Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “AWARDS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

Audit Report on "The Department of Energy's American Recovery and Reinvestment Act -- Florida State Energy Program"

The Department of Energy's Office of Energy Efficiency and Renewable Energy (EERE) provides grants to states, territories, and the District of Columbia to support their energy priorities through the State Energy Program (SEP). The SEP provides Federal financial assistance to carry out energy efficiency and renewable energy projects that meet each state's unique energy needs while also addressing national goals such as energy security. Federal funding is based on a grant formula that takes into account population and energy consumption. The SEP emphasizes the state's role as the decision maker and administrator for the program. The American Recovery and Reinvestment Act of 2009 (Recovery Act) expanded the SEP, authorizing $3.1 billion in grants. Based on existing grant formulas and after reviewing state-level plans, EERE made awards to states. The State of Florida's Energy Office (Florida) was allocated $126 million - a 90-fold increase over Florida's average annual SEP grant of $1.4 million. Per the Recovery Act, this funding must be obligated by September 30, 2010, and spent by April 30, 2012. As of March 10, 2010, Florida had expended $13.2 million of the SEP Recovery Act funds. Florida planned to use its grant funds to undertake activities that would preserve and create jobs; save energy; increase renewable energy sources; and, reduce greenhouse gas emissions. To accomplish Recovery Act objectives, states could either fund new or expand existing projects. As a condition of the awards, EERE required states to develop and implement sound internal controls over the use of Recovery Act funds. Based on the significant increase in funding from the Recovery Act, we initiated this review to determine whether Florida had internal controls in place to provide assurance that the goals of the SEP and Recovery Act will be met and accomplished efficiently and effectively. We identified weaknesses in the implementation of SEP Recovery Act projects that have adversely impacted Florida's ability to meet the goals of the SEP and the Recovery Act. Specifically: (1) Florida used about $8.3 million to pay for activities that did not meet the intent of the Recovery Act to create new or save existing jobs. With the approval of the Department, Florida used these funds to pay for rebates related to solar energy projects that had been completed prior to passage of the Recovery Act; (2) State officials did not meet Florida's program goals to obligate all Recovery Act funds by January 1, 2010, thus delaying projects and preventing them from achieving the desired stimulative economic impact. Obligations were delayed because Florida officials selected a number of projects that either required a lengthy review and approval process or were specifically prohibited. In June 2009, the Department notified Florida that a number of projects would not be approved; however, as of April 1, 2010, the State had not acted to name replacement projects or move funds to other projects; (3) Florida officials had not ensured that 7 of the 18 award requirements for Recovery Act funding promulgated by the Department had been passed down to sub-recipients of the award, as required; and, (4) Certain internal control weaknesses that could jeopardize the program and increase the risk of fraud, waste and abuse were identified in the Solar Energy System Incentives Program during our September 2009 visit to Florida. These included a lack of separation of duties related to the processing of rebates and deficiencies in the written procedures for grant managers to review and approve rebates. From a forward looking perspective, absent aggressive corrective action, these weaknesses threaten Florida's efforts to meet future Recovery Act goals. In response to our review, Florida took corrective action to incorporate the additional award requirements in sub-recipient documents. It also instituted additional controls to correct the internal control weaknesses we identified. More, however, needs to be done with respect to Department oversight. This report details the circumstances surrounding these program issues and outlines actions that, in our opinion, will help Florida achieve its SEP Recovery Act-funded goals.

14 SOLAR ENERGY↗

Puget Sound Tidal Energy In-Water Testing and Development Project (Final Technical Report)

Tidal energy represents potential for the generation of renewable, emission free, environmentally benign, and cost effective energy from tidal flows. A successful tidal energy demonstration project in Puget Sound, Washington may enable significant commercial development resulting in important benefits for the northwest region and the nation. This project promoted the United States Department of Energy's Wind and Hydropower Technologies Program's goals of advancing the commercial viability, cost-competitiveness, and market acceptance of marine hydrokinetic systems. The objective of the Puget Sound Tidal Energy Demonstration Project is to conduct in-water testing and evaluation of tidal energy technology as a first step toward potential construction of a commercial-scale tidal energy power plant. The specific goal of the project phase covered by this award was to conduct all activities necessary to complete engineering design and obtain construction approvals for a pilot demonstration plant in the Admiralty Inlet region of the Puget Sound. Public Utility District No. 1 of Snohomish County (The District) accomplished the objectives of this award through four tasks: Detailed Admiralty Inlet Site Studies, Plant Design and Construction Planning, Environmental and Regulatory Activities, and Management and Reporting. Pre-Installation studies completed under this award provided invaluable data used for site selection, environmental evaluation and permitting, plant design, and construction planning. However, these data gathering efforts are not only important to the Admiralty Inlet pilot project. Lessons learned, in particular environmental data gathering methods, can be applied to future tidal energy projects in the United States and other parts of the world. The District collaborated extensively with project stakeholders to complete the tasks for this award. This included Federal, State, and local government agencies, tribal governments, environmental groups, and others. All required permit and license applications were completed and submitted under this award, including a Final License Application for a pilot hydrokinetic license from the Federal Energy Regulatory Commission. The tasks described above have brought the project through all necessary requirements to construct a tidal pilot project in Admiralty Inlet with the exception of final permit and license approvals, and the selection of a general contractor to perform project construction.

16 TIDAL AND WAVE POWER↗

Research and Development of a Low Cost Solar Collector

This is a Final Technical Report on the Research and Development completed towards the development of a Low Cost Solar Collector conducted under the DOE cost-sharing award EE-0003591. The objective of this project was to develop a new class of solar concentrators with geometries and manufacturability that could significantly reduce the fully installed cost of the solar collector field for concentrated solar thermal power plants. The goal of the project was to achieve an aggressive cost target of $\$$170/m 2 , a reduction of up to 50% in the total installed cost of a solar collector field as measured against the current industry benchmark of a conventional parabolic trough. The project plan, and the detailed activities conducted under the scope of the DOE Award project addressed all major drivers that affect solar collector costs. In addition to costs, the study also focused on evaluating technical performance of new collector architectures and compared them to the performance of the industry benchmark parabolic trough. The most notable accomplishment of this DOE award was the delivery of a full-scale integrated design, manufacturing and field installation solution for a new class of solar collector architecture which has been classified as the Bi-Planar Fresnel Collector (BPFC) and may be considered as a viable alternative to the conventional parabolic trough, as well as the conventional Fresnel collectors. This was in part accomplished through the design and development, all the way through fabrication and test validation of a new class of Linear Planar Fresnel Collector architecture. This architecture offers a number of key differentiating features which include a planar light-weight frame geometry with small mass-manufacturable elements utilizing flat mirror sections. The designs shows significant promise in reducing the material costs, fabrication costs, shipping costs, and on-site field installation costs compared to the benchmark parabolic trough, as well as the conventional Fresnel collector. The noteworthy design features of the BPFC architecture include the use of relatively cheaper flat mirrors and a design which allows the mirror support beam sections to act as load-bearing structural elements resulting in more than a 36% reduction in the overall structural weight compared to an optimized parabolic trough. Also, it was shown that the utilization of small mass-produced elements significantly lowers mass-production and logistics costs that can more quickly deliver economies of scale, even for smaller installations while also reducing shipping and installation costs. Moreover, unlike the traditional Fresnel trough the BPFC architecture does not require complex articulating drive mechanisms but instead utilizes a standard parabolic trough hydraulic drive mechanism. In addition to the development of the Bi-Planar Fresnel Collector, an optimized conventional space-frame type parabolic trough was also designed, built, analyzed and field-tested during the first phase of this award. The design of the conventional space-frame parabolic collector was refined with extensive FEA and CFD analysis to reduce material costs and re-designed for simpler fabrication and more accurate lower-cost field assembly. This optimized parabolic trough represented an improvement over the state-of-the art of the traditional parabolic trough architecture and also served as a more rigorous and less subjective benchmark that was used for comparison of new candidate design architectures. The results of the expanded 1 st phase of the DOE award project showed that both the Optimized Parabolic Trough and the new Bi-Planar Fresnel Collector design concepts failed to meet the primary objectives for the project of achieving a 50% cost reduction from the industry reference total installed cost of $\$$350/m 2 . Results showed that the BPFC came in at projected total installed cost of $\$$237/m 2 representing a 32% savings compared to the industry benchmark conventional parabolic trough. And the cost reduction obtained by the Optimized Parabolic Trough compared to the industry benchmark reference was approximately 16.5% against the industry benchmark. The new BPFC design showed a weight savings of almost 36% compared to the optimized parabolic trough and a 50% reduction in field assembly labor and a 13% reduction in shipping volume. The BPFC design showed only a marginal improvement of 16% over the fully projected installed cost of the optimized parabolic trough benchmark developed as Concept One. During the course of the investigation numerous sensitivity analyses and other analytical studies were conducted to assess potential improvement opportunities, and further optimizations that could lead to cost reductions and performance improvements. Factors that could have a significant impact on high-volume costs were related to production and further improvements in design for manufacturability, automation, assembly jigs, and fixtures, and robotic welding etc. The wind modeling analysis showed that the Fresnel design concept did not reduce the wind load in a significant manner. The stress analysis showed that the design concept with almost a 36% lower weight than the parabolic trough and it was strong enough to withstand the expected wind loads and maintain targeting accuracy. The Initial on-sun optical testing showed that the Fresnel Trough was capable of concentrating sunlight effectively to the desired target and yielding an optical efficiency slightly lower than a parabolic trough.

14 SOLAR ENERGY↗

Kansas Consortium Plug-in Hybrid Medium Duty

On September 30, 2008, the US Department of Energy (DoE), issued a cooperative agreement award, DE-FC26-08NT01914, to the Metropolitan Energy Center (MEC), for a project known as “Kansas Consortium Plug-in Hybrid Medium Duty Certification” project. The cooperative agreement was awarded pursuant to H15915 in reference to H. R. 2764 Congressionally Directed Projects. The original agreement provided funding for The Consortium to implement the established project objectives as follows: (1) to understand the current state of the development of a test protocol for PHEV configurations; (2) to work with industry stakeholders to recommend a medium duty vehicle test protocol; (3) to utilize the Phase 1 Eaton PHEV F550 Chassis or other appropriate PHEV configurations to conduct emissions testing; (4) and to make an industry PHEV certification test protocol recommendation for medium duty trucks. Subsequent amendments to the initial agreement were made, the most significant being a revised Scope of Project Objectives (SOPO) that did not address actual field data since it was not available as originally expected. This project was mated by DOE with a parallel project award given to the South Coast Air Quality Management District (SCAQMD) in California. The SCAQMD project involved designing, building and testing of five medium duty plug-in hybrid electric trucks. SCAQMD had contracted with the Electric Power Research Institute (EPRI) to manage the project. EPRI provided the required match to the federal grant funds to both the SCAQMD project and the Kansas Consortium project. The rational for linking the two projects was that the data derived from the SCAQMD project could be used to validate the protocols developed by the Kansas Consortium team. At the same time, the consortium team would be a useful resource to SCAQMD in designating their test procedures for emissions and operating parameters and determining vehicle mileage. The years between award of the cooperative agreements and their completion were problematic for the US and world economies. This resulted in the President and Congress implementing the American Recovery and Reinvestment Act of 2009, abbreviated ARRA (Pub.L. 111-5), commonly referred to as the Stimulus or The Recovery Act. The stimulus money available for transportation projects encouraged the SCAQMD to seek additional funds. In August of 2009, they eventually were awarded an additional $45.5 M, and the scope of their project was expanded to 378 vehicles. However, as a consequence of the stimulus money and the inundation of DOE with applications for new project under the ARRA, the expected time table for producing and testing vehicles was significantly delayed. As a result, these vehicles were not available for validating the protocols developed by the Kansas Consortium. Therefore, in April of 2011, the Scope of Project Objectives (SOPO) for the project was revised, and limited to producing the draft protocol for PHEV certification as its deliverable.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Final Scientific/Technical Report- Searches for New Phenomena Beyond the Standard Model and Hunt for New Physics at the Large Hadron Collider

DOE award DE-SC0007863 supports theoretical research in high energy physics. PI and students are NOT a part of any experimental collaboration, even if some works were done in collaboration with experimental colleagues. All research products are in the form of research articles and they are publicly available under inspirehep.net and arxiv.org, which are typical publication methods in high energy physics. No invention or patent is involved with this research. No equipment or hardware is involved with the research under this award (beside a laptop purchased with PI's startup). Some of research outcome is in the form of a computer code, which is available in https://launchpad.net/maddm. This is community effort and anyone has access to the program. Its source is open and anyone can participate in the development. Research outcomes and the code are used by colleagues in high energy physics, including both theorists and experimentalists. Therefore the outcome of research topics under this award supported the High Energy Physics experimental research program, both in understanding the data and in finding new directions for experimental exploration. The research materials are used to train undergraduate students, graduate students and postdoctoral scholars. We summarize research activity under this award in the following section and major products are listed in section 3. Section 4 contains professional presentations given by PI. Other products developed during the award period are in section 5. Summary of expenses, and student/postdoc support are summarized in section 6 and 7, respectively.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Theoretical Particle Physics in the Data-Driven Era (Final Report)

DOE award DE-SC0021447 supports theoretical research in high energy physics. PI and students are not a part of any experimental collaboration, even if some works were done in collaboration with experimental colleagues. All research products are in the form of research articles and they are publicly available under inspirehep.net and arxiv.org, which are typical publication methods in high energy physics. No invention or patent is involved with this research. No equipment or hardware is involved with the research under this award. Research outcomes are used by colleagues in high energy physics, including both theorists and experimentalists. Therefore the outcome of research topics under this award supported the High Energy Physics experimental research program, both in understanding the data and in finding new directions for experimental exploration. The research materials are used to train undergraduate students, graduate students and postdoctoral scholars. We summarize research activity under this award in the following section and major products are listed in section 3. Section 4 contains professional presentations given by PI. Other products developed during the award period are in section 5. Students’ activities are summarized in section 6.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Offshore Testing Facility – Small Scale Turbine Testing and Development Final Technical Report

In July 2010 funding for an award was made available under contract DE-EE0004200 which is the focus of this report. Under this funding, The U.S. Department of Energy’s (USDOE) designated Florida Atlantic University’s (FAU) state of Florida marine renewable energy focused Center of Excellence for Ocean Energy Technology as the Southeast National Marine Renewable Energy Center (SNMREC). The award was advertised in 2008, when the USDOE Wind and Water Program issued a funding opportunity announcement (DE-PS36-08GO98030) to establish university-led National Marine Renewable Energy Centers (NMRECs). Although FAU was selected for this opportunity, funding did not become available until 2010 at which time three of the original five years of performance remained and scope was adjusted accordingly. This award was divided into two phases. The first phase focused on marine energy turbine system enhancement and research while the second phase aimed to advance offshore capabilities and testing opportunities for small-scale demonstration turbines. The project’s objective was to increase the nation’s capabilities, knowledge, and competitiveness with respect to ocean current energy technology. This project successfully achieved these goals by advancing marine energy technology testing opportunities and capabilities. This report details these accomplishments by phase and task. Descriptions include any relevant results, challenges, achievements, and outcomes. Additional intellectual products and publications are listed in the Appendix where detailed technical explanations can be found. Further, because this award designated SNMREC as a USDOE center, it challenges FAU to continue providing value for the marine energy sector in the long term. The direct accomplishments of this project, though noteworthy, are also the seeds for a greater partnership between the USDOE and FAU. SNMREC, leveraging its designation as an NMREC under this award, will expand these contributions for decades to come as a coordinated sustainable program that can serve the marine energy sector’s needs as they arise.

16 TIDAL AND WAVE POWER↗

Operating The Central Process Systems At Glenn Research Center

As a research facility, the Glenn Research Center (GRC) trusts and expects all the systems, controlling their facilities to run properly and efficiently in order for their research and operations to occur proficiently and on time. While there are many systems necessary for the operations at GRC, one of those most vital systems is the Central Process Systems (CPS). The CPS controls operations used by GRC's wind tunnels, propulsion systems lab, engine components research lab, and compressor, turbine and combustor test cells. Used widely throughout the lab, it operates equipment such as exhausters, chillers, cooling towers, compressors, dehydrators, and other such equipment. Through parameters such as pressure, temperature, speed, flow, etc., it performs its primary operations on the major systems of Electrical Dispatch (ED), Central Air Dispatch (CAD), Central Air Equipment Building (CAEB), and Engine Research Building (ERB). In order for the CPS to continue its operations at Glenn, a new contract must be awarded. Consequently, one of my primary responsibilities was assisting the Source Evaluation Board (SEB) with the process of awarding the recertification contract of the CPS. The job of the SEB was to evaluate the proposals of the contract bidders and then to present their findings to the Source Selecting Official (SSO). Before the evaluations began, the Center Director established the level of the competition. For this contract, the competition was limited to those companies classified as a small, disadvantaged business. After an industry briefing that explained to qualified companies the CPS and type of work required, each of the interested companies then submitted proposals addressing three components: Mission Suitability, Cost, and Past Performance. These proposals were based off the Statement of Work (SOW) written by the SEB. After companies submitted their proposals, the SEB reviewed all three components and then presented their results to the SSO. While the SEB does not select the company receiving the contract, they can make recommendations based on their findings to the SSO, who actually awards the contract. The SEB began work for this contract in July 2003 by writing the SOW and the selection will tentatively occur July 30, 2004. Contract awarding will take place Aug. 15. Following the awarding, the winning company has a 30-day Phase-in Period beginning Sept. 1,2004 and full performance will begin October 1.

Weiler, Carly P.↗

2015 Annual Report for the Flight Opportunities Program

Welcome to this third edition of the Flight Opportunities program annual report. In this edition, we continue our story of pathfinding NASA's role in the partnership with the U.S. commercial space and space technology R&D communities to advance national space interests and develop technologies critical to NASA's future missions. 2015 was the year in which a planned change to our payload solicitation strategy saw its first tangible result. As you might remember from our 2014 annual report, in 2015 we set out to facilitate a more direct interaction between flight providers and technology developers by providing fixed funding awards to researchers to directly purchase the flight service(s) that best meet their needs. The selection and award of the first six REDDI-F1 flight grants to non-U.S. government researchers was an important milestone in this regard. From now on, using the REDDI-F1 solicitation appendix, the program will enable non-U.S. government researchers to directly purchase flight services on the emerging suborbital market. The same (or similar) commercial flight services will be available to NASA and other U.S. government agencies (OGA) through commercial contracts that NASA has established through our program. For the latter, our program is available to provide campaign management services, similar to the role we play(ed) for technology payloads remaining in our pool from earlier selections. The full impact of this broader strategic change will likely become more visible in the years ahead as our legacy pool gets depleted and we have implemented a new NASA- and OGA-specific call for proposals. One observation that can already be made after two rounds of REDDI-F1 solicitations is that through this change, the list of commercial flight service providers of interest to non-U.S. government researchers has grown from five in 2014 to nine in 2015. On the industry development front, our Announcement of Collaborative Opportunities (ACO) solicitation was promoted to an STMD-wide solicitation and released in 2015 in combination with the Tipping Point solicitation. A total of 22 awards was announced in November 2015, 12 of which are ACO awards, and six of these are funded by Flight Opportunities. Through these ACO awards, the program funds NASA technical expertise and NASA test facilities to aid industry partners in maturing key space technologies, in our case focusing on small launch vehicle technology development. Flight test activity in 2015 saw a steady 13 campaigns with 31 payload-flights (29 unique payloads). Thirteen new payloads were selected into the program in FY2015, and 14 payloads completed flight testing, bringing the total number of completed technology demonstration payloads to 69. Overall, we are pleased with the evolution and growth of the Flight Opportunities program and look forward to continued success in our partnership with the technology R&D community and the commercial space sector.

Flight Testing↗

The Human Research Program Grant Lifecycle & Data Integration Schedule: Infographic

The Human Research Program (HRP) Grant Lifecycle process can be described using information from several government authoritative sources with overlapping generalizations. It is the responsibility of the HRP Program Planning & Control (PP&C) Office and the Data Management Integration Office (DMIO)to interpret this information into a cohesive process that can be communicated to the human research organization. PP&C and DMIO have been exploring training opportunities to facilitate understanding through the form of infographics. This communication tool combines eye-catching visuals and text making complex information and data more digestible and shareable. The infographic poster tells a short story about a federally awarded grant and is intended to help both the new and experienced HRP workforce understand the timeline for a research procurement and where their specific tasks fall within the 4 phases of the grant lifecycle. The Pre-Award, Award, Post-Award, and Closeout phases are overlayed with business swimlanes so HRP stakeholders can see where they fit into the timeline rather than working in an isolated part. This includes the Chief Scientist Office (CSO), PP&C, the Data Management Integration Office (DMIO), the Principal Investigator (PI), the Element stakeholders, the LSDA Archivists, and the Research & Operations Integration (ROI) team along with the stakeholders in the Human Health and Performance Directorate. Additionally, the poster introduces (1) the HRP Data Integration Schedule identified in the HRP Data Management Plan HRP-48047, Table 8-2 and (2) a Smartsheet Solution to automate the grants tracking business process. Emphasis is given to the Data Integration Schedule which is the basis for the milestone tasks that are to be completed during the Post-Award phase in the grant lifecycle. The poster is also an opportunity to present the Smartsheet Solution, a software collaboration and work management tool used to assign tasks and track project progress. This PP&C FY24 effort will facilitate an end-to-end solution to track grants and provide insight to the health of HRP grant research procurements using metrics, reports, and dashboards.

J Peace↗

The Citizen Cyberscience Lectures - 1) Mobile phones and Africa: a success story 2) Citizen Problem Solving

Mobile phones and Africa: a success story Dr. Mo Ibrahim, Mo Ibrahim Foundation Citizen Problem Solving Dr. Alpheus Bingham, InnoCentive The Citizen Cyberscience Lectures are hosted by the partners of the Citizen Cyberscience Centre, CERN, The UN Institute of Training and Research and the University of Geneva. The goal of the Lectures is to provide an inspirational forum for participants from the various international organizations and academic institutions in Geneva to explore how information technology is enabling greater citizen participation in tackling global development challenges as well as global scientific research. The first Citizen Cyberscience Lectures will welcome two speakers who have both made major innovative contributions in this area. Dr. Mo Ibrahim, founder of Celtel International, one of Africa’s most successful mobile network operators, will talk about “Mobile phones and Africa: a success story”. Dr. Alpheus Bingham, founder of InnoCentive, a Web-based community that solves industrial R&D; challenges, will discuss “Citizen Problem Solving”. The Citizen Cyberscience Lectures are open and free of charge. Participants from outside CERN must register by sending an email to Yasemin.Hauser@cern.ch BEFORE the 23rd october to be able to access CERN. THE LECTURES Mobile phones and Africa: a success story Dr. Mo Ibrahim, Mo Ibrahim Foundation Abstract The introduction of mobile phones into Africa changed the continent, enabling business and the commercial sector, creating directly and indirectly, millions of jobs. It enriched the social lives of many people. Surprisingly, it supported the emerging civil society and advanced the course of democracy Bio Dr Mo Ibrahim is a global expert in mobile communications with a distinguished academic and business career. In 1998, Dr Ibrahim founded Celtel International to build and operate mobile networks in Africa. Celtel became one of Africa’s most successful companies with operations in 15 countries, covering more than a third of the continent’s population and investing more than US 750 millionin Africa.The company was sold to MTC Kuwaitin 2005 for 3.4billion. In 2006 Dr Ibrahim established the Mo Ibrahim Foundation to support great African leadership. The Foundation focuses on two major initiatives to stimulate debate around, and improve the quality of, governance in Africa. The Ibrahim Prize for Achievement in African Leadership recognises and celebrates excellence; and the Ibrahim Index of African Governance provides civil society with a comprehensive and quantifiable tool to promote government accountability. Dr Ibrahim is also Founding Chairman of Satya Capital Ltd, an investment company focused on opportunities in Africa. Dr Ibrahim has been awarded an Honorary Doctorate by the University of London’s School of Oriental and African Studies, the University of Birmingham and De Montfort University, Leicester as well as an Honorary Fellowship Award from the London Business School. He has also received the Chairman’s Award for Lifetime Achievement from the GSM Association in 2007 and the Economists Innovation Award 2007 for Social & Economic Innovation. In 2008 Dr Ibrahim was presented with the BNP Paribas Prize for Philanthropy, and also listed by TIME magazine as one of the 100 most influential people in the world. Citizen Problem Solving Dr. Alpheus Bingham, InnoCentive Abstract American playwright Damien Runyon (Guys and Dolls) once remarked, "the race is not always to the swift, nor the victory to the strong -- but that IS how you bet." Not only does a system of race handicapping follow from this logic, but the whole notion of expertise and technical qualifications. Such 'credentials' allow one to 'bet' on who might most likely solve a difficult challenge, whether as consultant, contractor or employee. Of course, the approach would differ if one were allowed to bet AFTER the race. When such systems came into broad use, i.e., chat rooms, usenets, innocentive, etc., and were subsequently studied, it was often found that the greatest probability of solution lies in the "long tail" of the function rather than in the head representing formally vetted 'experts.' Insight into a problem is often the intersection of training, experience, metaphor and provocation (think Archimedes). Examples of "citizens" outside a targeted field of expertise providing uniques solutions will illustrate the principles involved. Bio Dr. Alph Bingham is a pioneer in the field of open innovation and an advocate of collaborative approaches to research and development. He is co-founder, and former president and chief executive officer of InnoCentive Inc., a Web-based community that matches companies facing R&D; challenges with scientists who propose solutions. Through InnoCentive, a platform that leverages the ability to connect to a whole planet of people through the Internet, organizations can access individuals – problem solvers – who might never have been found. Alph spent more than 25 years with Eli Lilly and Company, and offers deep experience in pharmaceutical research and development, research acquisitions and collaborations, and R&D; strategic planning. During his career he was instrumental in creating and developing Eli Lilly's portfolio management process as well as establishing the divisions of Research Acquisitions, the Office of Alliance Management and e.Lilly, a business innovation unit, from which various other ventures were spun out that create the advantages of open and networked organizational structures, including: InnoCentive, YourEncore, Inc., Coalesix, Inc., Maaguzi, Inc., Indigo Biosystems, Seriosity, Chorus and Collaborative Drug Discovery, Inc. He currently serves on the Board of Directors of InnoCentive, Inc., and Collaborative Drug Discovery, Inc.; the advisory boards of the Center for Collective Intelligence (MIT), and the Business Innovation Factory, as well as a member of the board of trustees of the Bankinter Foundation for Innovation in Madrid. He has lectured extensively at both national and international events and serves as a Visiting Scholar at the National Center for Supercomputing Application at the University of Illinois at Champaign-Urbana. He is also the former chairman of the Board of Editors of the Research Technology Management Journal. Dr. Bingham was the recipient of the Economist's Fourth Annual Innovation Summit "Business Process Award" for InnoCentive. He was also named as one of Project Management Institute's "Power 50" leaders in October 2005. Dr. Bingham received a Ph.D. in organic chemistry from Stanford University.

99 GENERAL AND MISCELLANEOUS↗

DOE Zero Energy Ready Homes

This article describes the U.S. Department of Energy's Zero Energy Ready Home Program and Housing Innovation Awards. Since 2013, builders around the country have certified over 1,170 homes to the high performance criteria of the DOE Zero Energy Ready Home program. Each year DOE recognizes the best innovators among this group with the DOE Housing Innovation Awards. 2017 winners will be announced at an awards event taking place at the Energy & Environmental Building Alliance (EEBA) high-performance home summit October 10-12, 2017, in Atlanta, Georgia. Twenty-five builders are expected to take home awards and grand award winners in each of the five competition categories will be revealed at the conference. Participating builders represent every climate zone in the country and DOE Zero Energy Ready labeled homes can be found in 34 states. Homes represent the full spectrum of the U.S. construction industry, from affordable to production to custom homes and from single-family detached to duplexes and up to five-story multifamily buildings as well as some retrofit projects have also met the criteria. Every DOE ZER certified home is certified through the ENERGY STAR Certified Homes (Version 3.0, revision 8) program and the U.S. Environmental Protection Agency’s Indoor airPLUS program. Each home must meet the hot water distribution requirements of the EPA’s WaterSense program and the insulation requirements of the 2012 International Energy Conservation Code. If the home has HVAC ducts, they must be installed within the conditioned space of the home. Appliances, exhaust fans, ceiling fans, and most of the lighting should be ENERGY STAR qualified. The DOE Zero Energy Ready Home program also requires homes to have solar electric panels installed or at a minimum to have the conduit and electrical panel space in place for future PV installation, if the home is in a location appropriate for solar power. Homes are constructed with enough energy efficiency built in so that, with a reasonable amount of solar PV panels (i.e., small enough to fit comfortably on the roof), the home could produce enough of its own power to equal the power it uses in a year.

U.S. Department of Energy Building Technologies Pr↗

Genomes to Life Diversity Initiative

This was a collaborative initiative between Western Carolina University, Furman University and the University of North Carolina-Asheville. At each of the institutions, funds from the grant award were used for the acquisition of mostly microscopy laboratory equipment, supporting supplies and necessary training as appropriate. The distribution of funds was: $495,000 Western Carolina University; $130,000 Furman University; $100,000 University of North Carolina-Asheville for a total of $725,000 total award from DOE. Western Carolina University purchased significant instrumentation with funds from this award that included among others, fermenters, a Confocal microscope, and an automated sequencer. The fermenters have been used in research and courses and to prepare biochemical materials for research and courses. The Confocal microscope has provided Western students and faculty with unique imaging opportunities not generally available except in medical schools. Unlike regular optical microscopy, confocal microscopy offers a three-dimensional image that can be viewed from different angles. In addition, the device has been set up to be controlled from remote locations, providing high school and institutions of higher education students across Western North Carolina with the opportunity to use state-of-the-art instrumentation from their location. One of the goals of this collaboration was to get more high school students interested in science. The automated sequencer has become a very significant instructional and research tool. It has been widely used for characterizing the oak genome, which has very significant implications for Western North Carolina. More recently, it has been used for groundbreaking forensic science research. This device has been used to create a database to identify unidentified persons. The instrument has also been used in several undergraduate and graduate courses, where students learn the principles and operation of this very important instrument. With its funds the University of North Carolina-Asheville purchased centrifuges, rotors, a thermocycler, and a fluorescent microscope enhancing its laboratory capabilities for faculty and students in undergraduate research and science courses. Furman University used its award for the acquisition of a Beckman-Coulter CEQ 8000 Genetic Analysis System which greatly enhanced its capability in genetic research providing much greater opportunity for students and faculty. The educational and research experience for students and faculty at each of these institutions and at other institutions of higher education in addition to high school students has and will continue to be greatly enriched because of this grant award.

36 MATERIALS SCIENCE↗

Solar Energy Research Center Instrumentation Facility

SOLAR ENERGY RESEARCH CENTER INSTRUMENTATION FACILITY The mission of the Solar Energy Research Center (UNC SERC) at the University of North Carolina at Chapel Hill (UNC-CH) is to establish a world leading effort in solar fuels research and to develop the materials and methods needed to fabricate the next generation of solar energy devices. We are addressing the fundamental issues that will drive new strategies for solar energy conversion and the engineering challenges that must be met in order to convert discoveries made in the laboratory into commercially available devices. The development of a photoelectrosynthesis cell (PEC) for solar fuels production faces daunting requirements: (1) Absorb a large fraction of sunlight; (2) Carry out artificial photosynthesis which involves multiple complex reaction steps; (3) Avoid competitive and deleterious side and reverse reactions; (4) Perform 13 million catalytic cycles per year with minimal degradation; (5) Use non-toxic materials; (6) Cost-effectiveness. PEC efficiency is directly determined by the kinetics of each reaction step. The UNC SERC is addressing this challenge by taking a broad interdisciplinary approach in a highly collaborative setting, drawing on expertise across a broad range of disciplines in chemistry, physics and materials science. By taking a systematic approach toward a fundamental understanding of the mechanism of each step, we will be able to gain unique insight and optimize PEC design. Access to cutting-edge spectroscopic tools is critical to this research effort. We have built professionally-staffed facilities equipped with the state-of the-art instrumentation funded by this award. The combination of staff, facilities, and instrumentation specifically tailored for solar fuels research establishes the UNC Solar Energy Research Center Instrumentation Facility as a unique, world-class capability. This congressionally directed project funded the development of two user facilities: TASK 1: SOLAR DEVICE FABRICATION LABORATORY DEVELOPMENT The space allocated for this laboratory was shell space that required an upfit in order to accommodate nano-fabrication equipment in a quasi-clean room environment. This construction project (cost $279,736) met the non-federal cost share requirement of $250,000 for this award. The central element of the fabrication laboratory is a new $400,000+ stand-alone system, funded by other sources, for fabricating and characterizing photovoltaic devices, in a state-of-the-art nanofabrication environment. This congressionally directed project also included the purchase of an energy dispersive x-ray analysis (EDX) detector for a pre-existing transmission electron microscope (TEM). This detector allows elemental analysis and elemental mapping of materials used to fabricate solar energy devices which is a key priority for our research center. TASK 2: SOLAR ENERGY SPECTROSCOPY LABORATORY DEVELOPMENT (INSTRUMENTATION) This laboratory provides access to modern spectroscopy and photolysis instrumentation for characterizing devices, materials and components on time scales ranging from femtoseconds to seconds and for elucidating mechanisms. The goals of this congressionally directed project included the purchase and installation of spectroscopy and photolysis instrumentation that would substantially and meaningfully enhance the capabilities of this laboratory. Some changes were made to the list of equipment proposed in the original budget. These changes did not represent a change in scope, approach or aims of this project. All of the capabilities and experiments represented in the original budget were maintained. The outcome of this Congressionally Directed Project has been the development of world-class fabrication and spectroscopy user facilities for solar fuels research at UNC-CH. This award has provided a significant augmentation of our pre-existing instrumentation capabilities which were funded by earlier UNC SERC projects, including the Energy Frontier Research Center UNC EFRC, funded by the US Department of Energy Office of Basic Energy Sciences. Equipment funded by this congressional award has provided important new capabilities for UNC SERC and has greatly facilitated collaborative research by many multi-institutional teams in the six partner institutions of the UNC EFRC, including Duke University, North Carolina Central University, and North Carolina State University. This state-of-the-art instrumentation has allowed us to design cutting-edge experiments that provide insight into the molecular structure and dynamics of materials and components for solar energy conversion under real working conditions. This research has resulted in ten publications already published or in preparation that acknowledge support from DOE EERE for this congressionally directed project.

14 SOLAR ENERGY↗

National Open-ocean Energy Laboratory (Final Technical Report)

Under the authorization provided by Section 634 of the Energy Independence and Security Act of 2007 (P.L. 110-140), in 2009 FAU was awarded U.S. Congressionally Directed Program (CDP) funding through the U.S. Department of Energy (DOE) to investigate and develop technologies to harness the energy of the Florida Current as a source of clean, renewable, base-load power for Florida and the U.S. A second CDP award in 2010 provided additional funding in order to enhance and extend FAU’s activities. These two CDPs in 2009 and 2010 were combined into a single DOE grant, DE-EE0000319, and are the subject of this report. Subsequently, in July 2010 funding was made available under a separate contract, DE-EE0004200. Under that funding, DOE’s Wind and Water Power Program designated FAU’s state of Florida marine renewable energy (MRE) center as the Southeast National Marine Renewable Energy Center (SNMREC). This report discusses SNMREC activities funded by the DE-EE0000319 grant, but will make reference, as appropriate, to activities that require further investigation under the follow-on grant. The concept of extracting energy from the motions of the oceans has a long history. However, implementation on large scales of the technologies to effect renewable energy recovery from waves, tides, and open-ocean currents is relatively recent. DOE’s establishment of SNMREC recognizes a significant potential for ocean current energy recovery associated with the (relatively) high-speed Florida Current, the reach of the Gulf Stream System flowing through the Straits of Florida, between the Florida Peninsula and the Bahamas Archipelago. The proximity of the very large electrical load center of southeast Florida’s metropolitan area to the resource itself makes this potential all the more attractive. As attractive as this potential energy source is, it is not without its challenges. Although the technology is conceptually simple, its design and implementation in a commercially-viable fashion presents a variety of challenges. Beyond the technology itself (and, especially, the effects on the technology of the harsh oceanic environment), it is important to consider the possible environmental impacts of commercial-scale implementation of oceanic energy extraction. Further, because such implementation represents a completely new undertaking, the human resources required do not exist, so education and training programs are critical to eventual success. This project, establishing a national open-ocean energy laboratory, was designed to address each of these three challenges in a flexible framework allowing for adaptive management as the project proceeded. In particular: the technology challenge, including resource assessment, evolved during the project to recognize and address the need for a national testing facility in the ocean for small-scale prototype MRE systems developed by industry; the environmental challenge became formalized and expanded during the permitting process for such a testing facility; and the human resources/societal challenges, both in terms of the need for education and training and in terms of public acceptance of MRE, stimulated a robust outreach program far beyond that originally envisioned at SNMREC. While all of these activities at SNMREC are ongoing, a number of significant milestones (in addition to the contributions listed in the appendices) were achieved under the auspices of this award. These include: Planning and site selection for the first-phase test facility, offshore of Dania Beach, FL, including some equipment for the facility, submission of an Interim Policy Lease Application to the U.S. Department of Interior’s Bureau of Ocean Energy Management (BOEM), and completion of an Environmental Assessment by BOEM and a positive Consistency Determination by the State of Florida; Measurements using acoustic profilers of the current structure and variability in the vicinity of the site under a variety of weather conditions, seasons and time durations; Design and implementation of instrumentation for the first phase of the offshore testing facility, the wet- and top-side data acquisition systems, and shore-based analysis systems; Implementation of a laboratory-scale dynamometer system to test generators of up to 25 kW capacity using real-world (simulated) forcing; Completion of 24 months of (airborne) marine vertebrate surveys and associated analysis of sea turtle offshore activity, marine mammal vocalization research, and ocean current turbine hydrodynamic noise characterization; Development of a secondary-school (nominally grade 10) curriculum about hydrokinetic MRE, “Energy from the Oceans: The New Renewable”, and training of over 200 high-school teachers in its use and in how to educate their colleagues in application of the material in the classroom; Presentations to over 50 interested civic groups in the region on various aspects of MRE in SE Florida A series of public lectures to over 600 residents of south Florida to provide broader education on MRE. Development of an interactive kiosk for installation in local science museums. These, and other accomplishments detailed in this report contribute to a comprehensive ongoing program at the SNMREC to support the affordable, responsible, and achievable commercialization of MRE. Many of the tasks of this award are continued or will be verified with follow-on funding DE-EE0004200, and its goal: the installation of the world’s first offshore ocean current turbine testing and validation capability.

16 TIDAL AND WAVE POWER↗

Crump Geyser Exploration and Drilling Project. High Precision Geophysics and Detailed Structural Exploration and Slim Well Drilling

The Crump Geyser Exploration and Drilling Project – High Precision Geophysics and Detailed Structural Exploration and Slim Well Drilling ran from January 29, 2010 to September 30, 2013. During Phase 1 of the project, collection of all geophysical surveys was completed as outlined in the Statement of Project Objectives. In addition, a 5000-foot full sized exploration well was drilled by Ormat, and preexisting drilling data was discovered for multiple temperature gradient wells within the project area. Three dimensional modeling and interpretation of results from the geophysical surveys and drilling data gave confidence to move to the project into Phase 2 drilling. Geological and geophysical survey interpretations combined with existing downhole temperature data provided an ideal target for the first slim-hole drilled as the first task in Phase 2. Slim-hole 35-34 was drilled in September 2011 and tested temperature, lithology, and permeability along the primary range-bounding fault zone near its intersection with buried northwest-trending faults that have been identified using geophysical methods. Following analysis of the results of the first slim-hole 35-34, the second slim hole was not drilled and subsequent project tasks, including flowing differential self-potential (FDSP) surveys that were designed to detail the affect of production and injection on water flow in the shallow aquifer, were not completed. NGP sold the Crump project to Ormat in August 2014, afterwards, there was insufficient time and interest from Ormat available to complete the project objectives. NGP was unable to continue managing the award for a project they did not own due to liability issues and Novation of the award was not a viable option due to federal award timelines. NGP submitted a request to mutually terminate the award on February 18, 2015. The results of all of the technical surveys and drilling are included in this report. Fault interpretations from surface geology, aeromag, seismic, and gravity data sets are in good agreement, illustrating two or more major range-bounding faults and buried northwest trending faults. The intersections of these fault systems provide the primary targets for drilling.

15 GEOTHERMAL ENERGY↗

Brigham City Hydro Generation Project

Brigham City owns and operates its own municipal power system which currently includes several hydroelectric facilities. This project was to update the efficiency and capacity of current hydro production due to increased water flow demands that could pass through existing generation facilities. During 2006-2012, this project completed efficiency evaluation as it related to its main objective by completing a feasibility study, undergoing necessary City Council approvals and required federal environmental reviews. As a result of Phase 1 of the project, a feasibility study was conducted to determine feasibility of hydro and solar portions of the original proposal. The results indicated that the existing Hydro plant which was constructed in the 1960’s was running at approximately 77% efficiency or less. Brigham City proposes that the efficiency calculations be refined to determine the economic feasibility of improving or replacing the existing equipment with new high efficiency equipment design specifically for the site. Brigham City completed the Feasibility Assessment of this project, and determined that the Upper Hydro that supplies the main culinary water to the city was feasible to continue with. Brigham City Council provided their approval of feasibility assessment’s results. The Upper Hydro Project include removal of the existing powerhouse equipment and controls and demolition of a section of concrete encased penstock, replacement of penstock just upstream of the turbine inlet, turbine bypass, turbine shut-off and bypass valves, turbine and generator package, control equipment, assembly, start-up, commissioning, Supervisory Control And Data Acquisition (SCADA), and the replacement of a section of conductors to the step-up transformer. Brigham City increased the existing 575 KW turbine and generator with an 825 KW turbine and generator. Following the results of the feasibility assessment Brigham City pursued required environmental reviews with the DOE and the U.S. Fish and Wildlife Services (USFWS) concurring with the National Environmental Policy Act of 1969 (NEPA) It was determined that Brigham City’s Upper Hydroelectric Power Plant upgrade would have no effect to federally listed or candidate species. However Brigham City has contributed a onetime lump sum towards Bonneville cutthroat trout conservation in the Northern Bonneville Geographic Management Unit with the intention to offset any impacts from the Upper Hydro Project needed to move forward with design and construction and is sufficient for NEPA compliance. No work was done in the river or river bank. During construction, the penstock was disconnected and water was diverted through and existing system around the powerhouse and back into the water system. The penstock, which is currently a 30-inch steel pipe, would be removed and replaced with a new section of 30-inch pipe. Brigham City worked with the DOE and was awarded a new modification and the permission to proceed with Phase III of our Hydro Project in Dec. 2013; with the exception to the modification of the award for the construction phase. Brigham City developed and issued a Request for Proposal for Engineer and Design vendor. Sunrise Engineering was selected for the Design and throughout the Construction Phase of the Upper Hydroelectric Power Plant. Brigham City conducted a Kickoff Meeting with Sunrise June 28, 2013 and received a Scope of Work Brigham City along with engineering firm sent out a RFP for Turbine, Generator and Equipment for Upper Hydro. We select Turbine/Generator Equipment from Canyon Industries located in Deming, WA. DOE awarded Brigham City a new modification and the permission to proceed with Phase III Construction of our Hydro Project. Brigham City Crews removed existing turbine/generator and old equipment alone with feeder wires coming into the building basically giving Caribou Construction an empty shell to begin demolition. Brigham City contracted with Caribou Construction from Jerome, Idaho for the Upper Power Plant construction. A kickoff meeting was June 24, 2014 and demolition was immediately started on building. Because of a delivery delay of Turbine, Generator and Equipment from Canyon Brigham City had to request another extension for the final date of completion. DOE awarded modification (.007) to Brigham City with a new completion date of August 1, 2015. The Turbine has had a few adjustments to help with efficiency; but the Generator had a slight vibration when generator got hot so Canyon Industries had U S Motor’s that manufactured the generator come to check out the issue. The other Equipment seems to be running normal. Brigham City, Sunrise Engineering and Canyon Industries met to determine what the vibration in the generator was and how to solve the issue Us Motor’s found some welds that failed: they have been repaired. U S Motor’s delivered the repaired generator Feb. 17, 2015. Canyon Industries arranged for a crane to installed generator in Power Plant. U S Motor’s balanced and wired generator. Plant Operators put the generator back on line. Canyon Industries returned and gave their approval to keep Hydro online. After Hydro was put back into operations it kept going off line because of overheating issues. Canyon Industries returned and replaced sensors and adjusted them to the proper settings for normal operations. Brigham City added additional steel screens to windows to increase air flow in Power Plant Building. After construction phase of the Upper Hydro Plant some landscaping has been restored around the building additional gravel brought in and leveled out and the road that was cut through for conduits to run wires. A retaining wall was installed to protect penstock. The Upper Hydro Plant is complete and in full operations. The final reimbursement was submitted.

13 HYDRO ENERGY↗

Development of Value-Added Products from Residual Algae to Biomass

DOE Award # EE0000393 was awarded to fund research into the development of beneficial uses of surplus algal biomass and the byproducts of biofuel production. At the time of award, Sapphire’s intended fuel production pathway was a fairly conventional extraction of lipids from biomass, resulting in a defatted residue which could be processed using anaerobic digestion. Over the lifetime of the award, we conducted extensive development work and arrived at the conclusion that anaerobic digestion presented significant technical challenges for this high-nitrogen, high-ash, and low carbon material. Over the same timeframe, Sapphire’s fuel production efforts came to focus on hydrothermal liquefaction. As a result of this technology focus, the residue from fuel production became unsuitable for either anaerobic digestion (or animal feed uses). Finally, we came to appreciate the economic opportunity that the defatted biomass could represent in the animal feed space, as well as understanding the impact of seasonal production on a biofuels extraction plant, and sought to develop uses for surplus biomass produced in excess of the fuel production unit’s capacity.

09 BIOMASS FUELS↗