Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “steam use data”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

Development of design, qualification, screening, and application requirements for plastic encapsulated solid-state devices for space applications

Test data were collected on 1035 plastic encapsulated devices and 75 hermetically scaled control group devices that were purchased from each of five different manufacturers in the categories of (1) low power Schottsky TTL (bipolar) digital circuits; (2) CMOS digital circuits; (3) operational amplifier linear circuits; and (4) NPN transistors. These parts were subjected to three different initial screening conditions, then to extended life testing, to determine any possible advantages or trends for any particular screen. Several tests were carried out in the areas of flammability testing, humidity testing, high pressure steam (auroclave) testing, and high temperature storage testing. Test results are presented. Procurement and application considerations for use of plastic encapsulated semiconductors are presented and a statistical analysis program written to study the log normal distributions resulting from life testing is concluded.

Source record↗

Considerations in Execution of High Temperature Steam Oxidation Testing

The Fuel Cycle Research and Development program’s Advanced Fuels Campaign is currently supporting a range of experimental efforts aimed at development and qualification of so-called ‘accident tolerant’ nuclear fuel forms. Numerous criteria have been developed by which proposed systems will be investigated; foremost among these will be their resistance to oxidation at high temperatures by steamdominated atmospheres. Experimental characterization of the various proposed systems is currently ongoing at numerous national laboratories as well as at industrial and university partners using a wide range of different laboratory equipment and techniques. This requires consideration of differences that may develop among test protocols due to both intrinsic (e.g. differences between experimental capabilities) and extrinsic (e.g. methodology of test execution) factors. These are essential to understand to provide confidence across institutions in the data collected if it is used to justify resources for further investigation. The focus of this document is to provide an initial discussion of factors that may play a role in governing the observed oxidation of a test sample. It will remain up to the principle investigator to judge whether a specific factor discussed is directly applicable to the system under investigation. The purpose of the specific experiment must also guide determination of whether a given factor requires careful consideration or not.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Corrective Action Investigation Plan for Corrective Action Unit 562: Waste Systems Nevada Test Site, Nevada, Revision 0

Corrective Action Unit 562 is located in Areas 2, 23, and 25 of the Nevada Test Site, which is approximately 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 562 is comprised of the 13 corrective action sites (CASs) listed below: • 02-26-11, Lead Shot • 02-44-02, Paint Spills and French Drain • 02-59-01, Septic System • 02-60-01, Concrete Drain • 02-60-02, French Drain • 02-60-03, Steam Cleaning Drain • 02-60-04, French Drain • 02-60-05, French Drain • 02-60-06, French Drain • 02-60-07, French Drain • 23-60-01, Mud Trap Drain and Outfall • 23-99-06, Grease Trap • 25-60-04, Building 3123 Outfalls These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective action investigation before evaluating corrective action alternatives and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on December 11, 2008, by representatives of the Nevada Division of Environmental Protection; U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and National Security Technologies, LLC. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 562. Appendix A provides a detailed discussion of the DQO methodology and the DQOs specific to each CAS. The scope of the corrective action investigation for CAU 562 includes the following activities: • Move surface debris and/or materials, as needed, to facilitate sampling. • Conduct radiological surveys. • Perform field screening. • Collect and submit environmental samples for laboratory analysis to determine the nature and extent of any contamination released by each CAS. • Collect samples of source material to determine the potential for a release. • Collect samples of potential remediation wastes. • Collect quality control samples. This Corrective Action Investigation Plan has been developed in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the State of Nevada; DOE, Environmental Management; U.S. Department of Defense; and DOE, Legacy Management (FFACO, 1996; as amended February 2008). Under the Federal Facility Agreement and Consent Order, this Corrective Action Investigation Plan will be submitted to the Nevada Division of Environmental Protection for approval. Fieldwork will be conducted following approval of the plan.

54 ENVIRONMENTAL SCIENCES↗

CASL COBRA-TF improvements for PWR DNB analysis

COBRA-TF (CTF) is a thermal hydraulic (T/H) subchannel code using either three-dimensional (3D) Cartesian or subchannel coordinate formulations for two-phase fluid flow and heat transfer solutions. CTF has been improved under the Consortium for Advanced Simulation of Light Water Reactors (CASL) program for Pressurized Water Reactor (PWR) applications, including software optimization, new closure models, pre- and post-processing and parallelization for modeling full reactor core T/H responses under normal operating and accident conditions. As a result of collaboration among CASL partners including the Westinghouse Electric Company, the Oak Ridge National Laboratory (ORNL), and the Sandia National Laboratories, additional modeling improvements were made to CTF specifically for PWR Departure from Nucleate Boiling (DNB) analysis, including a code option to evaluate fuel thermal margin in terms of DNB Ratio (DNBR) and an axial shape factor to account for effect of non-uniform axial power distribution on DNB. Multiple DNB correlations are now linked with CTF for different applications, including the Westinghouse proprietary WRB-1 correlation for fuel designs containing mixing vane grid spacers. The improved CTF code with the WRB-1 correlation (CTF/WRB-1) was validated using the DNB data from the PWR Subchannel Bundle Tests (PSBT). In addition to the comparison with the test data, the CTF/WRB-1 DNBR results and the associated local fluid conditions were compared to the results of the Westinghouse T/H design code, VIPRE-W, which is an enhanced version of the VIPRE-01 code originally developed by the Electric Power Research Institute (EPRI). The comparisons showed that CTF/WRB-1 DNBR predictions are in good agreement with the VIPRE-W results within the applicable range of the DNB correlation. A model sensitivity study was performed to confirm that the CTF void drift model had an insignificant effect on DNBR under the steam line break (SLB) low pressure condition. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

MINERALIZATION OF RADIOACTIVE WASTES BY FLUIDIZED BED STEAM REFORMING (FBSR): COMPARISONS TO VITREOUS WASTE FORMS, AND PERTINENT DURABILITY TESTING

The Savannah River National Laboratory (SRNL) was requested to generate a document for the Washington State Department of Ecology and the U.S. Environmental Protection Agency that would cover the following topics: (1) A description of the mineral structures produced by Fluidized Bed Steam Reforming (FBSR) of Hanford type Low Activity Waste (LAW including LAWR which is LAW melter recycle waste) waste, especially the cage structured minerals and how they are formed. (2) How the cage structured minerals contain some contaminants, while others become part of the mineral structure (Note that all contaminants become part of the mineral structure and this will be described in the subsequent sections of this report). (3) Possible contaminant release mechanisms from the mineral structures. (4) Appropriate analyses to evaluate these release mechanisms. (5) Why the appropriate analyses are comparable to the existing Hanford glass dataset. In order to discuss the mineral structures and how they bond contaminants a brief description of the structures of both mineral (ceramic) and vitreous waste forms will be given to show their similarities. By demonstrating the similarities of mineral and vitreous waste forms on atomic level, the contaminant release mechanisms of the crystalline (mineral) and amorphous (glass) waste forms can be compared. This will then logically lead to the discussion of why many of the analyses used to evaluate vitreous waste forms and glass-ceramics (also known as glass composite materials) are appropriate for determining the release mechanisms of LAW/LAWR mineral waste forms and how the durability data on LAW/LAWR mineral waste forms relate to the durability data for LAW/LAWR glasses. The text will discuss the LAW mineral waste form made by FBSR. The nanoscale mechanism by which the minerals form will be also be described in the text. The appropriate analyses to evaluate contaminant release mechanisms will be discussed, as will the FBSR test results to date and how they compare to testing performed on LAW glasses. Other details about vitreous waste form durability and impacts of REDuction/OXidation (REDOX) on durability are given in Appendix A. Details about the FBSR process, various pilot scale demonstrations, and applications are given in Appendix B. Details describing all the different leach tests that need to be used jointly to determine the leaching mechanisms of a waste form are given in Appendix C. Cautions regarding the way in which the waste form surface area is measured and in the choice of leachant buffers (if used) are given in Appendix D.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Characteristics of Axial Power Shape and Flow Field at Low Flow Condition

The representative event which experiences the low flow condition is SLB (Steam Line Break) event. During the SLB event with LOOP (Loss of Offsite Power), the reactor core is tripped and all RCPs (Reactor Coolant Pump) are stopped. The biggest worth control rod also stuck out. As a result, the flow rate and pressure in reactor core decrease and the peaking factor is relatively high compared to a nominal operating condition. In this paper, we study the tendency of the core axial power distribution and flow field with respect to the core average power at the SLB accident condition. Generally, the condition has been analyzed using the neutronics code with one dimensional flow result of the assemblies. However, if the core average power increases, the coolant density in the hot channel decreases and mass flux increases. The assumption that the mass flux is constant at the one dimensional analysis is incorrect. Hence, it is needed to couple the neutronics code and the subchannel analysis code in order to give feedback to neutronics code with the 3-D flow information. In this study, we coupled the nuclear design code and the subchannel analysis code and showed the characteristics of the axial power distribution and the flow field at the low flow condition. Since there is no experimental data at the condition, the characteristics of the power distribution and flow field were analyzed to understand the physical phenomena. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Comparing Velocity Profiles Along the Rod Length of a Helical Coil Steam Generator Model

A model of a specific type of tube and shell heat exchanger, the helical coil steam generator (HCSG), was designed and constructed to study multiple fluidic properties that attribute to the efficiency of the heat transfer it provides. Tube and shell heat exchangers are currently used throughout industry in chemical, power and petroleum engineering. Most commonly, a primary flow is circulated through a shell, while the secondary flow is run through several small tubes that are bundled together. Methods to increase the heat transfer between the two flows include adding baffles to force shell side flow over more tubes, fins added in-between layers of tubes and passing tubes multiple times through the shell to increase heat exchanger effectiveness. The HCSG incorporates many of the proposed methods but also relies on a complex geometry to increase the heat transfer between tube and shell side flow. In an area where cost effectiveness is favorable, such as inside a nuclear reactor, helically banked steam generators makes extensive use of the room with no sharp tube bends. This increases the pressure loss on the secondary flow and can solve potential temperature manufacturing issues at the welds of junctions. Additionally, they have exhibited pure cross flow behaviors with high heat transfer coefficients and axial temperature profiles that correspond to pure counter-flow with high mean temperature differences. Early work showed that helical banks can have a significant increase of 16 to 43% higher heat transfer coefficient than straight pipe heat exchangers. While many previous studies have looked at the heat transfer, pressure drop and flow fields of a tube and shell heat exchanger, they all focus on tube bundles that are either in-line or staggered. The early flow visualization studies on these types of bundle arrangements reported that attached eddies were formed alternatively behind each of the rods and were occasionally dragged into the main stream of shell side flow. Later studies suggested that observable periodic vortex shedding was dependent on geometry. Experimental data taken using techniques such as laser Doppler anemometry (LDV) by Simonin and Barcouda (1986) as mentioned in Hassan (2002), hot-wire anemometry with Tsuchida (1982) and particle image velocimetry (PIV) conducted by researchers as late as 2007 have been used to characterize turbulent flow and distinguish flow field structures within in-line and staggered tube bundles. By studying these flow field structures, their contribution to fluidic properties such as heat transfer efficiency and pressure drop can be characterized effectively. Literature review lead to a design that incorporated five layers of coils wrapped around one another. The outermost and middle layers of tubes coiled at a specific pitch in a clockwise direction while the other two layers coiled counterclockwise. The proposed design incorporates a constantly changing lateral pitch ratio, a, between adjacent rods. The constructed test section isolates a single interface between two adjacent coiling rod bundles of twelve rods. Three distinct cross sectional planes along the rod bundles were looked at to study the effect of the local geometry to flow fields, Section A, B and C. Particle Image Velocimetry (PIV) frames of 896 x 848 pixels were captured at each section across a specific height. Profiles of mean velocity fields for each section are compared and discussed as possible features of the changing lateral pitch ratio.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

97e Intermediate Temperature Catalytic Reforming of Bio-Oil for Distributed Hydrogen Production

With the world's energy demands rapidly increasing, it is necessary to look to sources other than fossil fuels, preferably those that minimize greenhouse emissions. One such renewable source of energy is biomass, which has the added advantage of being a near-term source of hydrogen. While there are several potential routes to produce hydrogen from biomass thermally, given the near-term technical barriers to hydrogen storage and delivery, distributed technologies such that hydrogen is produced at or near the point of use are attractive. One such route is to first produce bio-oil via fast pyrolysis of biomass close to its source to create a higher energy-density product, then ship this bio-oil to its point of use where it can be reformed to hydrogen and carbon dioxide. This route is especially well suited for smaller-scale reforming plants located at hydrogen distribution sites such as filling stations. There is also the potential for automated operation of the conversion system. A system has been developed for volatilizing bio-oil with manageable carbon deposits using ultrasonic atomization and by modifying bio-oil properties, such as viscosity, by blending or reacting bio-oil with methanol. Non-catalytic partial oxidation of bio-oil is then used to achieve significant conversion to CO with minimal aromatic hydrocarbon formation by keeping the temperature at 650 C or less and oxygen levels low. The non-catalytic reactions occur primarily in the gas phase. However, some nonvolatile components of bio-oil present as aerosols may react heterogeneously. The product gas is passed over a packed bed of precious metal catalyst where further reforming as well as water gas shift reactions are accomplished completing the conversion to hydrogen. The approach described above requires significantly lower catalyst loadings than conventional catalytic steam reforming due to the significant conversion in the non-catalytic step. The goal is to reform and selectively oxidize the bio-oil and catalyze the water gas shift reaction without catalyzing methanation or oxidation of CO and H{sub 2}, thus attaining equilibrium levels of H{sub 2}, CO, H{sub 2}O, and CO{sub 2} at the exit of the catalyst bed. Experimental Bio-oil (mixed with varied amounts of methanol to reduce the viscosity and homogenize the bio-oil) or selected bio-oil components are introduced at a measured flow rate through the top of a vertical quartz reactor which is heated using a five zone furnace. The ultrasonic nozzle used to feed the reactants allows the bio-oil to flow down the center of the reactor at a low, steady flow rate. Additionally, the fine mist created by the nozzle allows for intimate mixing with oxygen and efficient heat transfer, providing optimal conditions to achieve high conversion at relatively low temperatures in the non-catalytic step thus reducing the required catalyst loading. Generation of the fine mist is especially important for providing good contact between non-volatile bio-oil components and oxygen. Oxygen and helium are also delivered at the top of the reactor via mass flow meters with the amount of oxygen being varied to maximize the yields of H{sub 2} and CO and the amount of helium being adjusted such that the gas phase residence time in the hot zone is {approx}0.3 and {approx}0.45 s for bio-oil and methanol experiments, respectively. A catalyst bed can be located at the bottom of the reactor tube. To date, catalyst screening experiments have used Engelhard noble metal catalysts. The catalysts used for these experiments were 0.5 % rhodium, ruthenium, platinum, and palladium (all supported on alumina). Experiments were performed using pure alumina as well. Both the catalyst type and the effect of oxygen and steam on the residual hydrocarbons and accumulated carbon containing particulates were investigated. The residence time before the catalyst is varied to determine the importance of the non-catalytic step and its potential effect on the required catalyst loading. Non-catalytic experiments (primarily homogeneous cracking) use a bed of quartz placed to capture any deposits that are formed in the volatilization and cracking zones. The inner reactor effluent is quenched by a flow of 10 SLPM He which serves to sweep the products quickly ({approx}0.03 s) to a triple quadrupole molecular beam mass spectrometer (MBMS) for analysis. The MBMS serves as a universal detector and allows for real time data collection. The study of pyrolysis by MBMS has been described previously. The dilution of the reactor effluent reduces the potential problems caused by matrix effects associated with the MBMS analysis. Argon is used as an internal standard in the quantitative analysis of all the major products (CO, CO{sub 2}, H{sub 2}, H{sub 2}O, and benzene) as well as any residual carbon, which is determined by subsequent oxidation of carbon (monitored as CO{sub 2}) after shutting off the feed and maintaining the oxygen/helium flow.

08 HYDROGEN↗

Reducing Cost of Chlorinated Volatile Organic Compound Remediation by Transitioning from Active to Passive Soil Vapor Extraction - 20157

Areas of high chlorinated volatile organic compound (cVOC) contamination at the Savannah River Site (SRS) have been undergoing remediation via soil vapor extraction, sometimes coupled with thermal treatments to enhance extraction rates. These active systems are effective in removing large amounts of contaminant mass from the subsurface and mitigating the impacts to groundwater. However, as extraction rates decline, costs must be evaluated with respect to the benefit of continued active operation. A decision framework for identifying conditions when a transition to a more passive remediation is appropriate has been developed with state and federal regulatory agencies. Two remediation areas have recently been transitioned from active soil vapor extraction (ASVE) to passive soil vapor extraction (PSVE) at the SRS. Performance evaluation goals including plume stabilization, overall mass removal trends, environmental sustainability and costs were considered in transitioning from active remediation to passive technologies at both sites. At the Dynamic Underground Stripping (DUS) project at the M-Area Settling Basin, ASVE was combined with steam injection to extract cVOCs during active operations. Steam injection occurred from September 2005 to September 2009. DUS utilized 63 steam injection wells, 34 active vapor extraction wells, and 3 active soil vapor extraction units (SVEUs). Two active SVEUs had 60 horsepower blowers; the third had a 25-horsepower blower. Mass removal was closely tracked during DUS operations; over 181,437 kilograms (400,000 pounds) of cVOCs were removed while active steam injection occurred. After steaming was stopped, ASVE continued. The 34 active wells were evaluated in 2012. The ASVE wells were grouped into categories of high, medium, and low extraction rates. High producing wells remained connected to a single active SVEU. Low producing wells were abandoned, and the medium producing wells were transitioned to PSVE (Microblowers{sup TM}). Microblowers{sup TM} utilize a dedicated blower per well and are solar powered. This passive technology provides energy, maintenance, and operation costs savings while still providing an efficient reduction in cVOC migration to groundwater. In 2018, the remaining ASVE wells were evaluated again. The purpose of this testing was to identify which wells removed the most mass. An optimal well configuration was determined. The criteria to discontinue ASVE was removal of less than 18 kilograms (40 pounds) per week of cVOCs. After 3 months of shutdown (rebound conditions), 2.7 kilograms (5.9 pounds) of cVOCs per week were being removed. Data from the rebound test justified ending ASVE and transitioning wells with higher extraction rates to PSVE. Wells that had depleted the cVOC mass within their zone of influence were abandoned. Performance data from existing PSVE wells justified ending PSVE at wells with depleted extraction rates. Currently the system has 16 PSVE wells operating. Another ASVE system was being used to treat cVOC contaminated soil at the A-Area Miscellaneous Rubble Pile (AMRP) at SRS. System operation began in 2004, with 7 ASVE wells connected to a 60- horsepower blower. Mass removal rates and contaminant concentrations remained consistently low over the ASVE lifespan at AMRP. This indicated that mass removal was diffusion limited. With this data, the 7 ASVE wells were transitioned to PSVE in 2017. Twelve pressure monitoring points were also transitioned to PSVE wells. AMRP currently has 19 PSVE wells operating. Both transitions from active to passive remediation had concurrence from the United States Environmental Protection Agency and the South Carolina Department of Health and Environmental Control. These transitions ensure that only the necessary amount of energy is being exerted to remediate the environment. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Gasification of New Zealand coals: a comparative simulation study

The aim of this study was to conduct a preliminary feasibility assessment of gasification of New Zealand (NZ) lignite and sub-bituminous coals, using a commercial simulation tool. Gasification of these coals was simulated in an integrated gasification combined cycle (IGCC) application and associated preliminary economics compared. A simple method of coal characterization was developed for simulation purposes. The carbon, hydrogen, and oxygen content of the coal was represented by a three component vapor solid system of carbon, methane, and water, the composition of which was derived from proximate analysis data on fixed carbon and volatile matter, and the gross calorific value, both on a dry, ash free basis. The gasification process was modeled using Gibb's free energy minimization. Data from the U.S. Department of Energy's Shell Gasifier base cases using Illinios No. 6 coal was used to verify both the gasifier and the IGCC flowsheet models. The H:C and O:C ratios of the NZ coals were adjusted until the simulated gasifier output composition and temperature matched the values with the base case. The IGCC power output and other key operating variables such as gas turbine inlet and exhaust temperatures were kept constant for study of comparative economics. The results indicated that 16% more lignite than sub-bituminous coal was required. This translated into the requirement of a larger gasifier and air separation unit, but smaller gas and steam turbines were required. The gasifier was the largest sole contributor (30%) to the estimated capital cost of the IGCC plant. The overall cost differential associated with the processing of lignite versus processing sub-bituminous coal was estimated to be of the order of NZ $0.8/tonne. 13 refs., 9 tabs.

01 COAL, LIGNITE, AND PEAT↗

An Experimental Investigation of the Flow of Air in a Flat Broadening Channel

The wide use of diffusers, in various fields of technology, has resulted in several experimental projects to study the action and design of diffusers. Most of the projects dealt with steam (steam turbine nozzles). But diffusers have other applications - that is, ventilators, smoke ducts, air coolers, refrigeration, drying, and so forth. At present there is another application for diffusers in wind-tunnel design. Because of higher requirements and increased power of such installations more attention must be paid to the correctness of work and the decrease in losses due to every section of the tunnel. A diffuser, being one of the component parts of a tunnel , can in the event of faulty construction introduce considerable losses. Therefore, in the design of the new CAHI wind tunnel, it was suggested that an experimental study of diffusers be made, with a view to applying the results to wind tunnels. The experiments conducted by K. K. Baulin in the laboratories of CAHI upon models of diffusers of different cross sections, lengths, and angles of divergence, were a valuable source of experimental data. They were of no help, however, in reaching any conclusion regarding the optimum shape because of the complexity and diversity of the factors which all appeared simultaneously, thereby precluding the.study of the effects of any one factor separately. On the suggestion of the director of the CAHI,Prof. B. N. Ureff, it was decided to experiment on a two-dimensional diffuser model and determine the effect, of the angle of divergence. The author is acquainted with two experimental projects of like nature: the first was conducted with water, the other with air. The first of these works, although containing a wealth of experimental data, does not indicate the nature of flow or its relation to the angle of divergence. The second work is limited to four angles - that is, 12 deg, 24 deg, 45 deg, 90 deg. The study of this diffuser did not supply any information about the effect of smaller angles which, because of their advantages, are more commonly used, The author was able to acquaint himself with the second work only after the experiments were started. For these reasons, as well as because on the basis of those works no conclusion can be reached regarding the nature of flow distribution, of eddies, and so forth, experimental work was continued. The need for determining flow patterns follows from the fact that from them are determined methods of measurement - that is, the determination of velocities by means of the pitot tube, which, as is well known, gives correct indications only when placed with its axis parallel to the axis of flow. The data contained in this report were obtained from experiments conducted by the Aerodynamical Laboratories of the CAHI. The solutions to some. of the mathematical problems connected with the experiments are due to Prof. S. A, Chapligin.

Vedernikoff, A. N.↗

SSR COST – COmposite Structural Technologies for advanced reactor deployment (Final Scientific/Technical Report)

Moltex is designing a Generation 4 or Advanced nuclear reactor, the molten salt fast spectrum SSR-W. The design intent is to reduce the cost and complexity of the nuclear systems by relying on inherent safety characteristics, instead of engineered systems. One such characteristic as a natural tendency for power to decrease as temperature increases. Another characteristic that improves natural safety is the fact that the working fluids (molten salts) are at atmospheric pressure at operating temperatures. This significantly reduces the need for pressure boundary components and systems. Moltex is highly motivated to develop simple and economic reactors to reduce the carbon intensity and improve energy security of global electricity production. The COST project investigated the opportunities for reducing construction cost of advanced reactors with the adoption of Rigid Elastic Composite Civil works (RECC). The construction design and methods used in currently operational light water power plants would generally be suboptimal for the SSR-W since there is no requirement for civil structures to withstand high pressure accidents such as hydrogen combustion or steam explosion. In parallel to downselecting the most promising RECC-type technology, accident scenarios representing the largest credible challenge to the SSR-W civil and construction design were modelled. The capability of an SSR-W reactor constructed with and without the selected construction technology was evaluated and the consequential licensing challenges identified. A construction schedule and cost estimate of the SSR-W with and without the selected RECC construction technology was developed. Once the above data was collected, then Moltex was able to review the safety performance, license-ability and cost/schedule benefit of applying the preferred construction technology. The CAPEX/NPV benefit was quantified, and the licensing risks and opportunities were documented. Finally, the CAPEX/NPV benefit of the advanced construction technology was modest due to the suitability of traditional stick-built construction for the SSR-W design. However, previously unidentified benefits of the advanced construction technology were revealed during the studies that could credibly de-risk certain aspects of the design to be licensed. Since licensing (duration and delays) are very significant in new build project costs, the cost benefits may be significant. Further studies on the risk reduction of the construction technology are foreseen.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

CIRCULATING MOVING BED COMBUSTION PROOF OF CONCEPT

Circulating Moving Bed (CMB) combustion technology has its roots in traditional circulating fluidized bed technology and involves a novel method of solid fuel combustion and heat transfer. CMB technology represents a step change in improved performance and cost relative to conventional PC and FBC boilers. The CMB heat exchanger preheats the energy cycle working fluid, steam or air, to the high temperature levels required in systems for advanced power generation. Unique features of the CMB are the reduction of the heat transfer surfaces by about 60% as a result of the enhanced heat transfer rates, flexibility of operation, and about 30% lower cost over existing technology. The CMB Phase I project ran from July 2001 through March 2003. Its objective was to continue development of the CMB technology with a series of proof of concept tests. The tests were conducted at a scale that provided design data for scale up to a demonstration plant. These objectives were met by conducting a series of experiments in ALSTOM Power’s Multi-use Test Facility (MTF). The MTF was modified to operate under CMB conditions of commercial interest. The objective of the tests were to evaluate gas-to-solids heat transfer in the upper furnace, assess agglomeration in the high temperature CMB bubbling bed, and evaluate solids-to-tube heat transfer in the moving bed heat exchanger. The Phase I program results showed that there are still some significant technical uncertainties that needed to be resolved before the technology can be confidently scaled up for a successful demonstration plant design. Work remained in three primary areas: • scale up of gas to solid heat transfer • high temperature finned surface design • the overall requirements of mechanical and process design. The CMB Phase II workscope built upon the results of Phase I and specifically addressed the remaining technical uncertainties. It included a scaled MTF heat transfer test to provide the necessary data to scale up gas-to-solids heat transfer. A stress test rig was built and tested to provide validation data for a stress model needed to support high temperature finned surface design. Additional cold flow model tests and MTF tests were conducted to address mechanical and process design issues. This information was then used to design and cost a commercial CMB design concept. Finally, the MBHE was reconfigured into a slice arrangement and tested for an extended duration at a commercial CFB plant.

42 ENGINEERING↗

A Model for Generation of Martian Surface Dust, Soil and Rock Coatings: Physical vs. Chemical Interactions, and Palagonitic Plus Hydrothermal Alteration

This model is one of many possible scenarios to explain the generation of the current surface material on Mars using chemical, magnetic and spectroscopic data from Mars and geologic analogs from terrestrial sites. One basic premise is that there are physical and chemical interactions of the atmospheric dust particles and that these two processes create distinctly different results. Physical processes distribute dust particles on rocks, forming physical rock coatings, and on the surface between rocks forming soil units; these are reversible processes. Chemical reactions of the dust/soil particles create alteration rinds on rock surfaces or duricrust surface units, both of which are relatively permanent materials. According to this model the mineral components of the dust/soil particles are derived from a combination of "typical" palagonitic weathering of volcanic ash and hydrothermally altered components, primarily from steam vents or fumeroles. Both of these altered materials are composed of tiny particles, about 1 micron or smaller, that are aggregates of silicates and iron oxide/oxyhydroxide/sulfate phases. Additional information is contained in the original extended abstract.

Bishop, J. L.↗

Life cycle assessment of hydrogen production from S-I thermochemical process coupled to a high temperature gas reactor

The purpose of this paper is to quantify the greenhouse gas (GHG) emissions associated to the hydrogen produced by the sulfur-iodine thermochemical process, coupled to a high temperature nuclear reactor, and to compare the results with other life cycle analysis (LCA) studies on hydrogen production technologies, both conventional and emerging. The LCA tool was used to quantify the impacts associated with climate change. The product system was defined by the following steps: (i) extraction and manufacturing of raw materials (upstream flows), (U) external energy supplied to the system, (iii) nuclear power plant, and (iv) hydrogen production plant. Particular attention was focused to those processes where there was limited information from literature about inventory data, as the TRISO fuel manufacture, and the production of iodine. The results show that the electric power, supplied to the hydrogen plant, is a sensitive parameter for GHG emissions. When the nuclear power plant supplied the electrical power, low GHG emissions were obtained. These results improve those reported by conventional hydrogen production methods, such as steam reforming. (authors)

08 HYDROGEN↗

Combined Cycle Integrated Thermal Energy Storage “CiTES” (Final Scientific/Technical Report)

The Phase I of this project confirmed the technical feasibility of a Combined Cycle integrated Thermal Energy Storage “CiTES” system, calculated the key performance parameters like power efficiency and costs, and proved its commercial value with full-year simulations for several US electricity markets with high degree of variable renewable generation and volatile hourly electricity prices. The core element of this project is the Electro Thermal Energy Storage (ETES) technology from Siemens Gamesa Renewable Energy GmbH, using thermally stable and inexpensive volcanic rocks as storage material and air as heat transfer medium. This technology is backed by more than 10 years of experience and a 440MMBTU (130MWh-th) pilot plant in Hamburg, Germany, which is in operation since 2019. The integration of this thermal storage in an existing combined cycle power plant (CCPP) is typical power plant technology without any major technology risks. It allows the storage of inexpensive renewable energy during times of surplus renewable generation and the discharge of this energy in times of high energy demand when the fossil plant is in operation. This supplements the fossil power generation with CO2-emission-free energy. The secondary effect of the CiTES system is that a small part of the stored thermal energy is used to keep the heat recovery steam generator (HRSG) and steam turbine (ST) of the combined cycle power plant in hot and ready-to-start condition. This enables the plant to start rapidly when fossil generation is required to satisfy demand as soon variable generation drops off in the evenings or during cloud cover and calm wind periods. Without pre-warming of the HRSG and ST, the CCPP would need several hours for a cold or warm start, burn a lot of gas and release high NOx emissions during start and wouldn’t be able to use the short times of high energy prices in an efficient or economical manner. The economic parameters of CiTES were determined by a full year “8760” simulation using a data set calculation for each of the hours of the year, and historical electricity and gas prices. For consistency, the simulations were focused on the pre-COVID year 2019. The financially most attractive markets were in the Energy Reliability Council of Texas (ERCOT) region, which allowed substantial value generation with arbitrage (charge with cheap energy during renewable surplus times and discharge when energy is needed and expensive). The improvement of flexibility with the CiTES system by pre-heating and warm-keeping of the CCPP allowed for additional power generation during short time periods when demand is high but renewable generation is down; when the hourly energy prices are highest in these markets. The simulations are based on 2019 data, when ERCOT had 27GW of installed photovoltaic (PV) and wind generation. They showed that the created revenue with the prototypically sized CiTES system of 1,000MMBTU (300MWh-th) falls a little bit short of what is expected from a commercially viable investment. The system has optimization opportunities for cost reduction and increased effectiveness which will be realized during a potential Phase II Pre-FEED study following this project. Furthermore, it is safe to assume that a lot of renewable generation capacity will be added all over the US in the coming years. As an example, ERCOT is predicting to more than double its renewable generation from 27GW in 2019 to a forecasted 63GW in 2023. This will increase the amount of renewable overproduction exponentially. This rapid increase of local overproduction and the need to curtail renewable generation is well documented by the California ISO (www.CAISO.com / managing oversupply). However, the simulations also revealed a weakness in the structure of the electricity markets in the US. More specifically, when electricity prices are very low and approaching negative levels, the owners of Variable Renewable Energy (VRE) will curtail a part of their facility to stabilize the price by reducing supply. This results in a situation in which storage facilities, which are integrated in existing fossil assets and don’t have the behind-the-meter benefit of a VRE, won’t be able to purchase low cost – otherwise curtailed – renewable energy off the grid. A special tariff, which motivates VRE owners to sell otherwise curtailed renewable energy to storage facilities (Hydrogen, thermal, pumped hydro, etc.) can solve this issue. The implementation of such a regulating tariff by Independent System Operators, thus avoiding renewable curtailment, is a pre condition for successful commercialization for renewable energy storage technologies. With this advancement of design and technology and improvements in the market environment, it can be expected that the Combined Cycle integrated Thermal Energy Storage proves itself as an important innovation to keep highly efficient, natural gas-based power generation economically successful and relevant for the power industry in the United States of America.

Wolf, Thorsten↗

Mercury Specie and Multi-Pollutant Control

This project was awarded to demonstrate the ability to affect and optimize mercury speciation and multi-pollutant control using non-intrusive advanced sensor and optimization technologies. The intent was to demonstrate plant-wide optimization systems on a large coal fired steam electric power plant in order to minimize emissions, including mercury (Hg), while maximizing efficiency and maintaining saleable byproducts. Advanced solutions utilizing state-of-the-art sensors and neural network-based optimization and control technologies were proposed to maximize the removal of mercury vapor from the boiler flue gas thereby resulting in lower uncontrolled releases of mercury into the atmosphere. Budget Period 1 (Phase I) - Included the installation of sensors, software system design and establishment of the as-found baseline operating metrics for pre-project and post-project data comparison. Budget Period 2 (Phase II) - Software was installed, data communications links from the sensors were verified, and modifications required to integrate the software system to the DCS were performed. Budget Period 3 (Phase III) - Included the validation and demonstration of all control systems and software, and the comparison of the optimized test results with the targets established for the project site. This report represents the final technical report for the project, covering the entire award period and representing the final results compared to project goals. NeuCo shouldered 61% of the total project cost; while DOE shouldered the remaining 39%. The DOE requires repayment of its investment. This repayment will result from commercial sales of the products developed under the project. NRG's Limestone power plant (formerly owned by Texas Genco) contributed the host site, human resources, and engineering support to ensure the project's success.

01 COAL, LIGNITE, AND PEAT↗