Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “CERTIFICATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

Transportable Heavy Duty Emissions Testing Laboratory and Research Program

The objective of this program was to quantify the emissions from heavy-duty vehicles operating on alternative fuels or advanced fuel blends, often with novel engine technology or aftertreatment. In the first year of the program West Virginia University (WVU) researchers determined that a transportable chassis dynamometer emissions measurement approach was required so that fleets of trucks and buses did not need to be ferried across the nation to a fixed facility. A Transportable Heavy-Duty Vehicle Emissions Testing Laboratory (Translab) was designed, constructed and verified. This laboratory consisted of a chassis dynamometer semi-trailer and an analytic trailer housing a full scale exhaust dilution tunnel and sampling system which mimicked closely the system described in the Code of Federal Regulations for engine certification. The Translab was first used to quantify emissions from natural gas and methanol fueled transit buses, and a second Translab unit was constructed to satisfy research demand. Subsequent emissions measurement was performed on trucks and buses using ethanol, Fischer-Tropsch fuel, and biodiesel. A medium-duty chassis dynamometer was also designed and constructed to facilitate research on delivery vehicles in the 10,000 to 20,000lb range. The Translab participated in major programs to evaluate low-sulfur diesel in conjunction with passively regenerating exhaust particulate filtration technology, and substantial reductions in particulate matter were recorded. The researchers also participated in programs to evaluate emissions from advanced natural gas engines with closed loop feedback control. These natural gas engines showed substantially reduced levels of oxides of nitrogen. For all of the trucks and buses characterized, the levels of carbon monoxide, oxides of nitrogen, hydrocarbons, carbon dioxide and particulate matter were quantified, and in many cases non-regulated species such as aldehydes were also sampled. Particle size was also quantified during selected studies. A laboratory was established at WVU to provide for studies which supported and augmented the Translab research, and to provide for development of superior emissions measurement systems. This laboratory research focused on engine control and fuel sulfur issues. In recent years, as engine and aftertreatment technologies advanced, emissions levels were reduced such that they were at or below the Translab detectable limits, and in the same time frame the US Environmental Protection Agency required improved measurement methodologies for engine emissions certification. To remain current and relevant, the researchers designed a new Translab analytic system, housed in a container which can be transported on a semi-trailer. The new system's dilution tunnel flow was designed to use a subsonic venturi with closed loop control of blower speed, and the secondary dilution and particulate matter filter capture were designed to follow new EPA engine certification procedures. A further contribution of the program has been the development of techniques for creating heavy-duty vehicle test schedules, and the creation of schedules to mimic a variety of truck and bus vocations.

03 NATURAL GAS↗

Annual Transuranic Waste Inventory Report - 2008 (Rev. 0)

The U.S. Department of Energy’s (DOE’s) Waste Isolation Pilot Plant (WIPP) opened on March 26, 1999, becoming the nation’s first deep geologic repository for the permanent disposal of defense-generated transuranic (TRU) waste. TRU waste generation has occurred at 39 sites across the country (seven large-quantity and 32 small-quantity sites). Sixteen of these sites (one large site and 15 small quantity sites) have emplaced their waste at WIPP, found other disposition pathways for the waste, or have transferred the waste to other sites for further disposition (LANL-CO, 2007a). Babcock and Wilcox (BL) [this site did not pursue a defense determination and was considered deinventoried], United States Army Materiel Command (USAMC), Knolls Atomic Power Laboratory – Nuclear Fuels Service (KAPL-NFS), and Lawrence Berkeley National Laboratory (LBNL) have been de-inventoried once, but have identified additional waste after the originally identified waste was removed from the site. TRU waste is currently retrievably stored at 23 sites throughout the DOE complex. As of December 31, 2007, there have been 6340 shipments of TRU waste to WIPP for emplacement since WIPP’s opening (DOE 2008a). Since 1994, DOE complex-wide TRU waste inventory information has been collected, analyzed, and published for WIPP certification urposes in several reports. The WIPP Transuranic Waste Baseline Inventory Report (WTWBIR), Revision 0, published in June 1994 (DOE 1994), was the first attempt made by the DOE complex to report all of its TRU waste at the waste-stream level. The TRU waste data reported in Revision 0 were considered preliminary until the TRU waste sites completed quality checks of the data. Data changes resulting from the quality checks were contained in the WTWBIR, Revision 1 (DOE 1995a). The Transuranic Waste Baseline Inventory Report (TWBIR), Revisions 2 and 3, included WIPP and potential TRU waste streams, along with waste stream characteristic information. Data from Revisions 2 and 3 provided the TRU waste inventory that Sandia National Laboratories–Carlsbad Programs Group (SNL-CPG) used to perform the necessary modeling calculations for the performance assessment (PA) for the initial certification of the WIPP (Compliance Certification Application [CCA]).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Analytical Examination of the Relationship between Fuel Properties, Engine Efficiency, and R Factor Values

The variability in gasoline energy content, though most frequently not a consumer concern, is an issue of concern for vehicle manufacturers in demonstrating compliance with regulatory requirements. Advancements in both vehicle technology, test methodology, and fuel formulations have increased the level of visibility and concern with regard to the energy content of fuels used for regulatory testing. The R factor was introduced into fuel economy calculations for vehicle certification in the late 1980s as a means of addressing batch-to-batch variations in the heating value of certification fuels and the resulting variations in fuel economy results. While previous studies have investigated values of the R factor for modern vehicles through experimentation, subsequent engine studies have made clear that it is difficult to distinguish between the confounding factors that influence engine efficiency when R is being studied experimentally. The proposed study focuses on an analytical approach to examining the heating value effects so that R values can be studied without the influence of confounding effects of other fuel properties. Data previously published for a 1.6-liter naturally-aspirated engine are used as a case study to explore the relationship between fuel properties, engine efficiency, and R factor values. The results demonstrate that engine efficiency does vary as a result of differences in heating value among fuels, although other factors that are variant among fuels also impact efficiency. R factor values depend not only on the difference in heating value between two fuels, but also on the directionality of the change and on engine operating loads. The latter is integral because the reference engine efficiency point is itself a function of the engine operating condition. R factor values asymptotically approach unity as engine operating load increases. Increasing engine efficiency causes R values for a given test fuel to increase. A method is presented for which the test data from only one fuel is required to establish R factor values for individual vehicles and test cycles. An alternative method of establishing Indolene fuel economy equivalency for certification tests is also discussed.

33 ADVANCED PROPULSION SYSTEMS↗

Closeout of Award No. DE-FG02-97 SF 21413

This award provided general support funds for the preparation by the National Council on Radiation Protection and Measurements (NCRP) of reports in areas of interest to DOE. These publications included the following NCRP Reports on subjects related to health and environmental protection and the management of nuclear waste materials. Enclosed are executed copies of the following closeout documents for the above referenced grant: 1. Final Scientific/Technical Report, 2. Patent Certification Form, 3. Financial Assistance Property Closeout Certification, 4. Final Financial Status Report (SF 268A), 5. Final Payment Request (SF 270), and 6. Final Schedule of Costs by Element & Certification.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The role of science supporting the Waste Isolation Pilot Plant.

The presentation briefly addresses three topics. First, science has played an important role throughout the history of the WIPP project, beginning with site selection in the middle 1970s. Science was a key part of site characterization in the 1980s, providing basic information on geology, hydrology, geochemisty, and the mechanical behavior of the salt, among other topics. Science programs also made significant contributions to facility design, specifically in the area of shaft seal design and testing. By the middle 1990s, emphasis shifted from site characterization to regulatory evaluations, and the science program provided one of the essential bases for certification by the Environmental Protection Agency in 1998. Current science activities support ongoing disposal operations and regulatory recertification evaluations mandated by the EPA. Second, the EPA regulatory standards for long-term performance frame the scientific evaluations that provide the basis for certification. Unlike long-term dose standards applied to Yucca Mountain and proposed repositories in other nations, the WIPP regulations focused on cumulative releases during a fixed time interval of 10,000 years, and placed a high emphasis on the consequences of future inadvertent drilling intrusions into the repository. Close attention to the details of the regulatory requirements facilitated EPA's review of the DOE's 1996 Compliance Certification Application. Third, the scientific understanding developed for WIPP provided the basis for modeling studies that evaluated the long-term performance of the repository in the context of regulatory requirements. These performance assessment analyses formed a critical part of the demonstration that the site met the specific regulatory requirements as well as providing insight into the overall understanding of the long-term performance of the system. The presentation concludes with observations on the role of science in the process of developing a disposal system, including the importance of establishing the regulatory framework, building confidence in the long-term safety of the system, and the critical role of the regulator in decision making.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Testing Small Wind Turbines at NREL's NWTC (Presentation)

Reducing barriers to wind energy expansion, stabilizing the market, and expanding the number of small wind turbine (SWT) systems installed in the United States are important goals for the Department of Energy's (DOE) Wind and Hydropower Technologies Program. One of the barriers for the distributed wind market is the lack of SWT systems that are independently tested and certified. The National Renewable Energy Laboratory (NREL) has testing capabilities that are accredited by the American Association of Laboratory Accreditation (A2LA). Currently, NREL is one of only two facilities in the United States that are A2LA accredited. To help industry provide consumers with more certified SWT systems, DOE/NREL launched a project in 2007 called Independent Testing. Through a competitive solicitation, NREL selected four commercially available SWT systems to test in 2008/2009. The turbines will be tested to standards adopted by the International Electrotechnical Commission (IEC) and in compliance with the draft American Wind Energy Association (AWEA) standards for small wind turbine systems. The resultant test data may be used by the Small Wind Certification Council (SWCC), a nonprofit organization formed with support from DOE, AWEA, state energy offices, and turbine manufacturers to certify SWT systems. Certification by the SWCC is expected to commence in 2009. Test data could also be submitted to a certifying body as partial input for international certification. SWTs that are tested and certified will give consumers greater confidence that the systems they install will perform within specified wind regimes as advertised by the manufacturer.

17 WIND ENERGY↗

ISO 50001 for Commercial Buildings: Lessons Learned From U.S. DOE Pilot Project: Preprint

In the U.S., the ISO 50001 Standard, which establishes energy management systems (EnMSs) and processes, has shown uptake primarily in the industrial sector. The U.S. Department of Energy (DOE) undertook a pilot program to explore ISO 50001 implementation in commercial buildings. Eight organizations participated as pilots, with technical assistance provided by DOE, the National Renewable Energy Laboratory (NREL), the Lawrence Berkeley National Laboratory (LBNL), and the Georgia Institute of Technology (Georgia Tech). This paper shares important lessons learned from the pilot. Staff time was the most critical resource required to establish effective EnMSs in commercial buildings. The pilot also revealed that technical support and template/example materials were essential inputs. Crucial activities included evaluating performance, identifying goals, making connections, communicating operational controls, and tracking/reviewing progress. Benefits realized included enhanced intra-organizational connections, greater energy awareness, increased process efficiencies, and improved ability to make business cases. Incremental benefits for ISO 50001 certification were greater accountability, assurance of best practices, public relations opportunities, and potential to unlock verified savings credits or incentive money. Incremental certification costs included more staff/consultant time, money for certification, and a tendency to limit EnMS scope in order to ensure favorable audit results. Five best practices were identified - utilizing expert technical assistance, training, and other resources; focusing on implementation over documentation; keeping top management involved; considering organizational structure when selecting EnMS scope; and matching the implementation level to an EnMS's scope and scale. The last two practices are particularly relevant to the commercial buildings sector.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Strengthening Retrofit Markets for Comprehensive Savings in Multifamily Buildings (Interim Final Report)

Energy efficiency is vitally important in Maine. Nearly 70% of Maine households rely on fuel oil as their primary energy source for home heating, a higher share than in any other state. Coupled with the state's long, cold winters, Maine's dependence on oil renders homeowners particularly vulnerable to fluctuating fuel costs. With $\$$4.5 million in seed funding from the Energy Department's Better Buildings Neighborhood Program, the Governor's Energy Office (GEO), through Efficiency Maine Trust (the Trust), is spurring Maine landlords to lower their monthly energy bills and improve comfort for their tenants during the state's cold winter months and increasingly warmer summers. Maine's aging multifamily housing stock can be expensive to heat and costly to maintain. It is not unusual to find buildings with little or no insulation, drafty windows, and significant air leaks, making them ideal candidates for energy efficiency upgrades. Maine modeled its Multifamily Efficiency Program (MEP) after the state's highly successful Home Energy Savings Program (HESP) for single-family homes. HESP provided cash incentives and financing opportunities to owners of one-to four-unit structures, which resulted in thousands of energy assessments and whole-house energy upgrades in 225 communities. Maine's new MEP multifamily energy efficiency upgrade and weatherization initiative focuses on small to medium-sized (i.e., five to 20 units) apartment buildings. The program's energy efficiency upgrades will provide at least 20% energy savings for each upgraded multifamily unit. The Trust’s MEP relies on a network of approved program partners who help move projects through the pipeline from assessment to upgrade. MEP has two components: benchmarking and development of an Energy Reduction Plan (ERP). Using the ENERGY STAR® Portfolio Manager benchmarking tool, MEP provides an assessment of current energy usage in the building, establishes a baseline for future energy efficiency improvements, and enables tracking and monitoring of future energy usage at the building— all at no cost to the building owner. The ERP is developed by a program partner using either the Trust’s approved modeling or prescriptive tools; it provides detailed information about the current energy related conditions in the building and recommends energy efficiency, health, and safety improvements. The Trust's delivery contractor provides quality assurance and controls throughout the process. Through this effort, MEP's goal is to establish a self-sustaining, market-driven program, demonstrating the value of energy efficiency to other building owners. The increasing value of properties across the state will help incentivize these owners to continue upgrades after the grant period has ended. Targeting urban areas in Maine with dense clusters of multifamily units—such as Portland, Lewiston- Auburn, Bangor, and Augusta—MEP engaged a variety of stakeholder groups early on to design its multifamily program. Through direct emails and its website, program officials invited lending institutions, building professionals, engineering firms, equipment distributors, and local property owners associations to attend open meetings around the state to learn about the goals of the multifamily program and to help define its parameters. These meetings helped program administrators understand the diversity of the customer base: some owners are individuals with a single building, while other owners are groups of people or management companies with an entire portfolio of multifamily buildings. The diversity of the customer base notwithstanding, owners see MEP as an opportunity to make gains in their respective properties. Consistently high turnouts at stakeholder meetings fueled greater customer interest as awareness of the program spread through word of mouth. The program also gained traction by utilizing the program partner networks and building on the legacy of the Trust’s successful HESP for single-family residences. MEP offers significant incentives for building owners to participate in the upgrade program. Wholebuilding benchmarking services are available to most multifamily housing buildings free of charge. The service provides the building owner with an assessment of the building's current energy efficiency as compared to other multifamily buildings on a national scale, establishes a baseline to measure future improvements, and enables owners to track monthly energy consumption using the ENERGY STAR Portfolio Manager. Once the benchmarking process is complete, the program links building owners with approved program partners (e.g., energy professionals, home performance contractors) to identify and implement specific energy-saving opportunities in the building. Program partners can also provide project quotes with estimated financing incentives and payback period calculations that enable building owners to make informed decisions. What's more, the Trust provides two financial incentives for successful completion of program milestones. The first is a per-unit incentive for completion of an approved ERP (i.e., $\$$100 per unit if a prescriptive path is followed, and $\$$200 per unit for a modeled ERP). Upon final inspection of the installed project scope of work, an incentive of $\$$1,400 per unit or 50% of installed cost—whichever is less—is paid. The Trust originally established a $\$$1 million loan-loss reserve fund (LLRF) to further enhance financing opportunities for qualified multifamily building owners. This funding mechanism was designed to connect building owners with lenders that retain the mortgages for their properties and encourages the lenders to offer financing for energy efficiency improvements. However, there has been no interest in the LLRF and therefore the LLRF has been reduced. Ultimately, MEP plans to build an online tool for building owners to assess opportunities to make upgrades in their multifamily units. The tool will include a performance rating system to provide a way for building owners to more easily understand energy use in their building, and how it could be improved with energy efficiency upgrades. Prospective tenants will also be able to use the rating system to make informed decisions about where to rent. Furthermore, the rating can be incorporated into real estate listings as a way for prospective home buyers and the real estate financial community to evaluate a home's operating costs. The Trust’s MEP has identified the state's most experienced energy professionals, vendors, suppliers, and contractors that install energy efficiency equipment in the multifamily sector to be qualified program partners. To be eligible for partnership, energy assessment professionals and contractors are required to have demonstrated experience in the multifamily sector and hold associated professional certifications, such as Building Operator Certification (BOC), Certified Energy Manager (CEM), Professional Engineer (PE), or Building Performance Institute (BPI) Multifamily Building Analyst. Widespread program interest has enabled the Trust to redirect funds that might otherwise be needed for program promotion to building capacity through contractor training. In addition to boosting professional training and certification opportunities, MEP teaches its partners how to market the multifamily program to prospective multifamily homeowners.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Assessing the Costs and Benefits of the Superior Energy Performance Program

Industrial companies are seeking to manage energy consumption and costs, mitigate risks associated with energy, and introduce transparency into reports of their energy performance achievements. Forty industrial facilities are participating in the U.S. DOE supported Superior Energy Performance (SEP) program in which facilities implement an energy management system based on the ISO 50001 standard, and pursue third-party verification of their energy performance improvements. SEP certification provides industrial facilities recognition for implementing a consistent, rigorous, internationally recognized business process for continually improving energy performance and achievement of established energy performance improvement targets. This paper focuses on the business value of SEP and ISO 50001, providing an assessment of the costs and benefits associated with SEP implementation at nine SEP-certified facilities across a variety of industrial sectors. These cost-benefit analyses are part of the U.S. DOE?s contribution to the Global Superior Energy Performance (GSEP) partnership, a multi-country effort to demonstrate, using facility data, that energy management system implementation enables companies to improve their energy performance with a greater return on investment than business-as-usual (BAU) activity. To examine the business value of SEP certification, interviews were conducted with SEP-certified facilities. The costs of implementing the SEP program, including internal facility staff time, are described and a marginal payback of SEP certification has been determined. Additionally, more qualitative factors with regard to the business value and challenges related to SEP and ISO 50001 implementation are summarized.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Development of an Enhanced Payback Function for the Superior Energy Performance Program

The U.S. DOE Superior Energy Performance (SEP) program provides recognition to industrial and commercial facilities that achieve certification to the ISO 50001 energy management system standard and third party verification of energy performance improvements. Over 50 industrial facilities are participating and 28 facilities have been certified in the SEP program. These facilities find value in the robust, data driven energy performance improvement result that the SEP program delivers. Previous analysis of SEP certified facility data demonstrated the cost effectiveness of SEP and identified internal staff time to be the largest cost component related to SEP implementation and certification. This paper analyzes previously reported and newly collected data of costs and benefits associated with the implementation of an ISO 50001 and SEP certification. By disaggregating “sunk energy management system (EnMS) labor costs”, this analysis results in a more accurate and detailed understanding of the costs and benefits of SEP participation. SEP is shown to significantly improve and sustain energy performance and energy cost savings, resulting in a highly attractive return on investment. To illustrate these results, a payback function has been developed and is presented. On average facilities with annual energy spend greater than $2M can expect to implement SEP with a payback of less than 1.5 years. Finally, this paper also observes and details decreasing facility costs associated with implementing ISO 50001 and certifying to the SEP program, as the program has improved from pilot, to demonstration, to full launch.

Therkelsen, Peter↗

Emulation and Adversarial Analysis of EV Charging Networks

In the effort of decarbonization and evolution of the modern electrical grid, electric vehicles (EVs) play a key part to transform the grid. However, due to the rapid adoption of EVs and the demand of the charging infrastructure required to power said EVs, risk of a cyber-attack may impose serious consequences. There is a need to analyze and protect the charging ecosystem infrastructure from cyber threats before it reaches wide-scale deployment. In an effort to secure vehicle to grid (V2G) communications, standardization is necessary for continued reliable system operation. The protocol ISO 15118 outlines controls and practices that should be implemented for secure vehicle to grid (V2G) communications. The standard is gaining momentum for American markets as the demand for EV infrastructure grows. The adoption of ISO 15118 in American markets poses several challenges: the deployment of a public key infrastructure (PKI) as outlined within the standard, interoperability of charging different EVs with chargers from different manufactures using the PKI, and scaling the ecosystem to meet the demand while managing risks. This project was created to understand potential cyber and scaling challenges of PKI for EV infrastructure through utilizing a series of emulated components mapping to what exists in the EV ecosystem today, and the components of the PKI that are under development. The key nodes within the emulation that are under development are: electric vehicle (EV), electric vehicle supply equipment (EVSE), charge network operator (CNO), certificate authority (CA), and online certificate status protocol (OCSP) that must all interact using secure and trusted communications. With these emulated components and utilizing orchestration methods to rapidly deploy and scale the components, the ability to analyze risks of the ecosystem and address gaps before the PKI ecosystem is fully deployed to production should yield a more robust and mature production charging infrastructure. Our approach will use a modular architecture of virtual machines within an orchestration platform and will target scales of 100s, 1000s, and 10,000s of entities interacting. The core research questions trying to be answered with this scope of work are: what are the impacts of a rogue CA, what are the risks of certificate revocation list (CRL) management, what is the value of OCSP stapling, what components are vulnerable to DOS attacks, and what test effective payloads may impact the components.

charging ecosystem↗

Improvements in Hanford TRU Program Utilizing Systems Modeling and Analyses

Hanford's Transuranic (TRU) Program is responsible for certifying contact-handled (CH) TRU waste and shipping the certified waste to the Waste Isolation Pilot Plant (WIPP). Hanford's CH TRU waste includes material that is in retrievable storage as well as above ground storage, and newly generated waste. Certifying a typical container entails retrieving and then characterizing it (Non-Destructive Examination [NDE], Non-Destructive Assay [NDA], and Head Space Gas Sampling [HSG]), validating records (data review and reconciliation), and designating the container for a payload. The certified payload is then shipped to WIPP. Systems modeling and analysis techniques were applied to Hanford's TRU Program to help streamline the certification process and increase shipping rates. The modeling and analysis yields several benefits: - Maintains visibility on system performance and predicts downstream consequences of production issues. - Predicts future system performance with higher confidence, based on tracking past performance. - Applies speculation analyses to determine the impact of proposed changes (e.g., apparent shortage of feed should not be used as basis to reassign personnel if more feed is coming in the queue). - Positively identifies the appropriate queue for all containers (e.g., discovered several containers that were not actively being worked because they were in the wrong 'physical' location - method used previously for queuing up containers). - Identifies anomalies with the various data systems used to track inventory (e.g., dimensional differences for Standard Waste Boxes). A model of the TRU Program certification process was created using custom queries of the multiple databases for managing waste containers. The model was developed using a simplified process chart based on the expected path for a typical container. The process chart was augmented with the remediation path for containers that do not meet acceptance criteria for WIPP. Containers are sorted into queues based on their current status in the process. A container can be in only one queue at any given time. Existing data systems are queried to establish the quantity of containers in each queue on any given day. This sets the amount of feed available that is then modeled to be processed according to the daily production plans. The daily production plans were created by identifying the equipment necessary and the staff that performs each process step, and determining the expected production rate for each step. Production performance is monitored on a weekly basis with Project senior staff to establish a total operating efficiency (TOE) for each step (comparing actual performance to production capacity). The unit operations were modeled to be constrained by each day's feed queue plus the performance of the preceding step. The TOE for each unit operation was applied to an integrated model to determine bottlenecks and identify areas for improvement. All of the steps were linked to predict future system performance based on available feed and integrated system-level TOE. It has been determined that at times sub-optimization of a particular unit operation is necessary to ensure the system remains balanced (e.g., having excess capacity in assay does no good if there is no feed available because the real-time radiography [RTR] is working at half capacity). Several recommendations have been provided to the Project management team resulting in improvements in the performance of TRU certification activities by Hanford's TRU Program. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

It Just Keeps Getting Better-Tru Waste Inventory

The Waste Isolation Pilot Plant (WIPP) opened on March 26, 1999, becoming the nation's first deep geologic repository for the permanent disposal of defense-generated transuranic (TRU) waste. In May 1998, the U. S. Environmental Protection Agency (EPA) certified WIPP and re-certified WIPP in March 2006. The knowledge of TRU waste inventory is fundamental to packaging, transportation, disposal strategies, resource allocation, and is also imperative when working in a regulatory framework. TRU waste inventory data are used to define the waste that will fill the WIPP repository in terms of volume, radionuclides, waste material parameters, other chemical components, and to model the impact of the waste on the performance of the WIPP over a 10,000-year evolution. The data that pertain to TRU waste is defined in the WIPP Land Withdrawal Act (LWA), as '..waste containing more that 100 nanocuries of alpha-emitting transuranic isotopes per gram of waste, with half-lives greater than 20 years..' Defining TRU waste further, the wastes are classified as either contact-handled (CH) or remote-handled (RH) TRU waste, depending on the dose rate at the surface of the waste container. CH TRU wastes are packaged with an external surface dose rate not greater than 200 milli-rem (mrem) per hour, while RH TRU wastes are packaged with an external surface dose rate of 200 mrem per hour or greater. The Los Alamos National Laboratory-Carlsbad Operations (LANL-CO) Inventory Team has developed a powerful new database, the Comprehensive Inventory Database (CID), to maintain the TRU waste inventory information. The CID is intended to replace the Transuranic Waste Baseline Inventory Database (TWBID), Revision 2.1, as the central inventory information repository for tracking all existing and potential (TRU) waste generated across the Department of Energy (DOE) TRU waste complex. It is also the source for information submitted for the Annual TRU Waste Inventory Reports some of which will be used in future Compliance Re-certification Applications (CRAs) for the WIPP. Currently, the DOE is preparing for the second re-certification, CRA-2009. The CID contains comprehensive TRU waste inventory that is consistent, relevant, and easily accessible to support DOE needs, not only the CRAs and performance assessments, but also waste management planning activities and other regulatory needs (e.g., National Environmental Policy Act (NEPA) analyses). The comprehensive inventory contains information obtained via inventory updates and approved acceptable knowledge (AK) characterization information to ensure inventory data integrity is maintained and the inventory is current. The TRU waste inventory is maintained in the CID under configuration management as defined in the LANL-CO Quality Assurance Program. The CID was developed using Microsoft{sup TM} Access Data Project{sup TM} (ADP) technology with a Microsoft SQL Server{sup TM} back end. The CID is user friendly, contains more fields, provides for easy upload of data, and has the capability to generate fully qualified data reports. To go along with the new database, the LANL-CO Inventory Team has developed an improved data collection/screening process and has excellent communications with the TRU waste site personnel. WIPP has now received over 6,000 shipments, emplaced over 50,000 cubic meters of CH waste, and successfully completed one re-certification. With a new robust qualified database, the CID, to maintain the inventory information, the TRU waste inventory information is continuously improving in quality, accuracy, and usability (better). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Building a Credible and Updated WIPP Performance Assessment - New Knowledge Versus Conservative Assumptions and FEP Analysis, A Balancing Act - 16299

Conservative assumptions are important components in conceptual model development where limited data is available. And, as appropriate, during the early 1990's Department of Energy (DOE) adopted many conservative assumptions in the development of the Waste Isolation Pilot Plant's (WIPP's) 24 Conceptual Models incorporated in DOE's 1996 Compliance Certification Application (CCA) performance assessment (PA). Many of these assumptions were formulated and documented in the WIPP relevant features, events and processes (FEPs) analyses; others were adopted when developing input parameter values and their distributions that were used as inputs to computer models. The Agency accepted these conservative assumptions during their 1996 CCA assessment for several reasons; 1) at the time there was a scarcity of data related to long-term behavior of many parameters needed to be incorporated in the PA, 2) sensitivity studies performed during this time period determined that the affected 'conservative' assumptions adopted for some parameters had minimal to no impact on repository performance; and, 3) DOE could demonstrate compliance with EPA's radioactive waste disposal regulations while adopting conservative assumptions and data. Since the initial 1996 CCA DOE has modified the repository panel closure design, and the repository footprint in the experimental areas has expanded. These modifications were incorporated into DOE's 2014 Compliance Re-certification Application for WIPP. Additionally, there have been numerous investigations related to both the short- and long-term behavior of salt in a repository setting. As a result, the Agency is reassessing the use of these conservative assumptions and the continued applicability of the original FEP analyses, primarily developed during DOE's 1996 PA and carried forward to the current re-certification. This paper examines some of these analyses. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Content Addition and Testing for 2017 NRC Amendment for the Versa-Pac Type A Fissile Packaging - 18120

The Versa-Pac is a certified Type A, fissile packaging (USA NRC Certificate no. USA/9342/AF-96), often used as a waste package for one time use. Continuous content additions have improved the versatility of the package resulting in expanded uses for the nuclear industry. Principal design of the Versa-Pac packaging maintains the use of an inner liner positioned inside a 55-gallon (VP-55) or 110-gallon drum (VP-110), as used for decades in the transport and disposal of Type A fissile materials. The Versa-Pac is used directly or in conjunction with pails, pipe containers, poly bottles, and a variety of smaller containers, inserts and vessels. The Versa-Pac content developments assist the industry with site shutdown, decommissioning, and cleanup operations, allowing for removal, transport, and storage options for the residual waste materials. A 2017 NRC license amendment application adds new capabilities to the Versa-Pac that include a low 1.25 wt% {sup 235}U enriched uranium loading, small quantities of UF{sub 6} in the form of 1S and 2S cylinders, and a payload mass increase from 250 to 350 pounds for the Versa-Pac 55-gallon version (VP-55). The lower uranium enrichment loading of 1.25 wt% {sup 235}U allows for a higher uranium mass limit. The inclusion of 1S and 2S UF{sub 6} cylinders fills an industry need to remove and dispose of long-stored material during site cleanup activities. The content payload mass limit is increased for low contaminated or radioactive heavy metal contents, such as cut plant components and ingots. Regulatory certification of new contents is demonstrated by test, analysis, and a combination of these techniques to show that the design function of the Versa-Pac as a Type A fissile package remains unchanged. Specific UF{sub 6} criticality and thermal analysis upgrades are added to the design documentation to accommodate 1S and 2S UF{sub 6} cylinders. The parameters for criticality analyses are simplified, ensuring no credit for cylinder containment is required for HAC thus reducing the reliance on a single specific shoring device. An upgrade of the Versa-Pac thermal analysis demonstrates compliance with ANSI N14.1 UF{sub 6} cylinder thermal limits. A new drop test sequence for the VP-55 was performed, documenting the addition of the 350-pound payload and demonstrating the VP-55 maintains structural integrity during the NCT and HAC drop, crush and puncture events as defined by 10 CFR 71. The testing and analyses show no loss of the material occurs and the package maintains the material in a subcritical state. This paper traces the engineering and licensing efforts involved in expanding the Versa-Pac's versatility for the 2017 NRC amendment application; summarizing the new testing and results for the payload increase, the content addition criticality and thermal evaluations, and content description for the Versa-Pac Safety Analysis Report. The NRC license amendment is scheduled for Winter 2017. Testing and supporting analyses reported in the Versa-Pac Safety Analysis Report demonstrates the content developments met the performance requirements of 10 CFR 71 for a Type A fissile package. A revision of the NRC Certificate of Compliance is expected in Spring 2018. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Fermilab's Transition to Token Authentication

Fermilab is the first High Energy Physics institution to transition from X.509 user certificates to authentication tokens in production systems. All the experiments that Fermilab hosts are now using JSON Web Token (JWT) access tokens in their grid jobs. Many software components have been either updated or created for this transition, and most of the software is available to others as open source. The tokens are defined using the WLCG Common JWT Profile. Token attributes for all the tokens are stored in the Fermilab FERRY system which generates the configuration for the CILogon token issuer. High security-value refresh tokens are stored in Hashicorp Vault configured by htvault-config, and JWT access tokens are requested by the htgettoken client through its integration with HTCondor. The Fermilab job submission system jobsub was redesigned to be a lightweight wrapper around HTCondor. The grid workload management system GlideinWMS which is also based on HTCondor was updated to use tokens for pilot job submission. For automated job submissions a managed tokens service was created to reduce duplication of effort and knowledge of how to securely keep tokens active. The existing Fermilab file transfer tool ifdh was updated to work seamlessly with tokens, as well as the Fermilab POMS (Production Operations Management System) which is used to manage automatic job submission and the RCDS (Rapid Code Distribution System) which is used to distribute analysis code via the CernVM FileSystem. The dCache storage system was reconfigured to accept tokens for authentication in place of X.509 proxy certificates. As some services and sites have not yet implemented token support, proxy certificates are still sent with jobs for backwards compatibility, but some experiments are beginning to transition to stop using them.

Dykstra, Dave [Fermilab] (ORCID:0000000326539015)↗

ORNL Package Testing Program Overview

Radioactive materials are widespread in our everyday activities which are used in many different types of industries: Consumer products, Medicine, Industry, Energy, and Defense. In the United States there is about 3 million shipments of radioactive materials per year. With radioactive material being very widespread the number of new applications to ship these quantities increases daily. As such, ensuring the safe and secure transport of these materials is paramount, necessitating stringent packaging, transportation, and certification requirements. Shipments of radioactive materials have been made from Oak Ridge National Laboratory (ORNL) for the past 65 years. Since the 1940s ORNL has been at the forefront of the early development of regulations pertaining to the transport of radioactive shipments and associated regulatory testing. The early involvement resulted in ORNL being one of the leaders in the development of regulations and testing standards pertaining to the testing and design of packages. Today all package testing activities are conducted under the Package Testing Program (PTP) at ORNL at the Package Evaluation Facility (PEF). The PTP develops and evaluates testing solutions – ensuring that they are safe, efficient, and meet regulatory requirements ORNL PTP has extensive experience in the regulatory testing of radioactive material packages, supporting certification of Type A, Type, B, Type AF, and special form packages. The PEF serves as a one-stop-shop for design, testing, and certification of a wide variety of packages needed for shipment of radioactive materials. The facility provides the space, expertise, and equipment necessary to conduct rigorous performance testing under both normal and accident conditions or transport environments including free drop, dynamic crush, puncture, penetration, compression, vibration, water spray, water immersion, and thermal test. The PTP remains a key contributor to the safety and compliance of radioactive material transportation. This presentation will provide an overview of the program’s history, capabilities, and its ongoing role in advancing regulatory standards and transportation safety.

Martinez, Oscar [ORNL] (ORCID:0000000181814046)↗

Voluntary Renewable Energy Procurement Programs in Regulated Utility Markets

Multinational corporations are increasingly purchasing renewable energy (RE) to fulfill international commitments, reduce supply chain emissions, limit environmental impact, and secure stable and affordable electricity. The potential scale of global corporate RE purchasing has been estimated to be nearly 100 GW and growing; however, many markets still lack supportive enabling environments for corporations to access RE through on-site project development or private sector transactions. Even where allowed by law, on-site generation may be insufficient due to space and technical constraints, introducing additional challenges. Utility green pricing and utility green tariff programs backed by renewable energy certificates (RECs), referred to as utility green procurement programs (GPPs) in this report, offer powerful market-based solutions to utilities, regulators, and policymakers to provide corporate and other consumers with RE product options while generating revenue to support RE development. As RE markets expand around the globe, GPPs have proven to be effective mechanisms in market regimes, ranging from fully integrated state-owned utilities to broadly liberalized power markets. GPPs utilize RECs, which are a type of energy attribute certificate and closely resemble guarantees of origin, to track and ultimately monetize RE attributes that corporations and other buyers must procure to demonstrate progress against their RE commitments and make public claims of RE use. Time-tested and transparent REC accounting mechanisms provide market confidence, while at the same time offering flexibility to utilities, regulators, and customers for a range of applications. RECs are used in all types of electricity market structures, as indicated in Figure 1, but REC-based program designs and supporting components differ depending on the type of market. Liberalized markets allow for customers to contract directly with generators for electricity and RECs, while traditionally regulated markets with vertically integrated utility structures may have greater restrictions on generation asset ownership and electricity sales. RE markets can be further defined as being either mandatory or voluntary. Mandatory markets require suppliers to deliver specified amounts of RE to grid customers, such as under a renewable portfolio standard (RPS), while voluntary markets involve no legal mandates, but demand is driven by self-imposed customer goals.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗