Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “power systems planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

The Los Angeles 100% Renewable Energy Study (LA100): Chapter 1. Introduction

The City of Los Angeles has set ambitious goals to transform its electricity supply, aiming to achieve a 100% renewable energy power system by 2045, along with aggressive electrification targets for buildings and vehicles. To reach these goals, and assess the implications for jobs, electricity rates, the environment, and environmental justice, the Los Angeles City Council passed a series of motions directing the Los Angeles Department of Water and Power (LADWP) to determine the technical feasibility and investment pathways of a 100% renewable energy portfolio standard. The Los Angeles 100% Renewable Energy Study (LA100) is a first-of-its-kind objective, rigorous, and science-based power systems analysis to determine what investments could be made to achieve these goals. The LA100 final report is presented as a collection of 12 chapters and an executive summary, each of which is available as an individual download. This chapter introduces the study.

100% Renewable↗

Fault analysis of multichannel spacecraft power systems

The NASA Marshall Space Flight Center proposes to implement computer-controlled fault injection into an electrical power system breadboard to study the reactions of the various control elements of this breadboard. Elements under study include the remote power controllers, the algorithms in the control computers, and the artificially intelligent control programs resident in this breadboard. To this end, a study of electrical power system faults is being performed to yield a list of the most common power system faults. The results of this study will be applied to a multichannel high-voltage DC spacecraft power system called the large autonomous spacecraft electrical power system (LASEPS) breadboard. The results of the power system fault study and the planned implementation of these faults into the LASEPS breadboard are described.

Dugal-Whitehead, Norma R.↗

Space Station Module Power Management and Distribution System (SSM/PMAD)

This report provides an overview of the Space Station Module Power Management and Distribution (SSM/PMAD) testbed system and describes recent enhancements to that system. Four tasks made up the original contract: (1) common module power management and distribution system automation plan definition; (2) definition of hardware and software elements of automation; (3) design, implementation and delivery of the hardware and software making up the SSM/PMAD system; and (4) definition and development of the host breadboard computer environment. Additions and/or enhancements to the SSM/PMAD test bed that have occurred since July 1990 are reported. These include: (1) rehosting the MAESTRO scheduler; (2) reorganization of the automation software internals; (3) a more robust communications package; (4) the activity editor to the MAESTRO scheduler; (5) rehosting the LPLMS to execute under KNOMAD; implementation of intermediate levels of autonomy; (6) completion of the KNOMAD knowledge management facility; (7) significant improvement of the user interface; (8) soft and incipient fault handling design; (9) intermediate levels of autonomy, and (10) switch maintenance.

Miller, William↗

Reliability Issues in Stirling Radioisotope Power Systems

Stirling power conversion is a potential candidate for use in a Radioisotope Power System (RPS) for space science missions because it offers a multifold increase in the conversion efficiency of heat to electric power and reduced requirement of radioactive material. Reliability of an RPS that utilizes Stirling power conversion technology is important in order to ascertain long term successful performance. Owing to long life time requirement (14 years), it is difficult to perform long-term tests that encompass all the uncertainties involved in the design variables of components and subsystems comprising the RPS. The requirement for uninterrupted performance reliability and related issues are discussed, and some of the critical areas of concern are identified. An overview of the current on-going efforts to understand component life, design variables at the component and system levels, and related sources and nature of uncertainties are also discussed. Current status of the 110 watt Stirling Radioisotope Generator (SRG110) reliability efforts is described. Additionally, an approach showing the use of past experience on other successfully used power systems to develop a reliability plan for the SRG110 design is outlined.

Shah, Ashwin R.↗

Reliability Issues in Stirling Radioisotope Power Systems

Stirling power conversion is a potential candidate for use in a Radioisotope Power System (RPS) for space science missions because it offers a multifold increase in the conversion efficiency of heat to electric power and reduced requirement of radioactive material. Reliability of an RPS that utilizes Stirling power conversion technology is important in order to ascertain long term successful performance. Owing to long life time requirement (14 years), it is difficult to perform long-term tests that encompass all the uncertainties involved in the design variables of components and subsystems comprising the RPS. The requirement for uninterrupted performance reliability and related issues are discussed, and some of the critical areas of concern are identified. An overview of the current on-going efforts to understand component life, design variables at the component and system levels, and related sources and nature of uncertainties are also discussed. Current status of the 110 watt Stirling Radioisotope Generator (SRG110) reliability efforts is described. Additionally, an approach showing the use of past experience on other successfully used power systems to develop a reliability plan for the SRG110 design is outlined.

Schreiber, Jeffrey↗

Space Station power system

A Space Station Task Force was established by the NASA Administrator in May 1982 to provide focus and direction for Space Station planning activities. The Task Force also provides Congress and the Administration with sufficient information to allow them to make an informed decision on whether the United States should proceed with a Space Station as the next major national initiative in space. This paper will present the status of planning activities to date, with major emphasis on the power system. Technology options, power requirements, and schedule will be discussed.

Forestieri, A. F.↗

The Los Angeles 100% Renewable Energy Study (LA100): Chapter 11. Economic Impacts and Jobs

The City of Los Angeles has set ambitious goals to transform its electricity supply, aiming to achieve a 100% renewable energy power system by 2045, along with aggressive electrification targets for buildings and vehicles. To reach these goals, and assess the implications for jobs, electricity rates, the environment, and environmental justice, the Los Angeles City Council passed a series of motions directing the Los Angeles Department of Water and Power (LADWP) to determine the technical feasibility and investment pathways of a 100% renewable energy portfolio standard. The Los Angeles 100% Renewable Energy Study (LA100) is a first-of-its-kind objective, rigorous, and science-based power systems analysis to determine what investments could be made to achieve these goals. The LA100 final report is presented as a collection of 12 chapters and an executive summary, each of which is available as an individual download. This chapter reviews economic impacts, including local net economic impacts and gross workforce impacts.

100% Renewable↗

The Los Angeles 100% Renewable Energy Study (LA100): Chapter 2. Study Approach

The City of Los Angeles has set ambitious goals to transform its electricity supply, aiming to achieve a 100% renewable energy power system by 2045, along with aggressive electrification targets for buildings and vehicles. To reach these goals, and assess the implications for jobs, electricity rates, the environment, and environmental justice, the Los Angeles City Council passed a series of motions directing the Los Angeles Department of Water and Power (LADWP) to determine the technical feasibility and investment pathways of a 100% renewable energy portfolio standard. The Los Angeles 100% Renewable Energy Study (LA100) is a first-of-its-kind objective, rigorous, and science-based power systems analysis to determine what investments could be made to achieve these goals. The LA100 final report is presented as a collection of 12 chapters and an executive summary, each of which is available as an individual download. This chapter describes the LA100 study approach, including the modeling framework and scenarios.

100% Renewable↗

(abstract) MEASURE-Jupiter: Low Cost Missions to Explore Jupiter in the Post-Galileo Era

MEASURE-Jupiter is a new mission concept for the exploration of giant planets, with initial application to Jupiter. By flying sets of lightweight spacecraft with highly focused measurement objectives, it is designed to break the apparent impass in giant planet exploration beyond Cassini. The MEASURE-Jupiter concept is characterized by: 1) intensive exploration of a giant planet system, 2) multiple small missions flown in focused waves using spacecraft costing $100M to $200M, and 3) mission sets launched every 2 to 3 years. Why Jupiter? Jupiter is the most complex planetary system in the Solar System with many scientifically intriguing bodies and phenomena to explore. The Galileo mission will scratch the surface of the exploration of Jupiter, posing many questions for the MEASURE-Jupiter missions to address. Jupiter is also the easiest planet in the Outer Solar System to reach, making possible flight times of 2 years and total mission durations of 3 years or less. Concept design studies have uncovered a number of scientifically rewarding, simple, low-cost mission options. These options have the additional attraction of being able to launch on 2-year trajectories to Jupiter with low-cost Delta II expendable launch vehicles. A partial list of mission concepts studied to date include: Io Very Close Flyby, Jupiter Close Polar Pass, Mini-Orbiters, and Galilean Satellite Penetrators. Key to the realization of the MEASURE-Jupiter missions is the judicious use of the new low power consuming advanced technology and applicable systems from the Pluto Fast Flyby mission spacecraft design. Foremost of the new technologies planned for inclusion are the elements of hybrid solar array/battery power systems which make it possible to perform the identified missions without the need for Radioactive Thermoelectric Generators (RTGs). This relieves the mission design of the attendant programmatic complexities, cost, and constraints attendant with the use of RTGs.

MEASURE-Jupiter Jupiter Pluto Fast Flyby low cost ↗

Quantifying grid reliability and resilience impacts of energy efficiency: Examples and opportunities

Traditional reliability and emerging resilience metrics may not fully recognize benefits from distributed energy resources (DERs) such as energy efficiency. This technical brief explains how existing planning processes for bulk power and distribution systems capture the impact of energy efficiency on power system reliability and resilience with illustrative examples. We identify limitations in using existing reliability and resilience metrics to quantify efficiency and other DER benefits. The brief concludes with a discussion of opportunities to enhance current planning practices to better capture the reliability and resilience value of energy efficiency.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Status of ERDA-DOD applications plans

A demonstration program is reported that defines solar terrestrial photovoltaic systems as power sources for DOD applications by developing requirements and implementation plans for each demonstration project. Evaluation criteria emphasize military market potential and military advantages.

Dinger, D. B.↗

High temporal resolution generation expansion planning for the clean energy transition

As power systems integrate increasing quantities of wind, solar and energy storage resources, it is important to revisit power system capacity expansion modeling methods and assumptions that have been utilized in thermal- dominated systems. We conduct a series of case study analyses using a simplified representation of the Electric Reliability Council of Texas (ERCOT) system to demonstrate how least-cost capacity expansion outcomes are impacted by changes in model resolution across two temporal dimensions: 1) the number of considered representative periods, and 2) the system dispatch interval. First, we find that the least-cost generation portfolio can differ significantly for small changes in the number of representative days, but largely converges to the 365-day result once 104 representative days are considered. Furthermore, systems with wind, solar and storage resources were more sensitive to changes in the number of representative days than a thermal-dominated system. Second, we find that considering five-minute dispatch resolution consistently results in least-cost generation portfolios with less solar capacity and more energy storage capacity than corresponding scenarios with hourly dispatch intervals. This suggests that hourly dispatch representation fails to capture the intra-hour volatility of solar generation, and therefore also overlooks opportunities for storage resources to provide system value by balancing this volatility. Collectively these results indicate that capacity expansion modelers should revisit conventional approaches to temporal representation when conducting analyses of deeply decarbonized power systems to ensure that such analyses are robust and actionable. To our knowledge, this is the first study to analyze capacity expansion outcomes with five-minute dispatch resolution in this manner.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Grid Planning for Building Electrification: A Report by the Energy Systems Integration Group’s Grid Planning for Building Electrification Task Force

The increased electrification of buildings across the United States is being driven by technical advancements, cost reductions for some building technologies, consumer preferences, and policy goals for decarbonization. However, the effects of this load growth on the electric distribution system are often only a minor consideration in policymaking and long-term planning studies. The long lead time and useful life of power system equipment means that the decisions taken today are expected to support our society well into the 2060s and beyond. Distribution planning stakeholders can take steps today to establish a grid foundation that captures the new challenges presented by building electrification. This report focuses on building electrification for the residential and commercial sectors, focusing most heavily on space heating, as this end use stands to most strongly impact demand.1 Across all end uses, building electrification could require somewhere between 10% and 70% more electricity generation capacity than exists today depending on technology adoption and energy efficiency.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The Los Angeles 100% Renewable Energy Study (LA100): Chapter 10. Environmental Justice

The City of Los Angeles has set ambitious goals to transform its electricity supply, aiming to achieve a 100% renewable energy power system by 2045, along with aggressive electrification targets for buildings and vehicles. To reach these goals, and assess the implications for jobs, electricity rates, the environment, and environmental justice, the Los Angeles City Council passed a series of motions directing the Los Angeles Department of Water and Power (LADWP) to determine the technical feasibility and investment pathways of a 100% renewable energy portfolio standard. The Los Angeles 100% Renewable Energy Study (LA100) is a first-of-its-kind objective, rigorous, and science-based power systems analysis to determine what investments could be made to achieve these goals. The LA100 final report is presented as a collection of 12 chapters and an executive summary, each of which is available as an individual download. This chapter explores implications for environmental justice, including procedural and distributional justice, with an in-depth review of how projections for customer rooftop solar and health benefits vary by census tract.

100% Renewable↗

The Los Angeles 100% Renewable Energy Study (LA100): Executive Summary

The City of Los Angeles has set ambitious goals to transform its electricity supply, aiming to achieve a 100% renewable energy power system by 2045, along with aggressive electrification targets for buildings and vehicles. To reach these goals, and assess the implications for jobs, electricity rates, the environment, and environmental justice, the Los Angeles City Council passed a series of motions directing the Los Angeles Department of Water and Power (LADWP) to determine the technical feasibility and investment pathways of a 100% renewable energy portfolio standard. The Los Angeles 100% Renewable Energy Study (LA100) is a first-of-its-kind objective, rigorous, and science-based power systems analysis to determine what investments could be made to achieve these goals. The LA100 final report is presented as a collection of 12 chapters and an executive summary, each of which is available as an individual download.

100% renewable↗

The Los Angeles 100% Renewable Energy Study (LA100): Chapter 4. Customer-Adopted Rooftop Solar and Storage

The City of Los Angeles has set ambitious goals to transform its electricity supply, aiming to achieve a 100% renewable energy power system by 2045, along with aggressive electrification targets for buildings and vehicles. To reach these goals, and assess the implications for jobs, electricity rates, the environment, and environmental justice, the Los Angeles City Council passed a series of motions directing the Los Angeles Department of Water and Power (LADWP) to determine the technical feasibility and investment pathways of a 100% renewable energy portfolio standard. The Los Angeles 100% Renewable Energy Study (LA100) is a first-of-its-kind objective, rigorous, and science-based power systems analysis to determine what investments could be made to achieve these goals. The LA100 final report is presented as a collection of 12 chapters and an executive summary, each of which is available as an individual download. This chapter explores the technical and economic potential for rooftop solar in LA, and how much solar and storage might be adopted by customers.

100% Renewable↗

The Los Angeles 100% Renewable Energy Study (LA100): Chapter 12. Synthesis

The City of Los Angeles has set ambitious goals to transform its electricity supply, aiming to achieve a 100% renewable energy power system by 2045, along with aggressive electrification targets for buildings and vehicles. To reach these goals, and assess the implications for jobs, electricity rates, the environment, and environmental justice, the Los Angeles City Council passed a series of motions directing the Los Angeles Department of Water and Power (LADWP) to determine the technical feasibility and investment pathways of a 100% renewable energy portfolio standard. The Los Angeles 100% Renewable Energy Study (LA100) is a first-of-its-kind objective, rigorous, and science-based power systems analysis to determine what investments could be made to achieve these goals. The LA100 final report is presented as a collection of 12 chapters and an executive summary, each of which is available as an individual download. This chapter reviews high-level findings, costs, benefits, and lessons learned from integrating this diverse suite of models and conducting a high-fidelity 100% renewable energy study.

100% Renewable↗