Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “tasking”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

Summary document of tasks performed on the Shuttle-C/NLS contract

During FY92, USBI performed many programmatic related tasks. These programmatic tasks have been categorized as follows: (1) acquisition; (2) project engineering/program planning; and (3) cost. The reports associated with these tasks follow in paragraphs 1.1.1 through 1.3.3. Proceeding each task report is a brief description of the contents contained within.

Source record↗

On-orbit assembly/servicing task definition study

The OEXP vehicles being envisioned to carry out the Presidential space goals of a lunar outpost and human exploration of Mars will require on-orbit assembly, refurbishment, checkout, and launch. The On-orbit Assembly/Servicing Task Definition Study applies the space vehicle processing experience and procedures archives resident at NASA's Kennedy Space Center (KSC) to determine the task flows, and resources/facilities necessary to process the OEXP vehicles at Space Station Freedom (SSF). This data base is examined to find the closest analogies to OEXP vehicle components and assembly/refurbishment tasks. Transition tables are generated to provide traceability from KSC hardware processing experience to analogous on-orbit processing of the OEXP vehicles. Iterations in which the task flows are broken down into realistic extravehicular activity (EVA) primitive subtasks and times, and to apply automation and robotic technology to reduce crew risks and minimize EVA time, will enhance the value and accuracy of the predicted flows. These processing scenarios and the resulting resource/facility requirements are used to determine impacts of SSF, resulting in change requests to SSF requirements for provision of 'hooks and scars' to evolve the assembly complete Space Station into a transportation node. Study results to date include assembly analysis of the Martin Marietta Phobos Gateway Vehicle, refurbishment analysis of the Martin Marietta Lunar Evolution Piloted and Cargo Vehicles, and assembly analysis of the Boeing Mars Evolution Vehicle. The results of this study will be accumulated into the vehicle processing operations data base for subsequent modeling, life cycle cost, vehicle growth, and SSF impact analysis.

Vargo, Rick↗

Strength capabilities and load requirements while performing torquing tasks in zero gravity

A generic examination of the loads produced by individuals performing maximal efforts with a torquing tool in zero gravity, to determine operator strength when performing torquing tasks; quantify the loads placed on foot restraints while performing these tasks; and examine effects of orientation and direction of tool rotation on strength effectiveness was conducted. The experiment was conducted aboard NASA's KC-135 reduced-gravity aircraft, using two force plates attached to a test stand, one with a foot restraint. Subjects used a wrench to apply maximum torques to various fittings, in different positions, in clockwise and counterclockwise directions. It was seen that these subjects could produce approximately 400 to 750 N of force, depending on the orientation of the tool and the direction of effort. The most force could be produced when pushing the tool upwards. A force effectiveness ratio (FER) defined as an indication of how much of the subjects' total effort actually went into performing the desired task. Values of FER ranged from 0.55 to 0.90, with the greatest FER occurring with UP and DOWN efforts, and the lowest with AWAY and LEFT efforts. Designers can use these results to set specifications for craft structures; tools can be developed based on the known strength of the tool users; and tasks can be developed to not exceed the crewmembers' capabilities.

Poliner, Jeffrey↗

Automated system function allocation and display format: Task information processing requirements

An important consideration when designing the interface to an intelligent system concerns function allocation between the system and the user. The display of information could be held constant, or 'fixed', leaving the user with the task of searching through all of the available information, integrating it, and classifying the data into a known system state. On the other hand, the system, based on its own intelligent diagnosis, could display only relevant information in order to reduce the user's search set. The user would still be left the task of perceiving and integrating the data and classifying it into the appropriate system state. Finally, the system could display the patterns of data. In this scenario, the task of integrating the data is carried out by the system, and the user's information processing load is reduced, leaving only the tasks of perception and classification of the patterns of data. Humans are especially adept at this form of display processing. Although others have examined the relative effectiveness of alphanumeric and graphical display formats, it is interesting to reexamine this issue together with the function allocation problem. Currently, Johnson Space Center is the test site for an intelligent Thermal Control System (TCS), TEXSYS, being tested for use with Space Station Freedom. Expert TCS engineers, as well as novices, were asked to classify several displays of TEXSYS data into various system states (including nominal and anomalous states). Three different display formats were used: fixed, subset, and graphical. The hypothesis tested was that the graphical displays would provide for fewer errors and faster classification times by both experts and novices, regardless of the kind of system state represented within the display. The subset displays were hypothesized to be the second most effective display format/function allocation condition, based on the fact that the search set is reduced in these displays. Both the subset and the graphic display conditions were hypothesized to be processed more efficiently than the fixed display conditions.

Czerwinski, Mary P.↗

Microgravity Science and Applications. Program Tasks and Bibliography for FY 1993

An annual report published by the Microgravity Science and Applications Division (MSAD) of NASA is presented. It represents a compilation of the Division's currently-funded ground, flight and Advanced Technology Development tasks. An overview and progress report for these tasks, including progress reports by principal investigators selected from the academic, industry and government communities, are provided. The document includes a listing of new bibliographic data provided by the principal investigators to reflect the dissemination of research data during FY 1993 via publications and presentations. The document also includes division research metrics and an index of the funded investigators. The document contains three sections and three appendices: Section 1 includes an introduction and metrics data, Section 2 is a compilation of the task reports in an order representative of its ground, flight or ATD status and the science discipline it represents, and Section 3 is the bibliography. The three appendices, in the order of presentation, are: Appendix A - a microgravity science acronym list, Appendix B - a list of guest investigators associated with a biotechnology task, and Appendix C - an index of the currently funded principal investigators.

Source record↗

Ordering design tasks based on coupling strengths

The design process associated with large engineering systems requires an initial decomposition of the complex system into modules of design tasks which are coupled through the transference of output data. In analyzing or optimizing such a coupled system, it is essential to be able to determine which interactions figure prominently enough to significantly affect the accuracy of the system solution. Many decomposition approaches assume the capability is available to determine what design tasks and interactions exist and what order of execution will be imposed during the analysis process. Unfortunately, this is often a complex problem and beyond the capabilities of a human design manager. A new feature for DeMAID (Design Manager's Aid for Intelligent Decomposition) will allow the design manager to use coupling strength information to find a proper sequence for ordering the design tasks. In addition, these coupling strengths aid in deciding if certain tasks or couplings could be removed (or temporarily suspended) from consideration to achieve computational savings without a significant loss of system accuracy. New rules are presented and two small test cases are used to show the effects of using coupling strengths in this manner.

Rogers, James L., Jr.↗

Test Plans. Lightweight Durable TPS: Tasks 1,2,4,5, and 6

The objective of this task is to develop the fluted core flexible blankets, also referred to as the Tailorable Advanced Blanket Insulation (TABI), to a technology readiness level (TRL) of 6. This task is one of the six tasks under TA 3, Lightweight Durable TPS study, of the Single Stage to Orbit (SSTO) program. The purpose of this task is to develop a durable and low maintenance flexible TPS blanket material to be implemented on the SSTO vehicle.

Greenberg, H. S.↗

Real-time design with peer tasks

We introduce a real-time design methodology for large scale, distributed, parallel architecture, real-time systems (LDPARTS), as an alternative to those methods using rate or dead-line monotonic analysis. In our method the fundamental units of prioritization, work items, are domain specific objects with timing requirements (deadlines) found in user's specification. A work item consists of a collection of tasks of equal priority. Current scheduling theories are applied with artifact deadlines introduced by the designer whereas our method schedules work items to meet user's specification deadlines (sometimes called end-to-end deadlines). Our method supports these scheduling properties. Work item scheduling is based on domain specific importance instead of task level urgency and still meets as many user specification deadlines as can be met by scheduling tasks with respect to urgency. Second, the minimum (closest) on-line deadline that can be guaranteed for a work item of highest importance, scheduled at run time, is approximately the inverse of the throughput, measured in work items per second. Third, throughput is not degraded during overload and instead of resorting to task shedding during overload, the designer can specify which work items to shed. We prove these properties in a mathematical model.

Goforth, Andre↗

Comparison Of Human Modelling Tools For Efficiency Of Prediction Of EVA Tasks

Construction of the International Space Station (ISS) will require extensive extravehicular activity (EVA, spacewalks), and estimates of the actual time needed continue to rise. As recently as September, 1996, the amount of time to be spent in EVA was believed to be about 400 hours, excluding spacewalks on the Russian segment. This estimate has recently risen to over 1100 hours, and it could go higher before assembly begins in the summer of 1998. These activities are extremely expensive and hazardous, so any design tools which help assure mission success and improve the efficiency of the astronaut in task completion can pay off in reduced design and EVA costs and increased astronaut safety. The tasks which astronauts can accomplish in EVA are limited by spacesuit mobility. They are therefore relatively simple, from an ergonomic standpoint, requiring gross movements rather than time motor skills. The actual tasks include driving bolts, mating and demating electric and fluid connectors, and actuating levers; the important characteristics to be considered in design improvement include the ability of the astronaut to see and reach the item to be manipulated and the clearance required to accomplish the manipulation. This makes the tasks amenable to simulation in a Computer-Assisted Design (CAD) environment. For EVA, the spacesuited astronaut must have his or her feet attached on a work platform called a foot restraint to obtain a purchase against which work forces may be actuated. An important component of the design is therefore the proper placement of foot restraints.

Dischinger, H. Charles, Jr.↗

Evaluation of a Human Modeling Software Tool in the Prediction of Extra Vehicular Activity Tasks for an International Space Station Assembly Mission

The difficulty of accomplishing work in extravehicular activity (EVA) is well documented. It arises as a result of motion constraints imposed by a pressurized spacesuit in a near-vacuum and of the frictionless environment induced in microgravity. The appropriate placement of foot restraints is crucial to ensuring that astronauts can remove and drive bolts, mate and demate connectors, and actuate levers. The location on structural members of the foot restraint sockets, to which the portable foot restraint is attached, must provide for an orientation of the restraint that affords the astronaut adequate visual and reach envelopes. Previously, the initial location of these sockets was dependent upon the experienced designer's ability to estimate placement. The design was tested in a simulated zero-gravity environment; spacesuited astronauts performed the tasks with mockups while submerged in water. Crew evaluation of the tasks based on these designs often indicated the bolt or other structure to which force needed to be applied was not within an acceptable work envelope, resulting in redesign. The development of improved methods for location of crew aids prior to testing would result in savings to the design effort for EVA hardware. Such an effort to streamline EVA design is especially relevant to International Space Station construction and maintenance. Assembly operations alone are expected to require in excess of four hundred hours of EVA. Thus, techniques which conserve design resources for assembly missions can have significant impact. We describe an effort to implement a human modelling application in the design effort for an International Space Station Assembly Mission. On Assembly Flight 6A, the Canadian-built Space Station Remote Manipulator System will be delivered to the U.S. Laboratory. It will be released from its launch restraints by astronauts in EVA. The design of the placement of foot restraint sockets was carried out using the human model Jack, and the modelling results were compared with actual underwater test results. The predicted locations of the sockets was found to be acceptable for 94% of the tasks attempted by the astronauts, This effort provides confidence in the capabilities of this package to accurately model tasks. It therefore increases assurance that the tool maybe used early in the design process.

Dischinger, H. Charles↗

Report by the International Space Station (ISS) Management and Cost Evaluation (IMCE) Task Force

The International Space Station (ISS) Management and Cost Evaluation Task Force (IMCE) was chartered to conduct an independent external review and assessment of the ISS cost, budget, and management. In addition, the Task Force was asked to provide recommendations that could provide maximum benefit to the U.S. taxpayers and the International Partners within the President's budget request. The Task Force has made the following principal findings: (1) The ISS Program's technical achievements to date, as represented by on-orbit capability, are extraordinary; (2) The Existing ISS Program Plan for executing the FY 02-06 budget is not credible; (3) The existing deficiencies in management structure, institutional culture, cost estimating, and program control must be acknowledged and corrected for the Program to move forward in a credible fashion; (4) Additional budget flexibility, from within the Office of Space Flight (OSF) must be provided for a credible core complete program; (5) The research support program is proceeding assuming the budget that was in place before the FY02 budget runout reduction of $1B; (6) There are opportunities to maximize research on the core station program with modest cost impact; (7) The U.S. Core Complete configuration (three person crew) as an end-state will not achieve the unique research potential of the ISS; (8) The cost estimates for the U.S.-funded enhancement options (e.g., permanent seven person crew) are not sufficiently developed to assess credibility. After these findings, the Task Force has formulated several primary recommendations which are published here and include: (1) Major changes must be made in how the ISS program is managed; (2) Additional cost reductions are required within the baseline program; (3) Additional funds must be identified and applied from the Human Space Flight budget; (4) A clearly defined program with a credible end-state, agreed to by all stakeholders, must be developed and implemented.

Young, A. Thomas↗

Task Analytic Models to Guide Analysis and Design: Use of the Operator Function Model to Represent Pilot-Autoflight System Mode Problems

Task-analytic models structure essential information about operator interaction with complex systems, in this case pilot interaction with the autoflight system. Such models serve two purposes: (1) they allow researchers and practitioners to understand pilots' actions; and (2) they provide a compact, computational representation needed to design 'intelligent' aids, e.g., displays, assistants, and training systems. This paper demonstrates the use of the operator function model to trace the process of mode engagements while a pilot is controlling an aircraft via the, autoflight system. The operator function model is a normative and nondeterministic model of how a well-trained, well-motivated operator manages multiple concurrent activities for effective real-time control. For each function, the model links the pilot's actions with the required information. Using the operator function model, this paper describes several mode engagement scenarios. These scenarios were observed and documented during a field study that focused on mode engagements and mode transitions during normal line operations. Data including time, ATC clearances, altitude, system states, and active modes and sub-modes, engagement of modes, were recorded during sixty-six flights. Using these data, seven prototypical mode engagement scenarios were extracted. One scenario details the decision of the crew to disengage a fully automatic mode in favor of a semi-automatic mode, and the consequences of this action. Another describes a mode error involving updating aircraft speed following the engagement of a speed submode. Other scenarios detail mode confusion at various phases of the flight. This analysis uses the operator function model to identify three aspects of mode engagement: (1) the progress of pilot-aircraft-autoflight system interaction; (2) control/display information required to perform mode management activities; and (3) the potential cause(s) of mode confusion. The goal of this paper is twofold: (1) to demonstrate the use of the operator functio model methodology to describe pilot-system interaction while engaging modes And monitoring the system, and (2) to initiate a discussion of how task-analytic models might inform design processes. While the operator function model is only one type of task-analytic representation, the hypothesis of this paper is that some type of task analytic structure is a prerequisite for the design of effective human-automation interaction.

Degani, Asaf↗

Dual-Task Interference When A Response is Not Required

When subjects are required to respond to two stimuli presented in rapid succession, responses to the second stimulus are delayed. Such dual-task interference has been attributed to a fundamental processing bottleneck preventing simultaneous processing on both tasks. Two experiments show dual-task interference even when the first task does not require a response. The observed interference is caused by a bottleneck in central cognitive processing, rather than in response initiation or execution.

VanSelst, Mark↗

Managing Multiple Tasks in Complex, Dynamic Environments

Sketchy planners are designed to achieve goals in realistically complex, time-pressured, and uncertain task environments. However, the ability to manage multiple, potentially interacting tasks in such environments requires extensions to the functionality these systems typically provide. This paper identifies a number of factors affecting how interacting tasks should be prioritized, interrupted, and resumed, and then describes a sketchy planner called APEX that takes account of these factors when managing multiple tasks.

Freed, Michael↗

The Identification and Modeling of Visual Cue Usage in Manual Control Task Experiments

Many fields of endeavor require humans to conduct manual control tasks while viewing a perspective scene. Manual control refers to tasks in which continuous, or nearly continuous, control adjustments are required. Examples include flying an aircraft, driving a car, and riding a bicycle. Perspective scenes can arise through natural viewing of the world, simulation of a scene (as in flight simulators), or through imaging devices (such as the cameras on an unmanned aerospace vehicle). Designers frequently have some degree of control over the content and characteristics of a perspective scene; airport designers can choose runway markings, vehicle designers can influence the size and shape of windows, as well as the location of the pilot, and simulator database designers can choose scene complexity and content. Little theoretical framework exists to help designers determine the answers to questions related to perspective scene content. An empirical approach is most commonly used to determine optimum perspective scene configurations. The goal of the research effort described in this dissertation has been to provide a tool for modeling the characteristics of human operators conducting manual control tasks with perspective-scene viewing. This is done for the purpose of providing an algorithmic, as opposed to empirical, method for analyzing the effects of changing perspective scene content for closed-loop manual control tasks.

Sweet, Barbara Townsend↗

Why practice reduces dual-task interference

M. A. Van Selst, E. Ruthruff, and J. C. Johnston (1999) found that practice dramatically reduced dual-task interference in a Psychological Refractory Period (PRP) paradigm with 1 vocal response and 1 manual response. Results from 3 further experiments using the highly trained participants of M. A. Van Selst et al. (1999) support 4 main conclusions: (a) A processing bottleneck exists even after extensive practice; (b) the principal cause of the reduction in PRP interference with practice is shortening of Task 1 bottleneck stages; (c) a secondary cause is that 1 or more, but not all, of the Task 2 substages that are postponed before practice are not postponed after practice (i.e., become automatized); and (d) the extent of PRP reduction with practice depends on the modalities of the 2 responses. A control experiment with 2 manual response tasks showed less PRP reduction with practice than that found by Van Selst et al.

Auditory Perception/physiology↗

Ordering Design Tasks Based on Coupling Strengths

The design process associated with large engineering systems requires an initial decomposition of the complex system into modules of design tasks which are coupled through the transference of output data. In analyzing or optimizing such a coupled system, it is essential to be able to determine which interactions figure prominently enough to significantly affect the accuracy of the system solution. Many decomposition approaches assume the capability is available to determine what design tasks and interactions exist and what order of execution will be imposed during the analysis process. Unfortunately, this is often a complex problem and beyond the capabilities of a human design manager. A new feature for DeMAID (Design Manager's Aid for Intelligent Decomposition) will allow the design manager to use coupling strength information to find a proper sequence for ordering the design tasks. In addition, these coupling strengths aid in deciding if certain tasks or couplings could be removed (or temporarily suspended) from consideration to achieve computational savings without a significant loss of system accuracy. New rules are presented and two small test cases are used to show the effects of using coupling strengths in this manner.

Rogers, J. L.↗

Biocybernetic system evaluates indices of operator engagement in automated task

A biocybernetic system has been developed as a method to evaluate automated flight deck concepts for compatibility with human capabilities. A biocybernetic loop is formed by adjusting the mode of operation of a task set (e.g., manual/automated mix) based on electroencephalographic (EEG) signals reflecting an operator's engagement in the task set. A critical issue for the loop operation is the selection of features of the EEG to provide an index of engagement upon which to base decisions to adjust task mode. Subjects were run in the closed-loop feedback configuration under four candidate and three experimental control definitions of an engagement index. The temporal patterning of system mode switching was observed for both positive and negative feedback of the index. The indices were judged on the basis of their relative strength in exhibiting expected feedback control system phenomena (stable operation under negative feedback and unstable operation under positive feedback). Of the candidate indices evaluated in this study, an index constructed according to the formula, beta power/(alpha power + theta power), reflected task engagement best.

Cerebral Cortex/physiology↗