Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “planning scheduling optimization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

Monte Carlo Tree Search Methods for the Earth-Observing Satellite Scheduling Problem

This work explores on-board planning for the single spacecraft, multiple ground station Earth-observing satellite scheduling problem through artificial neural network function approximation of state–action value estimates generated by Monte Carlo tree search (MCTS). An extensive hyperparameter search is conducted for MCTS on the basis of performance, safety, and downlink opportunity utilization to determine the best hyperparameter combination for data generation. A hyperparameter search is also conducted on neural network architectures. The learned behavior of each network is explored, and each network architecture’s robustness to orbits and epochs outside of the training distributions is investigated. Furthermore, each algorithm is compared with a genetic algorithm, which serves to provide a baseline for optimality. MCTS is shown to compute near-optimal solutions in comparison to the genetic algorithm. The state–action value networks are shown to match or exceed the performance of MCTS in six orders of magnitude less execution time, showing promise for execution on board spacecraft.

Adam P. Herrmann↗

Lessons Learned from a Complex FUSRAP Site - Sylvania Corning FUSRAP Site - 12269

Since its addition to the Formerly Utilized Sites Remedial Action Program (FUSRAP) in 2005, the Sylvania Corning FUSRAP Site (the Site) in Hicksville, New York, has provided challenges and opportunities from which to gain lessons learned for conducting investigation work at a complex multi-contaminant FUSRAP Site. The United States Army Corps of Engineers (USACE) and its contractors conducted a Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) Remedial Investigation (RI) and are currently in the Feasibility Study (FS) phase at the Site. This paper presents the planning, execution, and reporting lessons learned by USACE during the RI/FS. The Site, operated from 1952 to 1967 for the research, development, and fabrication of nuclear elements under the Atomic Energy Commission, and other government and commercial contracts. Previous investigations performed by the New York State Department of Environmental Conservation (NYSDEC) and the current property owner have identified uranium, thorium, nickel, and chlorinated solvents, as Site contaminants [1]. The property owner is currently under two separate voluntary agreements with NYSDEC to investigate and remediate the Site. USACE's work at the site has been independent of this voluntary agreement and has moved on a parallel path with any work the property owner has completed. The project at the Site is complex because of the radiological and chemical concerns in both soils and groundwater, high hydraulically conductive soils, lack of a shallow aquiclude/aquitard, and a principal water table aquifer underlying the site. Contaminants are migrating from the Site and may potentially impact local drinking water supplies (municipal wells). During the RI/FS process the project team has encountered many issues and has thus developed many resolutions. The issues are organized into three categories: Planning and Contracting, Execution, and Reporting. Planning and Contracting lessons learned include: how to incorporate an overwhelming volume of historical data; how to manage a complex team of three prime contractors innovatively, and how to implement a project under an Award Fee task order. Execution lessons learned include: characterization of investigation derived wastes, and proper approach to radiological scanning of direct-push borings and soil cores. Reporting lessons learned include: coordinating multiple phase (iterative) reporting, large dataset presentation, and the National Priorities List (NPL) designation. The goal of this paper is to provide a resource for other project delivery teams that encounter similar situations on their projects to optimize cost savings, realization of efficiency, shorten schedules, or simply ensure higher quality deliverables. Each FUSRAP project is unique but there are many lessons we can apply to each site to gain efficiency and work more effectively. The Sylvania Corning FUSRAP site is a complex site with both soils and groundwater contamination, contamination to depths of 182 meters, and a highly politically charged environment of PRP involvement. Many of the lessons the project team has learned during the life of the project to date are being shared with others as well as being applied back to this project for future work. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Incorporating Wind Energy in Power System Restoration Planning

Wind energy is rapidly growing. While wind brings us clean and inexpensive energy, its inherent variability and uncertainty present challenges for the power grid. In particular, employing wind energy for power system restoration is very challenging. A fast and reliable restoration plays a vital role to achieve the self-healing power grid. This paper develops a novel offline restoration planning tool for harnessing wind energy to enhance grid resilience. The Wind-for-Restoration problem is formulated as a stochastic mixed-integer linear programming problem with generated wind energy scenarios. The problem is then decomposed into two stages and solved with the integer Lshaped algorithm. Numerical experiments have been conducted through different case studies using the modified IEEE 57-bus system. The developed tool can provide the scheduled wind power at each restoration time. The impact of wind energy is investigated from the aspects of location and inertia capability, as well as wind penetration, fluctuation, and uncertainty. Moreover, a dynamic response validation tool is developed to validate the results of optimization problem in a dynamic simulation software. Finally, simulation results demonstrate that the optimal wind harnessing strategy can help improve system restoration process and enhance system resilience.

17 WIND ENERGY↗

Cognitive Functioning in Space Exploration Missions: A Human Requirement

Solving cognitive issues in the exploration missions will require implementing results from both Human Behavior and Performance, and Space Human Factors Engineering. Operational and research cognitive requirements need to reflect a coordinated management approach with appropriate oversight and guidance from NASA headquarters. First, this paper will discuss one proposed management method that would combine the resources of Space Medicine and Space Human Factors Engineering at JSC, other NASA agencies, the National Space Biomedical Research Institute, Wyle Labs, and other academic or industrial partners. The proposed management is based on a Human Centered Design that advocates full acceptance of the human as a system equal to other systems. Like other systems, the human is a system with many subsystems, each of which has strengths and limitations. Second, this paper will suggest ways to inform exploration policy about what is needed for optimal cognitive functioning of the astronaut crew, as well as requirements to ensure necessary assessment and intervention strategies for the human system if human limitations are reached. Assessment strategies will include clinical evaluation and fitness-to-perform evaluations. Clinical intervention tools and procedures will be available to the astronaut and space flight physician. Cognitive performance will be supported through systematic function allocation, task design, training, and scheduling. Human factors requirements and guidelines will lead to well-designed information displays and retrieval systems that reduce crew time and errors. Means of capturing process, design, and operational requirements to ensure crew performance will be discussed. Third, this paper will describe the current plan of action, and future challenges to be resolved before a lunar or Mars expedition. The presentation will include a proposed management plan for research, involvement of various organizations, and a timetable of deliverables.

Fiedler, Edan↗

Streamlining Ground Station Network Compatibility Test for Small Satellites

A team of eight subject matter experts at NASA Goddard Space Flight Center (GSFC) completed a Lean Six Sigma project to identify process improvements for the compatibility test process for small satellites planning to use the NASA Near Earth Network (NEN). Ground station network compatibility testing is designed to reduce the risk to missions by resolving issues between the spacecraft's flight communication and navigation components and the ground systems prior to launch. Compatibility testing, which consists of a series of tests performed over a period of months and documented in reports, is an important step meant to prevent post-launch anomalies that could lead to expensive troubleshooting or mission failure. Compared to traditional missions, small satellite missions typically have a smaller budget and compressed schedules, which can result in small satellite projects' willingness to accept the risk associated with less comprehensive compatibility testing. Optimization and or refinement of the compatibility test process for small satellite missions could alleviate some of the pressures inherent with these factors. The goal of the Lean Six Sigma project was to develop alternative scalable methods of compatibility testing for small satellites. The Lean Six Sigma approach and the results of the project are reviewed in this paper.

Streamlining↗

Designing an Optimal LSST Deep Drilling Program for Cosmology with Type Ia Supernovae

The Vera C. Rubin Observatory's Legacy Survey of Space and Time (LSST) is forecast to collect a large sample of Type Ia supernovae (SNe Ia) expected to be instrumental in unveiling the nature of dark energy. The feat, however, requires accurately measuring the two components of the Hubble diagram, distance modulus and redshift. Distance is estimated from SN Ia parameters extracted from light-curve fits, where the average quality of light curves is primarily driven by survey parameters. An optimal observing strategy is thus critical for measuring cosmological parameters with high accuracy. We present in this paper a three-stage analysis to assess the impact of the deep drilling (DD) strategy parameters on three critical aspects of the survey: redshift completeness, the number of well-measured SNe Ia, and cosmological measurements. We demonstrate that the current DD survey plans (internal LSST simulations) are characterized by a low completeness (z ~ 0.55–0.65), and irregular and low cadences (several days), which dramatically decrease the size of the well-measured SN Ia sample. We propose a method providing the number of visits required to reach higher redshifts. We use the results to design a set of optimized DD surveys for SN Ia cosmology taking full advantage of spectroscopic resources for host galaxy redshift measurements. The most accurate cosmological measurements are achieved with deep rolling surveys characterized by a high cadence (1 day), a rolling strategy (at least two seasons of observation per field), and ultradeep (z ≳ 0.8) and deep (z ≳ 0.6) fields. A deterministic scheduler including a gap recovery mechanism is critical to achieving a high-quality DD survey.

79 ASTRONOMY AND ASTROPHYSICS↗

PDPTW-DB: MILP-Based Offline Route Planning for PDPTW with Driver Breaks

The Pickup and Delivery Problem with Time Windows (PDPTW) involves optimizing routes for vehicles to meet pickup and delivery requests within specific time constraints, a challenge commonly faced in logistics and transportation. Microtransit, a flexible and demand-responsive service using smaller vehicles within defined zones, can be effectively modeled as a PDPTW. Yet, the need for driver breaks—a key human constraint—is frequently overlooked in PDPTW solutions, despite being necessary for regulatory compliance. This study presents a novel mixed-integer linear programming formulation for the Pickup and Delivery Problem with Time Windows and Driver Breaks (PDPTW-DB). To the best of our knowledge this formulation is the first to consider mandatory periodic driver breaks within optimized Microtransit routes. The proposed model incorporates regulatory compliant break scheduling directly within the vehicle routing optimization framework. By considering driver break requirements as an integral component of the optimization process, rather than as a post-processing step, the model enables the generation of routes that respect hours of service regulations while minimizing operational costs. This integrated approach facilitates the generation of schedules that are operationally efficient and prioritize driver welfare through driver breaks. We work with a public transit agency from the southern USA, and highlight the specific nuances of driver break optimization, and present a Pickup and Delivery Problem with Time Windows formulation for optimizing Microtransit operations and scheduling driver breaks. We validate our approach using real-world data from the transit agency. Our results validate our formulation in producing cost-effective, and regulation-compliant solutions.

Applied Computing, Transportation↗

SU-F-T-681: Does the Biophysical Modeling for Immunological Aspects in Radiotherapy Precisely Predict Tumor and Normal Tissue Responses?

Purpose: Recent advances in immunotherapy make possible to combine with radiotherapy. The aim of this study was to assess the TCP/NTCP model with immunological aspects including stochastic distribution as intercellular uncertainties. Methods: In the clinical treatment planning system (Eclipse ver.11.0, Varian medical systems, US), biological parameters such as α/β, D50, γ, n, m, TD50 including repair parameters (bi-exponential repair) can be set as any given values to calculate the TCP/NTCP. Using a prostate cancer patient data with VMAT commissioned as a 6-MV photon beam of Novalis-Tx (BrainLab, US) in clinical use, the fraction schedule were hypothesized as 70–78Gy/35–39fr, 72–81Gy/40–45fr, 52.5–66Gy/16–22fr, 35–40Gy/5fr of 5–7 fractions in a week. By use of stochastic biological model applying for Gaussian distribution, the effects of the TCP/NTCP variation of repair parameters of the immune system as well as the intercellular uncertainty of tumor and normal tissues have been evaluated. Results: As respect to the difference of the α/β, the changes of the TCP/NTCP were increased in hypo-fraction regimens. The difference between the values of n and m affect the variation of the NTCP with the fraction schedules, independently. The elongation of repair half-time (long) increased the TCP/NTCP twice or much higher in the case of hypo-fraction scheme. For tumor, the repopulation parameters such as Tpot and Tstart, which is immunologically working to the tumor, improved TCP. Conclusion: Compared to default fixed value, which has affected by the probability of cell death and cure, hypo-fractionation schemes seemed to have advantages for the variations of the values of m. The possibility of an increase of the α/β or TD50 and repair parameters in tumor and normal tissue by immunological aspects were highly expected. For more precise prediction, treatment planning systems should be incorporated the complicated biological optimization in clinical practice combined with basic experiments data.

60 APPLIED LIFE SCIENCES↗

In silico trials predict that combination strategies for enhancing vesicular stomatitis oncolytic virus are determined by tumor aggressivity

Background Immunotherapies, driven by immune-mediated antitumorigenicity, offer the potential for significant improvements to the treatment of multiple cancer types. Identifying therapeutic strategies that bolster antitumor immunity while limiting immune suppression is critical to selecting treatment combinations and schedules that offer durable therapeutic benefits. Combination oncolytic virus (OV) therapy, wherein complementary OVs are administered in succession, offer such promise, yet their translation from preclinical studies to clinical implementation is a major challenge. Overcoming this obstacle requires answering fundamental questions about how to effectively design and tailor schedules to provide the most benefit to patients. Methods We developed a computational biology model of combined oncolytic vaccinia (an enhancer virus) and vesicular stomatitis virus (VSV) calibrated to and validated against multiple data sources. We then optimized protocols in a cohort of heterogeneous virtual individuals by leveraging this model and our previously established in silico clinical trial platform. Results Enhancer multiplicity was shown to have little to no impact on the average response to therapy. However, the duration of the VSV injection lag was found to be determinant for survival outcomes. Importantly, through treatment individualization, we found that optimal combination schedules are closely linked to tumor aggressivity. We predicted that patients with aggressively growing tumors required a single enhancer followed by a VSV injection 1 day later, whereas a small subset of patients with the slowest growing tumors needed multiple enhancers followed by a longer VSV delay of 15 days, suggesting that intrinsic tumor growth rates could inform the segregation of patients into clinical trials and ultimately determine patient survival. These results were validated in entirely new cohorts of virtual individuals with aggressive or non-aggressive subtypes. Conclusions Based on our results, improved therapeutic schedules for combinations with enhancer OVs can be studied and implemented. Our results further underline the impact of interdisciplinary approaches to preclinical planning and the importance of computational approaches to drug discovery and development.

60 APPLIED LIFE SCIENCES↗

Applying Squeaky-Wheel Optimization Schedule Airborne Astronomy Observations

We apply the Squeaky Wheel Optimization (SWO) algorithm to the problem of scheduling astronomy observations for the Stratospheric Observatory for Infrared Astronomy, an airborne observatory. The problem contains complex constraints relating the feasibility of an astronomical observation to the position and time at which the observation begins, telescope elevation limits, special use airspace, and available fuel. Solving the problem requires making discrete choices (e.g. selection and sequencing of observations) and continuous ones (e.g. takeoff time and setting up observations by repositioning the aircraft). The problem also includes optimization criteria such as maximizing observing time while simultaneously minimizing total flight time. Previous approaches to the problem fail to scale when accounting for all constraints. We describe how to customize SWO to solve this problem, and show that it finds better flight plans, often with less computation time, than previous approaches.

Frank, Jeremy↗

Framework for Architecture Trade Study Using MBSE and Performance Simulation

Increasing complexity in modern systems as well as cost and schedule constraints require a new paradigm of system engineering to fulfill stakeholder needs. Challenges facing efficient trade studies include poor tool interoperability, lack of simulation coordination (design parameters) and requirements flowdown. A recent trend toward Model Based System Engineering (MBSE) includes flexible architecture definition, program documentation, requirements traceability and system engineering reuse. As a new domain MBSE still lacks governing standards and commonly accepted frameworks. This paper proposes a framework for efficient architecture definition using MBSE in conjunction with Domain Specific simulation to evaluate trade studies. A general framework is provided followed with a specific example including a method for designing a trade study, defining candidate architectures, planning simulations to fulfill requirements and finally a weighted decision analysis to optimize system objectives.

Ryan, Jessica↗

Maximizing Operational Efficiencies in Waste Management on the Hanford Plateau Remediation Contract in a Down-turned Market - 13484

Recent changes in DOE priorities and funding have pressed DOE and its contractors to look for innovative methods to sustain critical operations at sites across the Complex. At the Hanford Site, DOE Richland Operations and its prime contractor, CH2M Hill Plateau Remediation Company (CHPRC), have completed in-depth assessments of the Plateau Remediation Contract (PRC) operations that compared available funding to mission and operational objectives in an effort to maintain requisite safety and compliance margins while realizing cost savings that meet funding profiles. These assessments included confirmation of current baseline activities, identification of potential efficiencies, barriers to implementation, and potential increased risks associated with implementation. Six operating PRC waste management facilities were evaluated against three possible end-states: complete facility closure, maintaining base operations, and performing minimum safe surveillance and maintenance activities. The costs to completely close evaluated facilities were determined to be prohibitively high and this end-state was quickly dropped from consideration. A summary of the analysis of remaining options by facility, efficiencies identified, impact to risk profiles, and expected cost savings is provided in Table I. The expected cost savings are a result of: - right-sizing and cross-training work crews to address maintenance activities across facilities; - combining and sequencing 'like-moded' operational processes; - cross-cutting emergency planning and preparedness staffing; - resource redistribution and optimization; - reducing areas requiring routine surveillance and inspection. For the efficiencies identified, there are corresponding increases in risk, including a loss of breadth and depth of available resources; lengthened response time to emergent issues; inability to invest in opportunities for improvement (OFIs); potential single-point failures or non-compliancies due to resource scarcity; limited cross-training capability; and reduced capability to respond to changes in DOE priorities. Finally, there are many challenges to achieving these cost savings. With a workforce nearing retirement effective succession planning becomes critical to success and requires establishing a balance between the cost of hiring and training and cost-saving activities. With six active waste management facilities spread across nearly 15 square miles, scheduling and deploying cross-trained surveillance and maintenance teams is a logistical challenge, particularly as the loss of funding has not diminished emphasis by regulatory agencies placed on the safe and compliant performance of DOE and its contractors. As reflected in Table I, efficiencies are currently being implemented on the Hanford Plateau Remediation Contract (PRC) that deliver cost savings that align with the current site budget while maintaining critical capabilities. It is currently estimated that these efficiencies will result in a cost savings of approximately $9 million for FY13 in base and minimum safe operations on the PRC - a cost reduction of more than 13 percent over FY12 and nearly 30 percent over FY09 levels. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Economic Dispatch for DC-Connected Battery Systems on Large PV Plants

Falling costs of energy storage combined with an increasing need to mitigate variable generation integration issues is leading to more PV projects that include batteries. Large PV plants that include batteries face challenges optimizing the value of the power they produce, especially when the batteries are DC-coupled and otherwise clipped power (due to high DC/AC ratio) is available. Multiple charging times and sources must be considered, including: grid charging, charging from PV that would otherwise be exported to the grid, and charging from clipped PV power. Then discharge schedules must be optimized against time-of-day pricing. The National Renewable Energy Laboratory in partnership with Southern Company has developed a heuristic algorithm in the System Advisor Model (SAM) which strategically charges the battery from PV and discharges the battery depending on the time-of-day prices of the PPA, the forecast PV production, and the estimated wear cost of the battery. The algorithm and case study results from a generic plant will be presented with recommendations for future work.

25 ENERGY STORAGE↗

Reducing Stray Light To Characterize Nirspec Subsystems: The Focal Plane Array And Micro-Shutter Array

The James Webb Space Telescope (JWST) is an infrared, space-based telescope scheduled for launch in 2013. JWST includes four scientific instruments, including the Near Infrared Spectrometer (NIRSpec), which operates in the wavelength range from 0.6 to 5 microns. NASA/Goddard Space Flight Center (GSFC) is responsible for two NIRSpec subsystems: the detector subsystem, with its focal plane array (FPA), and the micro-shutter subsystem, with its micro-shutter array (MSA). The FPA is comprised of two side-by-side Rockwell Scientific HgCdTe 2kx2k detectors, with detectors and readout electronics optimized for low noise. The MSA is a GSFC developed micro-electro-mechanical system (MEMS) that serves as a programmable slit mask, allowing NIRSpec to obtain simultaneous spectra of >100 objects in a single field of view. We present the optical characterization test plan of the FPA. The test plan is driven by many requirements: cryogenic operating temperature, a flight-like beam shape, and multi-wavelength photon flux from 1 to 60,000 per second, thus low stray light is critical. We use commercial optical modeling software to predict stray light effects at the FPA. We also present the optical contrast test plan of the MSA. Since each individual shutter element operates in on/off fashion, the most important optical metric is contrast. The MSA structure is designed to minimize stray and scattered light, and the test setup reduces stray light such that the optical contrast requirement is met.

Connelly, Joseph A.↗

Office of River Protection Advanced Low-Activity Waste Glass Research and Development Plan

The U.S. Department of Energy Office of River Protection (ORP) has initiated and leads an integrated Advanced Waste Glass (AWG) program to increase the loading of Hanford tank wastes in glass while meeting melter lifetime expectancies and process, regulatory, and product performance requirements. The integrated ORP program is focused on providing a technical, science-based foundation for making key decisions regarding the successful operation of the Hanford Tank Waste Treatment and Immobilization Plant (WTP) facilities in the context of an optimized River Protection Project (RPP) flowsheet. The fundamental data stemming from this program will support development of advanced glass formulations, key product performance and process control models, and tactical processing strategies to ensure safe and successful operations for both the low-activity waste (LAW) and high-level waste vitrification facilities. These activities will be conducted with the objective of improving the overall RPP mission by enhancing flexibility and reducing cost and schedule.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

IER 489: Critical Unresolved Region Integral Experiment (CURIE) CEDT Phase-2 Final Design

The final design for the CURIE integral benchmark experiment is presented in this report. Measurements will be performed on the Comet vertical assembly machine and include various critical configurations consisting of High Enriched Uranium (HEU) metal plates and Teflon moderator plates surrounded by a thick copper reflector. The various configurations with different Teflon plate thickness planned allow for complimentary measurements with differing nuclear data sensitivity in the Unresolved Resonance Region (URR). Similar to previously performed Zeus experiments, the proposed work will serve to validate vital nuclear data quantities and uncertainties and identify deficiencies in current radiation transport codes. Additionally, it will assess the applicability of optimization approaches to nuclear critical experiment design. The final experiment design is detailed in this report and includes design, optimization, uncertainty and continuous-energy nuclear data sensitivity analysis for the final experimental configurations that will provide the basis for a future benchmark evaluation intended for submission to the International Criticality Safety Benchmark Evaluation Project (ICSBEP) Handbook [1]. This document discusses the method, approach, considerations and final design chosen with conclusions. It also includes cost and schedule. The basis and principles of this document come from the preliminary design report [2]. Section 2 discusses the content and potential impact; section 3 gives an overview of the nuclear data and unresolved resonance region; section 4 gives a summary of the work done during the preliminary design; section 5 discusses the machine learning method and principles used for final design; section 6 summaries the results from final design; section 7 provides conclusions and the range of configurations chosen to carry forward to experiment execution; and section 8 includes a summary of costs.

42 ENGINEERING↗

Benefits Assessment for Single-Airport Tactical Runway Configuration Management Tool (TRCM)

The System-Oriented Runway Management (SORM) concept was developed as part of the Airspace Systems Program (ASP) Concepts and Technology Development (CTD) Project, and is composed of two basic capabilities: Runway Configuration Management (RCM), and Combined Arrival/Departure Runway Scheduling (CADRS). RCM is the process of designating active runways, monitoring the active runway configuration for suitability given existing factors, and predicting future configuration changes; CADRS is the process of distributing arrivals and departures across active runways based on local airport and National Airspace System (NAS) goals. The central component in the SORM concept is a tool for taking into account all the various factors and producing a recommendation for what would be the optimal runway configuration, runway use strategy, and aircraft sequence, considering as many of the relevant factors required in making this type of decision, and user preferences, if feasible. Three separate tools were initially envisioned for this research area, corresponding to the time scale in which they would operate: Strategic RCM (SRCM), with a planning horizon on the order of several hours, Tactical RCM (TRCM), with a planning horizon on the order of 90 minutes, and CADRS, with a planning horizon on the order of 15-30 minutes[1]. Algorithm development was initiated in all three of these areas, but the most fully developed to date is the TRCM algorithm. Earlier studies took a high-level approach to benefits, estimating aggregate benefits across most of the major airports in the National Airspace Systems (NAS), for both RCM and CADRS [2]. Other studies estimated the benefit of RCM and CADRS using various methods of re-sequencing arrivals to reduce delays3,4, or better balancing of arrival fixes5,6. Additional studies looked at different methods for performing the optimization involved in selecting the best Runway Configuration Plan (RCP) to use7-10. Most of these previous studies were high-level or generic in nature (not focusing on specific airports), and benefits were aggregated for the entire NAS, with relatively low fidelity simulation of SORM functions and aircraft trajectories. For SORM research, a more detailed benefits assessment of RCM and CADRS for specific airports or metroplexes is needed.

Oseguera-Lohr, Rosa↗