Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “power system planning and analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

Development of High Fidelity, Fuel-Like Thermal Simulators for Non-Nuclear Testing

This viewgraph presentation reviews the development of a simulator for non-nuclear tests for the development of a space nuclear power system. The development of the Instrumented Thermal Simulator is to assist in developing an understanding of individual components and integrated system operation without the cost, time, safety concerns associated with nuclear testing. The presentation shows the design, the electrical integration, the hardware, and the assembly of the simulators. There are slides that show the test plan, the analysis, and the initial results.

Bragg-Sitton, Shannon↗

GIS Methodology for Planning Planetary-Rover Operations

A document describes a methodology for utilizing image data downlinked from cameras aboard a robotic ground vehicle (rover) on a remote planet for analyzing and planning operations of the vehicle and of any associated spacecraft. Traditionally, the cataloging and presentation of large numbers of downlinked planetary-exploration images have been done by use of two organizational methods: temporal organization and correlation between activity plans and images. In contrast, the present methodology involves spatial indexing of image data by use of the computational discipline of geographic information systems (GIS), which has been maturing in terrestrial applications for decades, but, until now, has not been widely used in support of exploration of remote planets. The use of GIS to catalog data products for analysis is intended to increase efficiency and effectiveness in planning rover operations, just as GIS has proven to be a source of powerful computational tools in such terrestrial endeavors as law enforcement, military strategic planning, surveying, political science, and epidemiology. The use of GIS also satisfies the need for a map-based user interface that is intuitive to rover-activity planners, many of whom are deeply familiar with maps and know how to use them effectively in field geology.

Powell, Mark↗

NASA Tech Briefs, Februrary 2013

Topics covered include: Measurements of Ultra-Stable Oscillator (USO) Allan Deviations in Space; Gaseous Nitrogen Orifice Mass Flow Calculator; Validation of Proposed Metrics for Two-Body Abrasion Scratch Test Analysis Standards; Rover Low Gain Antenna Qualification for Deep Space Thermal Environments; Automated, Ultra-Sterile Solid Sample Handling and Analysis on a Chip; Measuring and Estimating Normalized Contrast in Infrared Flash Thermography; Spectrally and Radiometrically Stable, Wideband, Onboard Calibration Source; High-Reliability Waveguide Vacuum/Pressure Window; Methods of Fabricating Scintillators With Radioisotopes for Beta Battery Applications; Magnetic Shield for Adiabatic Demagnetization Refrigerators (ADR); CMOS-Compatible SOI MESFETS for Radiation-Hardened DC-to-DC Converters; Silicon Heat Pipe Array; Adaptive Phase Delay Generator; High-Temperature, Lightweight, Self-Healing Ceramic Composites for Aircraft Engine Applications; Treatment to Control Adhesion of Silicone-Based Elastomers; High-Temperature Adhesives for Thermally Stable Aero-Assist Technologies; Rockballer Sample Acquisition Tool; Rock Gripper for Sampling, Mobility, Anchoring, and Manipulation; Advanced Magnetic Materials Methods and Numerical Models for Fluidization in Microgravity and Hypogravity; Data Transfer for Multiple Sensor Networks Over a Broad Temperature Range; Using Combustion Synthesis to Reinforce Berms and Other Regolith Structures; Visible-Infrared Hyperspectral Image Projector; Three-Axis Attitude Estimation With a High-Bandwidth Angular Rate Sensor Change_Detection.m; AGATE: Adversarial Game Analysis for Tactical Evaluation; Ionospheric Simulation System for Satellite Observations and Global Assimilative; Modeling Experiments (ISOGAME); An Extensible, User- Modifiable Framework for Planning Activities; Mission Operations Center (MOC) - Precipitation Processing System (PPS) Interface Software System (MPISS); Automated 3D Damaged Cavity Model Builder for Lower Surface Acreage Tile on Orbiter; Mixed Linear/Square-Root Encoded Single-Slope Ramp Provides Low-Noise ADC with High Linearity for Focal Plane Arrays; RUSHMAPS: Real-Time Uploadable Spherical Harmonic Moment Analysis for Particle Spectrometers; Powered Descent Guidance with General Thrust-Pointing Constraints; X-Ray Detection and Processing Models for Spacecraft Navigation and Timing; and Extreme Ionizing-Radiation-Resistant Bacterium

Source record↗

Jupiter Icy Moons Orbiter interplanetary injection period analysis

This paper investigates the sensitivity of the planned Jupiter Icy Moons Orbiter mission to variations in interplanetary injection date, magnitude, and direction, starting in a low-Earth assembly orbit. These results are used to determine the frequency and number of injection opportunities from a processing assembly obit. It is shown that the use of a low-thrust propulsion system with a nuclear-electric power source would allow the interplanetary trajectory performance to be relatively insensitive to variations in injection conditions. This result yields many injection opportunities due to the long injection period and consecutive orbits with favorable geometry.

trajectory↗

Designing Resilience for Advanced Energy Systems

Advancements in energy technologies are making the grid more powerful, more efficient, and cleaner. As these promising innovations flourish across our communities, it is essential that our nation's infrastructure also becomes more resilient. Natural disasters, cyberattacks, user error, and a changing climate all present risks that could have devastating consequences. Individual emergencies are unique, but holistic planning and proactive measures can harden the grid and help anticipate and respond to any number of threats. The National Renewable Energy Laboratory (NREL) is at the forefront of this transition, establishing a vision for resilient energy systems today, and in the future.

energy disruption↗

SDO Delta H Mode Design and Analysis

While on orbit, disturbance torques on a three axis stabilized spacecraft tend to increase the system momentum, which is stored in the reaction wheels. Upon reaching the predefined momentum capacity (or maximum wheel speed) of the reaction wheel, an external torque must be used to unload the momentum. The purpose of the Delta H mode is to manage the system momentum. This is accomplished by driving the reaction wheels to a target momentum state while the attitude thrusters, which provide an external torque, are used to maintain the attitude. The Delta H mode is designed to meet the mission requirements and implement the momentum management plan. Changes in the requirements or the momentum management plan can lead to design changes in the mode. The momentum management plan defines the expected momentum buildup trend, the desired momentum state and how often the system is driven to the desired momentum state (unloaded). The desired momentum state is chosen based on wheel capacity, wheel configuration, thruster layout and thruster sizing. For the Solar Dynamics Observatory mission, the predefined wheel momentum capacity is a function of the jitter requirements, power, and maximum momentum capacity. Changes in jitter requirements or power limits can lead to changes in the desired momentum state. These changes propagate into the changes in the momentum management plan and therefore the Delta H mode design. This paper presents the analysis and design performed for the Solar Dynamics Observatory Delta H mode. In particular, the mode logic and processing needed to meet requirements is described along with the momentum distribution formulation. The Delta H mode design is validated using the Solar Dynamics Observatory High Fidelity simulator. Finally, a summary of the design is provided along with concluding remarks.

Mason, Paul A.↗

Resilience in an Age of Increasing Electrification

The purpose of this paper is to outline considerations of global electrification trends that include the resultant system-wide and nation-wide impacts. How we incorporate resilience into the electrification plans that transition a nation from conventional energy sources to secure clean energy sources can impact the success of those transitions. Electrification of energy systems has the potential to impact power system planning, emissions, and security; however, little research has been done on comprehensive solutions for incorporating resilience into the electrification process. Research has been conducted on aspects of the energy system and electrification, but not holistically across disciplines and related to the interdependencies of different components of the grid system. This gap in research provides an opportunity for more analysis and a collection of best practices to incorporate resilience into electrification plans. Although clean energy is the goal of an increasing number of nations worldwide, there are many considerations in designing clean energy transitions and increased electrification. Resilience must be factored into clean energy transitions from planning, market design, and policies to modernized grid structures and new, location-specific dispersed energy and energy storage technologies.

clean energy↗

Identification of pressure points in modern power systems using transfer entropy

Power shortages disrupt daily life, economic activity, and essential services. In modern power systems, weather is an increasingly important driver of reliability: high temperatures raise demand and limit transmission capacity, and calm or cloudy periods reduce wind and solar supply. Using a data-driven analysis, this study identifies grid infrastructure whose operating patterns help predict power shortages. The results show that reliability risks often emerge from interacting stresses across generation, transmission, and demand, rather than from single bottlenecks. By clarifying how system stress propagates through the grid, this diagnostic perspective helps explain why shortages occur under specific conditions and can complement traditional planning and operational tools to support adaptive reliability strategies, targeted monitoring, and coordinated infrastructure investments.

power systems↗

Introduction to Microgrids

A microgrid is simply a typical power system that has distributed energy resources (DERs), like small diesel generators, with loads in the network. The resiliency offered by microgrids to retain service during system events makes them a suitable support for the electric grid during natural disasters. One key factor that differentiates microgrids from a typical distribution grid is its ability to disconnect itself in the event of a blackout and sustain its loads through DERs. Microgrid systems will reconnect to the main grid when the grid comes back up. The resiliency offered by microgrids to retain service during system events makes them a suitable support for the electric grid during natural disasters. This presentation discusses the typical key steps involved in microgrid planning, installation, operation in a interoperable and interconnectable fashion.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The Automated Planetary Space Station

Results are presented for a study on mission definition and design to determine broad technology directions and needs for advanced planetary spacecraft and future planetary missions. The discussion covers mission selection, system design, and technology assessment and review for a multicomponent spacecraft exploration facility provided with nuclear power propulsion. As an example, the Automated Planetary Space Station at Jupiter is examined as a generic concept which has the capability of conducting in-depth investigations of different aspects of the entire Jovian system. Mission planning is discussed relative to low-thrust trajectory control, automatic target identification and landing, roving vehicle operation, and automated sample analysis.

Ivie, C. V.↗

Space station thermal control surfaces. Volume 1: Interim report

The U.S. space program goals for long-duration manned missions place particular demands on thermal-control systems. The objective of this program is to develop plans which are based on the present thermal-control technology, and which will keep pace with the other space program elements. The program tasks are as follows: (1) requirements analysis, with the objectives to define the thermal-control-surface requirements for both space station and 25 kW power module, to analyze the missions, and to determine the thermal-control-surface technology needed to satisfy both sets of requirements; (2) technology assessment, with the objectives to perform a literature/industry survey on thermal-control surfaces, to compare current technology with the requirements developed in the first task, and to determine what technology advancements are required for both the space station and the 25 kW power module; and (3) program planning that defines new initiative and/or program augmentation for development and testing areas required to provide the proper environment control for the space station and the 25 kW power module.

Maag, C. R.↗

Thermal system and environmental testing of the Mars Helicopter

The Mars Helicopter will be a technology demonstration conducted during the Mars 2020 mission. The primary mission objective is to achieve several 90-second flights demonstrating the feasibility of heavier than air flight on Mars and capture visible light images via forward and nadir mounted cameras. These flights could possibly provide reconnaissance data for sampling site selection for other Mars surface missions. A solar array and batteries for flight operations, imaging, communications, and survival heating power the Helicopter. The thermal design is driven by minimizing survival heater energy while maintaining compliance with allowable flight temperatures in a variable thermal environment. Due to the small size of the Helicopter and its complex geometries, along with the fact that it operates with very low power and small margins in the extreme Mars environment, additional care had to be paid while planning thermal tests and designing the thermal system. The first section of the paper describes the evolution of the thermal system of the Mars Helicopter. After the first thermal vacuum test of the engineering model, the thermal team has conducted a partial effect analysis on the thermal design components that had a major impact on the system performance. Several design choices derived by analysis and test have been made to meet the energy allocation and the temperature requirements. These changes included increased gas gaps to reduce gas conduction, low emissivity coatings for internal components, blanket implementation, optimization of wire routing and fine-tuning of surface operations to optimize waste heat recovery. The second part of the paper describes the flight model thermal vacuum test and the subsequent thermal model correlation necessary to confirm the fidelity of the analysis results.

Pauken, Michael↗

Collaborative Systems Engineering in the Ascent Abort-2 Crew Module/Separation Ring Project

Generally speaking, systems engineering (SE) tool-sets face a dilemma balancing power and accessibility. High-powered SE tools (MagicDraw, Cradle, Core, etc.) tend to be specialized and are available only to highly trained Systems Engineers, and/or through the use of a 'back room' developer team making the output products available to the broader team. On the other hand, highly accessible tools (MS Word, Excel, etc.) do not have the power to implement SE in a rigorous manner. NASA has to test all aspects of the new human-rated Orion Multi-Purpose Crew Vehicle spacecraft prior to its first crewed mission. The test program includes uncrewed launch abort flight tests to demonstrate the capability to save the crew in the event that a launch failure occurs. Orion's second abort flight test will be a low-altitude flight test known as "Ascent Abort 2 (AA-2)." This test is currently scheduled to be carried out at Cape Canaveral Air Force Station's Space Launch Complex 46 (SLC-46) in Florida in 2019. NASA's in-house AA-2 Crew Module and Separation Ring (CSR) Team is producing the crew module and separation ring. Operating jointly as both an Advanced Exploration Systems (AES) Project and an Orion Project, the CSR project charter includes development of innovative, streamlined and generally more efficient practices for creation of flight hardware and software. One result of this tasking has been development of a collaborative and data-centric systems engineering environment within the team's shared web environment (Microsoft SharePoint). Through the use of built-in, 'out of the box capabilities' present in MS SharePoint, the CSR Systems Engineering team has created (with some limited developer support) a data-centric architecture for the project's SE implementation, including functional and interface analysis, requirements development and management, risk management, verification planning and management, test results, and end item management. Data elements are linked between data structures so as to define and control relationships between item types, link requirements to parents and children, and link tests to the requirements that they verify. The overall project team integration is increased by also linking SE content to project management content over the project life cycle, including team communication, action items, configuration management, decisional and meeting materials, and life cycle reviews. This presentation will provide an overview of the collaborative SE environment, showing how it provides the power for a number of SE tasks while still providing the accessibility and transparency to allow the full project team to collaborate and succeed. Given the project phase, we'll be able to present a nearly full lifecycle discussion, from concept through verification and approaching delivery.

Systems Engineering environments↗

The Flexible Lunar Architecture for Exploration (FLARE): Designed for the Artemis-3 Moon 2024 Mission and Beyond

The Flexible Lunar Architecture for Exploration (FLARE) is a concept to deliver four crew to the lunar surface for 7 to 14 days and then return them safely to Earth by 2024. This meets NASA’s internal 2024 lunar landing deadline directed by President Trump (Trump, 2017) and the “5-year” goal set forth by Vice President Pence (Pence, 2019). FLARE is an alternative to NASA’s Human Landing System reference architecture from the Design Analysis Cycle (DAC) #2 (NASA, 2019b). The minimum FLARE concept uses one Space Launch System launch, one Orion, one European Service Module (ESM), and one human lander to deliver four crew to the Moon for a minimum surface duration of 7 days and return them to Earth. FLARE adds a new capability, called the SpaceTug, based upon the mature and successful United Launch Alliance “Common” Centaur Upper Stage vehicle, with modifications. In FLARE, the SpaceTug provides propulsion needed to return the Orion+ESM from the Moon to Earth. The SpaceTug also provides propulsion to deliver the human lander Descent Element (DE) and Ascent Element (AE) separately to lunar orbit. The Orion+ESM then completes a rendezvous with the mated DE+AE in lunar orbit. FLARE also offers optional phases to the Moon 2024 mission. The SpaceTug can also deliver components of the planned Gateway - including the Power and Propulsion Element and the Habitation and Logistics Outpost - to lunar orbit; however, the planned FLARE destination is a Low Lunar Frozen Polar Orbit unlike the NASA DAC2 plan for a Near Rectilinear Halo Orbit. FLARE also provides an option to deliver precursor equipment - including a habitation module, crew mobility devices and an In-Situ Resource Utilization demonstration - to the lunar surface for enhanced crew exploration and science with the extended 14-day surface mission.

Commercial Launch Vehicles (CLV)↗

Planning Optimization for Inductively Charged On-demand Automated Electric Shuttles Project at Greenville, South Carolina

Wireless charging technology presents an ideal fit for autonomous electric vehicles for realizing a fully automated system (vehicle and charger). This paper presents a planning optimization analysis for a pilot project of in-route wireless charging infrastructure serving fixed-route on-demand shared automated electric shuttles (SAESs) at Greenville, South Carolina, USA. A single-objective non-linear mixed integer system planning optimization problem is formulated. A comprehensive cost model representing the overall inductively charged SAESs system is developed, considering road construction, power electronics and materials, traction battery, and installation costs. The optimization problem is solved to determine the best combination of the system key design parameters (number and allocations of wireless chargers, charging power level, track length and on-board battery capacity) that show the most cost-effective solution and allow the SAESs to achieve charge-sustaining operation. The planning platform incorporates representative simulated traffic data (driving speed and routes) for four SAESs in the Greenville using the Simulation of Urban Mobility tool. These data are fed to a vehicle powertrain model and a wireless charger power model to predict the battery power, energy and state-of-charge profiles, which are provided to the search algorithm to assess the design objectives under specific constraints. Finally, the results indicate that implementing high-power (100 kW) wireless charger at a few designated stops for fixed-route SAESs with the proper track length allows the vehicles to realize charge-sustaining operation, infinite range, and zero recharge downtime, with a significant reduction in the on-board battery (36%) and road coverage (69%), at minimum cost.

33 ADVANCED PROPULSION SYSTEMS↗

Conceptual analysis of a lunar base transportation system

Important to the planning for a lunar base is the development of transportation requirements for the establishment and maintenance of that base. This was accomplished as part of a lunar base systems assessment study conducted by the NASA Langley Research Center in conjunction with the NASA Johnson Space Center. Lunar base parameters are presented using a baseline lunar facility concept and timeline of developmental phases. Masses for habitation and scientific modules, power systems, life support systems, and thermal control systems were generated, assuming space station technology as a starting point. The masses were manifested by grouping various systems into cargo missions and interspersing manned flights consistent with construction and base maintenance timelines. A computer program that sizes the orbital transfer vehicles (OTV's), lunar landers, lunar ascenders, and the manned capsules was developed. This program consists of an interative technique to solve the rocket equation successively for each velocity correction (delta V) in a mission. The delta V values reflect integrated trajectory values and include gravity losses. As the program computed fuel masses, it matched structural masses from General Dynamics' modular space-based OTV design. Variables in the study included the operation mode (i.e., expendable vs. reusable and single-stage vs. two-stage OTV's), cryogenic specific impulse, reflecting different levels of engine technology, and aerobraking vs. all-propulsive return to Earth orbit. The use of lunar-derived oxygen was also examined for its general impact. For each combination of factors, the low-Earth orbit (LEO) stack masses and Earth-to-orbit (ETO) lift requirements are summarized by individual mission and totaled for the developmental phase. In addition to these discrete data, trends in the variation of study parameters are presented.

Hoy, Trevor D.↗

DSO+T: Integrated System Simulation (DSO+T Study: Volume 2)

This report summarizes an integrated co-simulation model used by the Distribution System Operator with Transactive (DSO+T) study to represent an electrical generation, delivery, and end-load systems for the purposes of assessing the viability and value proposition of transactive energy coordination of flexible assets versus a business-as-usual case. The integrated co-simulation model includes the bulk generation and transmission system, including the day-ahead and real-time scheduling and dispatch of thermal generators. Forty distribution system operators were modelled in detail, including tens of thousands of residential and commercial buildings and their flexible end-loads. These included HVAC systems, residential water heaters, electric vehicles, and stationary, behind-the-meter, batteries. Both wholesale market and end-load results for the business-as-usual case are presented and compared to actual ERCOT system data to assess the accuracy and representativeness of the resulting model.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Satellite Power Systems (SPS) concept definition study. Volume 2, part 2: System engineering

The latest technical and programmatic developments are considered as well as expansions of the Rockwell SPS cost model covering each phase of the program through the year 2030. Comparative cost/economic analyses cover elements of the satellite, construction system, space transportation vehicles and operations, and the ground receiving station. System plans to define time phased costs and planning requirements that support major milestones through the year 2000. A special analysis is included on natural resources required to build the SPS reference configuration. An appendix contains the SPS Work Breakdown Structure and dictionary along with detail cost data sheet on each system and main element of the program. Over 200 line items address DDT&E, theoretical first unit, investment cost per satellite, and operations charges for replacement capital and normal operations and maintenance costs.

Hanley, G. M.↗