderwell Site (TTR)

54 ENVIRONMENTAL SCIENCES↗

Submittal of Final Post-Closure Inspection Letter Report for Corrective Action Unit 91: Area 3 U-3fi Injection Well, Nevada Test Site, Nevada, Revision 0, December 2007

This letter serves as the post-closure monitoring letter report for the above Corrective Action Unit (CAU) for calendar year 2007. CAU 91 is inspected every six months. The first inspection was conducted on March 29,2007, and the second inspection was conducted on September 27, 2007. Vegetation growth around the edge of the aboveground monument concrete pad was observed during the March inspection. This vegetation was removed on May 24,2007. All access roads, fences, gates, and signs were in excellent condition. No settling, cracking, or erosion was observed on the cover, and the use restriction had been maintained. No issues were identified, and no corrective actions were needed as a result of the September inspection. The post-closure inspection checklists for CAU 91 are attached. Photographs and field notes taken during site inspections are maintained in the project files.

54 ENVIRONMENTAL SCIENCES↗

Submittal of Final Post-Closure Inspection Letter Report for Corrective Action Unit 112: Area 23 Hazardous Waste Trenches, Nevada Test Site, Nevada, Revision 0, December 2007; DOE/NV--1103

This letter serves as the post-closure monitoring letter report for the above Corrective Action Unit (CAU) for the period October 2006-September 2007. Quarterly inspections were conducted on December 20,2006; March 29,2007; June 13,2007; and September 27, 2007, to observe the condition of the gate, use restriction warning signs, monuments, fencing, trenches, soil covers, and monitoring well covers. The first inspection was conducted on December 20,2006. Signs, fencing, riprap, monuments, and monitoring well covers were in excellent condition. No cracking, erosion, or subsidence was observed on the covers. No issues or concerns were identified, and no corrective actions were recommended. The second inspection was conducted on March 29,2007. Signs, fencing, riprap, monuments, and monitoring well covers were in excellent condition. No cracking, erosion, or subsidence was observed on the covers. Vegetation that was observed to be growing in several locations on the cover was the only identified concern, for which removal was recommended. Vegetation was removed on May 24,2007. The third inspection was conducted on June 13,2007. Signs, fencing, riprap, monuments, and monitoring well covers were in excellent condition. No cracking, erosion, or subsidence was observed on the covers. No issues or concerns were identified, and no corrective actions were recommended. The fourth inspection was conducted on September 27,2007. Signs, fencing, riprap, monuments, and monitoring well covers were in excellent condition. No cracking, erosion, or subsidence was observed on the covers. No issues or concerns were identified, and no corrective actions were recommended. The post-closure inspection checklists for CAU 112 are attached. Photographs and field notes taken during site inspections are maintained in the project files.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ANNULUS CLOSURE TECHNOLOGY DEVELOPMENT INSPECTION/SALT DEPOSIT CLEANING MAGNETIC WALL CRAWLER

The Liquid Waste Technology Development organization is investigating technologies to support closure of radioactive waste tanks at the Savannah River Site (SRS). Tank closure includes removal of the wastes that have propagated to the tank annulus. Although amounts and types of residual waste materials in the annuli of SRS tanks vary, simple salt deposits are predominant on tanks with known leak sites. This task focused on developing and demonstrating a technology to inspect and spot clean salt deposits from the outer primary tank wall located in the annulus of an SRS Type I tank. The Robotics, Remote and Specialty Equipment (RRSE) and Materials Science and Technology (MS&T) Sections of the Savannah River National Laboratory (SRNL) collaborated to modify and equip a Force Institute magnetic wall crawler with the tools necessary to demonstrate the inspection and spot cleaning in a mock-up of a Type I tank annulus. A remote control camera arm and cleaning head were developed, fabricated and mounted on the crawler. The crawler was then tested and demonstrated on a salt simulant also developed in this task. The demonstration showed that the camera is capable of being deployed in all specified locations and provided the views needed for the planned inspection. It also showed that the salt simulant readily dissolves with water. The crawler features two different techniques for delivering water to dissolve the salt deposits. Both water spay nozzles were able to dissolve the simulated salt, one is more controllable and the other delivers a larger water volume. The cleaning head also includes a rotary brush to mechanically remove the simulated salt nodules in the event insoluble material is encountered. The rotary brush proved to be effective in removing the salt nodules, although some fine tuning may be required to achieve the best results. This report describes the design process for developing technology to add features to a commercial wall crawler and the results of the demonstration testing performed on the integrated system. The crawler was modified to address the two primary objectives of the task (inspection and spot cleaning). SRNL recommends this technology as a viable option for annulus inspection and salt removal in tanks with minimal salt deposits (such as Tanks 5 and 6.) This report further recommends that the technology be prepared for field deployment by: (1) developing an improved mounting system for the magnetic idler wheel, (2) improving the robustness of the cleaning tool mounting, (3) resolving the nozzle selection valve connections, (4) determining alternatives for the brush and bristle assembly, and (5) adding a protective housing around the motors to shield them from water splash. In addition, SRNL suggests further technology development to address annulus cleaning issues that are apparent on other tanks that will also require salt removal in the future such as: (1) Developing a duct drilling device to facilitate dissolving salt inside ventilation ducts and draining the solution out the bottom of the ducts. (2) Investigating technologies to inspect inside the vertical annulus ventilation duct.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Post-Closure Report for Closed Resource Conservation and Recovery Act Corrective Action Units, Nevada Test Site, Nevada, for Fiscal Year 2009

This report serves as the combined annual report for post-closure activities for the following closed Corrective Action Units (CAUs): · CAU 90, Area 2 Bitcutter Containment · CAU 91, Area 3 U-3fi Injection Well · CAU 92, Area 6 Decon Pond Facility · CAU 110, Area 3 WMD U-3ax/bl Crater · CAU 112, Area 23 Hazardous Waste Trenches This report covers fiscal year 2009 (October 2008–September 2009). The post-closure requirements for these sites are described in Resource Conservation and Recovery Act Permit Number NEV HW0021 and summarized in each CAU-specific section in Section 1.0 of this report. Site inspections are conducted semiannually at CAUs 90 and 91 and quarterly at CAUs 92, 110, and 112. Additional inspections are conducted at CAU 92 if precipitation occurs in excess of 0.50 inches in a 24-hour period. Inspections include an evaluation of the condition of the units and identification of any deficiencies that may compromise the integrity of the units. The condition of covers, fencing, signs, gates, and locks is documented. In addition, soil moisture monitoring and subsidence surveys are conducted at CAU 110. The results of the inspections, summary of maintenance activities, results of vegetations surveys, and analysis of monitoring data are presented in this report. Copies of the inspection checklists are included as Appendix A. Field notes completed during each inspection are included in Appendix B. Photographs taken during the site inspections are included in Appendix C.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Nevada National Security Site Environmental Remediation Progress Toward Closure of Contaminated Sites

The Environmental Restoration activities at the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office assess the environmental impacts that resulted from atmospheric and underground nuclear tests conducted from 1951 to 1992 on the Nevada National Security Site and Nevada Test and Training Range (which includes the Tonopah Test Range). The goal is to protect public health and the environment through investigations and corrective actions. The Federal Facility Agreement and Consent Order (FFACO), established in 1996 between the State of Nevada Division of Environmental Protection (NDEP), DOE, and the U.S. Department of Defense, serves as the cleanup agreement for the Environmental Restoration activities and provides the framework for identifying, prioritizing, investigating, remediating, and monitoring contaminated sites. This agreement satisfies the corrective action requirements of the Resource Conservation and Recovery Act. To ensure efficiency in managing these corrective actions, the sites are grouped according to location, physical and geological characteristics, and/or contaminants. These groups, called corrective action units, are prioritized based on potential risk to workers and the public, available technology, future land use, agency and stakeholder concerns, and other criteria. Environmental Restoration activities include: Industrial Sites, Soils, and Underground Test Area. Nearly 15 years have passed since the FFACO was established, and during this time, more than 3,000 sites have been identified as requiring investigation or corrective actions. To date, approximately 1,945 sites have been investigated and closed through no further action, clean closure, or closure in place. Another 985 sites are currently being investigated or are in the remediation phase, leaving approximately 80 contaminated sites yet to be addressed.

54 ENVIRONMENTAL SCIENCES↗

A Fruit of Yucca Mountain: The Remote Waste Package Closure System

Was the death of the Yucca Mountain repository the fate of a technical lemon or a political lemon? Without caution, this debate could lure us away from capitalizing on the fruits of the project. In March 2009, Idaho National Laboratory (INL) successfully demonstrated the Waste Package Closure System, a full-scale prototype system for closing waste packages that were to be entombed in the now abandoned Yucca Mountain repository. This article describes the system, which INL designed and built, to weld the closure lids on the waste packages, nondestructively examine the welds using four different techniques, repair the welds if necessary, mitigate crack initiating stresses in the surfaces of the welds, evacuate and backfill the packages with an inert gas, and perform all of these tasks remotely. As a nation, we now have a proven method for securely sealing nuclear waste packages for long term storage—regardless of whether or not the future destination for these packages will be an underground repository. Additionally, many of the system’s features and concepts may benefit other remote nuclear applications.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Area Completion Strategies at Savannah River Site: Characterization for Closure and Beyond

During the first four decades of its 56 year existence, the Savannah River Site (SRS) was a key supplier of nuclear material for national defense. During the 1990's, the site's primary missions became waste site closure, environmental restoration, and deactivation and decommissioning (D and D) of remnant cold war apparatus. Since 1989, with the approval of State and Federal regulatory agencies and with the participation of interested stakeholders, SRS has implemented a final remedy for a majority of the more than 500 individual waste sites at the former nuclear materials complex. These waste sites range from small, inert rubble pits to large, heavy industrial areas and radioactive waste disposal grounds. The closure and final remediation of these waste sites mark significant progress toward achieving SRS's overarching goal of reducing or eliminating future environmental damage and human health threats. However, larger challenges remain. For example, what are appropriate and achievable end-states for decommissioned nuclear facilities? What environmental and human health risks are associated with these end-states? To answer these questions within the strictures of smaller budgets and accelerated schedules, SRS is implementing an 'area completion' strategy that: - unites several discrete waste units into one conceptual model, - integrates historically disparate environmental characterization and D and D activities - reduces the number of required regulatory documents, - and, in some cases, compresses schedules for achieving a stakeholder-approved end-state. The area completion approaches being implemented at SRS reflect an evolution of the traditional RCRA/ CERCLA remedial process. Area completion strategies: - group waste units and/or D and D facilities together for characterization, remediation, and possible reuse; - identify data needs and integrate data collection activities for D and D, characterization, and remediation; - identify problems that require action and match areas of concern with appropriate likely responses based on anticipated land use and end-states; - streamline the regulatory process and reduce the number of required regulatory documents; - and accelerate remedial and D and D decisions and reduce project costs versus the traditional 'piecemeal' approach. These strategies are achieving faster, more responsible, and less expensive solutions to managing the Cold War legacy while assuring protection of human and ecological receptors and future industrial workers.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

High-Level Waste Mechanical Sludge Removal at the Savannah River Site - F Tank Farm Closure Project

The Savannah River Site F-Tank Farm Closure project has successfully performed Mechanical Sludge Removal (MSR) using the Waste on Wheels (WOW) system for the first time within one of its storage tanks. The WOW system is designed to be relatively mobile with the ability for many components to be redeployed to multiple waste tanks. It is primarily comprised of Submersible Mixer Pumps (SMPs), Submersible Transfer Pumps (STPs), and a mobile control room with a control panel and variable speed drives. In addition, the project is currently preparing another waste tank for MSR utilizing lessons learned from this previous operational activity. These tanks, designated as Tank 6 and Tank 5 respectively, are Type I waste tanks located in F-Tank Farm (FTF) with a capacity of 2,840 cubic meters (750,000 gallons) each. The construction of these tanks was completed in 1953, and they were placed into waste storage service in 1959. The tank's primary shell is 23 meters (75 feet) in diameter, and 7.5 meters (24.5 feet) in height. Type I tanks have 34 vertically oriented cooling coils and two horizontal cooling coil circuits along the tank floor. Both Tank 5 and Tank 6 received and stored F-PUREX waste during their operating service time before sludge removal was performed. DOE intends to remove from service and operationally close (fill with grout) Tank 5 and Tank 6 and other HLW tanks that do not meet current containment standards. Mechanical Sludge Removal, the first step in the tank closure process, will be followed by chemical cleaning. After obtaining regulatory approval, the tanks will be isolated and filled with grout for long-term stabilization. Mechanical Sludge Removal operations within Tank 6 removed approximately 75% of the original 95,000 liters (25,000 gallons). This sludge material was transferred in batches to an interim storage tank to prepare for vitrification. This operation consisted of eleven (11) Submersible Mixer Pump(s) mixing campaigns and multiple intra-area transfers utilizing STPs from July 2006 to August 2007. This operation and successful removal of sludge material meets requirement of approximately 19,000 to 28,000 liters (5,000 to 7,500 gallons) remaining prior to the Chemical Cleaning process. Removal of the last 35% of sludge was exponentially more difficult, as less and less sludge was available to mobilize and the lighter sludge particles were likely removed during the early mixing campaigns. The removal of the 72,000 liters (19,000 gallons) of sludge was challenging due to a number factors. One primary factor was the complex internal cooling coil array within Tank 6 that obstructed mixer discharge jets and impacted the Effective Cleaning Radius (ECR) of the Submersible Mixer Pumps. Minimal access locations into the tank through tank openings (risers) presented a challenge because the available options for equipment locations were very limited. Mechanical Sludge Removal activities using SMPs caused the sludge to migrate to areas of the tank that were outside of the SMP ECR. Various SMP operational strategies were used to address the challenge of moving sludge from remote areas of the tank to the transfer pump. This paper describes in detail the Mechanical Sludge Removal activities and mitigative solutions to cooling coil obstructions and other challenges. The performance of the WOW system and SMP operational strategies were evaluated and the resulting lessons learned are described for application to future Mechanical Sludge Removal operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Dual Regime Reactive Transport Model for Simulation of High Level Waste Tank Closure Scenarios - 13375

A numerical simulation framework is presented in this paper for estimating evolution of pH and release of major species from grout within high-level waste tanks after closure. This model was developed as part of the Cementitious Barriers Partnership. The reactive transport model consists of two parts - (1) transport of species, and (2) chemical reactions. The closure grout can be assumed to have varying extents of cracking and composition for performance assessment purposes. The partially or completely degraded grouted tank is idealized as a dual regime system comprising of a mobile region having solid materials with cracks and macro-pores, and an immobile/stagnant region having solid matrix with micropores. The transport profiles of the species are calculated by incorporating advection of species through the mobile region, diffusion of species through the immobile/stagnant region, and exchange of species between the mobile and immobile regions. A geochemical speciation code in conjunction with the pH dependent test data for a grout material is used to obtain a mineral set that best describes the trends in the test data of the major species. The dual regime reactive transport model predictions are compared with the release data from an up-flow column percolation test. The coupled model is then used to assess effects of crack state of the structure, rate and composition of the infiltrating water on the pH evolution at the grout-waste interface. The coupled reactive transport model developed in this work can be used as part of the performance assessment process for evaluating potential risks from leaching of a cracked tank containing elements of human health and environmental concern. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Middlesex FUSRAP Site - A Path to Site-Wide Closure - 13416

The road-map to obtaining closure of the Middlesex Sampling Plant FUSRAP site in Middlesex, New Jersey (NJ) has required a multi-faceted approach, following the CERCLA Process. Since 1998, the US ACE, ECC, and other contractors have completed much of the work required for regulatory acceptance of site closure with unrestricted use. To date, three buildings have been decontaminated, demolished, and disposed of. Two interim storage piles have been removed and disposed of, followed by the additional removal and disposal of over 87,000 tons of radiologically and chemically-impacted subsurface soils by the summer of 2008. The US ACE received a determination from the EPA for the soils Operable Unit, (OU)-1, in September 2010 that the remedial excavations were acceptable, and meet the criteria for unrestricted use as required by the 2004 Record of Decision (ROD) for OU-1. Following the completion of OU-1, the project delivery team performed additional field investigation of the final Operable Unit for Middlesex, OU-2, Groundwater. As of December 2012, the project delivery team has completed a Supplemental Remedial Investigation, which will be followed with a streamlined Feasibility Study, Proposed Plan, and ROD. Several years of historical groundwater data was available from previous investigations and the FUSRAP Environmental Surveillance Program. Historical data indicated sporadic detections of Volatile Organic Compounds (VOCs), primarily trichloroethylene (TCE), carbon tetrachloride (CT), and methyl tert-butyl ether (MTBE), with no apparent trend or pattern indicating extent or source of the VOC impact. In 2008, the project delivery team initiated efforts to re-assess the Conceptual Site Model (CSM) for groundwater. The bedrock was re-evaluated as a leaky multi-unit aquifer, and a plan was developed for additional investigations for adequate bedrock characterization and delineation of groundwater contaminated primarily by CT, TCE, and tetrachloroethene (PCE). The investigation was designed to accumulate multiple lines of evidence to determine the source and to delineate the extent of contamination, as required to complete the CERCLA Process and gain regulatory acceptance. Investigative techniques included in-well vertical flow tracing, borehole geophysics and packer testing of temporary test holes to characterize contamination in the bedrock fractures beneath the site, and to delineate likely source areas. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Regulatory Framework for Salt Waste Disposal and Tank Closure at the Savannah River Site - 13663

The end of the Cold War has left a legacy of approximately 37 million gallons of radioactive waste in the aging waste tanks at the Department of Energy's Savannah River Site (SRS). A robust program is in place to remove waste from these tanks, treat the waste to separate into a relatively small volume of high-level waste and a large volume of low-level waste, and to actively dispose of the low-level waste on-site and close the waste tanks and associated ancillary structures. To support performance-based, risk-informed decision making and to ensure compliance with all regulatory requirements, the U.S. Department of Energy (DOE) and its current and past contractors have worked closely with the South Carolina Department of Health and Environmental Control (SCDHEC), the U.S. Environmental Protection Agency (EPA) and the Nuclear Regulatory Commission (NRC) to develop and implement a framework for on-site low-level waste disposal and closure of the SRS waste tanks. The Atomic Energy Act of 1954, as amended, provides DOE the authority to manage defense-related radioactive waste. DOE Order 435.1 and its associated manual and guidance documents detail this radioactive waste management process. The DOE also has a requirement to consult with the NRC in determining that waste that formerly was classified as high-level waste can be safely managed as either low-level waste or transuranic waste. Once DOE makes a determination, NRC then has a responsibility to monitor DOE's actions in coordination with SCDHEC to ensure compliance with the Title 10 Code of Federal Regulations Part 61 (10CFR61), Subpart C performance objectives. The management of hazardous waste substances or components at SRS is regulated by SCDHEC and the EPA. The foundation for the interactions between DOE, SCDHEC and EPA is the SRS Federal Facility Agreement (FFA). Managing this array of requirements and successfully interacting with regulators, consultants and stakeholders is a challenging task but ensures thorough and thoughtful processes for disposing of the SRS low-level waste and the closure of the tank farm facilities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗