Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “time service”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

Modeling Electric Vehicle Charging Station Siting Suitability with a Focus on Equity

As adoption of electric vehicles increases, the infrastructure to charge them must keep pace. Determining where to add new charging infrastructure is a complex process subject to many factors, including electrical service availability, vehicle dwell time, the type(s) of drivers and vehicles the stations will serve, traffic levels and timing, and land ownership. In addition, advancing social equity is a current priority of federal efforts to invest in electric vehicle charging infrastructure. Conducting Multi-criteria Decision Analysis (MCDA) within Argonne’s Energy Zones Mapping Tool (EZMT) is a useful method for analyzing many of the factors that influence how suitable a location is for potentially adding new charging infrastructure, and we show how equity metrics can be included in the analysis. However, data limitations impose challenges to using MCDA to evaluate and prioritize locations. We use three examples to demonstrate how to use publicly available data and MDCA to analyze different siting objectives. Each example starts with defining a specific objective and ends with how to use the results to identify specific potential locations that could be investigated further. This analysis demonstrates how interested stakeholders can use the EZMT to run the example MCDA models defined in this study, modify them to suit their needs, or create new MCDA models.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

HPC Analytics of Fused Thermal Plants Data to Optimize Operating Envelope

In this project, ORNL extensively reviewed the ORAP RAM data, and it guided us to develop machine learning models that can predict time to next failures and forecast failure trends, which will be useful for optimizing power plant operation strategies. More specifically, we trained multiple random forest models and evaluated the model accuracy to validate with 10+ years of historical data. In addition, we implemented a web-based graphical user interface system for the models to show how our models can be used in more intuitive ways. This proof of concept allowed exploration of model use with power plant operators in mind. Developed machine learning models will be helpful for managing risks, planning maintenance and operation, ultimately reducing the down time and increasing the service hours. For future work, there are several interesting research topics including but not limited to model enhancement, creating synergy with traditional failure modeling approaches, and data-driven actionable recommendation and suggestions.

20 FOSSIL-FUELED POWER PLANTS↗

ORNL Infrastructure: Status Update on BEA Research Reactor Cask Planning Activities Completed During FY 2025

This report documents Oak Ridge National Laboratory’s (ORNL’s) FY 2025 progress toward establishing readiness to use the Battelle Energy Alliance (BEA) Research Reactor (BRR) shipping cask in support of the Nuclear Science User Facilities (NSUF). The BRR cask will provide a new shared infrastructure capability for transporting irradiated fuels and materials between ORNL and Idaho National Laboratory (INL), thereby supporting NSUF’s mission of enabling user access to advanced nuclear research facilities. In FY 2025, ORNL advanced the regulatory, contractual, safety review, and planning activities necessary to qualify its facilities and staff for BRR cask handling. Although loaded shipments were delayed due to fabrication lead times for Orano Federal Services LLC’s internal basket hardware, the program progressed to the point where an empty cask dry run is scheduled for October 2025. This dry run represents a critical step in demonstrating ORNL’s ability to receive, handle, and return the BRR cask.

99 GENERAL AND MISCELLANEOUS↗

DMTN-093: Design of the LSST Alert Distribution System

We describe the proposed design and implementation of the LSST Alert Distribution System, which provides rapid dissemination of alerts to community alert brokers. At time of writing, this service is still under development; this “living document” describes current thinking, but is expected to evolve over the course of LSST construction.

79 ASTRONOMY AND ASTROPHYSICS↗

Manned Systems Utilization Analysis. Study 2.1: Space Servicing Pilot Program Study

Space servicing automated payloads was studied for potential cost benefits for future payload operations. Background information is provided on space servicing in general, and on a pilot flight test program in particular. An fight test is recommended to demonstrate space servicing. An overall program plan is provided which builds upon the pilot program through an interim servicing capability. A multipayload servicing concept for the time when the full capability tug becomes operational is presented. The space test program is specifically designed to provide low-cost booster vehicles and a flight test platform for several experiments on a single flight.

Wolfe, R. R.↗

An overview of aviation weather services

Safety of flight is the first concern of the aviation weather service, the economics of air transportation is a second major interest. Weather is a significant causal factor impacting on the efficiency of air transportation. A discussion is presented on the functions of various weather service agencies as they relate to one another in the dissemination of information to the pilot and to the air traffic controller. Improvements in the aviation weather service and weather knowledge are cited as future goals. The weather service at the present time is an efficient system but future aviation objectives dictate more improvements are needed (especially in automation technology) to enhance flight planning and for safe and efficient flight execution.

Connolly, J. W.↗

Summary report of the Weather Services Committee

Weather services to severe storms, turbulence, icing, visibility, and lightning are discussed. Each weather phenomenon area was explored in terms of needs, problems related to providing services, and availability of timely and appropriate information.

Spencer, L. J.↗

Comparison of polar motion results using lunar laser ranging

A comparison of polar motion results from three sources (Bureau International de l'Heure (BIH), Defense Mapping Agency Hydrographic/Topographic Center (DMAHTC-Doppler), the International Polar Motion Service (IPMS)) was performed using lunar laser ranging (LLR) data. The rms errors, both of the LLR data and of the determinations of polar motion by the three services, decreased in recent times. The BIH and Doppler polar motion are comparable in quality (12 + or - 6 cm for BIH values taken from August 1976 through May 1980, 14 + or - 7 cm for Doppler results taken from June 1977 through May 1980). The IPMS errors were substantially larger (33 + or - 7 cm for data taken from August 1976 through May 1980). All three analyses give 13 + or - 3 cm as an estimate for the combined LLR modeling, fitting, and instrumental error (noise) for the last four years.

Dickey, J. O.↗

Hitchhiker-G: A new carrier system for attached shuttle payloads

A new carrier system has been developed for economical and quick response flight of small attached payloads on the space shuttle. Hitchhiker-G can accommodate up to 750 lb. of customer payloads in canisters or mounted to an exposed plate. The carrier connects to the orbiter's electrical systems and provides up to six customers with standard electrical services including power, real time telemetry, and commands. A transparent data and command system concept is employed to allow the customer to easily use his own ground support equipment and personnel to control his payload during integration and flight operations. The first Hitchhiker-G was successfully flown in January 1986 on STS 61C.

Goldsmith, T. C.↗

Hitchhiker capabilities

A carrier system has been developed for economical and quick response flight of small attached payloads on the space shuttle. Hitchhiker can accommodate up to 750 lb of customer payloads in canisters or mounted to an exposed side-mount plate, or up to 1200 lb mounted on a cross-bay structure. The carrier connects to the orbiter's electrical systems and provides up to six customers with standard electrical services including power, real time telemetry and commands. A transparent data and command system concept is employed to allow the customer to easily use his own ground support equipment and personnel to control his payload during integration and flight operations. A general description of the Hitchhiker program and the Shuttle Payload of Opportunity Carrier (SPOC) is given and future enhancements are outlined.

Goldsmith, Theodore C.↗

EVA and telerobot interaction

We are about to enter into a new era - that of astronauts working hand in hand with telerobots in space. This has been done to some degree with astronauts and the Space Station Shuttle's Remote Manipulator Arm. However, for the Space Station Freedom, not only will astronauts be working with the RMS type system but also with smaller, more dexterous systems such as the Flight Telerobotic Servicer (FTS). Because EVA time is a premium resource, the most effective use of the astronauts and the telerobot will be required. There may be some tasks for which it is most efficient to have both the EVA astronaut and the telerobot working together. This type of close integration has not occurred before and brings up many issues. Most of these issues are related to technology: communication must be infallible, new control systems and devices may be required, enhanced telerobot safety systems may be necessary. IVA operations may also be affected by the combined EVA telerobot tasks. There is also the issue of how the EVA astronaut and the telerobot work on separate tasks but at the same time. For both situations, research and development of at least some new technology is required; enhanced communication both by voice and data, sophisticated collision detection systems, more responsive controls and displays. These new systems or system enhancements may require knowledge base systems for their operation. Some of the important issues, types of tasks, the FTS capabilities, the technology that is needed to address those issues, and the possible impact on Space Station Freedom are reviewed.

Willshire, Kelli F.↗

TLRS-3 system upgrades

This presentation describes the upgrades to the Transportable Laser Ranging Systems serial number three (TLRS-3), and the impact that these upgrades will have on the TLRS-3 performance in the field. The four major areas of system upgrades are the HP-380 computer, the Optical Attenuation Mechanism (OAM), the upgraded spatial, spectral and temporal filtering for improved daylight ranging capability, and the software upgrade to enable the system to track the Etalon satellites. The TLRS-3 was returned to the Goddard Geophysical and Astronomical Observatory (GGAO) in December 1991 for system upgrades in preparation of the TOPEX/POSEIDON campaign scheduled to begin in the summer of 1992. Many system upgrades were incorporated into the system while interleaving planned facility maintenance making TLRS-3 a more versatile and more dependable laser ranging system. The TLRS-3 was initially baselined with the MOBLAS-7 via simultaneous satellite ranging on the LAGEOS, Ajisai, Starlette, and ERS-I satellites. During the upgrades and following completion of the system upgrades intercomparisons with the MOBLAS-7 were made to verify the integrity and accuracy of the system changes. Several other groups of personnel participated in the TLRS-3 upgrade and they are: the Survey Section, the Precision Measurement Equipment Laboratory, the Architectural and Engineering Services Department, the Precision Timing Section, and the station personnel at TLRS-3 and MOBLAS-7.

Eichinger, Richard↗

Update on Douglas' high-speed civil transport studies

A summary is presented of high speed civil transport (HSCT) studies underway at Douglas Aircraft. A brief review is given of experience with design and development of advanced supersonic transport concepts and associated technology. A review is then presented of past NASA funded contract research studies focused on selection of appropriate concepts for high speed civil transport aircraft to be introduced in the year 2000 time frame for commercial service. Follow-on activities to those studies are then presented which were conducted under independent research studies as well as under further NASA funded efforts. Design Mach number selections and associated baseline design missions are then discussed along with forecasted passenger traffic and associated supersonic fleet sizes, and then proceeds into a discussion of individual issues related either to environmental acceptability or overall technology requirements in order to achieve the required economic viability of the program. A summary is given of current and future plans and activities.

Bunin, Bruce L.↗

Integrating O/S models during conceptual design, part 3

Space vehicles, such as the Space Shuttle, require intensive ground support prior to, during, and after each mission. Maintenance is a significant part of that ground support. All space vehicles require scheduled maintenance to ensure operability and performance. In addition, components of any vehicle are not one-hundred percent reliable so they exhibit random failures. Once detected, a failure initiates unscheduled maintenance on the vehicle. Maintenance decreases the number of missions which can be completed by keeping vehicles out of service so that the time between the completion of one mission and the start of the next is increased. Maintenance also requires resources such as people, facilities, tooling, and spare parts. Assessing the mission capability and resource requirements of any new space vehicle, in addition to performance specification, is necessary to predict the life cycle cost and success of the vehicle. Maintenance and logistics support has been modeled by computer simulation to estimate mission capability and resource requirements for evaluation of proposed space vehicles. The simulation was written with Simulation Language for Alternative Modeling II (SLAM II) for execution on a personal computer. For either one or a fleet of space vehicles, the model simulates the preflight maintenance checks, the mission and return to earth, and the post flight maintenance in preparation to be sent back into space. THe model enables prediction of the number of missions possible and vehicle turn-time (the time between completion of one mission and the start of the next) given estimated values for component reliability and maintainability. The model also facilitates study of the manpower and vehicle requirements for the proposed vehicle to meet its desired mission rate. This is the 3rd part of a 3 part technical report.

Ebeling, Charles E.↗

STS-70 Flight: Day 2

The second day of STS-70 Space Shuttle Discovery mission is contained on this video. The crew is shown onboard the Shuttle working on a variety of secondary experiments. These range from the Hercules camera, which imprints the latitude and longitude of areas photographed on Earth, to the WINDEX, which studies of the glow created as the Shuttle's surfaces interact with atomic oxygen in low Earth orbits. Also featured are astronauts Henricks, Kregel, and Weber answering questions from the general public via use of The New York Times On-Line Services.

Source record↗

Propagation issues in the Globalstar system

The purpose of the Globalstar system is to provide reliable, timely space based telecommunications services for fixed, handheld and mobile user telephones throughout the world. The system supports communication services for voice and data as well as low rate data services such as paging. The Globalstar system can also support user position determination. The purpose of this paper is to provide a brief introduction of the Globalstar system followed by a discussion of the propagation issues in the Globalstar system design.

Prescott, Toby↗

Management of fluorescent lamps in controlled environment chambers

Management of fluorescent lights is recommended to (1) maintain uniformity of light intensity over time and (2) permit reproducibility of lighting conditions during experimental replications. At the McGill Phytotron, the lighting intensity can be controlled to desired level because any individual pair of the 40 lamps in each chamber can be set to be 'on' at any particular time. A lamp canopy service history is maintained for each experiment permitting accurate replication of lighting conditions for subsequent replicate trials.

Romer, Mark↗

ACTS Multibeam Antenna On-Orbit Performance

The Advanced Communications Technology Satellite (ACTS) launched in September 1993 introduces several new technologies including a multibeam antenna (MBA) operating at Ka-band. The MBA with fixed and rapidly reconfigurable spot beams serves users equipped with small aperture terminals within the coverage area. The antenna produces spot beams with approximately 0.3 degrees beamwidth and gains of approximately 50 dBi. A number of MBA performance evaluations have been performed since the ACTS launch. These evaluations were designed to assess MBA performance (e.g., beam pointing stability, beam shape, gain, etc.) in the space environment. The on-orbit measurements found systematic environmental perturbation to the MBA beam pointing. These perturbations were found to be imposed by satellite attitude control system, antenna and spacecraft mechanical alignments, on-orbit thermal effects, etc. As a result, the footprint coverage of the MBA may not exactly cover the intended service area at all times. This report describes the space environment effects on the ACTS MBA performance as a function of time of the day and time of the year and compensation approaches for these effects.

Acosta, R.↗