Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “integrated planning and scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

AUTOPLAN: A PC-based automated mission planning tool

A PC-based automated mission and resource planning tool, AUTOPLAN, is described, with application to small-scale planning and scheduling systems in the Space Station program. The input is a proposed mission profile, including mission duration, number of allowable slip periods, and requirement profiles for one or more resources as a function of time. A corresponding availability profile is also entered for each resource over the whole time interval under study. AUTOPLAN determines all integrated schedules which do not require more than the available resources.

Paterra, Frank C.↗

Joint operations planning for space surveillance missions on the MSX satellite

The Midcourse Space Experiment (MSX) satellite, sponsored by BMDO, is intended to gather broad-band phenomenology data on missiles, plumes, naturally occurring earthlimb backgrounds and deep space backgrounds. In addition the MSX will be used to conduct functional demonstrations of space-based space surveillance. The JHU/Applied Physics Laboratory (APL), located in Laurel, MD, is the integrator and operator of the MSX satellite. APL will conduct all operations related to the MSX and is charged with the detailed operations planning required to implement all of the experiments run on the MSX except the space surveillance experiments. The non-surveillance operations are generally amenable to being defined months ahead of time and being scheduled on a monthly basis. Lincoln Laboratory, Massachusetts Institute of Technology (LL), located in Lexington, MA, is the provider of one of the principle MSX instruments, the Space-Based Visible (SBV) sensor, and the agency charged with implementing the space surveillance demonstrations on the MSX. The planning timelines for the space surveillance demonstrations are fundamentally different from those for the other experiments. They are generally amenable to being scheduled on a monthly basis, but the specific experiment sequence and pointing must be refined shortly before execution. This allocation of responsibilities to different organizations implies the need for a joint mission planning system for conducting space surveillance demonstrations. This paper details the iterative, joint planning system, based on passing responsibility for generating MSX commands for surveillance operations from APL to LL for specific scheduled operations. The joint planning system, including the generation of a budget for spacecraft resources to be used for surveillance events, has been successfully demonstrated during ground testing of the MSX and is being validated for MSX launch within the year. The planning system developed for the MSX forms a model possibly applicable to developing distributed mission planning systems for other multi-use satellites.

Stokes, Grant↗

An Enhanced Convective Forecast (ECF) for the New York TRACON Area

In an effort to relieve summer-time congestion in the NY Terminal Radar Approach Control (TRACON) area, the FAA is testing an enhanced convective forecast (ECF) product. The test began in June 2008 and is scheduled to run through early September. The ECF is updated every two hours, right before the Air Traffic Control System Command Center (ATCSCC) national planning telcon. It is intended to be used by traffic managers throughout the National Airspace System (NAS) and airlines dispatchers to supplement information from the Collaborative Convective Forecast Product (CCFP) and the Corridor Integrated Weather System (CIWS). The ECF begins where the current CIWS forecast ends at 2 hours and extends out to 12 hours. Unlike the CCFP it is a detailed deterministic forecast with no aerial coverage limits. It is created by an ENSCO forecaster using a variety of guidance products including, the Weather Research and Forecast (WRF) model. This is the same version of the WRF that ENSCO runs over the Florida peninsula in support of launch operations at the Kennedy Space Center. For this project, the WRF model domain has been shifted to the Northeastern US. Several products from the NASA SPoRT group are also used by the ENSCO forecaster. In this paper we will provide examples of the ECF products and discuss individual cases of traffic management actions using ECF guidance.

Wheeler, Mark↗

The Home Stretch Almost! Science with the Hubble and James Webb Space Telescope V

JWST has Made tremendous progress in the last few years. JWST Is fully immersed in integration and test, but testing JWST is a formable challenge. JWST's size, complexity, and cryogenic characteristics require a multifaceted test plan to verify mission readiness. Each of these tests are opportunities to uncover issues which must be corrected to be able to move forward. All observatory control, science planning, and science data processing operational systems are on schedule.

JWST Hubble↗

NASA Standing Review Board Handbook

This handbook provides guidance based on best practices for the planning, preparation, review, reporting, and closeout of Standing Review Board (SRB) activities. Revision C updates the Revision B version of the SRB Handbook published in 2016 to incorporate updates to NASA Procedural Requirements (NPR) 7120.5F, NASA Space Flight Program and Project Management Requirements. These updates include: - Changing the Dissenting Opinion process to the Formal Dissent process, which retains the current process augmented with an expedited escalation path. - Updates to requirements for establishing an Agency Baseline Commitment (ABC) and for performing Joint Cost and Schedule Confidence Level (JCL) analyses for tightly coupled programs. - Additional requirements for performing a JCL analysis for single-project programs and projects over $1B Life-Cycle Cost (LCC). - Use of initial capability cost estimates instead of LCC estimates in specific, identified instances for single-project programs and projects that plan continuing operations and production, including integration of capability upgrades, with an unspecified Phase E end point. These single-project programs and projects define an initial capability during Phase A and develop an initial capability cost that establishes the ABC at Key Decision Point (KDP) C. Initial capability is the first operational mission flight (or as defined in the KDP B Review Plan) and is documented in the KDP B Decision Memorandum. Initial capability cost includes operations cost for the initial capability. The Phase E cost estimate for continuing operations and production is established separately as part of the Operational Readiness Review (ORR) and KDP E for the 5 years after initial capability and subsequently updated and documented annually for the next 5-year period. Upgrades during Phase E that meet the Agency criteria for a major project for external reporting are treated as projects for the purposes of establishing their own development ABC outside the Phase E cost estimate. The Phase E cost estimate is updated to include production and operations costs associated with these upgrades. Development, production, and operations costs of other (i.e., non-major) upgrades are included in the Phase E cost estimate. (See NPR 7120.5, Sections 2.4.1.5 and 2.4.1.6 and the NASA Space Flight Program and Project Management Handbook (PM Handbook), Section 5.5.4 for additional information.) The scope of the SRB’s assessment with respect to initial capability, Phase E cost estimate, and major upgrades for these single-project programs and projects is defined in the Terms of Reference (ToR).

Kevin Michael Gilligan↗

Landsat Data Continuity Mission

The Landsat Data Continuity Mission (LDCM) is currently under development and is on schedule to launch the 8th satellite in the Landsat series in December of 2012. LDCM is a joint project between the National Aeronautics and Space Administration (NASA) and the United States Geological Survey (USGS). NASA is responsible for developing and launching the flight hardware and on-orbit commissioning and USGS is responsible for developing the ground system and operating the system onorbit after commissioning. Key components of the flight hardware are the Operational Land Imager (OLI), nearing completion by Ball Aerospace & Technologies Corp in Boulder, CO, the Thermal Infrared Sensor (TIRS), being built by NASA's Goddard Space Flight Center and the spacecraft, undergoing integration at Orbital Sciences Corp in Gilbert, Arizona. The launch vehicle will be an Atlas-5 with launch services provided by NASA's Kennedy Space Center. Key ground systems elements are the Mission Operations Element, being developed by the Hammers Corporation, and the Collection Activity Planning Element, Ground Network Element, and Data Processing and Archive System, being developed internally by the USGS Earth Resources Observations and Science (EROS) Center. The primary measurement goal of LDCM is to continue the global coverage of moderate spatial resolution imagery providing continuity with the existing Landsat record. The science goal for this imagery is to monitor land use and land cover, particularly as it relates to global climate change. Together the OLI and TIRS instruments on LDCM replace the ETM+ instrument on Landsat-7 with significant enhancements. The OLI is a pushbroom design instrument where the scanning mechanism of the ETM+ is effectively replaced by a long line of detectors. The OLI has 9 spectral bands with similar spatial resolution to ETM+: 7 of them similar to the reflective spectral bands on ETM+ and two new bands. The two new bands cover (1) the shorter wavelength blue part of the spectrum to help with coastal studies and aerosol analyses/atmospheric correction and (2) an atmospheric water absorption band, where the Earth surface is generally not visible, but Cirrus clouds are, to aid in cloud detection and screening. The radiometry of OLI benefits from improved SNR, dynamic range and quantization. OLI is undergoing system testing with a delivery scheduled for Spring 2011. The TIRS is also a pushbroom design and used QWIPS detectors that require cooling to 43K using a cryocooler. It.has two spectral bands, effectively splitting the ETM+ band 6 in half, that can be used as a split window to aid in atmospheric correction. It has nominally 100 m spatial resolution as opposed to the 60 m of Landsat-7 ETM+: TIRS has commenced integration and test, with a delivery to the spacecraft vendor scheduled for Winter 2011-2012. The Orbital spacecraft currently being integrated for LDCM will have improved capabilities for pointing over previous missions. These capabilities will allow the OLI and TIRS instruments to point off-nadir the equivalent of one WRS-2 path to increase the chances of coverage for high priority targets, particularly in the event of natural disasters. Also, the pointing capability will allow the calibration of the OLI using the sun (roughly weekly), the moon (monthly), stars (during commissioning) and the Earth (at 90 deg from normal orientation, a.k.a., side slither) quarterly. The solar calibration will be used for OLI absolute and relative calibration, the moon for trending the stability of the OLI response, the stars will be used for Line of Sight determination and the side slither will be an alternate OLI and relative gain determination methodology. The spacecraft is scheduled to begin integration with the OLI instrument in Summer 2011. The LDCM data processing and archive system (DPAS), located at USGS EROS, generates the products for distribution to users. Like Landsat-7 this includes an image assessment system for characrizing instrument performance and updating calibration parameters. Products will be generated that include the spectral bands from both instruments, terrain corrected and registered to the geoid. Also, like Landsat-7, data products will be distributed at no charge to the user. The current status and plans of the space and ground segments of the LDCM project will be presented along with performance predictions as available. More detailed information on the two instruments is intended to be presented in separate papers.

Markham, Brian↗

TARDIS: Acelerating TVAC Transitions

"Large spacecraft components, including instruments, require long durations to transition between temperature plateaus during TVAC (Thermal Vacuum) testing. This is especially true for cryogenic instruments whose operating temperatures are extremely low. Due to the T4 relation, using radiative heat transfer alone for temperature transitions to cryogenic temperatures is extremely time consuming. The Wide Field Instrument (WFI) on the upcoming Roman Space Telescope (RST) is one such cryogenic instrument. The TARDIS (Thermal Acceleration Rate Device for Integrated Systems) is a heat switch device which will be used during the WFI TVAC test campaign in order to decrease WFI transition times. Over the course of the planned ___ week WFI instrument-level TVAC testing, TARDIS is being estimated to save ___ days of test time. By reducing the total TVAC duration, TARDIS is providing significant cost and schedule savings to the RST WFI project. Based on the successful design of the LUCY L’Ralph AZQ Heat Switch, TARDIS can provide both high conductivity for temperature transitions and low conductivity Zero-Q for thermal balances. This is achieved by use of a mechanical clamp heat switch and actively controlled cold plate. Using this method, TARDIS is estimated to be able to change its conductance from approximately 0.20 W/K to ¬¬0.002 W/K, for a turndown ratio of 100. This paper details the design, analysis, and testing of TARDIS. It also previews the operation of TARDIS in the upcoming WFI TVAC test campaign. "

TVAC, Heat Switch↗

Spacelab Life Sciences 1 - The stepping stone

The Spacelab Life Sciences (SLS-1) mission scheduled for launch in March 1990 will study the effects of microgravity on physiological parameters of humans and animals. The data obtained will guide equipment design, performance of activities involving the use of animals, and prediction of human physiological responses during long-term microgravity exposure. The experiments planned for the SLS-1 mission include a particulate-containment demonstration test, integrated rodent experiments, jellyfish experiments, and validation of the small-mass measuring instrument. The design and operation of the Research Animal Holding Facility, General-Purpose Work Station, General-Purpose Transfer Unit, and Animal Enclosure Module are discussed and illustrated with drawings and diagrams.

Dalton, B. P.↗

Techniques and software for optimum and efficient mission science sequence development

Highly successful mission operations require efficient and cost-effective science sequence development. Of key importance is the Science Planning and Operations Team's (SPOT's) ability to complete science observation design and integration early in the sequence development process (i.e., before the sequence enters into a formal change control process). Once under formal change control, careful change paper documentation, Flight Team checks, and mission software checks make sequence changes more labor-intensive. This paper discusses team organization, strategies, scheduling, and software employed by the Voyager and Galileo SPOT's to complete science observation design and integration early in the sequence development process.

Bliss, David A.↗

Airspace Technology Demonstration 2 (ATD-2): Integrated Arrival/ Departure/Surface (IADS) System Demonstration Technology Transfer Document Summary (ReadMe) Version 2 - Phase 2 Fused IADS

Airspace Technology Demonstration 2 (ATD-2) is part of NASA's Airspace Technology Demonstrations (ATD) Project under its Airspace Operations and Safety Program (AOSP). ATD-2 is a multi-year research and development effort to improve the predictability and operational efficiency of the air traffic system in metroplex environments while maintaining or improving throughput by enhancing and integrating arrival, departure, and surface prediction, scheduling, and management systems. In order to ensure that the products of this knowledge and technology transfer are relevant and useful, NASA has created strong partnerships with the FAA and industry stakeholders. This summary document and accompanying artifacts satisfy the second of three research transition products (RTPs) defined in the IADS research transition team (RTT) plan. This transfer consists of NASA's ATD-2 Phase 1 Baseline IADS and Phase 2 Fused IADS system capabilities

Capps, Alan↗

Airspace Technology Demonstration 2 (ATD-2): Integrated Arrival/Departure/Surface (IADS) System Demonstration - Technology Transfer Document Summary (ReadMe) (Version 2.5 - Initial Phase 3 Metroplex IADS)

Airspace Technology Demonstration – 2 (ATD-2) is part of NASA’s Airspace Technology Demonstrations (ATD) Project under its Airspace Operations and Safety Program (AOSP). ATD-2 is a multi-year research and development effort to improve the predictability and operational efficiency of the air traffic system in metroplex environments while maintaining or improving throughput by enhancing and integrating arrival, departure, and surface prediction, scheduling, and management systems. In order to ensure that the products of this knowledge and technology transfer are relevant and useful, NASA has created strong partnerships with the FAA and industry stakeholders. This summary document and accompanying artifacts satisfy the next delivery of research transition products (RTPs) defined in the IADS research transition team (RTT) plan. With the ATD-2 project extended for another year, this Tech Transfer 2.5 constitutes an interim delivery of artifacts from the Phase 3 field demonstration. The final Phase 3 tech transfer delivery is planned for August 2021.

ATD-2, IADS, Phase 3, tech transfer↗

Airspace Technology Demonstration 2 (ATD-2): Integrated Arrival/ Departure/Surface (IADS) System Demonstration - Technology Transfer Document Summary (ReadMe)Version 3 (Final Phase 3 Metroplex IADS)

Airspace Technology Demonstration – 2 (ATD-2) is part of NASA’s Airspace Technology Demonstrations (ATD) Project under its Airspace Operations and Safety Program (AOSP). ATD-2 is a multi-year research and development effort to improve the predictability and operational efficiency of the air traffic system in metroplex environments while maintaining or improving throughput by enhancing and integrating arrival, departure, and surface prediction, scheduling, and management systems. In order to ensure that the products of this knowledge and technology transfer are relevant and useful, NASA has created strong partnerships with the FAA and industry stakeholders. This summary document and accompanying artifacts satisfy the final delivery of research transition products (RTPs) defined in the IADS research transition team (RTT) plan.

ATD-2↗

Development of a Safety Hazards Risk Assessment Tool for Uncrewed Aircraft System Traffic Management during Preflight Planning

Tremendous growth in the uncrewed and remotely piloted vehicle market is expected in low-altitude, uncontrolled airspace, resulting in potential decreases in safety without systems that support monitoring, assessing, and mitigating risk. At NASA, the System-Wide Safety (SWS) project has been developing a suite of data-driven tools to predict hazards so that the potential risks that these hazards pose can be mitigated. Services to predict various hazards have been developed, including battery capacity, proximity to static obstacles, population risks, global positioning system signal strength, radio frequency spectrum interference risk, and vertiport congestion. These services can monitor hazards along a flight path and if any risks posed by these hazards exceed a threshold, the uncrewed aircraft system (UAS) fleet manager can be alerted to mitigate the risk by modifying the flight path, changing the scheduled departure or arrival times, and/or diverting the vehicle to an alternate vertiport. These services were originally developed to monitor and assess risks during flight, but they have been adapted to assess hazard risks prior to departure so that a fleet manager can evaluate the potential risks for a fleet of UAS along their planned flight paths. These services have been integrated into a prototype tool called the Supplemental Data Service Provider-Consolidated Dashboard (SDSP-CD), developed at NASA Ames Research Center. The tool consists of a dashboard which provides a comprehensive overview for a number of risks and a map display that shows the details of the hazards along each flight’s path. Based on the findings from three previous studies, the SDSP-CD has been updated with new design elements and functions. In this paper, we describe lessons learned from the previous studies, changes made to the interface, and the feedback received during a follow-up usability study. Overall, participants reported that there is a substantial benefit of having a fleet manager use a consolidated dashboard to assess hazards for the vehicles in their fleet and to provide situational awareness to potential risks so that they can be mitigated prior to flight. Once the SDSP-CD matures, it will need to be integrated into flight and mission planning tools. Some initial thoughts on how this integration should be accomplished are shared in this paper. Finally, the functional differences between preflight vs. in-flight risk assessment and the differences in fleet manager vs. UAS pilot roles that may require different information and user interactions are discussed.

preflight↗

ADDS-EVS: An agent-based deployment decision-support system for electric vehicle services

Rapid and sustainable development of the electric vehicle (EV) industry places the requirement for the plan of EV deployment. For public EV, existing models mainly focus on the charging facility design and fail to capture the multi-modal scenarios. In this work, we develop an agent-based decision-support system for multi-modal electric transits to locate the optimal combinations of key parameters, including the fleet size, the transit schedule, the charging facility design, and the routing strategy. We demonstrate the utilities of our system by simulating public EV services deployed to serve travel needs related to a transportation hub in New York City. To support the decision of the fleet size, we summarize system-level performances including the total satisfied demand, passengers' waiting time, vehicle idling time. The spatial and temporal patterns are extracted to serve a deeper understanding of system dynamics and service quality. Finally, we investigate the interaction between the fleet size design and the routing strategy. The results suggest a necessity of integrating the operation strategies into the planning phase.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Research and technology goals and objectives for Integrated Vehicle Health Management (IVHM)

Integrated Vehicle Health Management (IVHM) is defined herein as the capability to efficiently perform checkout, testing, and monitoring of space transportation vehicles, subsystems, and components before, during, and after operational This includes the ability to perform timely status determination, diagnostics, and prognostics. IVHM must support fault-tolerant response including system/subsystem reconfiguration to prevent catastrophic failures; and IVHM must support the planning and scheduling of post-operational maintenance. The purpose of this document is to establish the rationale for IVHM and IVHM research and technology planning, and to develop technical goals and objectives. This document is prepared to provide a broad overview of IVHM for technology and advanced development activities and, more specifically, to provide a planning reference from an avionics viewpoint under the OAST Transportation Technology Program Strategic Plan.

Source record↗

Autonomous power management and distribution

The goal of the Autonomous Power System program is to develop and apply intelligent problem solving and control to the Space Station Freedom's electric power testbed being developed at NASA's Lewis Research Center. Objectives are to establish artificial intelligence technology paths, craft knowledge-based tools and products for power systems, and integrate knowledge-based and conventional controllers. This program represents a joint effort between the Space Station and Office of Aeronautics and Space Technology to develop and demonstrate space electric power automation technology capable of: (1) detection and classification of system operating status, (2) diagnosis of failure causes, and (3) cooperative problem solving for power scheduling and failure recovery. Program details, status, and plans will be presented.

Dolce, Jim↗

Data-Driven Unit Commitment Refinement - a Scalable Approach for Complex Modern Power Grids

Integration of renewable generation, which is often intermittent and decentralized, substantially increases the stochasticity and complexity of power grid operations. Future power systems planning will require significant computational capability to evaluate balance between demand and supply under varying conditions, both temporally and spatially. The standard approach for generation unit commitment is to use mixed-integer linear programming to find the optimal generation schedule considering ramping and generator constraints. In the future grid this poses computational scalability challenges because generation and demand are not known with certainty due to stochasticity in weather and complexity of the grid. To address this challenge, we present a data-driven unit commitment approach that can efficiently include stochastic weather impacts and contingency considerations to improve unit commitment. Our approach uses graph-based data analytics techniques on solutions to the security constrained (and possibly stochastic) economic dispatch problem to identify potential improvements to a given unit commitment. Recent breakthroughs in fully-parallel stochastic economic dispatch software allow this approach to be scalably deployed. Simulations on synthetic South Carolina and Texas grids show this method can improve grid reliability with security constraints over a set of contingencies, while also meaningfully lowering total generation cost.

Holt, Timothy↗

A trajectory planning scheme for spacecraft in the space station environment

Simulated annealing is used to solve a minimum fuel trajectory problem in the space station environment. The environment is special because the space station will define a multivehicle environment in space. The optimization surface is a complex nonlinear function of the initial conditions of the chase and target crafts. Small permutations in the input conditions can result in abrupt changes to the optimization surface. Since no prior knowledge about the number or location of local minima on the surface is available, the optimization must be capable of functioning on a multimodal surface. It was reported in the literature that the simulated annealing algorithm is more effective on such surfaces than descent techniques using random starting points. The simulated annealing optimization was found to be capable of identifying a minimum fuel, two-burn trajectory subject to four constraints which are integrated into the optimization using a barrier method. The computations required to solve the optimization are fast enough that missions could be planned on board the space station. Potential applications for on board planning of missions are numerous. Future research topics may include optimal planning of multi-waypoint maneuvers using a knowledge base to guide the optimization, and a study aimed at developing robust annealing schedules for potential on board missions.

Soller, Jeffrey Alan↗