Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

A Human-in-the Loop Evaluation of a Coordinated Arrival Departure Scheduling Operations for Managing Departure Delays at LaGuardia Airport

LaGuardia (LGA) departure delay was identified by the stakeholders and subject matter experts as a significant bottleneck in the New York metropolitan area. Departure delay at LGA is primarily due to dependency between LGA's arrival and departure runways: LGA departures cannot begin takeoff until arrivals have cleared the runway intersection. If one-in one-out operations are not maintained and a significant arrival-to-departure imbalance occurs, the departure backup can persist through the rest of the day. At NASA Ames Research Center, a solution called "Departure-sensitive Arrival Spacing" (DSAS) was developed to maximize the departure throughput without creating significant delays in the arrival traffic. The concept leverages a Terminal Sequencing and Spacing (TSS) operations that create and manage the arrival schedule to the runway threshold and added an interface enhancement to the traffic manager's timeline to provide the ability to manually adjust inter-arrival spacing to build precise gaps for multiple departures between arrivals. A more complete solution would include a TSS algorithm enhancement that could automatically build these multi-departure gaps. With this set of capabilities, inter-arrival spacing could be controlled for optimal departure throughput. The concept was prototyped in a human-in-the- loop (HITL) simulation environment so that operational requirements such as coordination procedures, timing and magnitude of TSS schedule adjustments, and display features for Tower, TRACON and Traffic Management Unit could be determined. A HITL simulation was conducted in August 2014 to evaluate the concept in terms of feasibility, controller workload impact, and potential benefits. Three conditions were tested, namely a Baseline condition without scheduling, TSS condition that schedules the arrivals to the runway threshold, and TSS+DSAS condition that adjusts the arrival schedule to maximize the departure throughput. The results showed that during high arrival demand period, departure throughput could be incrementally increased under TSS and TSS+DSAS conditions without compromising the arrival throughput. The concept, operational procedures, and summary results were originally published in ATM20151 but detailed results were omitted. This paper expands on the earlier paper to provide the detailed results on throughput, conformance, safety, flight time/distance, etc. that provide extra insights into the feasibility and the potential benefits on the concept.

trajectory-based operations↗

Evolving Management Strategies to Improve NASA Flagship's Cost and Schedule Performance: LUVOIR as a Case Study

The LUVOIR study process has brought to fruition an extremely exciting scientific mission concept. The 3.5 year LUVOIR study duration enabled an unprecedented level of scientific, engineering, and technology thoroughness prior to the Astro2020 Decadal. This detail also shed light on many technical and programmatic challenges for efficiently developing a mission of this scale. While NASA's flagships perform exquisitely once on-orbit, there is understandable growing frustration in their development cost and schedule overruns. We felt it incumbent upon ourselves to ask how we could improve on delivering LUVOIR (or any of NASA's future flagships) on schedule and on budget, not just for the next mission, but for all NASA large strategic missions to come. We researched past and current NASA flagship's lessons learned publications and other large government projects that pointed to some systemic challenges that will only grow with larger and more complex strategic missions. Our findings pointed us to some ways that could potentially evolve NASA's current flagship management practices to help improve on their development cost and schedule performance despite their growing complexity.. This paper briefly comments on the science motivation for NASA's flagships and on the science motivation for a LUVOIR-like mission. We argue the motivation for improving NASA's flagships development cost and schedule performance. We review the specific challenges of NASA's flagships to acknowledge their specific issues. We then examine the most repeated systemic challenges we found from previous NASA flagship and other large government project lessons learned/observed. Lastly, we offer recommendations to tackle these repeated systemic challenges facing NASA's flagships. The recommendations culminate into a proactive integrated development and funding framework to enable improving the execution of NASA's future flagship's cost and schedule performance.

Crooke, Julie A.↗

Enabling Limited Resource-Bounded Disjunction in Scheduling

We describe three approaches to enabling a severely computationallylimited embedded scheduler to consider a smallnumber of alternative activities based on resource availability.We consider the case where the scheduler is so computationallylimited that it cannot backtrack search. The first twoapproaches precompile resource checks (called guards) thatonly enable selection of a preferred alternative activity if sufficientresources are estimated to be available to schedule theremaining activities. The third approach mimics backtrackingby invoking the scheduler multiple times with the alternativeactivities. We present an evaluation of these techniques onMars mission scenarios (called sol types) from NASA’s nextplanetary rover where these techniques are being evaluatedfor inclusion in an onboard scheduler.

Vaquero, Tiago↗

Deep RL for Fast Long-Horizon Operations Scheduling on NASA's Carruthers Geocorona Observatory Mission

Spacecraft operations scheduling is a highly constrained, long-horizon combinatorial optimization problem that traditionally relies on heuristics, constraint programming, or manual planning. We present a scalable deep reinforcement learning framework developed and deployed for NASA’s Carruthers Geocorona Observatory mission. Our framework introduces a macro-action abstraction known as activity blocks coupled with dynamic action-masking to navigate the intractably large search space and strictly enforce complex power, thermal, and instrument constraints. The resulting architecture generates globally feasible schedules with overwhelming probability, establishes operational trust, and executes a full training cycle in under six hours, circumventing the need for policy robustness by enabling rapid, on-demand retraining. Further, resulting schedules outperform baseline heuristics in scheduled science quality. The deep reinforcement learning framework was deployed as the default operational scheduler for the Carruthers Geocorona Observatory mission from the outset of the mission, demonstrating that deep reinforcement learning can be trusted for real spacecraft operations under complex, evolving constraints.

Geocorona↗

Spread spectrum scheduling requests for wireless communication resource

Apparatuses, systems and methods are disclosed for wireless communication. A base station may communicate with a plurality of user equipments (UEs) without allocating spectral resources to the UEs for communicating scheduling requests. The base station may detect a scheduling request from a requesting UE of the plurality of UEs. The scheduling request may include a spread spectrum signal based on a spreading sequence. The scheduling request may indicate an identity for a requesting UE without indicating information other than the identity. The base station may grant spectral resources to the requesting UE in response to detecting a scheduling request.

Moradi, Hussein↗

DeepSurveySim: Simulation Software and Benchmark Challenges for Astronomical Observation Scheduling

Modern astronomical surveys have multiple competing scientific goals. Optimizing the observation schedule for these goals presents significant computational and theoretical challenges, and state-of-the-art methods rely on expensive human inspection of simulated telescope schedules. Automated methods, such as reinforcement learning, have recently been explored to accelerate scheduling. However, there do not yet exist benchmark data sets or user-friendly software frameworks for testing and comparing these methods. We present DeepSurveySim -- a high-fidelity and flexible simulation tool for use in telescope scheduling. DeepSurveySim provides methods for tracking and approximating sky conditions for a set of observations from a user-supplied telescope configuration. We envision this tool being used to produce benchmark data sets and for evaluating the efficacy of ground-based telescope scheduling algorithms, particularly for machine learning algorithms that would suffer in efficacy if limited to real data for training.We introduce three example survey configurations and related code implementations as benchmark problems that can be simulated with DeepSurveySim.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Stochastic scheduling for commercial building cooling systems: considering uncertainty in zone temperature prediction

Here, this paper presents the first attempt to address the uncertainty in zone temperature prediction with stochastic optimization. The uncertain zone temperature is a process uncertainty and has not been considered in the existing stochastic optimization for building control. To fill this gap, we proposed a novel formulation of stochastic optimization to handle process uncertainty in building control. Specifically, we first examined the accuracy of a typical linear model for predicting zone temperature. We then formulated the scheduling of the building cooling system as a stochastic optimization problem over a 24-hour look-ahead period to minimize the electricity cost of the studied building cooling system. After that, we applied the proposed stochastic load scheduling (SLS) to a direct expansion (DX) cooling system that serves a medium office building. Through simulation with a detailed building energy simulation software, EnergyPlus, we evaluated the operational cost and the thermal comfort compared with a deterministic load scheduling. The operation cost of scheduling was found to vary with the level of zone temperature prediction uncertainty. The proposed SLS can mitigate the impacts of uncertain zone temperature predictions on both operational cost and thermal comfort. The evaluation results indicate that the proposed SLS works better when the uncertainty level is more significant.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Modeling occupancy-driven building loads for large and diversified building stocks through the use of parametric schedules

Building energy modeling provides a fundamental tool to assess the potential for energy efficiency to contribute to reducing world energy consumption and global emissions. Occupancy-related operations are a key source of uncertainty for building energy analysis, particularly for aggregated building stocks. At a district or city level, it is critical to estimate aggregated power load profiles for sizing power grid infrastructure, power plant capacity allocation, and energy efficiency measures. The stochastic nature of behavior-related operations complicates the creation of models that accurately capture building load profiles for entire building stocks. This research introduces a new methodology called parametric schedules to model occupancy-driven schedules for large and diverse building stocks. In contrast to computationally expensive methodologies proposed in the literature, our work does not use a recursive time-consuming step. Occupancy is estimated by the extrapolation of operation times directly from metered electric consumption data; occupancy-related schedules are stochastically assigned to each building model, guaranteeing diversity of operation times in the stock. Our procedure has been tested on a large, diversified data-set of 25,000 commercial buildings in Los Angeles, California. It proved to be able to adequately represent the stochastic schedules diversity of the stock and to refine the stock calibration process by 1%. This innovative approach represents a useful asset for utility companies, grid operators, urban planners, and balancing authorities, seeking to improve building stock modeling and better estimate the impact of energy conservation measures. – This work is part of a larger stock modeling tool called ComStock, which is under development by NREL.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Minimizing total energy cost and tardiness penalty for a scheduling-layout problem in a flexible job shop system: A comparison of four metaheuristic algorithms

Job scheduling and machine layout are interrelated in improving energy consumption (EC) and productivity measures such as tardiness and represent two important decisions that must be made by manufacturers. This interdependency can be explained by transportation time, which connects scheduling and layout. Scheduling and layout, however, have not been thoroughly studied in conjunction using an integrated model in the context of sustainable manufacturing. Hence, we propose an energy-aware optimization model in which scheduling is integrated with layout in a single-level framework. More specifically, a single objective function is defined to minimize the facility energy cost and the job tardiness penalty, which control EC and tardiness respectively in a flexible job shop system. In order to model machine EC more accurately, we also consider three different machine states: a processing state and two idle states. Our case studies show that the integrated model exhibits better performance in controlling manufacturing EC and job tardiness than a non-integrated model in which machine locations are uncontrollable and transportation times between machines are unchangeable. To deal with large-sized problems, we also introduce four new metaheuristics. The performances of these new metaheuristics are compared in terms of objective function values and CPU times using various case studies. The results indicate that a hybrid ant colony optimization and simulated annealing (ACO-SA) algorithm provides better performance than the other algorithms. Specifically, our case studies show that the integrated model using ACO-SA can improve the objective function value by around 5% when compared to the non-integrated model.

42 ENGINEERING↗

Data-driven optimization of mixed-integer bi-level multi-follower integrated planning and scheduling problems under demand uncertainty

The coordination of interconnected elements across the different layers of the supply chain is essential for all industrial processes and the key to optimal decision-making. Yet, the modeling and optimization of such interdependent systems are still burdensome. Here we address the simultaneous modeling and optimization of medium-term planning and short-term scheduling problems under demand uncertainty using mixed-integer bi-level multi-follower programming and data-driven optimization. Bi-level multi-follower programs model the natural hierarchy between different layers of supply chain management holistically, while scenario analysis and data-driven optimization allow us to retrieve the guaranteed feasible solutions of the integrated formulation under various demand considerations. We address the data-driven optimization of this challenging class of problems using the DOMINO framework, which was initially developed to solve single-leader single-follower bi-level optimization problems to guaranteed feasibility. This framework is extended to solve single-leader multi-follower stochastic formulations and its performance is characterized by well-known single and multi-product process scheduling case studies. Through our data-driven algorithmic approach, we present guaranteed feasible solutions to linear and nonlinear mixed-integer bi-level formulations of simultaneous planning and scheduling problems and further characterize the effects of the scheduling level complexity on the solution performance, which spans over several hundred continuous and binary variables, and thousands of constraints.

42 ENGINEERING↗

Cluster analysis of occupancy schedules in residential buildings in the United States

The energy performance of residential buildings significantly depends on the building occupants’ behavior, which can be highly variable. When the heating, ventilation and air conditioning (HVAC) system is controlled based on the presence or absence of occupants in a building, occupant behavior is of even further importance to its energy performance. In current practice, building energy simulation tools generally use a single occupancy profile to represent the building’s occupancy schedule, the schedule of which is considered to be the same, regardless of the type of household being modeled. Thus, there is significant potential for improvement to allow for more flexibility and accuracy in calculation of occupancy. The objective of this study is to assess the variations in the typical types of occupancy schedules followed by the U.S. population using cluster analysis. American Time Use Survey data, which statically represents the overall U.S. population’s activities, across 12 years (2006–2017), is used. The ATUS data is segregated into smaller groups based on age and weekday/weekend, then divided into activities that are considered “at home” and “away from home”, which are mapped to the presence or non-presence of occupants in the home. Cluster analysis is then used to identify common types of occupancy schedule patterns for each age group. Three main types of patterns are obtained from cluster analysis for each age group, which together represent approximately 88% of people in the United States. The output of the cluster analysis is further analyzed to evaluate the variation in characteristics, including the number of times leaving home, time of day when leaving the home, and the timespan of absence from the home. The results of this study provide detailed insights on how typical occupants in the United States spend their time in residential spaces which can be used to create occupancy profiles for residential buildings. Finally, these occupancy profiles could be utilized inform an assessment of the energy use impact of occupancy-based controls of energy consuming systems and technologies.

42 ENGINEERING↗

Development of window scheduler algorithm exploiting natural ventilation and thermal mass for building energy simulation and smart home controls

Building energy simulations often rely on abstract assumptions when it comes to natural ventilation, such as ‘windows always open [or closed]’ or ‘windows open when outdoor temperature is below a certain threshold.’ However, simulations based on these assumptions fail to fully exploit the cooling potential of natural ventilation, as its effectiveness can be enhanced or diminished by various factors, including the presence of thermal mass. This issue also extends to smart home controls, where determining the window schedule becomes challenging without information about the building's response to outdoor conditions. To address these issues, this study has developed an analytical model for window operation schedules that leverages the passive cooling from natural ventilation. The analytical model was validated against a Modelica simulation. A case study utilizing the BESTEST model of ANSI/ASHRAE Standard 140 underwent validation with EnergyPlus simulations, showing strong concordance. The algorithm provides window schedule recommendations adapted to various airflow rates, thermal masses, and climate variations. Notably, the case study demonstrated that proper window scheduling could reduce indoor temperature by up to 8 °C under the given simulation settings, thereby improving resilience and indicating potential energy savings. Furthermore, the paper explores the potential opportunities and challenges this approach presents, especially for building simulation and smart home applications.

42 ENGINEERING↗

Meter-based synthesis of equipment schedules for improved models of electrical demand in multifamily buildings

Here, the authors present a novel method for using electrical meter data to synthesize realistic equipment use schedules that can improve models of electrical demand in buildings. Other methods exist for creating schedules based on historical data from a limited set of past field studies, but the method presented here is unique because it allows a modeller to customize and calibrate equipment use schedules based on user-specified meter data and load profile metrics. Additionally, a case study with water heaters demonstrates that this schedule synthesis method can outperform traditional modelling strategies by replicating key characteristics of a measured equipment load profile, including its magnitude, variability, and relationships between load and time. In particular, the new method was more effective at replicating the total water heater electrical load duration curve and ramp duration curve of a real-world reference building.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

A Non-Cooperative Game-Based Distributed Beam Scheduling Framework for 5G Millimeter-Wave Cellular Networks

Here, this paper studies the problem of distributed beam scheduling for 5G millimeter-Wave (mm-Wave) cellular networks where base stations (BSs) belonging to different operators share the same spectrum without centralized coordination among them. Our goal is to design efficient distributed scheduling algorithms to maximize the network utility, which is a function of the achieved throughput by the user equipment (UEs), subject to the average and instantaneous power consumption constraints of the BSs. We propose a Media Access Control (MAC) and a power allocation/adaptation mechanism utilizing the Lyapunov stochastic optimization framework and non-cooperative games. In particular, we first decompose the original utility maximization problem into two sub-optimization problems for each time frame, which are a convex optimization problem and a non-convex optimization problem, respectively. By formulating the distributed scheduling problem as a non-cooperative game where each BS is a player attempting to optimize its own utility, we provide a distributed solution to the non-convex sub-optimization problem via finding the Nash Equilibrium (NE) of the game whose weights are determined optimally by the Lyapunov optimization framework. Finally, we conduct simulation under various network settings to show the effectiveness of the proposed game-based beam scheduling algorithm in comparison to that of several reference schemes.

42 ENGINEERING↗

ASTER Scheduling Prioritization Function

ASTER schedules are generated by an automated scheduling system. This scheduler will generate psuedo-optimal schedules based on a priority scheme. This priority scheme is controlled by the Science Team.

scheduling ASTER↗

Distributed network scheduling

Distributed Network Scheduling is the scheduling of future communications of a network by nodes in the network. This report details software for doing this onboard spacecraft in a remote network. While prior work on distributed scheduling has been applied to remote spacecraft networks, the software reported here focuses on modeling communication activities in greater detail and including quality of service constraints. Our main results are based on a Mars network of spacecraft and include identifying a maximum opportunity of improving traverse exploration rate a factor of three; a simulation showing reduction in one-way delivery times from a rover to Earth from as much as 5 to 1.5 hours; simulated response to unexpected events averaging under an hour onboard; and ground schedule generation ranging from seconds to 50 minutes for 15 to 100 communication goals.

planning↗

E-Scheduling the Deep Space Network

This paper describes an operations concept for electronic scheduling and software interface for organizations to extract required views of the schedule. Advantages include widespread accessibility to a common schedule document, virtually instantaneous distribution of new schedule releases, and the ability of missions to perfom conflict resolution off-line without time-consuming meetings.

telecommunications↗

Collaborative Scheduling Using JMS in a Mixed Java and .NET Environment

A collaborative framework/environment was proto-typed to prove the feasibility of scheduling space flight missions on NASA's Deep Space Network (DSN) in a distributed fashion. In this environment, effective collaboration relies on efficient communications among all flight mission and DSN scheduling users. There-fore, messaging becomes critical to timely event notification and data synchronization. In the prototype, a rapid messaging system using Java Message Service (JMS) in a mixed Java and .NET environment is established. This scheme allows both Java and .NET applications to communicate with each other for data synchronization and schedule negotiation. The JMS approach we used is based on a centralized messaging scheme. With proper use of a high speed messaging system, all users in this collaborative framework can communicate with each other to generate a schedule collaboratively to meet DSN and projects tracking needs.

scheduling↗