Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “orbit maintenance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

Interchangeable Tools for Remote Manipulators

Report presents concepts and specifications for set of interchangeable end-effector tools used on remotely operated manipulator to work on satellites in orbit. Tools make urgent repairs, do routine maintenance, transfer fluids, construct and assemble satellites, and deploy and retract appendages. With modifications, tool concepts and systematic approach to tool design applicable to such terrestrial uses as industrial robots, manually operated tools, and safety equipment. Report discusses concept for tool-storage system that holds tools securely when not used but kept accessible to manipulator.

Cody, J. C.↗

The Space Station - Past, present and future with some thoughts on some legal questions that need to be addressed

The history of the concept of a space station is briefly considered, taking into account a story written by Hale (1869), quantitative work provided by Oberth and Tsiolkovsky, von Braun, and the U.S. decision regarding the establishment of a space station. Arguments in favor of constructing a space station are related to the utility of a laboratory in earth orbit, the importance of a repair and maintenance base for satellites, the provision of capabilities for the commercial utilization of space, and the employment of a space station as a staging base for missions to the moon, Mars, and, possibly, the asteroids. Plans for the implementation of the Space Station concept are discussed, taking into account also legal issues involved in such an implementation. Attention is given to questions regarding the applicability of the Liability convention, U.S. domestic law, the domestic law of other countries, and four treaties.

Hosenball, S. N.↗

Shuttle Ground Operations Efficiencies/Technologies Study (SGOE/T). Volume 5: Technical Information Sheets (TIS)

The Technology Information Sheet was assembled in database format during Phase I. This document was designed to provide a repository for information pertaining to 144 Operations and Maintenance Instructions (OMI) controlled operations in the Orbiter Processing Facility (OPF), Vehicle Assembly Building (VAB), and PAD. It provides a way to accumulate information about required crew sizes, operations task time duration (serial and/or parallel), special Ground Support Equipment (GSE). required, and identification of a potential application of existing technology or the need for the development of a new technolgoy item.

Scholz, A. L.↗

Space Station maintenance concept study

The relationships among NASA Space Station operational constraints and logistical requirements are presently investigated. The concepts studied locate organizational, intermediate, and depot maintenance at the Space Station, at the Kennedy Space Center (KSC), and at a depot remote from the KSC. Measures of reliability, maintainability, and availability were selected; a life-cycle study was then conducted to ascertain the optimum Space Station system maintenance concept. The results obtained indicate that orbital replacement unit MTBFs should not be less than 36,000 hours.

Nelson, Eric E.↗

Space Station utilization for the Astrometric Telescope Facility

It is shown how it is possible for the Astrometric Telescope Facility (ATF) to utilize the Space Station Freedom as an attached payload by complying with changes in the Station concept and schedule. The ability of the station to accommodate ATF's firm requirements is also addressed. The main factors that led the ATF to utilize the Space Station Freedom are the Station's relative orbital stability and longevity, the availability of maintenance and repair services, and the provision of utilities.

Nishioka, Kenji↗

Workspace visualization and time-delay telerobotic operations

The paper examines the performance of telerobotic tasks where the operator and robot are physically separated, and a comunication time delay of up to several seconds between them exists. This situation is applicable to space robotic servicing-assembly-maintenance operations on low earth or geosynchronous orbits with a ground-based command station. Attention is given to two developments which address advanced time-delay teleoperations for unstructured tasks: (1) the 'phantom robot', a real-time predictive graphics simulator developed to allow teleoperator eye-to-hand coordination or robot free-space kinematics under a time delay of several seconds; and (2) shared compliance control, a modified form of automatic electromechanical impedance control employed in parallel with manual position control to permit soft contact and grasp compliance with workpiece geometry under a time delay of several seconds.

Schenker, P. S.↗

Analysis of Direct Solar Illumination on the Backside of Space Station Solar Cells

The International Space Station (ISS) is a complex spacecraft that will take several years to assemble in orbit. During many of the assembly and maintenance procedures, the space station's large solar arrays must he locked, which can significantly reduce power generation. To date, power generation analyses have not included power generation from the backside of the solar cells in a desire to produce a conservative analysis. This paper describes the testing of ISS solar cell backside power generation, analytical modeling and analysis results on an ISS assembly mission.

Delleur, Ann M.↗

Columbia Accident Investigation Board Report. Volume Two

Volume II of the Report contains appendices that were cited in Volume I. The Columbia Accident Investigation Board produced many of these appendices as working papers during the investigation into the February 1, 2003 destruction of the Space Shuttle Columbia. Other appendices were produced by other organizations (mainly NASA) in support of the Board investigation. In the case of documents that have been published by others, they are included here in the interest of establishing a complete record, but often at less than full page size. Contents include: CAIB Technical Documents Cited in the Report: Reader's Guide to Volume II; Appendix D. a Supplement to the Report; Appendix D.b Corrections to Volume I of the Report; Appendix D.1 STS-107 Training Investigation; Appendix D.2 Payload Operations Checklist 3; Appendix D.3 Fault Tree Closure Summary; Appendix D.4 Fault Tree Elements - Not Closed; Appendix D.5 Space Weather Conditions; Appendix D.6 Payload and Payload Integration; Appendix D.7 Working Scenario; Appendix D.8 Debris Transport Analysis; Appendix D.9 Data Review and Timeline Reconstruction Report; Appendix D.10 Debris Recovery; Appendix D.11 STS-107 Columbia Reconstruction Report; Appendix D.12 Impact Modeling; Appendix D.13 STS-107 In-Flight Options Assessment; Appendix D.14 Orbiter Major Modification (OMM) Review; Appendix D.15 Maintenance, Material, and Management Inputs; Appendix D.16 Public Safety Analysis; Appendix D.17 MER Manager's Tiger Team Checklist; Appendix D.18 Past Reports Review; Appendix D.19 Qualification and Interpretation of Sensor Data from STS-107; Appendix D.20 Bolt Catcher Debris Analysis.

CAIB (COLUMBIA ACCIDENT INVESTIGATION BOARD)↗

Performance as Promised: How the Chandra X-ray Observatory Accomplished One of Nasa's Most Challenging Missions for Billions of Dollars Less than Originally Planned

As the nation looks toward bold new ventures in space, the Chandra X-ray Observatory program offers an example of how billion-dollar missions can be successfully developed within tightening fiscal constraints. Chandra experienced many of challenges facing bold space programs (state-of-the-art technical requirements and budget-induced slips and restructurings), and yet the Chandra team achieved nearly all the originally envisioned performance for dramatically lower cost. This was accomplished by a combination of team- work, systems engineering, advanced technology insertion, and effective approaches for program implementation. A thorough tradeoff of science utility vs. cost led to the selection of a highly elliptical orbit with uncrewed robotic delivery, deployment, and maintenance. Progressive, focused technology demonstrations were accomplished prior to commitment of major resources to critical elements of the system design, such as the high resolution mirror assembly (HRMA). Pathfinder hardware was developed to reduce risks. A variety of schedule risk reduction measures were implemented and resulted in the X-ray calibration taking place exactly within five days of its originally planned date after after five years of development. The team worked together in an effective manner to contain requirements creep. reductions such as the ACIS-2 chip device. It is estimated that the above combination of measures achieved the avoidance of over $4B in costs, while enabling a highly successful mission.

Davidson, Greg↗

Maturing Pump Technology for EVA Applications in a Collaborative Environment

The transition from low earth orbit Extravehicular Activity (EVA) for construction and maintenance activities to planetary surface EVA on asteroids, moons, and, ultimately, Mars demands a new spacesuit system. NASA's development of that system has resulted in dramatically different pumping requirements from those in the current spacesuit system. Hamilton Sundstrand, Cascon, and NASA are collaborating to develop and mature a pump that will reliably meet those new requirements in space environments and within the design constraints imposed by spacesuit system integration. That collaboration, which began in the NASA purchase of a pump prototype for test evaluation, is now entering a new phase of development. A second generation pump reflecting the lessons learned in NASA's testing of the original prototype will be developed under Hamilton Sundstrand internal research funding and ultimately tested in an integrated Advanced Portable Life Support System (APLSS) in NASA laboratories at the Johnson Space Center. This partnership is providing benefit to both industry and NASA by supplying a custom component for EVA integrated testing at no cost to the government while providing test data for industry that would otherwise be difficult or impossible to duplicate in industry laboratories. This paper discusses the evolving collaborative process, component requirements and design development based on early NASA test experience, component stand alone test results, and near term plans for integrated testing at JSCs.

Hodgson, Edward↗

Challenges to Health During Deep Space Exploration Missions

Long duration missions outside of low Earth orbit will present unique challenges to the maintenance of human health. Stressors with physiologic and psychological impacts are inherent in exploration missions, including reduced gravity, increased radiation, isolation, limited habitable volume, circadian disruptions, and cabin atmospheric changes. Operational stressors such as mission timeline and extravehicular activities must also be considered, and these varied stressors may act in additive or synergistic fashions. Should changes to physiology or behavior manifest as a health condition, the rendering of care in an exploration environment must also be considered. Factors such as the clinical background of the crew, inability to evacuate to Earth in a timely manner, communication delay, and limitations in available medical resources will have an impact on the assessment and treatment of these conditions. The presentations associated with this panel will address these unique challenges from the perspective of several elements of the NASA Human Research Program, including Behavioral Health and Performance, Human Health Countermeasures, Space Radiation, and Exploration Medical Capability.

Watkins, S.↗

Onboard configuration and operation of the TDRSS onboard navigation system (TONS)

This paper presents an overview of onboard navigation via TDRSS for both the EP/EUVE (Explorer Platform/Extreme Ultraviolet Explorer) experiment and for future users of TONS. System goals and objectives are discussed, and the operations concept for the three stages of TONS development is presented. A description is given of the first stage of the TONS development, the experiment implementation on EP, including the hardware characteristics, signal acquisition process, onboard data acquisition, and ground data processing in the flight emulation environment of the TONS Ground Support System (TGSS). Evaluation of the experiment implementation is presented and improvements described in terms of the second development stage, a full TONS I system, which uses Doppler data derived from scheduled forward-link S-band services to provide onboard orbit and frequency determination. A method for onboard time maintenance commensurate with TONS I is also presented. TONS II, the third stage, will use Doppler and pseudorange data derived from a continuous, nonscheduled forward-link S-band beacon service to provide onboard orbit, time, and frequency determination.

Gramling, Cheryl J.↗

HL-20 structural design comparison - Conformal shell versus cylindrical crew compartment

Extensive studies have been performed at NASA Langley Research Center (LaRC) on personnel launch systems (PLS) concepts. The primary mission of a PLS is the transport of Space Station crew members from Earth to the Space Station and return. The NASA LaRC PLS studies have led to the design of a lifting body configuration named the HL-20. In this study, two different HL-20 structural configurations are evaluated. The two configurations are deemed the conformal shell and the cylindrical crew compartment. The configurations are based on two different concerns for maintenance and operations. One configuration allows for access to subsystems while on-orbit from the interior, while the other allows for easy access to the subsystems during ground maintenance and operations. For each concept, the total structural weight required to sustain the applied loads is quantified through a structural evaluation. Structural weight for both configurations is compared along with the particular attributes of each. Analyses of both configurations indicate no appreciable weight or load relief advantage of one concept over the other. Maintainability and operability, therefore become the primary discriminator, leading to a choice of a crew compartment configuration.

Bush, Lance B.↗

Spaceport aurora: An orbiting transportation node

With recent announcements of the development of permanently staffed facilities on the Moon and Mars, the national space plan is in need of an infrastructure system for transportation and maintenance. A project team at the University of Houston College of Architecture and the Sasakawa International Center for Space Architecture, recently examined components for a low Earth orbit (LEO) transportation node that supports a lunar build-up scenario. Areas of investigation included identifying transportation node functions, identifying existing space systems and subsystems, analyzing variable orbits, determining logistics strategies for maintenance, and investigating assured crew return systems. The information resulted in a requirements definition document, from which the team then addressed conceptual designs for a LEO transportation node. The primary design drivers included: orbital stability, maximizing human performance and safety, vehicle maintainability, and modularity within existing space infrastructure. For orbital stability, the power tower configuration provides a gravity gradient stabilized facility and serves as the backbone for the various facility components. To maximize human performance, human comfort is stressed through zoning of living and working activities, maintaining a consistent local vertical orientation, providing crew interaction and viewing areas and providing crew return vehicles. Vehicle maintainability is accomplished through dual hangars, dual work cupolas, work modules, telerobotics and a fuel depot. Modularity is incorporated using Space Station Freedom module diameter, Space Station Freedom standard racks, and interchangeable interior partitions. It is intended that the final design be flexible and adaptable to provide a facility prototype that can service multiple mission profiles using modular space systems.

Source record↗

STS-109 Crew Interviews - Currie

STS-109 Mission Specialist 2 Nancy Jane Currie is seen during a prelaunch interview. She answers questions about her inspiration to become an astronaut and her career path. She gives details on the Columbia Orbiter mission which has as its main tasks the maintenance and augmentation of the Hubble Space Telescope (HST). While she will do many things during the mission, the most important will be her role as the primary operator of the robotic arm, which is responsible for grappling the HST, bringing it to the Orbiter bay, and providing support for the astronauts during their EVAs (Extravehicular Activities). Additionally, the robotic arm will be responsible for transferring new and replacement equipment from the Orbiter to the HST. This equipment includes: two solar arrays, a Power Control Unit (PCU), the Advanced Camera for Surveys, and a replacement cooling system for NICMOS (Near Infrared Camera Multi-Object Spectrometer).

Source record↗

Commercial Application of In-Space Assembly

In-Space assembly (ISA) expands the opportunities for cost effective emplacement of systems in space. Currently, spacecraft are launched into space and deploy into their operational configuration through a carefully choreographed sequence of operations. The deployment operation dictates the arrangement of the primary systems on the spacecraft, limiting the ability to take full advantage of launch vehicles volume and mass capability. ISA enables vastly different spacecraft architectures and emplacement scenarios to be achieved, including optimal launch configurations ranging from single launch and assembly to on-orbit aggregation of multiple launches at different orbital locations and times. The spacecraft can be visited at different orbital locations and times to effect expansion and maintenance of an operational capability. To date, the primary application of ISA has been in large programs funded by government organizations, such as the International Space Station. Recently, Space Systems Loral (SSL) led a study funded by the Defense Advanced Research Projects Agency (DARPA), called Dragonfly, to investigate the commercial applicability and economic advantages of ISA. In the study, it was shown that ISA enables SSL to double the capability of a commercial satellite system by taking advantage of alternate packaging approaches for the reflectors. The study included an ultra-light-weight robotic system, derived from Mars manipulator designs, to complete assembly of portions of the antenna system using a tool derived from DARPA orbital express and National Aeronautics and Space Administration (NASA) automated structural assembly experience. The mechanical connector that enables robotic ISA takes advantage of decades of development by NASA from the 1970's to 1980's during the Space Station Freedom program, the precursor to the ISS. The mechanical connector was originally designed for rapid astronaut assembly while also providing a high quality structural connection with linear load deflection response. The paper will discuss the business case for ISA, the general approach taken to exploit on-orbit assembly in the GEO communication satellite market, and the concept of operations associated with the ISA approach, thus laying the foundation for ISA to become an accepted operational approach for commercial in-space operations.

Lymer, John↗

Medical care capabilities for Space Station Freedom: A phase approach

As a result of Congressional mandate Space Station Freedom (SSF) was restructured. This restructuring activity has affected the capabilities for providing medical care on board the station. This presentation addresses the health care facility to be built and used on the orbiting space station. This unit, named the Health Maintenance Facility (HMF) is based on and modeled after remote, terrestrial medical facilities. It will provide a phased approach to health care for the crews of SSF. Beginning with a stabilization and transport phase, HMF will expand to provide the most advanced state of the art therapeutic and diagnostic capabilities. This presentation details the capabilities of such a phased HMF. As Freedom takes form over the next decade there will be ever-increasing engineering and scientific developmental activities. The HMF will evolve with this process until it eventually reaches a mature, complete stand-alone health care facility that provides a foundation to support interplanetary travel. As man's experience in space continues to grow so will the ability to provide advanced health care for Earth-orbital and exploratory missions as well.

Doarn, C. R.↗

STS-1 orbital trajectory reconstruction using unmodelled acceleration estimation

A postflight trajectory reconstruction and analysis were conducted in order to determine the effects of unmodeled thrusting on the Space Shuttle Orbiter, to generate representative thrusting uncertainties for input to error analyses, and to evaluate the accuracy of the Ancillary trajectory data product and real-time vectors. The methods of selecting appropriate data arcs, time placement of compensation forces, limitations of the orbit determination process, and methods of evaluating solutions obtained from various force combinations are presented. It is shown that the estimation of forces to compensate for uncoupled attitude maneuvers and attitude hold maintenance thrusting significantly improves the postflight reconstruction of Space Shuttle Orbiter trajectories. A reduction of measurement residual statistics due to dynamic model uncertainties yields improved accuracy for postflight orbit determination.

Lacarna, R. J.↗