Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “technical assessment”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

Assessment of task‐based performance from five clinical DBT systems using an anthropomorphic breast phantom

Purpose Digital breast tomosynthesis (DBT) is a limited‐angle tomographic breast imaging modality that can be used for breast cancer screening in conjunction with full‐field digital mammography (FFDM) or synthetic mammography (SM). Currently, there are five commercial DBT systems that have been approved by the U.S. FDA for breast cancer screening, all varying greatly in design and imaging protocol. Because the systems are different in technical specifications, there is a need for a quantitative approach for assessing them. In this study, the DBT systems are assessed using a novel methodology with an inkjet‐printed anthropomorphic phantom and four alternative forced choice (4AFC) study scheme. Method A breast phantom was fabricated using inkjet printing and parchment paper. The phantom contained 5‐mm spiculated masses fabricated with potassium iodide (KI)‐doped ink and microcalcifications (MCs) made with calcium hydroxyapatite. Images of the phantom were acquired on all five systems with DBT, FFDM, and SM modalities where available using beam settings under automatic exposure control. A 4AFC study was conducted to assess reader performance with each signal under each modality. Statistical analysis was performed on the data to determine proportion correct (PC), standard deviations, and levels of significance. Results For masses, overall detection was highest with DBT. The difference in PC was statistically significant between DBT and SM for most systems. A relationship was observed between increasing PC and greater gantry span. For MCs, performance was highest with DBT and FFDM compared to SM. The difference between PC of DBT and PC of SM was statistically significant for all manufacturers. Conclusions This methodology represents a novel approach for evaluating systems. This study is the first of its kind to use an inkjet‐printed anthropomorphic phantom with realistic signals to assess performance of clinical DBT imaging systems.

Ikejimba, Lynda C.↗

Roadmap for Assessing Fuel Reprocessing in Fluoride-Based Salts

This joint report assesses the pyroprocessing of used nuclear fuel from molten fluoride salts being conducted between Idaho National Laboratory and Argonne National Laboratory. The goal of this report is to identify the research and development gaps needed to reduce the technical risks of extending pyroprocessing technologies and unit operations to molten fluoride salts used in molten salt reactors (MSRs). Assessing and performing the tasks outlined in this report will help mitigate the technical risks and design appropriate flowsheets for reprocessing fuel and coolant salts. These suggested tasks will provide necessary data to implement the development of unit operations. Sections are highlighted to identify processes that need to be assessed and unit operations that may be used in fluoride-based chemistries. Research and development needs are listed and discussed including re-fluorination methods, electrowinning for separations, reference electrode development, materials compatibility, salt purification/re-fluorination, and waste disposition. This report will examine the technical challenges associated with pyroprocessing in molten fluoride-based salt and outline approaches to increase the technical readiness level of pyroprocessing in molten fluoride salts.

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Hot Springs and Geysers: Exploring Historical and Modern Impacts of Geothermal Energy Production on Associated Natural Surface Systems and Standardizing Management Practices

Surface thermal features, most notably hot springs and geysers are increasingly being recognized for their importance to ecosystems, indigenous cultures, and in some cases agriculture, recreation, and tourism. Geothermal project development poses a potential risk to these natural features but current regulatory requirements for assessing and managing these risks during exploration, permitting and monitoring are somewhat inconsistent and unpredictable across different geothermal fields. This has resulted in uncertainty and increases in exploration risk for geothermal energy developers that have led to costly project delays, cancellations, or hesitation to commit. Varying regulatory requirements may also influence public perception, fostering confusion, distrust and ultimately opposition to geothermal projects, further contributing to project delays or cancellations. At a time when there is an increasing urgency for reliable baseload clean energy, geothermal is a net-zero, renewable solution that additionally provides access to more equitable and environmentally just clean power. Continued integration of geothermal energy into the national energy roadmap can be facilitated through consistent and predictable permitting, providing regulators the framework they need, developers a clear path forward, and transparency that the public deserves. This project, currently in its beginning phases, seeks to address this important issue by providing a technical basis from which to build a preliminary protocol for assessing and managing potential impacts from new or existing geothermal energy projects to surface thermal features and their associated ecosystems. Development of this preliminary protocol will be informed by (1) a literature review of well-documented case studies in the western U.S. and New Zealand to understand the range of conditions that exemplify geothermal-surface thermal systems; (2) development of generic illustrative conceptual-numerical models to quantify, understand, and predict the first-order controls (e.g., pressure and permeability) on surface flows; and (3) additional independent and scientifically rigorous evaluations of geothermal-surface thermal system case studies from the Basin and Range Province that incorporate publicly available data as well as data provided by industry through data-sharing agreements. Learning from the successes of the process used to develop the Induced Seismicity Management Protocol (ISMP), we ultimately aim to use these initial efforts as a springboard for establishing a surface thermal feature management working group that will work collaboratively to finalize the protocol as well as co-create recommended best practices for implementation. We envision that the working group will primarily be composed of representatives from regulatory entities, government agencies, Tribes, academia, national laboratories, and industry, and will include early and regular engagement with community organizations and environmental groups. This will help ensure broad acceptance and implementation of the protocol, which will facilitate a more consistent, predictable, and standardized regulatory process, and help to ensure that geothermal energy continues to provide a reliable source of clean energy, and a pathway to achieving greater energy equity in the U.S.

Best Practices↗

Application of Electrochemical Methods to Molten Salt Reactors: Draft TLR Documenting Assessment of Electrochemical Monitoring

Nuclear Regulatory Commission (NRC) is developing the regulatory framework and technical expertise to support regulatory review of advanced non-water reactors, including molten salt reactors (MSRs). In an MSR, it is essential that the salt chemistry be maintained in a desired range in terms of redox potential for reliable operation and mitigation of corrosion to structural materials in the reactor, particularly the reactor vessel and heater exchanger. Measuring the redox potential of the salt in the reactor would also allow for the material lifetimes to be predicted more accurately, and chemical issues to be diagnosed more quickly. In addition to the chemical composition analysis by ICP-MS, electrochemical methods including potentiometry and linear wave scanning (LSC) were also used in molten salt reactor experiment (MSRE) for redox potential monitoring purposes. Electrochemcial methods offers unique advantages such as quick turnaround in results and unique capability of in-line monitoring of redox potential, and are considered popular electroanalytical techniques that can be used to monitor redox potentials and salt chemistry including impurities. The last two decades have seen significant advances in science and engineering of electrochemical methods for potential application to molten salts. The primary goal of this report is to assist NRC in understanding the monitoring of the salt chemistry by electrochemical methods and provide NRC reviewers with necessary information and tools to support regulatory review of MSR designs. This reports consists of two majors parts—Part 1, chemical potential of molten salts and effects by fission process in MSR; Part 2, assessment of electrochemical methods for application to MSRs. The TRLs of the typical relevant electrochemical methods for molten salts were evaluated based on the DOE TRL guidelines and upon a review of the current status of the electrochemical methods for two typical salt systems, fluoride and chloride, for MSRs.

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Application of quantitative risk assessment to address stakeholder questions in geologic carbon storage

Ambitious international greenhouse gas emissions reduction targets demand a rapid transformation to a low-carbon economy. This transformation includes the accelerated adoption of carbon dioxide (CO2) capture and storage (CCS) technology. However, as with any large-scale engineering enterprise, the widespread commercial-scale deployment of geologic carbon storage (GCS) raises important questions about technology and cost-effectiveness, safety, environmental risk, and long-term liability. Effectively assessing and managing risks and liability associated with GCS projects is a key technical need throughout the project life cycle-from site selection and permitting to monitoring design, operational risk management, and post-operational site closure. This presentation highlights recent advancements in tools for quantitative risk assessment, being developed by the National Risk Assessment Partnership (NRAP). NRAP is a multi-year, multinational laboratory research collaboration sponsored by the U.S. Department of Energy's Office of Fossil Energy and Carbon Management. Our focus will be on these tools' applications in addressing critical stakeholder questions related to supporting permitting to ensure secure and environmentally protective storage; designing effective and efficient monitoring plans; evaluating the effectiveness of remedial actions and risk management alternatives; and informing liability assessment and investment decisions. This paper will detail the key functionality of NRAP’s Open-Source Integrated Assessment Model (NRAP-Open-IAM), a computational framework for assessing leakage risk and containment assurance. This model features streamlined workflows for calculating leakage risk profiles, delineating risk-based area of review, and assessing contingency plans and post-injection site care requirements. ORION is an open-source, observation-based ensemble forecasting toolkit to help operators assess the seismic hazard at a carbon storage site. The State of Stress Analysis Tool (SOSAT), designed to assess subsurface stress conditions and evaluate geomechanical risk resulting from CO2 injection in an area of interest will also be presented. We will also introduce a prototype model to evaluate storage project costs and liability associated with risk management. The Technoeconomic and Liability Evaluation for Storage (TALES) model uses results from forecasts of leakage and induced seismicity risk to estimate the lifecycle cost of managing risk. Finally, a preliminary example of how the NRAP Risk-based Adaptive Monitoring Plan (RAMP) tool can be used to design efficient and effective site monitoring plans and estimate the detectability of fluid leakage will be provided. The relevance of these tools for addressing key stakeholder questions amidst uncertainty will be emphasized.

decision support↗

Independent Review of Groundwater Remediation Strategy for Hexavalent Chromium and RDX Groundwater Plumes at Los Alamos National Laboratory (Rev. 1)

Site operations at the Los Alamos National Laboratory (LANL) resulted in the release of oxidized chromium, Cr(VI), into Sandia Canyon from cooling tower effluent from 1956 until 1972. The chromium traveled with the surface water approximately 3 miles downstream before migrating below ground surface. Chromium concentrations exceed 50 μg/L in the upper portion of the aquifer. Another LANL groundwater plume of concern is associated with RDX (Royal Demolition Explosives, 1,3,5-trinitro-1,3,5-triazine). Between 1951 and 1996, RDX was released to the mesa-top facilities' process water outfall, adjacent and underlying soils, and alluvial sediments, along with surface water in Cañon de Valle. Between 2000 and 2010, two remedial actions were deployed, removing much of the near-surface RDX, however, recharge due to precipitation has transported RDX into the perched-intermediate zone and into the regional aquifer. The report documents an independent technical review by scientists from the Department of Energy (DOE) Network of National Laboratories for Environmental Management and Stewardship (NNLEMS) to provide recommendations for potential near term actions to address and optimize remediation for both the Cr(VI) and RDX plumes. The proposed near-term remedial actions include design of pump and treat systems for Cr(VI) and monitoring and study for natural attenuation for RDX. The review assesses existing data, conceptual and numerical modeling, and it recommends a technical integration process to support identifying and implementing strategic, effective and efficient remedies. The DOE Environmental Management Los Alamos Field Office (EM-LA) and their cleanup contractor Newport News Nuclear-BWTX, LLC Los Alamos (N3B) provided the information required for the review. Interviews were also conducted with regulators to obtain the full spectrum of technical, regulatory and scientific perspectives. The independent review team was impressed by the capabilities, experiences, innovativeness, and insightfulness of the technical representatives from both the regulator, the New Mexico Environment Department (NMED) and N3B. Incorporation of vadose zone flow pathways in the conceptual site model (CSM) and configuring the numerical modeling for the site was generally state-of-the-practice (or better). This could be considered state-of-the-art by addressing uncertainties related to spatial extent of hydraulic windows. The reviews from the regulators were thorough and often provided useful concepts for consideration and future/study resolutions. The overarching consensus recommendation of independent review team is that the LANL groundwater plumes should be addressed in context of the emerging "management of complex sites" paradigm.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Connective Actions for Educational Institutions and Wind Industry Firms [Slides]

As a part of the National Wind Workforce Assessment, four presentations have been created in conjunction with the technical report to provide more insight into key findings. The four presentations are catered towards specific stakeholder groups that include: educators, wind industry firms, students, and current wind industry employees. This presentation is intended for use by wind industry firms and educational institutions looking to gain insight into key levers and actionable steps that can be taken to help narrow the wind workforce gap. Data and guidance on how wind industry firms and education institutions can collaborate to 1) grow the number of graduates applying into wind occupational roles through increasing awareness of opportunities in the industry and 2) increase the quality of applicants applying into wind through relevant experience gaining opportunities like internships and apprenticeships is included in the presentation.

17 WIND ENERGY↗

National Wind Workforce Assessment: Current Workers to Industry [Slides]

As a part of the National Wind Workforce Assessment, four presentations have been created in conjunction with the technical report to provide more insight into key findings. The four presentations are catered towards specific stakeholder groups that include: educators, wind industry firms, students, and current wind industry employees. This presentation is intended for us by wind industry employers and current workers, including recent graduates in work, looking to gain insight into key levers that can contribute to the narrowing or widening of the wind workforce gap. The discussion around how the wind workforce gap is brought up as it relates to current workers and recent graduates and barriers to employment for wind energy firms. It breaks down the discussion by discussing about wind industry perceptions by current workers and wind energy firms, hiring challenges by wind energy firms as well as consideration by prospective workers on the wind industry, and then lastly discusses automation and its contribution to narrowing the wind workforce gap.

17 WIND ENERGY↗

Electric Vehicle Supply Equipment (EVSE) Site Assessment Report for the U.S. Army Corps of Engineers Chena Site Near Fairbanks, Alaska

This report presents an analysis of the requirements for charging station installation and electric vehicle operation at the US Army Corps of Engineers - Chena Site, located in a cold weather climate in the Fairbanks North Star Borough, AK. The report includes findings from a site visit, and a detailed electric vehicle (EV) charging site plan with cost estimates. Cost for three 50-ampere pedestal chargers located on the edge of the existing parking lot is estimated at $\$$53,100, and the cost of three 80-ampere chargers is estimated at $\$$89,400. The authors did not assess the cost of a heated garage. The USACE Chena site reaches extreme cold temperatures of -40 Degrees Celsius (-40 Degrees Fahrenheit) and below in a typical winter, often for days on end. Considerations of operating EVs as well as electrical vehicle supply equipment (EVSE) at this site can be applicable to other cold or extremely cold locations. Interviews with EV users in cold climates and a literature review indicated that EVs operate well but have significantly decreased range compared to 21 Degrees Celsius (70 Degrees Fahrenheit) operations. Some strategies such as prewarming the vehicle while it is plugged in and using heated seats and steering wheel instead of cabin heat, can improve cold weather performance. Storing the EV in a garage would mean the battery and cabin are automatically preheated, the battery would not age as rapidly as when the vehicle is stored outside, and problems with charging the vehicle are less likely. Lowest temperate-rated Electric Vehicle Supply Equipment (EVSE), as electric vehicle chargers are known as, are rated to -40 Degrees Celsius (-40 Degrees Fahrenheit), and sometimes malfunction. No EVSE is rated to the temperatures that USACE Chena site experienced for more than a week in winter 2023-4, of -50 Degrees Celsius (-45 Degrees Fahrenheit) and which are typical for the area. If reliability is a must, entities may want to consider a heated garage to minimize potential problems with charging equipment. There is a companion technical report to this titled "Electric Vehicle and Charging Infrastructure Assessment in Cold-Weather Climates: A Case Study of Fairbanks, Alaska" that examines the data on EV and EVSE cold-weather functionality in more detail. (Esparza, Truffer Moudra, and Hodge 2024).

33 ADVANCED PROPULSION SYSTEMS↗

Advanced Laboratory and Field Arrays (ALFA)/Lab Collaboration Project (LCP) for Marine Energy (Final Scientific/Technical Report)

The objective of the Advanced Laboratory and Field Arrays (ALFA) project was to reduce the Levelized Cost of Energy (LCOE) of Marine and Hydrokinetic (MHK) energy by leveraging research, development, and testing capabilities at Oregon State University, University of Washington, and the University of Alaska, Fairbanks. ALFA is a project within the Pacific Marine Energy Center (PMEC; formerly NNMREC), a multi-institution entity with a diverse funding base that focuses on research and development for marine renewables. The ALFA project aimed to accelerate the development of next-generation arrays of wave energy conversion (WEC) and tidal energy conversion (TEC) devices through a suite of field-focused R&D activities spanning a broad range of strategic opportunity areas identified in the Funding Opportunity Announcement: • Device and/or array operation and maintenance (O&M) logistics development; • High-fidelity resource characterization and/or modeling technique development and validation; • Array-specific component technology development (e.g. moorings and foundations, transmission, and other offshore grid components); • Array performance testing and evaluation; and • Novel cost-effective environmental monitoring techniques and instrumentation testing and evaluation. The objective of the Lab Collaboration Project (LCP) was to accelerate the development of next-generation marine energy conversion systems. The LCP aimed to achieve these project objectives in collaboration with the national laboratories by: • Developing concept generation and assessment tools; • Improving access to existing testing resources; • Validating collision risk models between fish and turbines; and • Advancing analysis and simulation capabilities for wave-WEC interactions and PTO analysis in nonlinear ocean waves. The ALFA portion of the project was comprised of six overarching technical tasks: • Task 1: Debris Modeling, Detection and Mitigation; • Task 2: Autonomous Monitoring & Intervention; • Task 3: Resource Characterization for Extreme Conditions; • Task 4: Robust Models for Design of Offshore Anchoring and Mooring Systems; • Task 5: Performance Enhancement for Marine Energy Converter (MEC) Arrays; and • Task 6: Evaluating Sampling Techniques for MHK Biological Monitoring. The LCP was divided into four overarching technical tasks: • Task 7: Project Management and Reporting • Task 8: Novel Design and Assessment Methodologies for Wave Energy Converter Design (Wave- SPARC) • Task 9: Testing Access for Commercial Marine Renewable Energy Technology Developers • Task 10: Quantifying Collision Risk for Fish and Turbines • Task 11: Nonlinear Ocean Waves and PTO Control Strategy Each ALFA/LCP task listed above functioned as a separate and discreet project. A final Technical Report was written for each individual task and these reports were uploaded to OSTI, after receiving DOE approval. The following document is a compilation of each of these final, approved reports arranged as individual chapters.

13 HYDRO ENERGY↗

National Wind Workforce Assessment: Educators to Students [Slides]

As a part of the National Wind Workforce Assessment, four presentations have been created in conjunction with the technical report to provide more insight into key findings. The four presentations are catered towards specific stakeholder groups that include: educators, wind industry firms, students, and current wind industry employees. This presentation is intended for use by educators and students looking to gain insight into key levers that can influence hiring difficulty and actionable steps that can be taken to help narrow the workforce gap. The report includes the current student perception of the wind industry, current hiring difficulties faced by wind energy firms, and current hiring difficulties faced by the potential workforce. The hiring difficulties for wind industry employers are divided by entry level employees and non-entry-level employees and by cross sections such as firm size, location, value chain segment, and wind industry sector. Hiring challenges faced by students trying to enter the wind industry are divided by 2-year degree and certification programs, 4-year degree programs, and current wind employees.

17 WIND ENERGY↗

National Wind Workforce Assessment: Industry to Students [Slides]

As a part of the National Wind Workforce Assessment, four presentations have been created in conjunction with the technical report to provide more insight into key findings. The four presentations are catered towards specific stakeholder groups that include: educators, wind industry firms, students, and current wind industry employees. This presentation is intended for use by wind industry employers looking to gain insight into key levers that can influence hiring difficulty and actionable steps that can be taken to help narrow the workforce gap. The report includes the current perception of the wind industry by the potential workforce, current hiring difficulties faced by wind energy firms, and current hiring difficulties faced by the potential workforce. The hiring difficulties for wind industry employers are divided by entry level employees and non-entry-level employees and by cross sections such as firm size, location, value chain segment, and wind industry sector. Hiring challenges faced by students trying to enter the wind industry are divided by 2-year degree and certification programs, 4-year degree programs, and current wind employees.

17 WIND ENERGY↗

Pumped Storage Hydropower Resource and Deployment Potential

There is growing interest in deploying new pumped storage hydropower (PSH) to meet grid needs for flexibility, reliability, and resiliency. This presentation describes how NLR resource assessment, cost modeling, and capacity expansion modeling are used to identify technical and economic PSH deployment potential and support industry decision-making on PSH investments. NLR's open data and tools demonstrate the vast technical potential of PSH on the order of 80 TW, and modeling shows economic PSH deployment under an attractive cost-value proposition.

13 HYDRO ENERGY↗

Renewable Portfolio Standard Assessment for Alaska's Railbelt

This memorandum for the Governor of Alaska evaluates the technical feasibility of reaching 80% renewable electricity by 2040 in the Railbelt corridor of Alaska, which represents 75% of Alaska's electric load. This analysis was developed to inform renewable energy portfolio standard (RPS) legislation.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

SCORE (Synthesis of COnsists as Rolling Energy microgrids) (Final Technical Report)

The SCORE toolset is an open source, web-based application to assess the impact of new powering technologies on railroad performance, specifically technologies capable of both putting power into the rail (motive force) and taking power from the rail (regeneration). SCORE’s primary goal is generate trade studies to analyze different powering and train make-up options to minimize energy usage and greenhouse gas generation. At the core of generating these trade spaces is calculating the optimal powering policy for the train given the makeup of the train, the route, and time constraints. This paper presents details on the algorithms used in SCORE to compute this powering policies that is fast and accurate, discusses its implementation in an Energy-Longitudinal Train Dynamics (E-LTD) model, compares it to naïve approaches, and demonstrates its use across a variety of train/route pairs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Review and Assessment of NGNP PIRTs for TRISO and HTGR Technologies

The main objective of this technical report is to ensure that research and development (R&D) needs are identified to address the significant (highly ranked) technical challenges related to TRISO-coated particle fuel, high-temperature gas-reactor (HTGR) technologies, and other TRISO-related advanced designs by recognizing the existing foundation of identified R&D needs and augmenting that foundation with insights drawn from current TRISO-related research results and R&D needs related to novel applications of TRISO-related technologies that extend beyond the traditional HTGR designs.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Life-cycle costing assessment of back contact doping and encapsulation alternatives for increasing the life expectancy of CdTe PV modules (Final Report)

Contribution of Research to the State-of-Knowledge This research produced comparative sustainability evaluations of back contact doping and encapsulation alternatives considered by First Solar for decreasing degradation and increasing the life of the cadmium telluride (CdTe) photovoltaic (PV) modules. Technical Effectiveness and Economic Feasibility of Methods Investigated A holistic life-cycle-assessment of the alternatives considered for longer module operational lives, showed that they add between 0.2% and 2% to environmental impact indicators at the cradle-to-gate module level, but at the cradle-to-grave system level, alternative materials offer only benefits (i.e., environmental impact indicator decreases) to the public and the environment. Parallel experimental studies at First Solar showed that the use of the considered alternative materials did not impact the effectiveness of the current module recycling separations and material recovery processes. Furthermore, the increment on the module manufacturing cost due to using alternative materials was estimated to be negligible (i.e., >1%) and longer module lives more than compensate cost increases. Specifically, increase of the current warranted module life of 30 years to 50 years, would decrease the levelized cost of electricity (LCOE) from $40/MWh to $24/MWh for utility-scale installations in the US-SW, the economic feasibility of the considered alternatives is assured. Benefit to the Public With decreasing degradation from the current ~0.3%/year of Series 6 modules to less than 0.2%/year, the public will be benefited by longer photovoltaic operational lives, and therefore. In addition, the requirement for end-of-life management is shifted from 30 years to 40 or 50 years, with profound benefits to the public and the environment.

14 SOLAR ENERGY↗

Corral Summit Pumped Storage Hydropower Hybrid: Site Suitability Assessment

In 2024, Idaho National Laboratory (INL) and Pacific Northwest National Laboratory (PNNL) initiated a technical-assistance project to support Cat Creek Energy, LLC, (CCE) in evaluating site suitability for the proposed Corral Summit Pumped Storage Hydropower (PSH) project in south-central Idaho near Mackay Reservoir. The Corral Summit facility incorporates battery storage and photovoltaic (PV) solar arrays in a Trybrid configuration to deliver large-volume long-duration (LVLD) storage solutions for rural electric cooperatives in eastern Idaho. The evaluation process focused on determining the most-suitable location for the upper reservoir of the PSH system, guided by a comprehensive assessment framework spanning multiple categories, including physical characteristics, environmental constraints, building infrastructure, regulatory constraints, cultural resources and sensitivity, social factors, and power market and grid integration. Each site was analyzed based on a ranking scale (0–1), which scores ranging from “severely disfavored” to “highly favored,” allowing detailed comparisons of site-specific conditions. Categories such as hydraulic head, utilities corridor, land ownership, and transmission-grid limitations emerged as key contributors to the overall assessment. Site 2 (Idaho Trust) demonstrated a slight advantage over Site 1 (Bureau of Land Management) primarily due to favorable outcomes in regulatory constraints, building infrastructure, and power-market integration. However, Site 1 outperformed Site 2 in factors related to physical characteristics and social factors. The report emphasizes the need for further evaluation of both sites before clear determination of which site is preferred, due to the limited information available on either site at the time of this report. Key areas of evaluation to clearly define the preferred site are ecological impacts, cultural-resource surveys, and economic-feasibility assessments. For successful project execution, recommended follow-up actions include seismic and geotechnical surveys, groundwater and habitat monitoring, regulatory reviews of water rights and right-of-way agreements, cultural engagement with local tribal governments, and enhanced stakeholder strategies. These efforts will ensure the Corral Summit Trybrid facility meets local energy needs while balancing environmental, social, and regulatory responsibilities.

13 - HYDRO ENERGY↗