A Practical Approach of Mining Operational Risks in Cigeo - A field-test - 19349
Andra is currently completing the detailed engineering phase of the stepwise design development of Cigeo (the French HLW and IL-LLW Deep Geological Repository, aka DGR). Various technical issues are at stake, including the risk management requirements linked to the safety of 'Mining Operations' (i.e. occupational safety issues related to underground excavation/dismantling works at some 500 m of depth), at different stages of the DGR life cycle (i.e. from its construction start-up to its final closure and future monitoring/or conversely a decision of waste retrieval). These occupational safety requirements have a significant impact on Cigeo's design, its progressive construction and later closure. On a shorter term, one must demonstrate that the design bases are technically sound and that the solutions selected (to build, operate, close the DGR infrastructures or conversely retrieve the waste) are both feasible and safe. In that sense (and following an identification of operational risks during construction), Andra focused on two sensitive cases: - The construction of large diameter drift crossings, in particular those related to the connection between a transfer drift (main) and a IL-LLW disposal vault (i.e. during construction operations), - The partial dismantling of a drift concrete lining (made of concrete segment rings, erected and placed by a TBM) at time of construction of a horizontal seal (i.e. during closure operations). The discussion starts with a description of the geotechnical conditions prevailing at the (French) Bure site, in the Callovo-Oxfordian (COx) claystone formation. Then the paper presents the Cigeo underground architecture (at large) and the specific structural choices made (at the end of the detailed engineering phase) for drifts, disposal vaults and seals. The discussion on construction - deconstruction challenges for each of the critical issues cited above provides an opportunity to explain the operational sequences (and how the methodology selected enables to reduce the risks). The following part of the paper focuses the technological demonstration (an in-situ test to be planned in detail) of a partial dismantling of the concrete segments rings forming the support lining of two tunnels previously built in the Meuse/Haute-Marne URL (Underground Research Laboratory) infrastructures, combined with the construction of a specific drift crossing. In this dismantling and construction test, the technical demonstration objective is three-fold: - The capacity to lay down compressible arch segments and support (by bolts and mesh) the rock after the lining removal, - The capacity to excavate and line the drift crossing, - The structural / geomechanical behavior (evolution with time) of the rock and lining compared with that of 'neighboring' zones. This paper provides a timeline of the tests. Should the results obtained deliver some positive perspectives of technical feasibility (and convincing operational safety) Andra will incorporate this dismantling/construction solution in the 'design freeze' of the DGR underground infrastructures. The positive outcomes of this technical test campaign will also provide 'elements of proof' for the instruction of the Cigeo licensing (a process likely to take place between 2020 and 2024) by the French Nuclear Safety Authority (ASN). (authors)