Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “integrated arrival”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

Planar ion trap (retarding potential analyzer) experiment for atmosphere explorer

The retarding potential analyzer and drift meter were carried aboard all three Atmosphere Explorer spacecraft. These instruments measure the total thermal ion concentration and temperature, the bulk thermal ion velocity vector and some limited properties of the relative abundance of H(+), He(+), O(+) and molecular ions. These instruments functioned with no internal failures on all the spacecraft. On AE-E there existed some evidence for external surface contamination that damaged the integrity of the RPA sweep grids. This led to some difficulties in data reduction and interpretation that did not prove to be a disastrous problem. The AE-D spacecraft functioned for only a few months before it re-entered. During this time the satellite suffered from a nutation about the spin axis of about + or - 2 deg. This 2 deg modulation was superimposed upon the ion drift meter horizontal ion arrival angle output requiring the employment of filtering techniques to retrieve the real data.

Hanson, W. B.↗

Performance Evaluation of Individual Aircraft Based Advisory Concept for Surface Management

Surface operations at airports in the US are based on tactical operations, where departure aircraft primarily queue up and wait at the departure runways. NASA's Spot And Runway Departure Advisor (SARDA) tool was developed to address these inefficiencies through Air Traffic Control Tower advisories. The SARDA system is being updated to include collaborative gate hold, either tactically or strategically. This paper presents the results of the human-in-the-loop evaluation of the tactical gate hold version of SARDA in a 360 degree simulated tower setting. The simulations were conducted for the east side of the Dallas/Fort Worth airport. The new system provides gate hold, ground controller and local controller advisories based on a single scheduler. Simulations were conducted with SARDA on and off, the off case reflecting current day operations with no gate hold. Scenarios based on medium (1.2x current levels) and heavy (1.5x current levels) traffic were explored. Data collected from the simulation was analyzed for runway usage, delay for departures and arrivals, and fuel consumption. Further, Traffic Management Initiatives were introduced for a subset of the aircraft. Results indicated that runway usage did not change with the use of SARDA, i.e., there was no loss in runway throughput as compared to baseline. Taxiing delay was significantly reduced with the use of advisory by 45% in medium scenarios and 60% in heavy. Arrival delay was unaffected by the use of advisory. Total fuel consumption was also reduced by 23% in medium traffic and 33% in heavy. TMI compliance appeared unaffected by the advisory

departure metering↗

Comparison of level-1 and level-2 buckling and postbuckling solutions

The accuracy of the solutions obtained with the Level-1 computational modules of DISDECO (Delft Interactive Shell Design Code) are investigated by comparing them with solutions obtained with ANILISA, a Level-2 computational module. Whereas the Level-1 solutions are based on the use of trigonometric functions to represent the out-of-plane displacement W and involve Galerkin type approximations to reduce the governing partial differential equations to simple algebraic expressions, the Level-2 solutions employ a truncated Fourier expansion in the circumferential direction and solve the resulting ordinary differential equations forming a nonlinear eigenvalue problem by a Stodola like technique. This involves the numerical integration of the set of ordinary differential equations, which in turn makes it possible to satisfy the specified boundary conditions exactly. It is shown that in many applications the Level-1 predictions concerning the critical buckling load of the perfect structure and its imperfection sensitivity are quite accurate and reliable. For those cases where this is not true, it is shown how the pre and postprocessing facilities of DISDECO can be used efficiently to arrive at a reliable prediction. This involves always the use of the Level-2 computational module ANILISA with its rigorous prebuckling solution and its feature which makes it possible to satisfy the specified boundary conditions exactly.

Arbocz, J.↗

Some ideas and opportunities concerning three-dimensional wind-tunnel wall corrections

Opportunities for improving the accuracy and reliability of wall corrections in conventional ventilated test sections are presented. The approach encompasses state-of-the-art technology in transonic computational methods combined with the measurement of tunnel-wall pressures. The objective is to arrive at correction procedures of known, verifiable accuracy that are practical within a production testing environment. It is concluded that: accurate and reliable correction procedures can be developed for cruise-type aerodynamic testing for any wall configuration; passive walls can be optimized for minimal interference for cruise-type aerodynamic testing (tailored slots, variable open area ratio, etc.); monitoring and assessment of noncorrectable interference (buoyancy and curvature in a transonic stream) can be an integral part of a correction procedure; and reasonably good correction procedures can probably be developd for complex flows involving extensive separation and other unpredictable phenomena.

Rubbert, P. E.↗

Making Intercontinental Burning Influences Quantitative: Lessons on Transport and Geochemistry From the 3-D Simulation of CO in PEM-T A and TRACE-A

We report on two aspects of the simulation of global transport of plumes originating from subtropical biomass fires. We use of meteorological assimilation (MM5) at 2-degree resolution with a Grail cloud parameterization and a Blackadar-based planetary boundary layer parameterization. Ames's GRACES model provides emissions, transport, and an appropriate level of simulated chemical transformation. We have worked with passive-tracer CO or linear chemistry. This is appropriate since we find major work to be done in evaluating CO source strengths and transport mechanisms before chemical integrations could be meaningful. First, we present mechanisms by which CO and other pollutants are introduced into the free troposphere, and are then transported with hate dilution from approx. 0 to approx. 180 degrees longitude. One principal conduit for these plumes is the vernal subtropical jet; however the plumes appear at various altitudes and latitudes as they influenced by frontal motions and (most likely) radiative processes. A common, repeated pattern of transport has pollutant plumes arriving in the distant Pacific Ocean from Africa and South America at 25 degrees south and 14 km altitude. Following this, there is then a general appearance of pollution at extending down to 5 kin at more equatorial (10 S) and polar latitudes (to 45 S). Second, we evaluate the quantitative success of our simulation. (Such success requires efforts considerably beyond trajectory analyses, and is necessary for our community to claim an understanding of the effects of biomass burning on global atmospheric chemistry and the planet's trend in oxidizing capacity.) We find that we simulate most pollution episodes sampled by Glenn Sachse's CO instrument and the Blake hydrocarbon analyses during PENT A. We will present our current ideas on why our general levels appear satisfactory when the observations are within 20 ppb of background levels, but substantially miss the variability associated with the most intense biomass burning plumes. As time allows, we will speculate on the origins of a class of plumes that appear in the mid-troposphere, but are missing from our simulations.

Chatfield, Robert↗

Second-Generation Six-Limbed Experimental Robot

The figure shows the LEMUR II - the second generation of the Limbed Excursion Mechanical Utility Robot (LEMUR), which was described in "Six-Legged Experimental Robot" (NPO-20897), NASA Tech Briefs, Vol. 25, No. 12 (December 2001), page 58. The LEMUR II incorporates a number of improvements, including new features, that extend its capabilities beyond those of its predecessor, which is now denoted the LEMUR I. To recapitulate: the LEMUR I was a six-limbed robot for demonstrating robotic capabilities for assembly, maintenance, and inspection. The LEMUR I was designed to be capable of walking autonomously along a truss structure toward a mechanical assembly at a prescribed location and to perform other operations. The LEMUR I was equipped with stereoscopic video cameras and image-data-processing circuitry for navigation and mechanical operations. It was also equipped with a wireless modem, through which it could be commanded remotely. Upon arrival at a mechanical assembly, the LEMUR I would perform simple mechanical operations with one or both of its front limbs. It could also transmit images to a host computer. Each of the six limbs of the LEMUR I was operated independently. Each of the four rear limbs had three degrees of freedom (DOFs), while each of the front two limbs had four DOFs. The front two limbs were designed to hold, operate, and/or be integrated with tools. The LEMUR I included an onboard computer equipped with an assortment of digital control circuits, digital input/output circuits, analog-to-digital converters for input, and digital-to-analog (D/A) converters for output. Feedback from optical encoders in the limb actuators was utilized for closed-loop microcomputer control of the positions and velocities of the actuators. The LEMUR II incorporates the following improvements over the LEMUR I: a) The drive trains for the joints of the LEMUR II are more sophisticated, providing greater torque and accuracy. b) The six limbs are arranged symmetrically about a hexagonal body platform instead of in straight lines along the sides. This symmetrical arrangement is more conducive to omnidirectional movement in a plane. c) The number of degrees of freedom of each of the rear four limbs has been increased by one. Now, every limb has four degrees of freedom: three at the hip (or shoulder, depending on one s perspective) and one at the knee (or elbow, depending on one s perspective). d) Now every limb (instead of only the two front limbs) can perform operations. For this purpose, each limb is tipped with an improved quick-release mechanism for swapping of end-effector tools. e) New end-effector tools have been developed. These include an instrumented rotary driver that accepts all tool bits that have 0.125-in. (3.175-mm)-diameter shanks, a charge-coupled-device video camera, a super bright light-emitting diode for illuminating the work area of the robot, and a generic collet tool that can be quickly and inexpensively modified to accept any cylindrical object up to 0.5 in. (12.7 mm) in diameter. f) The stereoscopic cameras are mounted on a carriage that moves along a circular track, thereby providing for omnidirectional machine vision. g) The control software has been augmented with software that implements innovations reported in two prior NASA Tech Briefs articles: the HIPS algorithm ["Hybrid Image-Plane/Stereo Manipulation" (NPO-30492), Vol. 28, No. 7 (July 2004), page 55] and the CAMPOUT architecture ["An Architecture for Controlling Multiple Robots" (NPO-30345), Vol. 28, No. 10 (October 2004), page 65].

Kennedy, Brett↗

Integrated Demand Management: Minimizing Unanticipated Excessive Departure Delay while Ensuring Fairness from a Traffic Management Initiative

This paper introduces NASA's Integrated Demand Management (IDM) concept and presents the results from an early proof-of-concept evaluation and an exploratory experiment. An initial development of the concept was focused on integrating two systems - i.e. the FAA's newly deployed Traffic Flow Management System (TFMS) tool called the Collaborative Trajectory Options Program (CTOP) and the Time-Based Flow Management (TBFM) system with Extended Metering (XM) capabilities to manage projected heavy traffic demand into a capacity-constrained airport. A human-in-the-loop (HITL) simulation experiment was conducted to demonstrate the feasibility of the initial development of the concept by adapting it to an arrival traffic problem at Newark Liberty International Airport (EWR) during clear weather conditions. In this study, the CTOP was utilized to strategically plan the arrival traffic demand by controlling take-off times of both short- and long-haul flights (long-hauls specify aircraft outside TBFM regions and short-hauls specify aircraft within TBFM regions) in a way that results in equitable delays among the groups. Such strategic planning allows less airborne delay to occur within TBFM by feeding manageable long-haul traffic demand while reserving sufficient slots in the overhead streams for the short-haul departures. The manageable traffic demand indicates the TBFM scheduler assigns no more airborne delay than its assigned airspace is capable of absorbing. TBFM then uses its time-based metering capabilities to deliver the desirable throughput by tactically rescheduling the TBFM entered long-haul flights and short-haul departures. Additional research was also performed to explore use of Required Time of Arrival (RTA) capabilities as a potential control mechanism for the airborne flights to improve arrival traffic delivery accuracy of scheduled long-haul traffic demand. The study results show that both short- and long-haul flights received similar ground delays. In addition, there was a noticeable reduction in the total amount of excessive unanticipated last-minute ground delays, i.e. delays that are frequently imposed on the short-haul flight in current day operations due to saturation in the overhead stream, commonly referred to as 'double penalty'. Furthermore, the concept achieved the target throughput while minimizing the expected cost associated with overall delays in arrival traffic. Assessment of the RTA capabilities showed that there was indeed improvement of the scheduled entry times into TBFM regions by using RTA capabilities. However, with respect to reduction in delays incurred within TBFM, there was no observable benefit of improving the precision of long-haul flights entry times.

Collaborative Trajectory Options Program (CTOP)↗

Overview of the Capture, Containment, and Return System (CCRS)

The Mars Sample Return (MSR) campaign is one of the most ambitious and complex planetary exploration missions currently underway. With the participation of NASA, ESA, and a large number of industry partners, MSR aims to bring Martian soil, rock, and atmospheric samples back to Earth, in order to answer key questions about Mars’ biological evolution. To accomplish this goal the campaign relies on four coordinated missions, each fulfilling a fundamental role to bring the samples to Earth. The Mars Perseverance rover, the first of the four missions, landed safely on Mars on February 18, 2021 and has already acquired candidate samples for Earth return. A selection of the samples of Martian soil and atmosphere that Perseverance has captured during its mission will be recovered, launched into Mars orbit, and transported back to Earth. The Sample Fetch Rover and Mars Ascent System, both parts of the Sample Return Lander project, perform the Mars surface missions to retrieve the collected samples and launch them into Mars orbit. NASA’s Capture, Containment, and Return System (CCRS), hosted on ESA’s Earth Return Orbiter (ERO), brings the samples back to Earth from Mars orbit. These retrieval and return missions are currently in the planning and design stages of development. The NASA-provided CCRS is the payload of the ESA ERO and is the focus of this presentation. ERO will enter Mars orbit and provide communication relay to Earth for the other MSR elements. The Sample Return Lander systems will fetch the sample tubes and integrate them into a protective vessel – the Orbiting Sample (OS) system – which is then launched into low Mars orbit. ERO will perform rendezvous maneuvers, allowing its CCRS payload to capture the OS, contain it, and perform the first automated in-space assembly of a spacecraft, the Earth Entry System (EES), while in Mars orbit. ERO will then begin its journey back to Earth, with CCRS and its assembled EES spacecraft. Three days prior to arrival, CCRS will release the EES on an Earth entry trajectory from a distance beyond the orbit of the Moon. The passive EES spacecraft will then enter Earth’s atmosphere, flying on a ballistic trajectory, followed by a terminal descent (without a parachute) and landing at the Utah Test and Training Range (UTTR). This presentation will show the current design of the CCRS system and its concept of operations. ERO and CCRS will perform several firsts in planetary exploration: (a) orbital rendezvous and capture in Mars orbit, (b) in-space sterilization and containment, (c) on-orbit spacecraft assembly at Mars, and (d) fully-passive entry, descent, and landing sequence for sample return.

Carlie H. Zumwalt↗

Numerical simulation of a supersonic reacting mixing layer

In order to arrive at physical models that can adequately describe supersonic combustion, and develop accurate and efficient numerical techniques for the solution of such models' governing equations, a computer program has been developed for the study of reacting flows which considers the multicomponent diffusion and convection of important chemical species, as well as their finite state reaction and the interaction of the fluid mechanics and the chemistry that occurred. The code employs a hybrid Chebyshev pseudospectral technique for integration of the models' resulting governing equations; the program is here used to study a spatially developing and reacting mixing layer.

Drummond, J. Philip↗

Summary of the Science Performed Onboard the International Space Station within the United States Orbital Segment during Increments 16 and 17

With the launch of the STS-122 on February 7, 2008, which delivered the European Columbus science module and the upcoming STS-124 flight, which will deliver the Japanese Kibo science module in May 2008, the International Space Station will become truly International with Europe and Japan joining the United States of America and Russia to perform science on a continuous basis in a wide spectrum of science disciplines. The last science module, Kibo, of the United States Orbital Segment (USOS) will be mated to the station on time to celebrate its first decade in low Earth orbit in October 2008 (end of Increment 17), thus ushering in the second decade of the station with all the USOS science modules mated and performing science. The arrival of the Kibo science module will also mark continuous human presence on the station for eighty eight (88) months, and, with the addition of the ESA science module during the STS-122 flight, the USOS will be made up of four space agencies: CSA, ESA, JAXA and NASA, spanning three continents. With the additional partners coming onboard with different research needs, every effort is being made to coordinate science across the USOS segment in an integrated manner for the benefit of all parties. One of the objectives of this paper is to discuss the integrated manner in which science planning/replanning and prioritization during the execution phase of an increment is being done. The main focus, though, of this paper is to summarize and to discuss the science performed during Increments 16 and 17 (October 2007 to October 2008). The discussion will focus mainly on the primary objectives of each investigation and their associated hypotheses that were investigated during these two Increments. Also, preliminary science results will be discussed for each of the investigation as science results availability permit. Additionally, the paper will briefly touch on what the science complement for these two increments was and what was actually accomplished due to real time science implementation and constraints. Finally, the paper will briefly discuss the science research complements for the next three Increments: Increments 18 to 20, in order to preview how much science might be accomplished during these three upcoming Increments of the station next decade.

Jules, Kenol↗

Simulator evaluation of the Final Approach Spacing Tool

The design and simulator evaluation of an automation tool for assisting terminal radar approach controllers in sequencing and spacing traffic onto the final approach course is described. The automation tool, referred to as the Final Approach Spacing Tool (FAST), displays speed and heading advisories for arrivals and sequencing information on the controller's radar display. The main functional elements of FAST are a scheduler that schedules and sequences the traffic, a four-dimensional trajectory synthesizer that generates the advisories, and a graphical interface that displays the information to the controller. FAST has been implemented on a high-performance workstation. It can be operated stand-alone in the terminal radar approach control (TRACON) facility or as an element of a system integrated with automation tools in the Air Route Traffic Control Center). Simulation results show that FAST significantly reduced controller workload and demonstrated a potential for an increase in landing rate.

Davis, Thomas J.↗

Mars Global Surveyor Thermal Emission Spectrometer (TES) Observations of Dust Opacity During Aerobraking and Science Phasing

The Mars Global Surveyor (MGS) arrived at Mars in September 1997 near Mars southern spring equinox and has now provided monitoring of conditions in the Mars atmosphere for more than half a Mars year. The large majority of the spectra taken by the Thermal Emission Spectrometer (TES) are in a nadir geometry (downward looking mode) where Mars is observed through the atmosphere. Most of these contain the distinct spectral signature of atmospheric dust. For these nadir-geometry spectra we retrieve column-integrated infrared aerosol (dust) opacities. TES observations during the aerobraking and science-phasing portions of the MGS mission cover the seasonal range L(sub s)=184 deg - 28 deg. Excellent spatial coverage was obtained in the southern hemisphere. Northern hemisphere coverage is generally limited to narrow strips taken during the periapsis pass but is still very valuable. At the beginning of the mission the 9-(micron)meter dust opacity at midsouthern latitudes was low (0.15-0.25). As the season advanced through southern spring and into summer, TES observed several regional dust storms (including the Noachis dust storm of November 1997) where peak 9-(micron)meter dust opacities approached or exceeded unity, as well as numerous smaller local storms. Both large and small dust storms exhibited significant changes in both spatial coverage and intensity over a timescale of a day. Throughout southern spring and summer the region at the edge of the retreating southern seasonal polar ice cap was observed to be consistently more dusty than other latitudes.

Smith, Michael D.↗

Study of flutter related computational procedures for minimum weight structural sizing of advanced aircraft

Results of a study of the development of flutter modules applicable to automated structural design of advanced aircraft configurations, such as a supersonic transport, are presented. Automated structural design is restricted to automated sizing of the elements of a given structural model. It includes a flutter optimization procedure; i.e., a procedure for arriving at a structure with minimum mass for satisfying flutter constraints. Methods of solving the flutter equation and computing the generalized aerodynamic force coefficients in the repetitive analysis environment of a flutter optimization procedure are studied, and recommended approaches are presented. Five approaches to flutter optimization are explained in detail and compared. An approach to flutter optimization incorporating some of the methods discussed is presented. Problems related to flutter optimization in a realistic design environment are discussed and an integrated approach to the entire flutter task is presented. Recommendations for further investigations are made. Results of numerical evaluations, applying the five methods of flutter optimization to the same design task, are presented.

Oconnell, R. F.↗

An operating system for future aerospace vehicle computer systems

The requirements for future aerospace vehicle computer operating systems are examined in this paper. The computer architecture is assumed to be distributed with a local area network connecting the nodes. Each node is assumed to provide a specific functionality. The network provides for communication so that the overall tasks of the vehicle are accomplished. The O/S structure is based upon the concept of objects. The mechanisms for integrating node unique objects with node common objects in order to implement both the autonomy and the cooperation between nodes is developed. The requirements for time critical performance and reliability and recovery are discussed. Time critical performance impacts all parts of the distributed operating system; e.g., its structure, the functional design of its objects, the language structure, etc. Throughout the paper the tradeoffs - concurrency, language structure, object recovery, binding, file structure, communication protocol, programmer freedom, etc. - are considered to arrive at a feasible, maximum performance design. Reliability of the network system is considered. A parallel multipath bus structure is proposed for the control of delivery time for time critical messages. The architecture also supports immediate recovery for the time critical message system after a communication failure.

Foudriat, E. C.↗

Simulator evaluation of the final approach spacing tool

The design and simulator evaluation of an automation tool for assisting terminal radar approach controllers in sequencing and spacing traffic onto the final approach course is described. The automation tool, referred to as the Final Approach Spacing Tool (FAST), displays speed and heading advisories for arrivals as well as sequencing information on the controller's radar display. The main functional elements of FAST are a scheduler that schedules and sequences the traffic, a 4-D trajectory synthesizer that generates the advisories, and a graphical interface that displays the information to the controller. FAST was implemented on a high performance workstation. It can be operated as a stand-alone in the Terminal Radar Approach Control (TRACON) Facility or as an element of a system integrated with automation tools in the Air Route Traffic Control Center (ARTCC). FAST was evaluated by experienced TRACON controllers in a real-time air traffic control simulation. Simulation results show that FAST significantly reduced controller workload and demonstrated a potential for an increase in landing rate.

Davis, Thomas J.↗

Robust Trajectory Optimization for NRHO Rendezvous Using SPICE Kernel Relative Motion

In this paper, robust optimization is performed on trajectory correction maneuvers during the lunar lander return phase of an Artemis mission, treating the trajectory from one hour after low lunar orbit departure to arrival in the vicinity of the lunar Gateway as a relative motion problem. To enable rapid stochastic optimization techniques requiring many candidate trajectories, SPICE kernel relative motion as implemented by the Quadratic Interpolated State Transition (QIST) system is used as the underlying dynamics propagation. The optimization is performed with a genetic optimizer using linear covariance (LinCov) software in a simplified operational context, taking into account the availability of navigation sensors with varying measurement models, ranges, and accuracies. No numerical integration is used, since the relative motion around Gateway is fully characterized with the a priori computation of the QIST coefficients. Maneuver placements are computed to optimize the minimum 3σ delta-v of the trajectory, the position dispersion at a target point, and a convex combination of these two metrics. An order of magnitude runtime improvement is provided over legacy methods with less than 10% error introduced. All QIST results are shown to be in-family with legacy methods. The tradespace for optimal delta-v design is found to range from 77.0 to 93.9 m/s, while the range of optimal dispersion is between 1.4 and 11.7 km.

Relative Motion↗

Benefit Assessment of the Integrated Demand Management Concept for Multiple New York Metroplex Airports

Benefits of the Integrated Demand Management (IDM) concept were assessed utilizing a newly developed automated simulation capability called ‘Traffic Management Initiative Automated Simulation (TMIAutoSim).’ The IDM concept focuses on improving traffic flow management (TFM) by coordinating the FAA’s strategic Traffic Flow Management System (TFMS) with its more tactical Time-Based Flow Management (TBFM) system. The IDM concept leverages a new TFMS capability called Collaborative Trajectory Options Program (CTOP) to strategically pre-condition traffic demand flowing into a TBFM-managed arrival environment, where TBFM is responsible for tactically managing traffic by generating precise arrival schedules. The IDM concept was developed over a multi-year effort, focusing on solving New York metroplex airport arrival problems. TMIAutoSim closely mimics NASA’s high-fidelity simulation capabilities while enabling more data to be collected at higher speed. Using this new capability, the IDM concept was evaluated using realistic traffic across various weather scenarios. Six representative weather days were selected after clustering three months of historical data. For those selected six days, Newark Liberty International Airport (EWR) and LaGuardia Airport (LGA) arrival traffic scenarios were developed. For each selected day, the historical data were analyzed to accurately simulate actual operations and the weather impact of the day. The current day operations and the IDM concept operations were simulated for the same weather scenarios and the results were compared. The selected six days were categorized into two groups: ‘clear weather’ for days without Ground Delay Programs (GDP) and ‘convective weather’ for days with GDP and significant weather around New York metroplex airports. For the clear weather scenarios, IDM operations reduced last minute, unanticipated departure delays for short-haul flights within TBFM control boundaries with minimal to no impact on throughput and total delay. For the convective weather scenarios, IDM significantly reduced delays and increased throughput to the destination airports.

Traffic Management Initiative Automated Simulation↗

PSR J2030+364I: Radio Discovery and Gamma-ray Study of a Middle-aged Pulsar in the Now Identified Fermi-LAT Source 1FGL J2030.0+3641

In a radio search with the Green Bank Telescope of three unidentified low Galactic latitude Fermi-LAT sources, we have discovered the middle-aged pulsar J2030+3641, associated with IFGL J2030.0+3641 (2FGL J2030.0+3640). Following the detection of gamma-ray pulsations using a radio ephemeris, we have obtained a phase-coherent timing solution based on gamma-ray and radio pulse arrival times that spans the entire Fermi mission. With a rotation period of 0.28, spin-down luminosity of 3 x 10(exp 34) erg/s, and characteristic age of 0.5 Myr, PSR J2030+3641 is a middle-aged neutron star with spin parameters similar to those of the exceedingly gamma-ray-bright and radio-undetected Geminga. Its gamma-ray flux is 1 % that of Geminga, primarily because of its much larger distance, as suggested by the large integrated column density of free electrons, DM = 246 pc/cu cm. We fit the gamma-ray light curve, along with limited radio polarimetric constraints, to four geometrical models of magnetospheric emission, and while none of the fits have high significance some are encouraging and suggest that further refinements of these models may be worthwhile. We argue that not many more non-millisecond radio pulsars may be detected along the Galactic plane that are responsible for LAT sources, but that modified methods to search for gamma-ray pulsations should be productive - PSR J2030+364 I would have been found blindly in gamma rays if only > or approx. 0.8 GeV photons had been considered, owing to its relatively flat spectrum and location in a region of high soft background.

Camilo, F.↗