Space station definition and preliminary design, WP-01. Volume 2: Results

The basis for the studies and analyses which led to the results and conclusions documented and summarized, was the Engineering Master Schedule (EMS) generated by NASA and used as the controlling set of milestones and associated activities required to produce in a timely manner those products needed by all program participants in the establishment of an approved program baseline. The EMS consisted of twenty themes grouped into categories covering requirements, configurations, and strategies. A number of studies and analyses that were coordinated with the MSFC program and technical personnel as being needed to provide the requisite back-up material to satify the EMS were identified. These studies and analyses provided the data sufficient to support the conclusions and recommendations given to the MSFC in response to their EMS activity and to support the system level and conceptual design level approaches developed and reflected in the detailed sections of this document.

Lenda, J. A.↗

Reducing NPR 7120.5D to Practice: Transitioning from Design Reviews to the SIR Hardware Review

The Gravity Recovery And Interior Laboratory (GRAIL) mission was the first Jet Propulsion Laboratory (JPL) project initiated under NASA's revised rules for space flight project management, NPR 7120.5D, "NASA Space Flight Program and Project Management Requirements." NASA selected GRAIL through a competitive Announcement of Opportunity process and funded its Phase B Preliminary Design effort. The team's first major milestone was a JPL institutional milestone, the Project Mission System Review (PMSR), which proved an excellent tune-up for the end-of-Phase-B NASA life-cycle review, the Preliminary Design Review (PDR). Building on JPL experience on the Prometheus and Juno projects, the team successfully organized for and conducted these reviews on an aggressive schedule. For the Project Critical Design Review (CDR), lessons learned from the PDR and updated Standing Review Board (SRB) practices from the Agency were factored into the review preparation effort. Additionally, the review was held at the Principal Investigator's institution, the Massachusetts Institute of Technology, rather than at the project management center (JPL), which necessitated additional cross-country coordination steps. The PMSR, PDR, and CDR were design reviews and largely paper-oriented. For the System Integration Review (SIR), the project needed to transition to a hardware review and deal with paper in a very different manner. While many of the practices employed for the design reviews were modified and retained (e.g., review preparation team, gate products management, pre-reviews, SRB coordination), the review agenda, presentation style, and slide templates were significantly changed. A key success factor concerned the handling of project open paper, which was succinctly and effectively communicated to the SRB in presentations.This paper provides a brief overview of the GRAIL mission and its project management challenges, provides a detailed description of project SIR preparation and execution activities, including positive and negative lessons learned and identifies recommendations for future NASA (and non- NASA) project teams.

NPR 7120.5D↗

Benefit Assessment of the Integrated Demand Management Concept for Multiple New York Metroplex Airports

Benefits of the Integrated Demand Management (IDM) concept were assessed utilizing a newly developed automated simulation capability called ‘Traffic Management Initiative Automated Simulation (TMIAutoSim).’ The IDM concept focuses on improving traffic flow management (TFM) by coordinating the FAA’s strategic Traffic Flow Management System (TFMS) with its more tactical Time-Based Flow Management (TBFM) system. The IDM concept leverages a new TFMS capability called Collaborative Trajectory Options Program (CTOP) to strategically pre-condition traffic demand flowing into a TBFM-managed arrival environment, where TBFM is responsible for tactically managing traffic by generating precise arrival schedules. The IDM concept was developed over a multi-year effort, focusing on solving New York metroplex airport arrival problems. TMIAutoSim closely mimics NASA’s high-fidelity simulation capabilities while enabling more data to be collected at higher speed. Using this new capability, the IDM concept was evaluated using realistic traffic across various weather scenarios. Six representative weather days were selected after clustering three months of historical data. For those selected six days, Newark Liberty International Airport (EWR) and LaGuardia Airport (LGA) arrival traffic scenarios were developed. For each selected day, the historical data were analyzed to accurately simulate actual operations and the weather impact of the day. The current day operations and the IDM concept operations were simulated for the same weather scenarios and the results were compared. The selected six days were categorized into two groups: ‘clear weather’ for days without Ground Delay Programs (GDP) and ‘convective weather’ for days with GDP and significant weather around New York metroplex airports. For the clear weather scenarios, IDM operations reduced last minute, unanticipated departure delays for short-haul flights within TBFM control boundaries with minimal to no impact on throughput and total delay. For the convective weather scenarios, IDM significantly reduced delays and increased throughput to the destination airports.

Traffic Management Initiative Automated Simulation↗

Resolving Off-Nominal Situations in Schedule-Based Terminal Area Operations: Results from a Human-in-the-Loop Simulation

A recent human-in-the-loop simulation in the Airspace Operations Laboratory (AOL) at NASA's Ames Research Center investigated the robustness of Controller-Managed Spacing (CMS) operations. CMS refers to AOL-developed controller tools and procedures for enabling arrivals to conduct efficient Optimized Profile Descents with sustained high throughput. The simulation provided a rich data set for examining how a traffic management supervisor and terminal-area controller participants used the CMS tools and coordinated to respond to off-nominal events. This paper proposes quantitative measures for characterizing the participants responses. Case studies of go-around events, replicated during the simulation, provide insights into the strategies employed and the role the CMS tools played in supporting them.

Mercer, Joey↗

Emergency Preparedness for Catastrophic Events at Small and Medium Sized Airports: Lacking or Not?

The implementation of security methods and processes in general has had a decisive impact on the aviation industry. However, efforts to effectively coordinate varied aspects of security protocols between agencies and general aviation components have not been adequately addressed. Whether or not overall security issues, especially with regard to planning for catastrophic terrorist events, have been neglected at the nation's smaller airports is the main topic of this paper. For perspective, the term general aviation is generally accepted to include all flying except for military and scheduled airline operations. Genera aviation makes up more than 1 percent of the U.S. Gross Domestic Product and supports almost 1.3 mission high-skilled jobs in professional services and manufacturing and hence is an important component of the aviation industry (AOPA, n.d.). In both conceptual and practical terms, this paper argues for the proactive management of security planning and repeated security awareness training from both an individual and an organizational perspective within the general aviation venue. The results of a research project incorporating survey data from general aviation and small commercial airport managers as well as Transportation Security Administration (TSA) employees are reported. Survey findings suggest that miscommunication does take place on different organizational levels and that between TSA employees and airport management interaction can be contentious and cooperation diminished. The importance of organizational training for decreasing conflict and increasing security and preparedness is discussed as a primary implication.

Sweet, Kathleen M.↗

Keeping Promises

Commitments are between people, not schedules. Project management as practiced today creates a "commitment-free zone," because it assumes that people will commit to centrally managed schedules without providing a mechanism to ensure their work can be done. So they give it their best, but something always seems to come up ..."I tried, but you know how it is." This form of project management does not provide a mechanism to ensure that what should be done, can in fact be done at the required moment. Too often, promises reliable promise. made in coordination meetings are conditional and unreliable. It has been my experience that at times trust can be low and hard to build in this environment. The absence of reliable promises explains why on well-run projects, people are often only completing 30-50 percent of the deliverables they d promised for the week. We all know what a promise is; we have plenty of experience making them and receiving them from others. So what s the problem? The sad fact is that the project environment-like many other work environments- is often so filled with systemic dishonesty, that we don t expect promises that are reliable. Project managers excel when they manage their projects as networks of commitments and help their people learn to elicit and make reliable promises.

Howell, Gregory A.↗

Space Communications Responsive to Events Across Missions (SCREAM): An Investigation of Network Solutions for Transient Science Space Systems

Space Communications Responsive to Events Across Missions (SCREAM): An Investigation of Network Solutions for Transient Science Space Systems The National Academies have prioritized the pursuit of new scientific discoveries using diverse and temporally coordinated measurements from multiple ground and space-based observatories. Networked communications can enable such measurements by connecting individual observatories and allowing them to operate as a cohesive and purposefully designed system. Timely data flows across terrestrial and space communications networks are required to observe transient scientific events and processes. Currently, communications to space-based observatories experience large latencies due to manual service reservation and scheduling procedures, intermittent signal coverage, and network capacity constraints. If space communications network latencies could be reduced, new discoveries about dynamic scientific processes could be realized. However, science mission and network planners lack a systematic framework for defining, quantifying and evaluating timely space data flow implementation options for transient scientific observation scenarios involving multiple ground and space-based observatories. This dissertation presents a model-based systems engineering approach to investigate and develop network solutions to meet the needs of transient science space systems. First, a systematic investigation of the current transient science operations of the National Aeronautics and Space Administration’s (NASA) Tracking and Data Relay Satellite (TDRS) space data network and the Neil Gehrels Swift Observatory resulted in a formal architectural model for transient science space systems. Two methods individual missions may use to achieve timely network services were defined, quantitatively modeled, and experimentally compared. Next, the architectural model was extended to describe two alternative ways to achieve timely and autonomous space data flows to multiple space-based observatories within the context of a purposefully designed transient science observation scenario. A quantitative multipoint space data flow modeling method based in queueing theory was defined. General system suitability metrics for timeliness, throughput, and capacity were specified to support the evaluation of alternative network data flow implementations. A hypothetical design study was performed to demonstrate the multipoint data flow modeling method and to evaluate alternative data flow implementations using TDRS. The merits of a proposed future TDRS broadcast service to implement multipoint data flows were quantified and compared to expected outcomes using the as-built TDRS network. Then, the architectural model was extended to incorporate commercial network service providers. Quantitative models for Globalstar and Iridium short messaging data services were developed based on publicly available sources. Financial cost was added to the set of system suitability metrics. The hypothetical design study was extended to compare the relative suitability of the as-built TDRS network with the commercial Globalstar and Iridium networks. Finally, results from this research are being applied by NASA missions and network planners. In 2020, Swift implemented the first automated command pipeline, increasing its expected gravitational wave follow-up detection rate by greater than 400%. Current NASA technology initiatives informed by this research will enable future space-based observatories to become interoperable sensing devices connected by a diverse ecosystem of network service providers.

Christopher J. Roberts↗

Investigating Low-Altitude Constellations of Ad-Hoc Lunar PNT System for Distributed Spacecraft Autonomy

In this study, we examine a low-altitude Lunar Position, Navigation, and Timing (LPNT) constellations and the localization performance of Centralized Extended Kalman Filter (CEKF) and Decentralized Extended Kalman Filter (DEKF) algorithms. The primary investigation involves a 100-node swarm operating at a 100 km altitude, in contrast to previous studies that examined a 21-node asset in a frozen-orbit at 5,500 km. The autonomous operation of large-scale swarm is based on two-way Inter-Satellite Link (ISL) measurements, which involve pseudoranges and relative velocities among swarm nodes. We perform a numerical assessment of the two filtering approaches, utilizing ‘fully sampled’ measurements from all available assets as well as ‘two ISL’ measurements where each spacecraft is restricted to only two antennas. This research includes an analysis of CEKF under 2-ISL constraints and evaluates the performance of DEKF in a 100-node swarm, which has not been explored in previous studies. In addition, we examine the impact of increasing the sampling frequency for DEKF, showing that the update cycle can be shortened from a 10-minute interval. A novel approach for ‘2-ISL limited’ DEKF will also be introduced, using a matching formulation that exhaustively enumerates all potential matches. This study provides valuable insights into large-scale distributed swarm operations, considering various filter configurations, sampling frequencies, matching strategies, and scalability of CEKF and DEKF for low-altitude LPNT applications. The Lunar PNT technology plays a key role in providing reliable and robust navigation services on the Moon's surface and the South pole, where the primary Lunar missions are planned. To support upcoming Lunar missions, including small satellites from NASA's Commercial Lunar Payload Services program, the Lunar PNT system must be adaptable to smaller platforms like CubeSats. Driven by the growing involvement of public and private exploration partnerships, the traditional low Earth orbit missions are shifting to beyond geosynchronous orbit [1]. These upcoming missions aim to foster a sustainable and innovative exploration program, in collaboration with commercial and international partners, to facilitate human expansion throughout the solar system and return new knowledge and opportunities to Earth [2]. As part of this trend, there are increasing efforts to utilize science missions in Lunar orbit to develop a non-dedicated and ad-hoc PNT network system. Two traditional approaches, the Deep Space Network (DSN) and the weak signal Global Positioning System (GPS), are established deep-space navigation technologies for missions beyond the geosynchronous orbit. Beginning in 1958, the DSN was developed to communicate with the Explorer 1 spacecraft based on the use of radiometric tracking in spacecraft navigation [3]. The DSN is capable of providing nearly unfettered coverage to spacecraft beyond low-Earth orbit (LEO), however, increased space mission volume has created concerns about future expectations of DSN usage for spacecraft navigation [4]. For cislunar mission applications, the position accuracy using DSN achieves 100 m (3σ) with at least three geometrically diverse ground stations when using radiometric tracking alone [5]. The DSN's dependence on Earth-based ground stations restricts its operational capabilities to periods of Earth visibility. This limitation, coupled with its poor localization performance, renders the DSN unsuitable for future lunar missions that demand continuous tracking and precise positioning. To satisfy the increasing requirements of DSN in Lunar applications, spacecrafts are also required to improve their onboard antenna power and efficiency of the transmission. However, there is an important aggregate cost trade between adding capabilities to every spacecraft and adding to a capacity on the ground that serves multiple spacecraft [6]. A weak GPS system can provide PNT service while the user spacecraft is bound to the Moon, leveraging a single, steerable high gain antenna with the relatively narrow beam which includes all the sources in its field of view [7]. However, the higher the altitude the receiver is above the GPS constellations, the poorer and the weaker are the relative geometry and the received signal powers, respectively, leading to a significant navigation accuracy reduction [8]. The transmitted power becomes weaker with increasing distance from the Earth as well as signals tracked from one of the side lobes of the GPS antenna pattern. As a results, the number of visible satellites and relative geometric condition of the GPS satellites at very high altitude drops dramatically and reduces the navigation solution accuracy. Therefore, the weak GPS system is also not an ideal way to provide PNT service to upcoming Lunar missions when considering its limited geometric condition and the recued navigation accuracy. Another navigation approach on the Moon is being developed, similar to the Global Navigation Satellite System (GNSS) on Earth, aiming to offer navigation service with continuous 24/7 coverage across the entire Lunar surface. For example, lunar communications relay and navigation systems (LCRNS) by NASA and Lunar navigation satellite systems (LNSS) by JAXA are designed to serve as dedicated Position, Navigation, and Timing (PNT) systems for the Moon. However, designing a dedicated LNSS and PNT service involves additional challenges, which are unique to the lunar environment, including limited payload capacity for the CubeSat platform, i.e., the size, weight, and power (SWaP) of the onboard clock, limited lunar ground monitoring stations, and limited financial investment as compared to the legacy Earth-GPS [9]. NASA’s focus on utilizing CubeSat platforms on the Moon leads to an alternative Lunar navigation platform that leverages the existing Lunar science and exploration assets. The small satellites used in Lunar missions can be used to create a low-cost, autonomous, ad-hoc, and on-demand mission-centric Lunar PNT swarm capable of providing PNT services to these low-cost lunar missions [10]. As upcoming Lunar missions will often operate at low-altitude about 30 km to 100 km for scientific observations and mapping purposes, the low-altitude orbital constellations could be employed to create an ad-hoc Lunar PNT system. However, several issues must be addressed, such as the instability of these orbits, which often require maintenance or are only suitable for short-duration missions, operating for fewer than 90 days. Additionally, at an altitude of 100 km, the satellites have a limited period during which they are above the horizon and capable of providing PNT service to users. The implementation of a non-dedicated, ad-hoc Lunar navigation constellation facilitates on-demand PNT services. A preliminary study of ad-hoc Lunar PNT system was conducted using 21 spacecraft in 5,5000 km altitude frozen orbits to test its feasibility and a basic performance of orbital asset localization among ad-hoc Lunar constellations in small satellites format [10]. These swarm assets are designed for autonomous localization with minimal Earth interaction, reducing dependency on bandwidth and ground resources. The design in [10] demonstrated the feasibility of a decentralized PNT approach, specifically employing a DEKF approach for state estimation, which helps minimize onboard operating costs. The DEKF method distributes computation across individual satellites, which lightens the computational load while maintaining accuracy in orbit ephemeris and clock offsets, similar to centralized systems [11]. In a follow-on study [12], each spacecraft was limited to 2 communications antennae, forcing the selection of measurements and scheduling spacecraft activities to perform the measurements. A matching algorithm is implemented to select the best measurements and schedule position estimation updates. The decentralized localization performance is also investigated with increasing levels of network degradation for swarm assets considering the impact of intermittent and permanent communication failure, to demonstrate the robustness and fidelity of the decentralized Lunar PNT service [13]. This study confirmed that the ad-hoc PNT constellations in frozen orbit are highly robust and resilient to communication failures. However, unlike frozen orbit swarm assets, the low-altitude satellites have a limited ground view at an altitude of 100 km, where the ad-hoc Lunar constellation consists of 98 low-altitude satellites, evenly distributed across seven circular polar orbital planes, alongside two satellites in a frozen orbit at an altitude of 5,500 km (Figure 1). Therefore, the number of satellites visible to ground users is significantly limited in low-altitude orbit constellations. As each visibility of a spacecraft remains intact for only a few ticks before it moves out of the field of view, the ground user encounters challenges in maintaining continuous navigation service, resulting in sparse availability and provision of Lunar PNT system. Consequently, service availability is primarily restricted to the Lunar South Pole region (Figure 2). Given these limitations and concerns, the localization performance of low-altitude swarm assets will be assessed in this study. We focus on the investigation of the localization performance of low-altitude swarm assets and ground users near the Lunar South Pole. The overall flow of the Lunar PNT simulation incorporates the DEKF approach of asset localization and the weighted least-squares approach in user localization (Figure 3). The autonomous Lunar PNT simulation is primarily implemented in MATLAB, where the DEKF based on the matching scheduler is implemented with Google’s OR-tools as a model builder and Gurobi optimization tool as a backend solver. The General Mission Analysis Tool (GMAT) is utilized to generate ephemeris data for swarm assets, and accounts for satellite orbital details, mass, and perturbations like solar radiation pressure and drag coefficients. Each ephemeris dataset is produced in the Moon International Celestial Reference Frame (ICRF) inertial coordinate system. For state estimation, the distributed swarm assets rely on two-way Inter-Satellite Link (ISL) measurements, which involve tracking pseudoranges and relative velocities between visible satellites and anchor nodes during each observation. Numerical evaluations of the decentralized localization process are conducted to demonstrate the feasibility of the low-altitude PNT system in providing reliable navigation services. The main approach involves using DEKF and CEKF to localize 100 satellites in low-altitude constellations, where the CEKF is implemented to serve as a baseline for comparing the performance of distributed algorithms. In both cases, we evaluate ‘fully sampled’ measurements from all available assets, and ‘two ISL’ measurements when spacecraft are constrained to have only two antennas. We test four estimation techniques: CEKF fully sampled, CEKF two ISL, DEKF fully sampled, and DEKF two ISL filters. As the DEKF update cycle is comprised of network setup, communication, and computations, a global broadcast network and 2-way ISL network setup will take from 4 to 6 minutes as maximum [12]. In this simulation, the DEKF update cycle is set to 10 minutes, including a 4-minute latency for obtaining and computing the actual measurement updates. We experiment an increased update cycle to demonstrate the feasibility and evaluate the impact on localization performance using various tuning values for measurement noise covariances (Figures 4 and 5). By comparing centralized and decentralized approaches using a matching algorithm, we analyze the influence of cross-correlation factors in the covariance matrix, assuming 100% reliability of all assets and measurements. The increased frequency and the adjustments of tuning parameters reveal distinct error patterns between the two scenarios. The localization accuracy of the swarm assets and ground users is assessed by taking the median error across 100 assets and one ground user (84.9°S, 137.5°E) over 7-day simulation period (Table 1). Since the user localization accuracy is significantly affected by the performance of the swarm assets, it is crucial to maintain high localization accuracy within the swarm. This study will continue to explore decentralized filtering for autonomous LPNT operations, with further investigation of an 'iterative' matching approach which enumerates every valid matching pair, planned for the following month.

Yeji Kim↗

The Impact of Maneuver Failures on the EOS Afternoon Constellation

The first four satellites, Aqua, CloudSat, Calipso, and Parasol, in NASA's EOS Afternoon constellation will fly in similar orbits within 4 minutes of each other. This study was undertaken to examine the effect of one or more missions failing to perform a scheduled orbit maintenance maneuver. Tools were developed to rapidly calculate the initial orbital elements for the satellites that established the formation. Baseline maneuver strategies were implemented to maintain the desired spacing of the satellites. Maneuver failures were examined and close approach opportunities were identified. It was found that close-approaches between CloudSat and Calipso could occur in less than one day after a missed maneuver if close coordination between the missions is not achieved.

Demarest, Peter↗

GUST LAT Multiwavelength Planning

Because gamma-ray astrophysics profits in powerful ways from multi-wavelength studies, the GLAST Large Area Telescope (LAT) Collaboration has started multiwavelength planning well before the scheduled 2007 launch. Many aspects of this program are of direct interest to observers using VERITAS and other atmospheric Cerenkov telescopes, whose capabilities complement those of GLAST. This talk with describe some of the current developmental concepts for GLAST LAT multiwavelength work, including release of data for transient sources, nearly-continuous monitoring of selected time-variable sources, pulsar timing, follow-on observations for source identification, coordinated blazar campaigns, and cross-calibration with other high-energy telescopes. Although few details are firm at this stage of preparation for GLAST, the LAT Collaboration looks forward to cooperation with a broad cross-section of the multiwave-length community. The GLAST Large Area Telescope is an international effort, with U.S. funding provided by the Department of Energy and NASA.

Thompson, D. J.↗

A performance analysis method for distributed real-time robotic systems: A case study of remote teleoperation

Robot coordination and control systems for remote teleoperation applications are by necessity implemented on distributed computers. Modeling and performance analysis of these distributed robotic systems is difficult, but important for economic system design. Performance analysis methods originally developed for conventional distributed computer systems are often unsatisfactory for evaluating real-time systems. The paper introduces a formal model of distributed robotic control systems; and a performance analysis method, based on scheduling theory, which can handle concurrent hard-real-time response specifications. Use of the method is illustrated by a case of remote teleoperation which assesses the effect of communication delays and the allocation of robot control functions on control system hardware requirements.

Lefebvre, D. R.↗

Automated Management of Small Unmanned Aircraft System Communications and Navigation Contingency

The number of small Unmanned Aircraft System (sUAS) operating in the low-altitude of the National Airspace System (NAS) has been rapidly increasing in the past few years and this number is expected to grow in the future. However, aside from a few special cases, all sUAS must fly within visual line-of-sight (VLOS) of their operators and this limitation is blocking highly anticipated beyond visual line-of-sight (BVLOS) sUAS applications such as package delivery from practice. To enable routine low-altitude BVLOS operations, there needs to be a traffic management ecosystem that complements the FAA’s Air Traffic Management (ATM) system, which does not provide air traffic services under 400 feet above ground level (AGL). NASA has been pioneering research and development of this ecosystem under UAS Traffic Management (UTM) project since 2015 in a series of Technical Capability Levels (TCL) activities that are increasingly complex. In TCL1, completed in 2015, visual line-of-sight operations such as agriculture, firefighting, and infrastructure monitoring were addressed with a focus on geofencing and operations scheduling. Technologies and requirements needed for BVLOS operations in sparsely populated areas were examined in TCL2 in 2016, and those for operations over moderately populated areas in TCL3 in 2017 and 2018. TCL4 is building on the earlier TCLs and focuses on technologies and requirements for operations in higher-density urban areas for tasks such as newsgathering and package delivery and for managing large-scale contingencies. To coordinate and facilitate the incremental implementation of the UTM ecosystem in the NAS, a Research Transition Team (RTT) has been formed between the FAA, NASA, and industry. The RTT is divided into four subgroups, concept and use case development, data exchange and information architecture, sense and avoid, and communications and navigation (C&N). This paper focuses on C&N subgroup activities, in particular about the development of automated sUAS communications and navigation contingency management. The goal of this development is to prepare sUAS to display predictable behavior while handling C&N off-nominal events. It is expected that the adoption of the presented automated contingency management by the sUAS community will accommodate and inform rulemaking towards governing low-altitude BVLOS operations.

Unmanned Aviation System (UAS) Traffic Management↗

Automated Management of Small Unmanned Aircraft System (UAS) Communications and Navigation Contingency

The number of small Unmanned Aircraft System (sUAS) operating in the low-altitude of the National Airspace System (NAS) has been rapidly increasing in the past few years and this number is expected to grow in the future. However, aside from a few special cases, all sUAS must fly within visual line-of-sight (VLOS) of their operators and this limitation is blocking highly anticipated beyond visual line-of-sight (BVLOS) sUAS applications such as package delivery from practice. To enable routine low-altitude BVLOS operations, there needs to be a traffic management ecosystem that complements the FAA’s Air Traffic Management (ATM) system, which does not provide air traffic services under 400 feet above ground level (AGL). NASA has been pioneering research and development of this ecosystem under UAS Traffic Management (UTM) project since 2015 in a series of Technical Capability Levels (TCL) activities that are increasingly complex. In TCL1, completed in 2015, visual line-of-sight operations such as agriculture, firefighting, and infrastructure monitoring were addressed with a focus on geofencing and operations scheduling. Technologies and requirements needed for BVLOS operations in sparsely populated areas were examined in TCL2 in 2016, and those for operations over moderately populated areas in TCL3 in 2017 and 2018. TCL4 is building on the earlier TCLs and focuses on technologies and requirements for operations in higher-density urban areas for tasks such as newsgathering and package delivery and for managing large-scale contingencies. To coordinate and facilitate the incremental implementation of the UTM ecosystem in the NAS, a Research Transition Team (RTT) has been formed between the FAA, NASA, and industry. The RTT is divided into four subgroups, concept and use case development, data exchange and information architecture, sense and avoid, and communications and navigation (C&N). This paper focuses on C&N subgroup activities, in particular about the development of automated sUAS communications and navigation contingency management. The goal of this development is to prepare sUAS to display predictable behavior while handling C&N off-nominal events. It is expected that the adoption of the presented automated contingency management by the sUAS community will accommodate and inform rulemaking towards governing low-altitude BVLOS operations.

Unmanned Aviation Systems (UAS) Traffic Management↗

Collaboration technology and space science

A summary of available collaboration technologies and their applications to space science is presented as well as investigations into remote coaching paradigms and the role of a specific collaboration tool for distributed task coordination in supporting such teleoperations. The applicability and effectiveness of different communication media and tools in supporting remote coaching are investigated. One investigation concerns a distributed check-list, a computer-based tool that allows a group of people, e.g., onboard crew, ground based investigator, and mission control, to synchronize their actions while providing full flexibility for the flight crew to set the pace and remain on their operational schedule. This autonomy is shown to contribute to morale and productivity.

Leiner, Barry M.↗

Geolocation Assessment Algorithm for CALIPSO Using Coastline Detection

Cloud-Aerosol Lidar Infrared Pathfinder Satellite Observations (CALIPSO) is a joint satellite mission between NASA and the French space agency CNES. The investigation will gather long-term, global cloud and aerosol optical and physical properties to improve climate models. The CALIPSO spacecraft is scheduled to launch in 2004 into a 98.2 inclination, 705 km circular orbit approximately 3 minutes behind the Aqua spacecraft. The payload consists of a two-wavelength polarization-sensitive lidar, and two passive imagers operating in the visible (0.645 mm) and infrared (8.7 - 12.0 mm) spectral regions. The imagers are nadir viewing and co-aligned with the lidar. Earth viewing measurements are geolocated to the Earth fixed coordinate system using satellite ephemeris, Earth rotation and geoid, and instrument pointing data. The coastline detection algorithm will assess the accuracy of the CALIPSO geolocation process by analyzing Wide Field Camera (WFC) visible ocean land boundaries. Processing space-time coincident MODIS and WFC scenes with the coastline algorithm will help verify the co-registration requirement with Moderate Resolution Imaging Spectrometer (MODIS) data. This paper quantifies the accuracy of the coastline geolocation assessment algorithm.

Currey, J. Chris↗

Charlotte - EDC Evaluation and Demonstration (CEED) Human-in-the-Loop Results Briefing to ATD-2 FAA Partners

The Charlotte EDC Evaluation and Demonstration (CEED) was the first Human-In-The-Loop experiment under the Air Traffic Management Technology Demonstration-2 (ATD-2) project. The purpose of the study was fourfold: 1) to establish a simulation environment (Charlotte) for airspace operations for ATD-2 technology, 2) to simulate current-day departures and arrival operations, 3) to assess the impact of current Traffic Management Initiatives (TMI) on Charlotte (CLT) departure flows and en route operations in Washington (ZDC) and Atlanta Centers (ZTL), and 4) to assess the impact of departure takeoff time compliance on airspace operations. The experimental design compared 3 TMIs and 2 compliance levels. Fourteen FAA retired controllers participated in the simulation. In addition, two Traffic Management Coordinators from ZTL and ZDC managed traffic flows. Surface and airborne delays, control efficiency, throughput, realism, workload, and acceptability were assessed and will be compared across the experimental conditions. Participants rated the simulation as very realistic. Results indicate that different TMIs have different impacts on surface and airspace delay. Departure compliance indicates partial benefits to sector complexity and controller workload. This simulation will provide an initial assessment of the tactical scheduling problems that the ATD-2 technology will address in the near term.

airspace technology demonstration 2↗

Effects of Nighttime Light Radiance on the Sleep of the General Population

The objectives of this study is to verify if the exposure to greater nighttime radiance is associated with changes in the sleep/wake schedule and with greater sleep disturbances. Methods: The target population was the adults (18 years and older) living in California, USA. This represents 24 million of inhabitants. A total of 3,104 subjects participated in the survey (participation rate 85.6%). The participants were interviewed by telephone using the Sleep-EVAL system. The interviews covered several topics including sleeping habits, sleep quality, sleep disturbances, physical symptoms related to menopause. Chronic insomnia was defined as difficulty initiating or maintaining sleep for at least 3 months. Global nighttime light emissions have been collected by the Defense Meteorological Satellite Program's Operational Linescan System (DMSP/OLS) sensors. We extracted the radiance calibrated nighttime lights corresponding to the date of the interviews for a three by three window centered on each coordinate corresponding to an interview address. Results: Dissatisfaction with sleep quantity and/or quality was associated with an increased nighttime radiance (p=0.02). Similarly, excessive sleepiness accompanied with impaired functioning was significantly associated with an increased nighttime radiance (p (is) less than 0.0001). The association remained significant after controlling for age, gender and use of a night lamp in the bedroom. Confusional arousals were also significantly associated with an increased nighttime radiance (p (is) less than 0.0001). Bedtime hour was linearly increasing with the intensity of nighttime radiance: the later the bedtime, the greater the nighttime radiance (p (is) less than 0.0001). Similarly, wakeup time became progressively later as the nighttime radiance increased (p (is) less than 0.0001). Both associations remained significant after controlling for age, gender and use of a night lamp in the bedroom. Circadian Rhythm Disorders were the only sleep disorder significantly associated with increased nighttime radiance (p (is) less than 0.0001). Exposure to increased nighttime light radiance appeared to cause a shift in the sleep/wake schedule, excessive sleepiness and Circadian Rhythm Disorders.

Excessive Sleepiness↗

Lunar Atmosphere and Dust Environment Explorer Integration and Test

Integration and test (I&T) of the Lunar Atmosphere and Dust Environment Explorer (LADEE) is presented. A collaborative NASA project between Goddard Space Flight Center and Ames Research Center, LADEE's mission is to explore the low lunar orbit environment and exosphere for constituents. Its instruments include two spectrometers, a dust detector, and a laser communication technology demonstration. Although a relatively low-cost spacecraft, LADEE has I&T requirements typical of most planetary probes, such as prelaunch contamination control, sterilization, and instrument calibration. To lead to a successful mission, I&T at the spacecraft, instrument, and observatory level must include step-by-step and end-to-end functional, environmental, and performance testing. Due to its compressed development schedule, LADEE I&T planning requires adjusting test flows and sequences to account for long-lead critical-path items and limited spares. A protoflight test-level strategy is also baselined. However, the program benefits from having two independent but collaborative teams of engineers, managers, and technicians that have a wealth of flight project experience. This paper summarizes the LADEE I&T planning, flow, facilities, and probe-unique processes. Coordination of requirements and approaches to I&T when multiple organizations are involved is discussed. Also presented are cost-effective approaches to I&T that are transferable to most any spaceflight project I&T program.