Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “lessons learned process”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

Lessons Learned from a Complex FUSRAP Site - Sylvania Corning FUSRAP Site - 12269

Since its addition to the Formerly Utilized Sites Remedial Action Program (FUSRAP) in 2005, the Sylvania Corning FUSRAP Site (the Site) in Hicksville, New York, has provided challenges and opportunities from which to gain lessons learned for conducting investigation work at a complex multi-contaminant FUSRAP Site. The United States Army Corps of Engineers (USACE) and its contractors conducted a Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) Remedial Investigation (RI) and are currently in the Feasibility Study (FS) phase at the Site. This paper presents the planning, execution, and reporting lessons learned by USACE during the RI/FS. The Site, operated from 1952 to 1967 for the research, development, and fabrication of nuclear elements under the Atomic Energy Commission, and other government and commercial contracts. Previous investigations performed by the New York State Department of Environmental Conservation (NYSDEC) and the current property owner have identified uranium, thorium, nickel, and chlorinated solvents, as Site contaminants [1]. The property owner is currently under two separate voluntary agreements with NYSDEC to investigate and remediate the Site. USACE's work at the site has been independent of this voluntary agreement and has moved on a parallel path with any work the property owner has completed. The project at the Site is complex because of the radiological and chemical concerns in both soils and groundwater, high hydraulically conductive soils, lack of a shallow aquiclude/aquitard, and a principal water table aquifer underlying the site. Contaminants are migrating from the Site and may potentially impact local drinking water supplies (municipal wells). During the RI/FS process the project team has encountered many issues and has thus developed many resolutions. The issues are organized into three categories: Planning and Contracting, Execution, and Reporting. Planning and Contracting lessons learned include: how to incorporate an overwhelming volume of historical data; how to manage a complex team of three prime contractors innovatively, and how to implement a project under an Award Fee task order. Execution lessons learned include: characterization of investigation derived wastes, and proper approach to radiological scanning of direct-push borings and soil cores. Reporting lessons learned include: coordinating multiple phase (iterative) reporting, large dataset presentation, and the National Priorities List (NPL) designation. The goal of this paper is to provide a resource for other project delivery teams that encounter similar situations on their projects to optimize cost savings, realization of efficiency, shorten schedules, or simply ensure higher quality deliverables. Each FUSRAP project is unique but there are many lessons we can apply to each site to gain efficiency and work more effectively. The Sylvania Corning FUSRAP site is a complex site with both soils and groundwater contamination, contamination to depths of 182 meters, and a highly politically charged environment of PRP involvement. Many of the lessons the project team has learned during the life of the project to date are being shared with others as well as being applied back to this project for future work. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Multi-unit Operations in Non-Nuclear Systems: Lessons Learned for Small Modular Reactors

The nuclear-power community has reached the stage of proposing advanced reactor designs to support power generation for decades to come. Small modular reactors (SMRs) are one approach to meet these energy needs. While the power output of individual reactor modules is relatively small, they can be grouped to produce reactor sites with different outputs. Also, they can be designed to generate hydrogen, or to process heat. Many characteristics of SMRs are quite different from those of current plants and may be operated quite differently. One difference is that multiple units may be operated by a single crew (or a single operator) from one control room. The U.S. Nuclear Regulatory Commission (NRC) is examining the human factors engineering (HFE) aspects of SMRs to support licensing reviews. While we reviewed information on SMR designs to obtain information, the designs are not completed and all of the design and operational information is not yet available. Nor is there information on multi-unit operations as envisioned for SMRs available in operating experience. Thus, to gain a better understanding of multi-unit operations we sought the lesson learned from non-nuclear systems that have experience in multi-unit operations, specifically refineries, unmanned aerial vehicles and tele-intensive care units. In this paper we report the lessons learned from these systems and the implications for SMRs.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Analysis of Photovoltaic System Energy Performance Evaluation Method

Documentation of the energy yield of a large photovoltaic (PV) system over a substantial period can be useful to measure a performance guarantee, as an assessment of the health of the system, for verification of a performance model to then be applied to a new system, or for a variety of other purposes. Although the measurement of this performance metric might appear to be straight forward, there are a number of subtleties associated with variations in weather and imperfect data collection that complicate the determination and data analysis. A performance assessment is most valuable when it is completed with a very low uncertainty and when the subtleties are systematically addressed, yet currently no standard exists to guide this process. This report summarizes a draft methodology for an Energy Performance Evaluation Method, the philosophy behind the draft method, and the lessons that were learned by implementing the method.

14 SOLAR ENERGY↗

Material Test Reactors; Annular Core Research Reactor Testing

The Material Test Reactors Fifth Workshop reviews the successes and failures of material test protocols and lessons learned. This presentation introduces the Annular Core Research Reactor (ACRR), the history of nuclear reactors at Sandia National Labs and the experiment review process. Included are actual examples of experimental activities at ACRR.

Martin, Lonnie E. [Sandia National Laboratories (S↗

Improving User Notification on Frequently Changing HPC Environments

Today s HPC centers user environments can be very complex. Centers often contain multiple large complicated computational systems each with their own user environment. Changes to a system s environment can be very impactful; however, a center s user environment is, in one-way or another, frequently changing. Because of this, it is vital for centers to notify users of change. For users, untracked changes can be costly, resulting in unnecessary debug time as well as wasting valuable compute allocations and research time. Communicating frequent change to diverse user communities is a common and ongoing task for HPC centers. This paper will cover the OLCF s current processes and methods used to communicate change to users of the center s large Cray systems and supporting resources. The paper will share lessons learned and goals as well as practices, tools, and methods used to continually improve and reach members of the OLCF user community.

communication↗

FGD wastewater treatment still has a way to go

The power industry should jointly address questions about FGD water treatment and share the lessons it has learned so far. The article describes a scheme developed by CH2M Hill to treat FGD wastewater and remove heavy metals. The process desaturates the waste water of sulfates and removes the bulk of the insoluble suspended solids prior to tertiary treatment of heavy metals using a chemical/physical treatment process. Additional treatment could be provided (for example, anoxic biological treatment) for selenium, nitrates and organics. 2 figs.

01 COAL, LIGNITE, AND PEAT↗

Protecting the Columbia River through Removal and Packaging of Radioactive Sludge in Hanford's K Area - 16572

The Columbia River once provided power and cooling water to operations on the Hanford Site; today, more than a million people downstream from Hanford rely on the river for agriculture, fishing and recreation. The Department of Energy and contractor CH2M HILL Plateau Remediation Company (CH2M) is making significant progress in protecting that vital resource. Eight of nine reactors along the river have been cocooned and soil and groundwater remediation is successfully reducing the concentration of contaminants in groundwater. The 100-K area is the last area where significant work remains to protect the river. CH2M has accomplished much in the past ten years, including demolishing the K East reactor fuel storage basin in 2009. Prior to demolition of the basin, highly radioactive sludge from that basin was transferred into containers located in the nearby K West reactor fuel storage basin. Today, the K East reactor is in interim surveillance mode, and work is underway in the K West basin to remove the sludge, which is a mixture of tiny fuel corrosion particles, fuel rod and metal fragments and soil and sand less than 1/4-inch in diameter. CH2M has designed a sludge removal system that will safely and efficiently remove the sludge from the K West basin and deposit it into specially designed containers which will be relocated to a storage facility on Hanford's Central Plateau. Procurement, fabrication and delivery of the sludge removal system is underway, with extensive testing and training planned for 2016 and 2017 ahead of the goal of removing sludge from the river by September 30, 2018. This project must account for many technical and safety considerations that render the project very challenging. Several safety measures have been incorporated as a result of safety evaluations. This paper will describe the issues facing the project team in developing the safety basis requirements and incorporating them into the design of the process equipment and construction of the facility to house the repackaging operations. This paper will allow CH2M and DOE-RL to share lessons learned and progress to date with other complex and hazardous projects across the DOE complex. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lessons Learned "Establishing an Electrically Safe Work Condition" Specifically related to Racking Electrical Breakers

During low voltage electrical equipment maintenance, a bad breaker was identified. The breaker was racked out from the substation cubicle without following the hazardous energy control process identified in the Integrated Work Document (IWD). The IWD required the substation to be in an electrically safe work condition prior to racking the breaker. Per NFPA 70E requirements, electrical equipment shall be put into an electrically safe work condition before an employee performs work on or interacts with equipment in a manner that increases the likelihood of creating an arc flash. Racking in or out a breaker on an energized bus may increase the likelihood of creating an arc flash dependent on equipment conditions. A thorough risk assessment must be performed prior to performing such a task. The risk assessment determines the risk control measures to be put in place prior to performing the work. Electrical Safety Officers (ESO) can assist in performing risk assessments and incorporating risk control measures.

30 DIRECT ENERGY CONVERSION↗

Save Energy Now Assessments Results 2008 Summary Report

In October 2005, U.S. Department of Energy Secretary Bodman launched his Easy Ways to Save Energy campaign with a promise to provide energy assessments to 200 of the largest U.S. manufacturing plants. DOE's Industrial Technologies Program (ITP) responded to the Secretary's campaign with its Save Energy Now initiative, featuring a new and highly cost-effective form of energy savings assessment. The approach for these assessments drew heavily on the existing resources of ITP's technology delivery component. Over the years, ITP Technology Delivery has worked with industry partners to assemble a suite of respected software tools, proven assessment protocols, training curricula, certified energy experts, and strong partnerships for deployment. The Save Energy Now assessments conducted in calendar year 2006 focused on natural gas savings and targeted many of the nation's largest manufacturing plants - those that consume at least 1 TBtu of energy annually. The 2006 Save Energy Now assessments focused primarily on assessments of steam and process heating systems, which account for an estimated 74% of all natural gas use by U.S. manufacturing plants. Because of the success of the Save Energy Now assessments conducted in 2006 and 2007, the program was expanded and enhanced in two major ways in 2008: (1) a new goal was set to perform at least 260 assessments; and (2) the assessment focus was expanded to include pumping, compressed air, and fan systems in addition to steam and process heating. DOE ITP also has developed software tools to assess energy efficiency improvement opportunities in pumping, compressed air, and fan systems. The Save Energy Now assessments integrate a strong training component designed to teach industrial plant personnel how to use DOE's opportunity assessment software tools. This approach has the advantages of promoting strong buy-in of plant personnel for the assessment and its outcomes and preparing them better to independently replicate the assessment process at the company's other facilities. Another important element of the Save Energy Now assessment process is the follow-up process used to identify how many of the recommended savings opportunities from individual assessments have been implemented in the industrial plants. Plant personnel involved with the Save Energy Now assessments are contacted 6 months, 12 months, and 24 months after individual assessments are completed to determine implementation results. A total of 260 Save Energy Now assessments were successfully completed in calendar year 2008. This means that a total of 718 assessments were completed in 2006, 2007, and 2008. As of July 2009, we have received a total of 239 summary reports from the ESAs that were conducted in year 2008. Hence, at the time that this report was prepared, 680 final assessment reports were completed (200 from year 2006, 241 from year 2007, and 239 from year 2008). The total identified potential cost savings from these 680 assessments is $1.1 billion per year, including natural gas savings of about 98 TBtu per year. These results, if fully implemented, could reduce CO{sub 2} emissions by about 8.9 million metric tons annually. When this report was prepared, data on implementation of recommended energy and cost savings measures from 488 Save Energy Now assessments were available. For these 488 plants, measures saving a total of $147 million per year have been implemented, measures that will save $169 million per year are in the process of being implemented, and plants are planning implementation of measures that will save another $239 million per year. The implemented recommendations are already achieving total CO{sub 2} reductions of about 1.8 million metric tons per year. This report provides a summary of the key results for the Save Energy Now assessments completed in 2008; details of the 6-month, 12-month, and 24-month implementation results obtained to date; and an evaluation of these implementation results. This report also summarizes key accomplishments, findings, and lessons learned from all the Save Energy Now assessments completed to date. A separate report (Wright et al. 2010) provides more detailed information on key results for all of the 2008 assessments of steam, process heating, pumping, compressed air, and fan systems. Two prior reports (Wright et al. 2007 and Wright et al. 2009) detail the results from the 2006 and 2007 assessments and discuss the major components of the assessment process and improvements in the process made in 2007.

03 NATURAL GAS↗

Save Energy Now Assessments Results 2008 Detailed Report

In October 2005, U.S. Department of Energy Secretary Bodman launched his Easy Ways to Save Energy campaign with a promise to provide energy assessments to 200 of the largest U.S. manufacturing plants. DOE's Industrial Technologies Program (ITP) responded to the Secretary's campaign with its Save Energy Now initiative, featuring a new and highly cost-effective form of energy savings assessment. The approach for these assessments drew heavily on the existing resources of ITP's technology delivery component. Over the years, ITP Technology Delivery has worked with industry partners to assemble a suite of respected software tools, proven assessment protocols, training curricula, certified energy experts, and strong partnerships for deployment. The Save Energy Now assessments conducted in calendar year 2006 focused on natural gas savings and targeted many of the nation's largest manufacturing plants - those that consume at least 1 TBtu of energy annually. The 2006 Save Energy Now assessments focused primarily on assessments of steam and process heating systems, which account for an estimated 74% of all natural gas use by U.S. manufacturing plants. Because of the success of the Save Energy Now assessments conducted in 2006 and 2007, the program was expanded and enhanced in two major ways in 2008: (1) a new goal was set to perform at least 260 assessments; and (2) the assessment focus was expanded to include pumping, compressed air, and fan systems in addition to steam and process heating. DOE ITP also has developed software tools to assess energy efficiency improvement opportunities in pumping, compressed air, and fan systems. The Save Energy Now assessments integrate a strong training component designed to teach industrial plant personnel how to use DOE's opportunity assessment software tools. This approach has the advantages of promoting strong buy-in of plant personnel for the assessment and its outcomes and preparing them better to independently replicate the assessment process at the company's other facilities. Another important element of the Save Energy Now assessment process is the follow-up process used to identify how many of the recommended savings opportunities from individual assessments have been implemented in the industrial plants. Plant personnel involved with the Save Energy Now assessments are contacted 6 months, 12 months, and 24 months after individual assessments are completed to determine implementation results. A total of 260 Save Energy Now assessments were successfully completed in calendar year 2008. This means that a total of 718 assessments were completed in 2006, 2007, and 2008. As of July 2009, we have received a total of 239 summary reports from the ESAs that were conducted in year 2008. Hence, at the time that this report was prepared, 680 final assessment reports were completed (200 from year 2006, 241 from year 2007, and 239 from year 2008). The total identified potential cost savings from these 680 assessments is $1.1 billion per year, including natural gas savings of about 98 TBtu per year. These results, if fully implemented, could reduce CO{sub 2} emissions by about 8.9 million metric tons annually. When this report was prepared, data on implementation of recommended energy and cost savings measures from 488 Save Energy Now assessments were available. For these 488 plants, measures saving a total of $147 million per year have been implemented, measures that will save $169 million per year are in the process of being implemented, and plants are planning implementation of measures that will save another $239 million per year. The implemented recommendations are already achieving total CO{sub 2} reductions of about 1.8 million metric tons per year. This report provides a summary of the key results for the Save Energy Now assessments completed in 2008; details of the 6-month, 12-month, and 24-month implementation results obtained to date; and an evaluation of these implementation results. This report also summarizes key accomplishments, findings, and lessons learned from all the Save Energy Now assessments completed to date. A separate report (Wright et al. 2010) provides more detailed information on key results for all of the 2008 assessments of steam, process heating, pumping, compressed air, and fan systems. Two prior reports (Wright et al. 2007 and Wright et al. 2009) detail the results from the 2006 and 2007 assessments and discuss the major components of the assessment process and improvements in the process made in 2007.

03 NATURAL GAS↗

Session 078 - Panel: Start-Up of Three Major DOE Treatment Facilities -SWPF, IWTU and DFLAW (2/2) (R2.4)

This panel focused on the successes and challenges of the DOE High-Level radioactive tank waste management program, with an emphasis on the completion of construction and startup of three major treatment facilities - the Salt Waste Processing Facility (SWPF) at Savannah River, the Integrated Waste Treatment Unit (IWTU) at Idaho, and Direct Feed Low-Activity Waste (DFLAW) processing at Hanford. As a companion to Session 23, DOE managers and federal project directors discussed the status of facility startup efforts from a federal management and oversight perspective, highlighting readiness planning, challenges and lessons learned. Panelists with presentations: Transitioning Oversight: A Project Becomes an Operating Facility (James Folk); Tools for SU/C (Tom Fletcher); Startup and Commissioning -Integrate Waste Treatment Unit-Federal Perspective (Joel Case)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Manufacturing the Harmonic Kicker Cavity Prototype for the Electron-Ion Collider

High-bunch-frequency beam-separation schemes, such as the injection scheme proposed for the Rapid Cycling Synchrotron at the Electron-Ion Collider, demand rise and fall times an order of magnitude below what can realistically be accomplished with a stripline kicker. Nanosecond-time-scale kick waveforms can instead be obtained by Fourier synthesis in a harmonically resonant quarter-wave radio-frequency cavity which is optimized for high shunt impedance. Originally developed for the Jefferson Lab Electron-Ion Collider (JLEIC) Circulator Cooler Ring, a hypothetical 11-pass ring driven by an energy-recovery linac at Jefferson Lab, our high-power prototype of such a harmonic kicker cavity, which operates at five modes at the same time, will demonstrate the viability of this concept with a beam test at Jefferson Lab. As the geometry of the cavity, tight mechanical tolerances, and number of ports complicate the design and manufacturing process, special care must be given to the order of the manufacturing steps. We present our experiences with the manufacturability of the present design, lessons learned, and first RF test results from the prototype.

Overstreet, S. A.↗

Software-defined Networking for Energy Delivery Systems (SDN4EDS): An Architectural Blueprint (Final Report)

This is the initial version of a reference for suppliers and energy companies of all sizes to deploy networks based on software-defined networking technology (SDN) to improve reliability, reduce cyber security attack surface, and facilitate mitigation of adversarial behavior. It is a living document and will progress over the life cycle of the Software-Defined Networking for Energy Delivery Systems (SDN4EDS) project. Version 2 of this report provides information on the Red Team tabletop assessment performed against the initial reference architecture. Version 3 of this report updates the reference architecture with lessons learned from the Red Team tabletop assessment, as well as provides additional details for the use cases. It also provides information on the decision process that could be used by an organization when considering deploying SDN in their environment. The final version of this report consolidates all the interim reports generated by the project into a final report. It also draws from PNNL’s experience in deploying SDN to make recommendations on how SDN could be deployed in a utility environment, and provides rationale for those decisions allowing individual utilities to make risk-based and knowledge-based decisions on how to best deploy SDN in their own environment

97 MATHEMATICS AND COMPUTING↗

Software-defined Networking for Energy Delivery Systems (SDN4EDS): An Architectural Blueprint (Final Summary Report)

This is the initial version of a reference for suppliers and energy companies of all sizes to deploy networks based on software-defined networking technology (SDN) to improve reliability, reduce cyber security attack surface, and facilitate mitigation of adversarial behavior. It is a living document and will progress over the life cycle of the Software-Defined Networking for Energy Delivery Systems (SDN4EDS) project. Version 2 of this report provides information on the Red Team tabletop assessment performed against the initial reference architecture. Version 3 of this report updates the reference architecture with lessons learned from the Red Team tabletop assessment, as well as provides additional details for the use cases. It also provides information on the decision process that could be used by an organization when considering deploying SDN in their environment. The final version of this report consolidates all the interim reports generated by the project into a final report. It also draws from PNNL’s experience in deploying SDN to make recommendations on how SDN could be deployed in a utility environment, and provides rationale for those decisions allowing individual utilities to make risk-based and knowledge-based decisions on how to best deploy SDN in their own environment. This summary report provides a higher-level overview of the project reports. Readers interested in additional detail, including results of the Red Team assessments and the final configuration, are encouraged to read the full final report.

97 MATHEMATICS AND COMPUTING↗

Manufacturing the Harmonic Kicker Cavity Prototype for the Electron-Ion Collider

High-bunch-frequency beam-separation schemes, such as the injection scheme proposed for the Rapid Cycling Synchrotron at the Electron-Ion Collider, demand rise and fall times an order of magnitude below what can realistically be accomplished with a stripline kicker. Nanosecond-time-scale kick waveforms can instead be obtained by Fourier synthesis in a harmonically resonant quarter-wave radio-frequency cavity which is optimized for high shunt impedance. Originally developed for the Jefferson Lab Electron-Ion Collider (JLEIC) Circulator Cooler Ring, a hypothetical 11-pass ring driven by an energy-recovery linac at Jefferson Lab, our high-power prototype of such a harmonic kicker cavity, which operates at five modes at the same time, will demonstrate the viability of this concept with a beam test at Jefferson Lab. As the geometry of the cavity, tight mechanical tolerances, and number of ports complicate the design and manufacturing process, special care must be given to the order of the manufacturing steps. We present our experiences with the manufacturability of the present design, lessons learned, and first RF test results from the prototype.

Overstreet, S. A.↗

SQMS Quantum R&D in Machine Learning, Optimization and Sensing beyond Fundamental Physics Applications

This newly formed team at SQMS under the Ecosystem Thrust is looking to develop capabilities impacting societal advances outside the core domain of HEP and condensed matter physics. We explicitly leverage the experimental and algorithmic innovations developed across all groups as well as connect to broad-scope external projects of the diverse team of PIs. As the inaugural set of projects, we are studying numerically quantum machine learning models inspired by efficiently trainable echo-state and orthogonal neural networks and developing designs for related experiments to be performed on quantum processors based on SQMS SRF cQED technology and Rigetti s transmon arrays. Investigated models exploit ideas and lessons learned from multiple prior work by SQMS team members in a variety of internal and external activities [R1]. Target initial applications include noisy signal processing, potentially captured by quantum sensors or noisy QPUs, as well as simulation and classification of healthcare data. For instance, image reconstruction of the brain s electrical properties by solving the inverse Maxwell equation problem with uncertainty [R2] through a hybrid quantum-classical physics-informed architecture for time-dependent processes [R3]. The group is also investigating the application and development of novel quantum sensors based on magnetic levitation of a superconducting sphere coupled to a superconducting qubit. This coupling enables high-precision measurements of the position of the sphere, which can be used for sensitive detection of forces, enabling practical applications such as gravimetry for geophysics analysis, or accelerometry for GPS-denied navigation [R4] [R1] Rieffel, Eleanor G., Ata Akbari Asanjan, M. Sohaib Alam, Namit Anand, David E. Bernal Neira, Sophie Block, Lucas T. Brady et al. "Assessing and advancing the potential of quantum computing: A NASA case study." Future Generation Computer Systems (2024). [R2] Yu, X., Serrall s, J.E., Giannakopoulos, I.I., Liu, Z., Daniel, L., Lattanzi, R. and Zhang, Z., 2023. Pifon-ept: Mr-based electrical property tomography using physics-informed fourier networks. IEEE Journal on Multiscale and Multiphysics Computational Techniques. [R3] Wudarski, Filip, Daniel OConnor, Shaun Geaney, Ata Akbari Asanjan, Max Wilson, Elena Strbac, P. Aaron Lott, and Davide Venturelli. "Hybrid quantum-classical reservoir computing for simulating chaotic systems." arXiv preprint arXiv:2311.14105 (2023). [R4] Higgins, Gerard, Saarik Kalia, and Zhen Liu. "Maglev for dark matter: Dark-photon and axion dark matter sensing with levitated superconductors." Physical Review D 109.5 (2024): 055024.

Venturelli, Davide↗

Highlights of the Quad Multilateral Nuclear Arms Control Research Initiative LETTERPRESS Simulation

The US, UK, Sweden and Norway have formed the Quad Nuclear Verification Partnership and have been working together as the ‘Quad’ to ensure non-nuclear weapon states (NNWS) and nuclear weapon states (NWS) participate to overcome the challenge of nuclear arms control verification. The Quad aims to complement and inform the work of other multinational initiatives such as the International Partnership for Nuclear Disarmament Verification (IPNDV). The initial engagement of the Quad was the development and execution of a role-playing, in-field verification simulation, named LETTERPRESS. A benefit of role-playing events is the capacity they have to allow researchers to engage critically with a challenge from multiple perspectives. This paper will introduce LETTERPRESS and the process the Quad followed to develop and execute the multilateral simulation. The paper will highlight the in-play objectives of the verification regime, the site hosting the on-site inspection, and the verification technologies and their roles with respect to the objectives. The paper will include lessons learned from LETTERPRESS, focusing on the in-play objectives and technologies and their contribution to a successful monitoring result. The paper will conclude by highlighting the in-play success of a multilateral verification body and the ability of both NNWS and NWS to contribute to the verification process within LETTERPRESS.

arms control, Quad, LETTERPRESS↗

Transition of Site Programs and Implementation of Decommissioning Agent Oversight - 18653

San Onofre Nuclear Generating Station (SONGS), acting as the Decommissioning Agent (DA), retained its NRC License and contracted a Decommissioning General Contractor (DGC) to manage plant programs and execute the Demolition and Dismantlement (D and D) of the site. To support this effort, over twenty-one programs transitioned to the DGC, including Occupational Health and Safety, Radiation Protection, Maintenance, and Engineering. In addition, SONGS effected a cultural shift from an operating station performing work to one of overseeing it. The framework and road map for this kind of D and D model is new to the industry. This presentation shares the SONGS' experience and lessons learned associated with this transition. SONGS and the DGC entered an Agreement that established the contractual requirements and responsibilities of the parties, the Scope of Work, and the mechanisms to ensure effective transition of DA programs. As a part of defining the Scope of Work, the contract established functional areas and divisions of responsibilities divided into the roles of Governance, Oversight, Support, and Performance (GOSP). SONGS, as the site licensee, retained the Oversight Role, with exception of those areas that, as the licensee, would be considered 'non-transferrable'. Examples of those programs were Quality Assurance, Regulatory Affairs and the Employee Concerns Program. While the Company retained responsibility for those programs the DGC developed their own 'parallel' programs that the Company provided Oversight for. In 2017, SONGS completed program transition within one-year following the notice-to-proceed. The overall strategy was driven by three high-level principles: - Allow the DGC the most unfettered execution of the Scope of Work with limited interference and maximum self-governance. With the overriding principle that transitioned programs have a direct link to a basis in regulation or law. - Identify safety and compliance risks, and then bridge the transition of programs from the SONGS to the DGC such that identified risks are minimized and/or mitigated. - Allow the SONGS organization to transition from a Performance role to a primarily Oversight role as the DA. Working collaboratively with the DGC, programs were strategically grouped and sequenced for turnover. Central to the success of transition was fostering a collaborative environment with the DGC, facilitating knowledge transfer, applying schedule rigor, and keeping the team horizontally and vertically aligned to management expectations. SONGS achieved this alignment by embedding the formal process with management expectations for review and acceptance of proposed programs. SONGS' transitioned core programs to a general contractor and transition from a 'perform' organization to an 'oversight' organization. Lessons learned from this experience may benefit other nuclear generating station owners currently evaluating options for site D and D. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗