Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “site built”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

346 records · Page 20

Expedited Walkdowns and Preparation of Cost Estimates for Decontamination and Demolition of Excess Facilities - 20335

Lawrence Livermore National Security, LLC (LLNS) is the prime contractor responsible for managing and operating Lawrence Livermore National Laboratory (LLNL). The mission of the LLNL is to strengthen security of the United States through development and application of world-class science and technology to enhance the nation's defense, reduce the global threat from terrorism and weapons of mass destruction, and respond with vision, quality, integrity, and technical excellence to scientific issues of national importance. To accomplish its mission, LLNL must plan and manage its campus space and facilities to optimize use of its relatively small one-square-mile footprint. LLNL currently has numerous excess facilities that require decontamination and demolition (D and D). The LLNL Legacy Facility Program is responsible for stewardship and risk reduction programs to effectively manage these excess assets at LLNL. The Legacy Facility Program identified 10 excess facilities at LLNL that were candidates for demolition based on risks from further degradation of the facilities, potential exposure to hazardous materials, or need for removal to make way for new program facilities. The buildings range from a structure built in 1943 to serve as a US Navy drill hall during World War II, to a facility that provided neutrons to study material properties for the fusion energy program. The National Nuclear Security Administration (NNSA) appropriated FY19 funding for the development of Class 3 estimates for these 10 excess facilities that would be used to develop a Program Management Plan for funding consideration. Class 3 estimates are not conceptual, nor overly detailed, but adequate to be used for budget and appropriation purposes. Using existing strategic sourcing agreements, LLNL was able to organize a team of senior subject matter experts (SMEs) with diverse technical backgrounds across the Department of Energy (DOE) Complex to complete extensive process knowledge (PK) reviews and walk-downs of each excess facility and to deliver accurate and complete estimates under an expedited schedule (i.e., within eight weeks). To facilitate the expedited schedule, LLNL was fully prepared for the arrival of the JGMS team, which consisted of the following companies: J.G. Management Systems, Inc. (JGMS); Strata-G, LLC; and Michael Baker International. LLNL provided background and PK information on the excess facilities, pictures, supporting historical documentation, and radiological survey history as well as escorted access to the facilities. The JGMS team has previous experience supporting Program Management Plans for excess facilities at the Y-12 National Security Complex. The team mobilized to LLNL and performed the facility walk-downs from January 22-25, 2019. Using a methodical evaluation process, expertise, and experience, the team was able to deliver walk-down draft reports and estimates to LLNL before their February 8, 2019 deadline. LLNL then in turn reviewed, completed the estimates by adding waste management costs and other LLNL costs, and delivered the estimates to NNSA by February 15, 2019. The completed final reports, including draft D and D estimates, were delivered to LLNL before their March 6, 2019 deadline. The work was successfully completed ahead of the expedited schedule required by LLNL, resulting in a commendation from the client. This paper describes how the partnership and collaboration as a fully integrated team comprised of the prime contractor, LLNS, and the JGMS team successfully met the needs of the US government, resulting in the performance of expedited site walk-downs, the development of summary evaluation reports, and the preparation of draft Class 3 estimates and preliminary schedules for the D and D of 10 excess facilities at LLNL. The efforts of the team will enable the D and D of the first excess facility in the 2020-2021 time frame. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Million Worker Study

Radiation health issues have been an important aspect of DOE's Worker Safety and Health programs. The goal is to ensure that workers are adequately protected from the various radiological hazards associated with DOE sites and operations. Since the early 1940’s DOE has supported the conduct of epidemiologic studies of practically every DOE (AEC) facility and collected these data, now managed by the Oak Ridge Associated Universities (ORAU), in remarkable detail. In the early 2000s, the Office of Health, Safety and Security authorized access to specific DOE worker datasets. Shortly thereafter, the DOE Office of Science provided funds for a pilot study that confirmed the feasibility of the Million Worker Study (MWS), and then additional resources were provided (with other agencies) to extend the follow-up of many populations, not just DOE workers, but also atomic veterans, industrial radiographers, nuclear power plant workers and medical radiation workers (the Million Persons Study (MPS)). This proposal was a continuation of support provided by DOE, specifically to extend the follow-up of the worker populations at the Mallinckrodt Chemical Works (MCW) and Los Alamos National Laboratory (LANL). The work addresses DOE’s interest in clarifying the health risks of their workers as well as contributing knowledge on radiation risks that is relevant today with regard to compensation schemes. The findings are also important for the US public in light of the increased population exposure to medical imaging, environmental circumstances such as hydraulic fracturing, increased exposures during high altitude flights, and with regard to nuclear accidents such as Fukushima and possible terrorist events. Furthermore, it is important to consider reducing the uncertainty in current risk estimates by developing risk coefficients based on healthy American workers who are more representative of U.S. workers and the general public than 1945 Japanese survivors of the atomic bombs living in a war-torn country which experienced deprivation, malnourishment, and increased rates of infections and other diseases. But more importantly, it is important to learn whether radiation exposures received gradually over time (e.g., years) are more or less effective in causing health effects, cancer in particular, than if the radiation dose is received all at once in a fraction of a second as experienced by the Japanese atomic bomb survivors. Finally, the ability to evaluate and combine large populations with intakes of radionuclides such as uranium, radium, plutonium, americium and polonium will provide new quantitative knowledge on human health effects that hitherto has not been possible. This cost-efficient study has built on the investments made and foundations laid by investigators and government agencies, including DOE, over the past 30-40 years, which have established early worker cohorts that can now provide answers to questions on the lifetime human health risks associated with low-level radiation exposures. Collaborating institutions included: International Epidemiology Institute, Oak Ridge Associated Universities, Oak Ridge National Laboratory, Los Alamos National Laboratory, Landauer, Inc., and Vanderbilt University. Follow-up of these two populations and the integration of them with the many other cohorts (now a total of 31) in the MPS continues under a separate DOE grant (DE-AU0000046).

61 RADIATION PROTECTION AND DOSIMETRY↗

Robust Carbon Dioxide Plume Imaging Using Joint Tomographic Inversion of Seismic Onset Time and Distributed Pressure and Temperature Measurements (Final Report)

We develop and demonstrate rapid and cost-effective methodologies for spatiotemporal tracking of CO2 plumes during geologic sequestration using joint inversion of seismic data and distributed pressure and temperature measurements. Key elements of our methodology are: (a) a computationally efficient approach to pressure and temperature propagation, (b) analysis of time lapse seismic data using a novel ‘seismic onset time’ approach to detect fluid front propagation, and (c) data assimilation and uncertainty assessment via joint inversion of pressure, temperature and time lapse seismic data, and (d) validating the numerical tomographic inversion using a CO2 injection demonstration projects, specifically data collected from the from the Petra Nova Parish Holdings CCUS project in the West Ranch Field, Texas and the Chester-16 reef CO2 injection site in Northern Michigan which is part of the DOE Midwestern Carbon Sequestration Project. The research team is led by Texas A&M University and includes Battelle as a subcontractor with support from Shell, Anadarko, Chevron and JX Nippon. A carbon dioxide (CO2) water-alternating-gas (WAG) pilot was conducted to gain insights into tertiary oil recovery potential via CO2 flood in the West Ranch Field as part of the Petra Nova project, the world’s largest post-combustion CO2 capture and utilization initiative. With a fluvial formation geology and large contrasts in permeability, this is a challenging and novel application of CO2 enhanced oil recovery (EOR). We build a predictive dynamic model of the subsurface that incorporates the multiphase and compositional data acquired during the pilot operation. The calibrated model is used for the carbon dioxide plume imaging. The study began with an initialization of the pilot sector model extracted from a calibrated full-field model. The pilot model calibration follows a two-step hierarchical workflow. First, we performed a large-scale update of the permeability distribution by integrating available bottomhole pressure and multiphase production data. In the second step, local permeability field is fine-tuned using a streamline-based method to match CO2 breakthrough times at the producers. The predictive capability of the calibrated model was verified through two blind validation tests: (1) the model showed good agreement with saturation logs acquired at two observation wells; and (2) the model reproduced the CO2 recovery as a fraction of the injected CO2. The use of seismic onset times has shown great promise for integrating near-continuous seismic surveys for updating geologic models. In this study, we analyze the impact of seismic survey frequency on the onset time approach aiming to extend the application of onset time to infrequent seismic surveys. In addition, we quantitatively examine the nonlinearity of the onset time method and compare it to the commonly used amplitude inversion method. We carry out a sensitivity analysis of seismic survey frequency based on the complete seismic survey data (over 175 surveys) of steam injection in a heavy oil reservoir (Peace River Unit) in Canada. Our results show that an adequate onset time map can be obtained from the infrequent seismic surveys by interpolation between seismic surveys as long as there is no change in the dominant underlying physics between the successive surveys. The study also shows that nonlinearity of the onset time method can be -smaller than that of the amplitude inversion method by several orders of magnitude. Application to the Brugge benchmark case shows that the onset time method obtains comparable permeability update as the traditional seismic amplitude inversion method with faster computation and improved convergence characteristics. We extend the streamline-based data integration approach to incorporate distributed temperature sensor (DTS) data using the concept of thermal tracer travel time. Then, a hierarchical workflow composed of evolutionary and streamline methods is employed to jointly history match the DTS and pressure data. Finally, CO2 saturation and streamline maps are used to visualize the CO2 plume movement during the sequestration process. The hierarchical workflow is applied to a carbon sequestration project in a carbonate reef reservoir within the Northern Niagaran Pinnacle Reef Trend in Michigan, USA. The monitoring data set consists of distributed temperature sensing (DTS) data acquired at the injection well and a monitoring well, flowing bottom-hole pressure data at the injection well, and time-lapse pressure measurements at several locations along the monitoring well. The history matching results indicate that the CO2 movement is mostly restricted to the intended zones of injection which is consistent with an independent warm-back analysis of the temperature data. In addition to employing simulation models and inverse methods for CO2 plume imaging, we also initialized a data-driven technology for detecting inter-well connectivity based on production and pressure data. Our machine-learning framework is built on the statistical recurrent unit (SRU) model and interprets well-based injection/production data into inter-well connectivity without relying on a geologic model. We test it on synthetic and field-scale CO2 EOR projects utilizing the water-alternating-gas (WAG) process. The validation of the proposed data-driven inter-well connectivity assessment is performed using synthetic data from simulation models where inter-well connectivity can be easily measured using the streamline-based flux allocation. The SRU model is shown to offer excellent prediction performance on the synthetic case. Despite significant measurement noise and frequent well shut-ins imposed in the field-scale case, the SRU model offers good prediction accuracy, the overall relative error of the phase production rates at most producers ranges from 10% to 30%. It is shown that the dominant connections identified by the data-driven method and streamline method are in close agreement. Texas A&M University, the lead organization in the project, was primarily responsible for the development of tomographic approaches for CO2 plume mapping in conjunction with distributed pressure, temperature and seismic onset time data. Battelle, as a subcontractor, was primarily responsible for the development of analytical and empirical methods for analyzing transient injection rate and pressure data from point/line sources such as injection and monitoring wells. An additional area of emphasis for Battelle was the use of machine learning for such tasks as inferring reservoir connectivity information from injection-production data, and identifying variable importance for machine learning-based proxy models developed from full-physics simulations. The two organizations also collaborated on the application of the tomographic inversion methodology for a field data set.

02 PETROLEUM↗

Innovating the next generation of commercial smart building software

Nearly 30% of commercial building energy use is wasted due to equipment faults and HVAC controls problems. The result is increased emissions, compromised comfort and productivity, and less reliable coordination of building power needs with a clean grid. The energy impact alone represents $17 billion in potential savings. Today’s smart building software provides a robust solution to address these operational deficiencies. Energy management and information systems (EMIS) are saving up to 9% on average, with two-year paybacks. They are being incorporated into energy management processes, commissioning services, and utility programs. As effective as they are, two barriers prevent even deeper benefits; limited personnel to fix problems once they are identified, and the expense and time to manually implement changes in control systems. In partnership with the research community, the EMIS industry is developing new capabilities to overcome these barriers. Moving beyond siloed products for either fault detection and diagnostics, or optimal control, these new capabilities empower users to not only automatically identify faults, but also to push corrective action, and control improvements to their buildings. In this paper, several areas for enhancements are documented: ‘one-time’ correction of faults such as setpoints, schedules, and economizer lockouts; short-term active testing for automated proportional integral derivative (PID) loop tuning and functional testing; and continuous supervisory control for demand flexibility and year-round efficiency. Results are presented from a pair of partner implementations out of a dozen providers integrating these enhancements into their products, including field tests from across the country, and insights into operator acceptance and integration into operations and maintenance practices.

Casillas, Armando↗