Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “installed capacity”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

Innovative Advanced Hydrogen Mobile Fueler (Final Technical Report)

The US Department of Energy (DOE) funded a project to design, develop, deploy and analyze the economic viability of an innovative Advanced Hydrogen Mobile Fueler (AHMF). As part of the design activity the project team defined specifications based upon vehicle requirements and compliance with specific fueling performance criteria. The AHMF was originally designed to fuel 10-20 fuel cell vehicles (FCV) per day, consistent with the requirements of the H70 fueling category. The AHMF is able to operate without remote power connections, is modular for easy transport and deployment, and can provide expanded daily capacity and multi-day operations using delivered gaseous hydrogen. Toward the end of the project, due to request from the hydrogen industry and some necessary modifications of the AHMF, the system is now modified to fuel heavy duty vehicles. The project was conducted over two primary phases, each including several key tasks, subtasks, and project milestones. Phase 1 involved the design, development, and construction of the AHMF, moving from a conceptual design through to completion of assembly and testing. In addition to reviewing several different approaches, the team chose to take a conventional station design and modify it for mobile fueling. There were several innovative components included in the design. The high pressure storage was the first to achieve a US Department of Energy (DOE) Special Permit (SP 20391) to transport high pressure hydrogen (95 MPa) in a composite cylinder. The second novel system was a liquid nitrogen (LIN) cooling system with a compact heat exchanger. Without this change, the cooling system would not be able to fit into the AHMF. Phase 2 demonstrated the AHMF by fueling fuel cell buses at a fleet in Pomona, CA. The site was chosen because a temporary fueling solution was required while a fixed station was being installed. The existing permits for the fixed station and non-public access also was a determining factor. Over two months, the buses were fueled 320 times with over 5000 kg of hydrogen from tube trailers. Existing shore power was used, and the average electrical efficiency was 0.13 kWh/kg. The average liquid nitrogen (LIN) consumption was 90.68 scf/kg. The fueling and consumption data was provided to the National Renewable Energy Laboratory (NREL) for analysis. An economic analysis was performed and will be provided in a separate report. The project was successful, but not without challenges and lessons learned. The DOT special permit led the way for the use of high pressure, composite cylinders and is being by multiple other systems and applications. The pandemic along with time for the DOT special permit approval delayed the project for years. The team also believes that hydrogen mobile fueling has a use for the industry, especially during this upcoming phase of expansion. However, it does have its limitations due to high cost to build and operate, and the same permitting challenges as a fixed station. A fully capable system at the speeds and pressures of the AHMF may not be necessary for most applications and would help reduce the cost and increase storage capacity. The on-board generator can be easily replaced with shore power or the wide range of power generation solutions in the marketplace. One of the major results of the project was the development of new code language in National Fire Protection Agency (NFPA) 2 and the International Fire Code (IFC) for on-demand mobile fueling. This will provide guidance for Authorities Having Jurisdiction (AHJ) and user on how to permit temporary fueling sites across the nation.

08 HYDROGEN↗

Potential Infrastructure Cost Savings at Hybrid Wind Plus Solar PV Plants

This report documents the creation of NREL's Balance of System model for Hybrid Renewable Energy Systems (HybridBOSSE). Balance of System (BOS) costs account for approximately 30% of the capital expenditure required to install a land-based wind plant, and as much as 40% of the cost of installing a solar PV plant. Hybrid Renewable Energy systems present an opportunity to combine balance of system components to achieve cost savings, and HybridBOSSE aims to provide a component-level model to determine the associated BOS costs in a hybrid renewable energy system. Prior BOS models for hybrid systems (at NREL and elsewhere) have relied on empirical curve fits of legacy industry data, limiting their utility and their predictive ability for new technology combinations and configurations, such as those found in Hybrid Plants. Hybrid plants at the utility scale have considerably more interest in the last number of years, with ever-growing capacities in the interconnection queues, and many large developers pivoting to only consider hybrid plants going forward. As these plants become a commercial reality, the need for a detailed analysis of costs in a hybrid plant to fully exploit the available cost savings grows. The tool developed and documented in this work, HybridBOSSE, provides an open-source, python-based method of assessing the costs in hybrid plants. This analysis capability unlocks greater certainty in hybrid plant costs, as well as the ability to examine scenarios of hybridization and glean combinations that offer the greatest flexibility and cost reduction.

14 SOLAR ENERGY↗

Improving Solar and Solar+Storage Screening Techniques to Reduce Utility Interconnection Time and Costs (Final Technical Report)

Residential PV installations have increased rapidly over the last decade, and the increased application volume has caused permitting delays and lower overall adoption rates. In this project, we developed and evaluated whether data-driven secondary modeling and screening techniques can help utilities assess customer applications more accurately than traditional screening shortcuts. Secondary topologies are predicted using decision trees and commonly available information, such as service transformer, customer, and street locations. Conductors were predicted using a logistic regression method based on real world object (RWO) types, service transformer ratings, conductor length, and distance to transformer. After developing the combined primary and secondary distribution network model, hosting capacity results were used to train a random forest model to predict the pass/fail likelihood of a customer application. Powerflow based models with predicted secondaries and data-driven methods both increased the screening success rate, relative to common utility heuristics, by as much as 55 percentage points. Data-driven screening techniques were described by one utility as a "right-sized" approach for residential customers given the low-risk of small errors and the high-cost of accurate modeling.

14 SOLAR ENERGY↗

Optimal Electrification Using Renewable Energies: Microgrid Installation Model with Combined Mixture k-Means Clustering Algorithm, Mixed Integer Linear Programming, and Onsset Method

Optimal planning and design of microgrids are priorities in the electrification of off-grid areas. Indeed, in one of the Sustainable Development Goals (SDG 7), the UN recommends universal access to electricity for all at the lowest cost. Several optimization methods with different strategies have been proposed in the literature as ways to achieve this goal. This paper proposes a microgrid installation and planning model based on a combination of several techniques. The programming language Python 3.10 was used in conjunction with machine learning techniques such as unsupervised learning based on K-means clustering and deterministic optimization methods based on mixed linear programming. These methods were complemented by the open-source spatial method for optimal electrification planning: onsset. Four levels of study were carried out. The first level consisted of simulating the model obtained with a cluster, which is considered based on the elbow and k-means clustering method as a case study. The second level involved sizing the microgrid with a capacity of 40 kW and optimizing all the resources available on site. The example of the different resources in the Togo case was considered. At the third level, the work consisted of proposing an optimal connection model for the microgrid based on voltage stability constraints and considering, above all, the capacity limit of the source substation. Finally, the fourth level involved a planning study of electrification strategies based mainly on microgrids according to the study scenario. The results of the first level of study enabled us to obtain an optimal location for the centroid of the cluster under consideration, according to the different load positions of this cluster. Then, the results of the second level of study were used to highlight the optimal resources obtained and proposed by the optimization model formulated based on the various technology costs, such as investment, maintenance, and operating costs, which were based on the technical limits of the various technologies. In these results, solar systems account for 80% of the maximum load considered, compared to 7.5% for wind systems and 12.5% for battery systems. Next, an optimal microgrid connection model was proposed based on the constraints of a voltage stability limit estimated to be 10% of the maximum voltage drop. The results obtained for the third level of study enabled us to present selective results for load nodes in relation to the source station node. Finally, the last results made it possible to plan electrification using different network technologies and systems in the short and long term. The case study of Togo was taken into account. The various results obtained from the different techniques provide the necessary leads for a feasibility study for optimal electrification of off-grid areas using microgrid systems.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The Fast Modular Reactor (FMR) - Development Plan of a New 50 MWe Gas-cooled Fast Reactor

General Atomics Electromagnetic Systems (GA-EMS) will be developing a new 50-megawatt electric (MWe) fast modular reactor (FMR), under the Department of Energy’s (DOE’s) Advanced Reactor Demonstration Program (ARDP), Advanced Reactor Concepts 2020 (ARC-20) development pathway, that provides safe, carbon free electricity, capable of incremental capacity additions. A modular design allows it to be factory-built and assembled on-site to keep the cost of capital low, while the dry-cooling facilitates siting to complement renewables in nearly any location. GA-EMS is committed to commercialization of the proposed reactor, with a demonstration by 2030, and deployment by the mid-2030s. The ultimate goal of the design is to develop flexible and dispatchable carbon-free power source for the 2035 US electricity market. The GAEMS- led team will verify that simplified characteristics (e.g., inert helium gas coolant, pellet-loaded fuel rod, installation-free of heat sink requirements, small and passive heat removal systems) of the FMR will result in a safe, maintainable, cost-effective, distributed, nuclear energygenerating station. Three key specific project objectives for the next three years include: Development of the conceptual design of the 50- MWe FMR plant, Achievement of Technology Readiness Level (TRL) 4 for key system and component technologies through in-pile tests, out-of-pile tests, and numerical experiments; and Development of robust techno-economic analysis (TEA) and pre-application licensing approach necessary for timely demonstration and eventual commercialization.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Economically Viable Intermediate to Long Duration Hydrogen Energy Storage Solutions for Fossil Fueled Assets

This report was prepared as an account of work sponsored by the Office of Fossil Energy and Carbon Management of U.S. Department of Energy under Funding Opportunity Announcement Number DE-FOA-0002332 “Energy Storage for Fossil Power Generation”. The work aimed to explore and advance an innovative hydrogen energy storage system – the synergistically integrated hydrogen energy storage system (SIHES) – that has the following characteristics: • Compatible with existing or new coal and gas fuel electricity generation units, • best suited for intermediate to long duration energy storage, from 12 hours to weeks even months, and • capable of storing energy at the utility scale – hundreds of MWh to GWh energy storage with power output level in tens to hundreds of MW. Preliminary front-end engineering design (Pre-FEED) studies was carried out to develop and refine a site-specific SIHES as peaking power generation units (so named as HyPeaker) as the first market entry point, to demonstrate both the technical feasibility and the economic viability to integrate the HyPeaker “within the fence” of a fossil power plant. This specific site was TVA’s Johnsonville Combustion Turbine Plant. The HyPeaker was designed and engineered to integrate with a 60MW aeroderivative gas turbine unit already available at TVA’s Johnsonville site. This site-specific HyPeaker consists of an alkaline electrolyzer to produce hydrogen from CO 2 free electricity sources, an innovative low-cost high-pressure hydrogen storage system (Big-Ton) and the aero gas turbine to generate electricity using blend of hydrogen and natural gas. A holistic system level technoeconomic analysis tool specific to HyPeaker was developed to optimize the engineering design of the Johnsonville site-specific HyPeaker for cost and performance. The optimal design and specification of the Johnsonville site-specific HyPeaker are the following: • Alkaline electrolyzer: 3MW • Big-Ton storage vessel: 11,000kg H 2 at 3000psi. • 4-stage diaphragm hydrogen compressor: 55kg-H 2 /hr from 150psi to 3000psi. The HyPeaker is designed to provide sufficient hydrogen for 90% continuous operation of the HyPeaker. All major components have design life of 30 years. The capex of HyPeaker is estimated at $\$$7.1M. This included $\$$1.5M for the electrolyzer, $\$$5.6M for the storage vessel and compressor. The cost of aero gas turbine was included as it is already available at the site. Key findings are: • HyPeaker can be designed, manufactured, installed and integrated with the fossil power plants, with sub-systems and components commercially available on the market today, even when it is scaled up to an order of magnitude larger than the one at the Johnsonville site. HyPeaker is a technologically viable solution to cover a wide range of energy storage duration needs, from daily peaking operation to seasonal shifting for fossil fueled assets. • The cost advantage of SCCV based Big-Ton H 2 storage vessel made it possible to “oversize” the H 2 storage subsystem to achieve overall system level cost optimization. The benefits are two-fold. First, it allows to significantly reduce the capacity and cost of electrolyzer by spreading H 2 production over a much longer period of time when the fuel cost for electricity production is low. Second, it allows to balance the hydrogen production and usage shift over weeks to months to meet the peak demands. As such, the capital cost of HyPeaker system using the Big-Ton was less than half of the cost of a system with today’s steel tube based H 2 storage system. The HyPeaker has even better cost advantage Li-ion battery based energy storage system. The estimated capital cost of Li-Ion battery system would be at $\$$38M, under the same projected 20-year electricity generation profile of the Johnsonville site. This is over 5 times more expensive than the HyPeaker system. • Since industry scale energy storage systems do not have 100% energy conversion and storage efficiency, energy storage systems using fossil fuel generated electricity would increase the CO 2 emission. This is particularly the case for HyPeaker due to its low round trip efficiency. Therefore, a more sensible solution would be to the excessive or curtailed electricity from CO 2 emission free sources such as solar farms, wind farms or nuclear power plants, to produce hydrogen, and integrate them with the HyPeaker. Electricity from TVA’s nuclear power plants was used for the Johnsonville HyPeaker. • The economic viability of HyPeaker is expected to be further improved when global supply chains are taken into consideration. For the same Johnsonville site specific HyPeaker, the capex would be reduced to ~$\$$3.6M from ~$\$$7.1M, and the added LCOE is reduced to ~$\$$85/MWh. With the bipartisan Infrastructure Investment and Jobs Act, the cost of domestically produced HyPeaker sub-systems would be at the level of today’s global suppliers. Since the peaking units generally operate at peak usage period, thereby demanding higher price, the projected $\$$85/MWh LCOE would be within the realm of financial viability for utility operators.

08 HYDROGEN↗

SRS Strategy for Tank 3 Salt Dissolution - Performance and Lessons Learned - 20441

The Savannah River Site (SRS) Tank Farms have 51 underground waste tanks used to store and process liquid nuclear waste materials. There are 4 different tank types, ranging in capacity from 2,840,000 to 4,920,000 L (750,000 to 1,300,000 Gal). Twenty-four of the tanks are older style and do not meet full secondary containment standards. The older style tanks are the initial focus of waste removal efforts for tank closure at SRS. Eight of these twenty-four tanks have completed waste removal and are filled with grout. Prior to salt dissolution, Tank 3 was a dry salt tank that contained 5.06 m (199.3 in) of salt and sludge waste. Additional salt waste was present on cooling coils above the salt layer up to approximately 5.59 m (220 in). Three mixing eductors were installed in Tank 3 to aid in dissolving salt waste in three tank riser access ports. A transfer pump was installed, and the transfer pump suction was located 25.4 cm (10 in) from the tank bottom. Well water was added to the tank through a downcomer until the dry bulk salt was covered with liquid. During the initial fill of Tank 3, approximately 242,000 L (64,000 Gal) of rain water were added from periodic F-Tank Farm (FTF) Catch Tank additions and approximately 17,000 L (4,500 Gal) of well water were added. Following liquid additions to cover the dry bulk salt, well water was added through the three mixing eductors in batches during each stage. Additionally, during the salt dissolution campaigns, the FTF Catch Tank was utilized to add rain water through a downcomer in the center tank riser access port as needed for volume relief in the FTF Catch Tank. Following liquid additions, the water was recirculated (internal to the tank) using the transfer pump, and a sample was pulled to confirm the target specific gravity (SpG) of the dissolved salt solution was achieved. The dissolved salt solution was then transferred to the receipt tank (Tank 7), and the mixing eductors were lowered as close to the new bulk salt layer as possible, to support subsequent dissolution campaigns. While the mixing jets were able to dissolve salt successfully in Tank 3, they did not do so in a completely uniform manner. Throughout dissolution, mounds were discovered under Riser 1, Riser 2, and the Center Riser. The mixing jets dissolved the salt around the edges of the tank well but were not as effective toward the center of the tank. FTF Catch Tank additions through the center tank riser access port downcomer were required to impact the mound under the center tank riser. FTF Catch Tank additions were sporadic as they were dependent on rainfall in the area. Additionally, all mixing jets were rarely able to be lowered to the same elevation, indicating some mounding in the bulk salt layer. Indexing of the mixing jets was also utilized to impact the salt mounds. Overall, Tank 3 salt dissolution was successful as approximately 1,476,000 L (390,000 Gal) of dissolved salt solution was transferred to Tank 7 over six stages. Slightly less than 852,000 L (225,000 Gal) of water were added to Tank 3. The original material balance prediction estimated that the bulk salt level in Tank 3 would be 3.88 m (152.8 in) after six salt dissolution stages. After six stages the actual bulk salt level was 3.38 m (133 in). This paper will discuss the salt removal strategy, each salt dissolution stage, and lessons learned for future salt dissolution. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Optimized Dispatch of Distributed Energy Resources for Resiliency and Power Quality Improvements at the Grid-Edge

Distributed Energy Resources (DERs) installed on low-voltage distribution systems, both utility-owned and nonutility owned may be employed to make improvements to system resiliency and power quality, in addition to simply serving load demand. By selectively dispatching active and reactive power from these existing DERs, improvements in voltage profiles and service availability during adverse events may be achieved. Further benefits can be gained by optimally choosing which DERs to dispatch power from, and the distribution of power from those DERs. For a given operating condition, using Linear Programming methods, optimal power dispatch values for individual DERs can be determined, while considering variables such as voltage gains, losses in the lines and the DERs, and DER reserve capacities. One such optimization technique is developed in this paper, and results from a real-time simulation study on a modified IEEE 13-bus distribution system with three DERs, are being presented. The operation of the optimized DER selection and dispatch algorithm is shown during normal operation of the transmission system when the DERs operate in grid-connected mode. Similar analyses can drive decision making during transmission system failure when the DERs operate in grid-forming or islanded mode.

Chowdhury, Prithwiraj Roy↗

Fracture Toughness and Fatigue Crack Growth Rate Testing of Baffle-Former Bolts Harvested from a Westinghouse Two-Loop Downflow Type PWR

As one of the pressurized water reactor (PWR) internal components, baffle-former bolts (BFBs) are subjected to significant mechanical stress and neutron irradiation from the reactor core during the plant operation. Over the long operation period, these conditions lead to potential degradation and reduced load-carrying capacity of the bolts. In support of evaluating long-term operational performance of materials used in core internal components, the Oak Ridge National Laboratory (ORNL), through the Department of Energy (DOE), Light Water Reactor Sustainability (LWRS) Program, Materials Research Pathway (MRP) has harvested two high fluence BFBs from a commercial Westinghouse two-loop downflow type PWR. The two bolts of interest, i.e. bolts # 4412 and 4416, were withdrawn from service in 2011 as part of a preventative replacement plan. No identification of cracking or potential damage was found for these bolts during their removal in 2011. However, the bolts required a lower torque for removal from the baffle structure than the original torque specified during installation. Irradiation displacement damage levels in the bolts range from 15 to 41 displacements per atom. The goal of this project is to perform detailed microstructural and mechanical property characterization of BFBs following in-service exposures. The information from these bolts will be integral to the LWRS program initiatives in evaluating end of life microstructure and properties. Furthermore, valuable data will be obtained that can be incorporated into model predictions of long-term irradiation behavior and compared to results obtained in high flux experimental reactor conditions.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Microstructural Characterization of the Second High Fluence Baffle-Former Bolt Retrieved from a Westinghouse Two-loop Downflow Type PWR

As one of the pressurized water reactor (PWR) internal components, baffle-former bolts (BFBs) are subjected to significant mechanical stress and neutron irradiation from the reactor core during the plant operation. Over the long operation period, these conditions lead to potential degradation and reduced load-carrying capacity of the bolts. In support of evaluating long-term operational performance of materials used in core internal components, the Oak Ridge National Laboratory (ORNL), through the Department of Energy (DOE), Light Water Reactor Sustainability (LWRS) Program, Materials Research Pathway (MRP) has harvested two high fluence BFBs from a commercial Westinghouse two-loop downflow type PWR. The two bolts of interest, i.e. bolts # 4412 and 4416, were withdrawn from service in 2011 as part of a preventative replacement plan. No identification of cracking or potential damage was found for these bolts during their removal in 2011. However, the bolts required a lower torque for removal from the baffle structure than the original torque specified during installation. Irradiation displacement damage levels in the bolts range from 15 to 41 displacements per atom. The goal of this project is to perform detailed microstructural and mechanical property characterization of BFBs following in-service exposures. The information from these bolts will be integral to the LWRS program initiatives in evaluating end of life microstructure and properties. Furthermore, valuable data will be obtained that can be incorporated into model predictions of long-term irradiation behavior and compared to results obtained in high flux experimental reactor conditions. In this report, we present our latest study in FY22 on microstructural characterizations of the second high fluence baffle-former bolt, i.e., bolt # 4412. Analytical electron microscopy and atom probe tomography characterization were performed. The radiation-induced defects in the material add to the large wealth of knowledge for neutron-induced defects in 304/316 grades of stainless steels, specifically for radiation-induced precipitation after high fluence commercial PWR irradiation. The main findings are summarized as follows: 1) The cavity size was considerably larger in the bolt thread section than in the bolt head, with the bolt thread section having a bimodal distribution of cavities greater than ~6 nm in diameter and less than ~3 nm in diameter. The bolt head only had the small-sized cavities. In addition, there was a denuded zone of large cavities near grain boundaries in the thread section of the bolt. 2) Radiation-induced precipitation in the BFB #4412 was highly complex, with the volume fraction, size, and number density of Ni/Si and Cu-rich precipitates depending strongly on the radiation temperature/dose. In many cases, co-precipitates of adjoined clusters were found with Ni/Si-rich precipitates sandwiched between Cu-rich clusters and Mo/Cr/P-rich clusters. 3) Solute segregation out of solution was highest for most solutes in the thread section of the bolt #4412 with the exception of Cu, which experienced more separation out of solution into Curich clusters in the bolt head section. This highlights the difference in the mechanisms for precipitation of Ni/Si clusters, which have the Ni 3 Si phase composition, and precipitation of Cu-rich clusters. 4) There appear to be multiple simultaneous influences that affect the microstructural variation along the length of the bolt that overcomes the ~2X difference in irradiation dose between the bolt head and the bolt thread. The irradiation temperature, thermal/fast neutron ratio variation, potential strain gradient, and exposure to PWR coolant water that each section of the bolt sees may have more influence on the microstructural evolution than the total irradiation dose. The bolt thread and shank, with higher temperature, higher relative fast neutron flux, higher strain, and exposure to coolant but lower dose, underwent more enhanced cavity formation, precipitation, and solute segregation than the bolt head section.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Resilient and Cost-Effective Hybrid Li-Ion Battery Energy Storage System for Sites with Solar Generation and Electric Vehicle (EV) Charging (CRADA Final Report, CRD-19-00799)

The batteries of an energy storage system designed for multiple use-cases are traditionally selected to withstand the highest rate at which a battery is discharged relative to its maximum capacity (C-rate) and cycling requirements of the most intense use-case. However, this is not cost-effective given that the price of the batteries is strongly correlated to C-rate and cyclability. We propose to establish design guidelines for a hybrid energy storage system and test an edge controller that uses high-power and high-energy batteries for high- cyclability use cases such as frequency regulation and electric vehicle (EV) charging and low-cost batteries for low-power and low-cyclability use cases such as summer peak loads. The three main objectives of this proposal are (i) establishing sizing guidelines for such a hybrid storage system, (ii) installing a hybrid storage system in the Energy Systems Integration Facility (ESIF) sized based on those guidelines, and (iii) testing an edge controller specific for the system through hardware tests.

14 SOLAR ENERGY↗

Hazard and Operability Study for the Ammonia Fuel Systems at the National Transportation Research Center

Oak Ridge National Laboratory’s (ORNL’s) Buildings and Transportation Science Division (BTSD) plans to operate research engines fueled by ammonia in two engine test cells at the National Transportation Research Center (NTRC). A scientific need has recently emerged to evaluate the suitability of liquid anhydrous ammonia as a low-lifecycle-carbon fuel source for difficult-to-electrify transportation sectors, including the marine sector. Therefore, BTSD plans to install an ammonia storage and delivery system to 2360 HVC engine research labs L125 (Cell 3) and L111 (Cell 7) capable of delivering 35 and 75 lb/h, respectively. These laboratories are specifically designed to allow for engine and fuels research and development, and they have existing safety systems for mitigating risks associated with toxics and flammables. Anhydrous ammonia is toxic and flammable, and the system will use relatively large quantities compared with standard gas bottles. Ammonia is one of the most widely produced chemicals in the world, and the hazards associated with toxicity and flammability are well understood. Ammonia storage for use in engine research at NTRC is anticipated to take the form of an ammonia tank with capacity of 1,000 water gallons; this quantity will remain below the threshold quantity of 10,000 lb (~2,000 gal) used both by the US Environmental Protection Agency for reporting under the Emergency Planning and Community Right to Know Act and for Risk Management Program requirements, and also by the US Occupational Safety and Health Administration for Process Safety Management requirements. ORNL’s Environmental Protection Services Division was also consulted to verify that the quantities of ammonia anticipated to be used would be in compliance with environmental regulations. The Environmental Protection Services Division staff confirmed that the anticipated quantities fall below ORNL’s permit thresholds. However, because of the hazards associated with anhydrous ammonia, the quantities to be used, and the limited experience with similar quantities of ammonia at ORNL, BTSD decided to perform a hazard and operability (HazOp) study on the ammonia storage and delivery system.

33 ADVANCED PROPULSION SYSTEMS↗

Wetlands Geoprocessor (v 1.0)

Wetlands have often been described as the “Earth’s kidneys” because wetlands have the ability filter pollutants and purify water. Based upon wetland storage capacity, average daily flow, and inflow nutrient loading this model estimates potential load reductions of nitrate and orthophosphate) from a constructed surface flow wetland (CW). The model relies upon equations, coefficients, and models provided by Cheng et al. 2020 and Cheng & Basu 2017. Nitrogen (N) and phosphorus are important nutrients to ecosystems, but high concentrations can lead to water quality issues. Major sources of these nutrients come from agricultural areas where fertilizer is applied in large quantitates and/or animal waste is present. Excess nitrate and phosphorus may result in overgrowth of algae, which can decrease the dissolved oxygen in water, thereby harming and killing fish and other aquatic species. This model evaluates water purification results and estimates cost to install a surface flow constructed wetlands.

Davis, Cleve↗

Life Cycle Assessment for Closed-Loop Pumped Hydropower Energy Storage in the United States

The federal government has initiated an aggressive set of policies to achieve a net-zero carbon emission goal for the electricity sector by 2050. As a result, rapid growth in deployment of renewable energy technologies is expected. Most commercially mature technologies are temporally variable and do not provide grid inertia, while renewable technologies with high projected deployment have intermittent generation methods. Energy storage technologies are needed to both dispatch power on-demand and help provide the needed grid inertia. Pumped storage hydro (PSH) is a well-established technology that has gained renewed interest in recent years offering energy-balancing, grid stability, control of electrical network frequency, and large-scale storage capacity. For widespread adoption of PSH, more information is needed regarding its current life cycle environmental impacts. The objective of this study is to perform a full life cycle assessment (LCA) of new closed-loop PSH in the U.S. The functional unit for this study is 1 kWh of electrical power delivered to the grid and the base case project lifetime is 80 years. The life cycle inventory for this project accounts for all material and energy flows associated with the green-field construction, operation, maintenance, and decommissioning of a closed-loop PSH plant in the U.S. Collected data represents a range of potential PSH specifications and geographic locations coming from all prospective closed-loop PSH installations in the U.S. with data available. In addition, existing PSH installations are used to provide assumptions for inventory inputs. Results presented will include the global warming potential (GWP IPCC 100a) and Energy Return on Investment (EROI) from our base case (average PSH installation) as well as from scenario analyses and model sensitivity. These results will be compared to the impacts from existing PSH sites and alternate storage technologies. Methods align with the assumptions and guidelines put in place by previous PSH LCAs to ensure an accurate comparison with the results from this report.

ENERGY PLANNING, POLICY, AND ECONOMY,HYDRO ENERGY↗

Microstructural Characterizations of Two High Fluence Baffle-Former Bolts Retrieved from a Westinghouse Two-loop Downflow Type PWR

As one of the pressurized water reactor (PWR) internal components, baffle-former bolts (BFBs) are subjected to significant mechanical stress and neutron irradiation from the reactor core during the plant operation. Over the long operation period, these conditions lead to potential degradation and reduced load-carrying capacity of the bolts. In support of evaluating long-term operational performance of materials used in core internal components, the Oak Ridge National Laboratory (ORNL), through the Department of Energy (DOE), Office of Nuclear Energy, Light Water Reactor Sustainability (LWRS) Program, Materials Research Pathway (MRP), has harvested two high fluence BFBs from a commercial Westinghouse two-loop downflow type PWR. The two bolts of interest, i.e. bolts # 4412 and 4416, were withdrawn from service in 2011 as part of a preventative replacement plan. No identification of cracking or potential damage was found for these bolts during their removal in 2011. However, the bolts required a lower torque for removal from the baffle structure than the original torque specified during installation. Irradiation damage levels in the bolts range from 15 to 41 displacements per atom. The goal of this project is to perform detailed microstructural and mechanical property characterization of BFBs following in-service exposures. The information from these bolts will be integral to the LWRS program initiatives in evaluating end of life microstructure and properties. Furthermore, valuable data will be obtained that can be incorporated into model predictions of long term irradiation behavior and compared to results obtained from experimental reactor conditions

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Optimizing Renewable Ammonia Production for a Sustainable Fertilizer Supply Chain Transition

Local renewable ammonia production using electrolytic hydrogen is an emerging approach to alleviate emissions attributed to synthetic nitrogen fertilizer production while also insulating against fluctuations in fertilizer prices and mitigating transportation costs and emissions. However, replacing ammonia currently produced using fossil fuels will not be immediate. To this end, we develop a supply chain transition model, which first optimizes the design and hourly operation of new renewable ammonia facilities to minimize production costs and then optimizes the annual installation timing, production scale, and location of these new renewable facilities along with ammonia transportation to meet county resolution demands. The objective is to augment and eventually replace conventional ammonia market imports in an economically competitive manner. We performed a case study for Minnesota's ammonia supply chain and found that a full transition to in-state renewable production by 2032 is optimal. This is incentivized by the U.S. federal government's clean hydrogen production credits. This transition results in 99 % reduction in carbon intensity along with stable supply costs below $475 per metric tonne. New renewable production facilities are an order of magnitude smaller than existing conventional plants. They use both wind and solar resources and operate dynamically to minimize expensive battery and hydrogen storage capacities.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Integrated Thermal Energy Storage System for Air-Conditioners with Phase-Change Composites

Thermal energy storage (TES) is a promising solution to store and dispatch energy and shave peak electric load, reducing the operational cost of HVAC systems. We present results of a TES system using phase-change materials (PCM) integrated with an air conditioner. The proposed system uses an organic PCM (tetradecane) encapsulated within compressed expanded natural graphite foams referred to as phase-change composite. The graphite foam encapsulates the PCM eliminating the need for expensive storage vessels, reduces installation costs, and provides higher thermal conductivity that can lead to faster charge/discharge rates. Two serpentines, multi-pass circuits, operating as a heat source and a sink, exchange heat to and from the phase-change composite. These two circuits are embedded in multiple slabs of this material. The "charge" circuit contains the refrigerant that is directly coupled to a vapor compression system, and the "discharge" circuit removes heat from an airstream and releases it into the PCM composite through a water-glycol liquid coupling. This configuration allows for multiple modes of operation depending on the state of charge of the thermal energy storage module, the building air-conditioning load, and the current electricity and demand charges. This flexible operation allows variable air volume capacity control without the need to have a variable capacity refrigeration system. We developed a 21 kW-hr (6 RT-hr) prototype TES system coupled with a commercial air-conditioner to characterize the component-and system-level performance.

air-conditioning↗