Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “installation tests”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

Control Strategies to Reduce the Energy Consumption of Central Domestic Hot Water Systems

Domestic hot water (DHW) heating is the second largest energy end use in U.S. buildings, exceeded only by space conditioning. Recirculation systems consisting of a pump and piping loop(s) are commonly used in multifamily buildings to reduce wait time for hot water at faucets; however, constant pumping increases energy consumption by exposing supply and return line piping to continuous heat loss, even during periods when there is no demand for hot water. In this study, ARIES installed and tested two types of recirculation controls in a pair of buildings in order to evaluate their energy savings potential. Demand control, temperature modulation controls, and the simultaneous operation of both were compared to the baseline case of constant recirculation. Additionally, interactive effects between DHW control fuel reductions and space conditioning (heating and cooling) were estimated in order to make more realistic predictions of the payback and financial viability of retrofitting DHW systems with these controls. Results showed that DHW fuel consumption reduced by 7% after implementing the demand control technique, 2% after implementing temperature modulation, and 15% after implementing demand control and temperature modulation techniques simultaneously; recirculation pump runtime was reduced to 14 minutes or less per day. With space heating and cooling interactions included, the estimated annual cost savings were 8%, 1%, and 14% for the respective control techniques. Possible complications in the installation, commissioning and operation of the controls were identified and solutions offered.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Evaluation of GE-167 Silicone Rubber (RTV) For Possible Service As A Moisture-Barrier For Certain Strain Gage Applications

The Langley Research Center uses strain gages in a wide variety of demanding test environments. Strain gage installations, depending on the testing scenario, may see high temperatures, cryogenic temperature, moisture accumulation, mechanical abuse, or any combination of these conditions. At Langley, there is often a need to provide protection for strain gages against moisture and mechanical abuse, especially when large-scale, harsh environment testing is to be encountered. This technical memorandum discusses the evaluation of a room temperature curing silicone rubber sealant manufactured by the General Electric Company for consideration as a moisture-barrier for certain strain gage installations.

Hare, David A.↗

Building America Case Study: Control Retrofits for Multifamily Domestic Hot Water Recirculation Systems, Brooklyn, New York

Domestic hot water (DHW) heating is the second largest energy end use in U.S. buildings, exceeded only by space conditioning. Recirculation systems consisting of a pump and piping loop(s) are commonly used in multifamily buildings to reduce wait time for hot water at faucets; however, constant pumping increases energy consumption by exposing supply and return line piping to continuous heat loss, even during periods when there is no demand for hot water. In this study, ARIES installed and tested two types of recirculation controls in a pair of buildings in order to evaluate their energy savings potential. Demand control, temperature modulation controls, and the simultaneous operation of both were compared to the baseline case of constant recirculation. Additionally, interactive effects between DHW control fuel reductions and space conditioning (heating and cooling) were estimated in order to make more realistic predictions of the payback and financial viability of retrofitting DHW systems with these controls. Results showed that DHW fuel consumption reduced by 7% after implementing the demand control technique, 2% after implementing temperature modulation, and 15% after implementing demand control and temperature modulation techniques simultaneously; recirculation pump runtime was reduced to 14 minutes or less per day. With space heating and cooling interactions included, the estimated annual cost savings were 8%, 1%, and 14% for the respective control techniques. Possible complications in the installation, commissioning and operation of the controls were identified and solutions offered.

ARIES↗

Building America Case Study: Control Retrofits for Multifamily Domestic Hot Water Recirculation Systems, Brooklyn, New York

Domestic hot water (DHW) heating is the second largest energy end use in U.S. buildings, exceeded only by space conditioning. Recirculation systems consisting of a pump and piping loop(s) are commonly used in multifamily buildings to reduce wait time for hot water at faucets; however, constant pumping increases energy consumption by exposing supply and return line piping to continuous heat loss, even during periods when there is no demand for hot water. In this study, ARIES installed and tested two types of recirculation controls in a pair of buildings in order to evaluate their energy savings potential. Demand control, temperature modulation controls, and the simultaneous operation of both were compared to the baseline case of constant recirculation. Additionally, interactive effects between DHW control fuel reductions and space conditioning (heating and cooling) were estimated in order to make more realistic predictions of the payback and financial viability of retrofitting DHW systems with these controls. Results showed that DHW fuel consumption reduced by 7 percent after implementing the demand control technique, 2 percent after implementing temperature modulation, and 15 percent after implementing demand control and temperature modulation techniques simultaneously; recirculation pump runtime was reduced to 14 minutes or less per day. With space heating and cooling interactions included, the estimated annual cost savings were 8 percent, 1 percent, and 14 percent for the respective control techniques. Possible complications in the installation, commissioning and operation of the controls were identified and solutions offered.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Application of laser anemometry to cryogenic wind tunnels

The installation and tests conducted with the laser Doppler and transit anemometer in the 0.3-Meter Transonic Cryogenic Tunnel are described. Using residual particulates in the flow field, a series of free stream velocity measurements were conducted which agreed to within 1-percent of predicted values for a range of Mach numbers, 0.2 to 0.85, and temperatures, 100 to 250 K. Measurements about a shock wave provided an estimate of scattering particulate size of 4 microns or less. The particle concentration is approximately 3 x 10 to the 5th to 1.6 x 10 to the 6th/cu m. Necessary isolation of the plenum wall windows from ambient air with slightly positive pressure of dry nitrogen gas to prevent condensation on the window surface was achieved. This was accomplished through the use of large enclosures fixed to the tunnel wall. A second method used an additional sheet of thin plate glass to create the dry gas pocket next to the plenum window. The installation of a laser anemometer in the National Transonic Facility is examined. The laser transit anemometer has been tentatively selected for the initial entry because of its compact laser-optics package.

Hunter, W. W., Jr.↗

NASA's Marshall Space Flight Center Recent Studies and Technology Developments in the Area of SSA/Orbital Debris

NASA/MSFC has been investigating the various aspects of the growing orbital debris problem since early 2009. Data shows that debris ranging in size from 5 mm to 10 cm presents the greatest threat to operational spacecraft today. Therefore, MSFC has focused its efforts on small orbital debris. Using off-the-shelf analysis packages, like the ESA MASTER software, analysts at MSFC have begun to characterize the small debris environment in LEO to support several spacecraft concept studies and hardware test programs addressing the characterization, mitigation, and ultimate removal, if necessary, of small debris. The Small Orbital Debris Active Removal (SODAR) architectural study investigated the overall effectiveness of removing small orbital debris from LEO using a low power, space-based laser. The Small Orbital Debris Detection, Acquisition, and Tracking (SODDAT) conceptual technology demonstration spacecraft was developed to address the challenges of in-situ small orbital debris environment classification including debris observability and instrument requirements for small debris observation. Work is underway at MSFC in the areas of hardware and testing. By combining off the shelf digital video technology, telescope lenses, and advanced video image FPGA processing, MSFC is building a breadboard of a space based, passive orbital tracking camera that can detect and track faint objects (including small debris, satellites, rocket bodies, and NEOs) at ranges of tens to hundreds of kilometers and speeds in excess of 15 km/sec,. MSFC is also sponsoring the development of a one-of-a-kind Dynamic Star Field Simulator with a high resolution large monochrome display and a custom collimator capable of projecting realistic star images with simple orbital debris spots (down to star magnitude 11-12) into a passive orbital detection and tracking system with simulated real-time angular motions of the vehicle mounted sensor. The dynamic star field simulator can be expanded for multiple sensors (including advanced star trackers), real-time vehicle pointing inputs, and more complex orbital debris images. This system is also adaptable to other sensor optics, missions, and installed sensor testing.

Wiegmann, Bruce M.↗

Reactor Engineering: Experimental Investigation of Alpha Convection

This report summarizes the progress on DE-FG07-07ID14806 project funded by the US Department of Energy under Nuclear Engineering Education Research (NEER) program. During the project a test apparatus was designed and manufactured for experimental investigation of Alpha Convection. Benchmark testing of the new apparatus without the neutron radiation was performed and numerical simulations were conducted to validate the experimental results on natural convection. These results were reported in a journal publication. Subsequently, we conducted the experiment at Missouri S&T research reactor in the beam port to investigate the phenomenon of Alpha Convection. Unfortunately, these experiments were inconclusive. No observable effect of neutron beam was noticed. Insufficient neutron flux as it passes through the borated water is responsible for the unsuccessful experiments. A number of new experiments are designed and manufactured to investigate the phenomenon. A new experiment using shadowgraphy is designed and manufactured to investigate and visualize the natural convection and the impact of neutron on the phenomenon. Moreover, to continue with the original and newly designed experiments a neutron generator was needed to supply a vertical beam of neutrons. This new source of neutron is acquired using DOE NEUP General Scientific Infrastructure number DE-FOA-0000321. The new facility is installed and tested but is yet to be licensed by NRC for regular use and continuation of the experiments.

Conduction convection transition.↗

Production and Testing Experience with the SRF Cavities for the CEBAF 12 GeV Upgrade

The CEBAF recirculating CW electron linear accelerator at Jefferson Lab is presently undergoing a major upgrade to 12 GeV. This project includes the fabrication, preparation, and testing of 80 new 7-cell SRF cavities, followed by their incorporation into ten new cryomodules for subsequent testing and installation. In order to maximize the cavity Q over the full operable dynamic range in CEBAF (as high as 25 MV/m), the decision was taken to apply a streamlined preparation process that includes a final light temperature-controlled electropolish of the rf surface over the vendor-provided bulk BCP etch. Cavity processing work began at JLab in September 2010 and will continue through December 2011. The excellent performance results are exceeding project requirements and indicate a fabrication and preparation process that is stable and well controlled. The cavity production and performance experience to date will be summarized and lessons learned reported to the community.

43 PARTICLE ACCELERATORS↗

Brayton cycle solarized advanced gas turbine

Described is the development of a Brayton Engine/Generator Set for solar thermal to electrical power conversion, authorized under DOE/NASA Contract DEN3-181. The objective was to design, fabricate, assemble, and test a small, hybrid, 20-kW Brayton-engine-powered generator set. The latter, called a power conversion assembly (PCA), is designed to operate with solar energy obtained from a parobolic dish concentrator, 11 meters in diameter, or with fossil energy supplied by burning fuels in a combustor, or by a combination of both (hybrid model). The CPA consists of the Brayton cycle engine, a solar collector, a belt-driven 20-kW generator, and the necessary control systems for automatic operation in solar-only, fuel-only, and hybrid modes to supply electrical power to a utility grid. The original configuration of the generator set used the GTEC Model GTP36-51 gas turbine engine for the PCA prime mover. However, subsequent development of the GTEC Model AGT101 led to its selection as the powersource for the PCA. Performance characteristics of the latter, thermally coupled to a solar collector for operation in the solar mode, are presented. The PCA was successfully demonstrated in the fuel-only mode at the GTEC Phoenix, Arizona, facilities prior to its shipment to Sandia National Laboratory in Albuquerque, New Mexico, for installation and testing on a test bed concentractor (parabolic dish). Considerations relative to Brayton-engine development using the all-ceramic AGT101 when it becomes available, which would satisfy the DOE heat engine efficiency goal of 35 to 41 percent, are also discussed in the report.

Source record↗

Solar Row Zero Energy Townhomes - Boulder, CO

Wonderland Development has constructed a new "near zero energy" row home design in North Boulder consisting of 9 units: one 5-plex and two duplexes. NREL has performed short-term tests and installed long-term monitoring equipment in three of these units. Two of these units used a solar thermal combi system with a boiler for radiant space heating and water heating and mini-split system for space conditioning. The third unit used a high efficiency tank water heater for space heating. In addition to studying the overall performance of the homes, one unit was used for a detailed study on hot water draws at each fixture. Several reports and presentations were produced on this project, however, due to shifting funding and staffing priorities, a comprehensive final report for this project was never completed. This dataset contains a wealth of raw and analyzed data and several unpublished reports.

Array↗

Greenridge Multi-Pollutant Control Project Preliminary Public Design Report

The Greenidge Multi-Pollutant Control Project is being conducted as part of the U.S. Department of Energy's Power Plant Improvement Initiative to demonstrate an innovative combination of air pollution control technologies that can cost-effectively reduce emissions of SO{sub 2}, NO{sub x}, Hg, acid gases (SO{sub 3}, HCl, and HF), and particulate matter from smaller coal-fired electrical generating units (EGUs). The multi-pollutant control system includes a hybrid selective non-catalytic reduction (SNCR)/in-duct selective catalytic reduction (SCR) system to reduce NOx emissions by {ge}60%, followed by a Turbosorp{reg_sign} circulating fluidized bed dry scrubber system to reduce emissions of SO{sub 2}, SO{sub 3}, HCl, and HF by {ge}95%. Mercury removal of {ge}90% is also targeted via the co-benefits afforded by the in-duct SCR, dry scrubber, and baghouse and by injection of activated carbon upstream of the scrubber, as required. The technology is particularly well suited, because of its relatively low capital and maintenance costs and small space requirements, to meet the needs of coal-fired units with capacities of 50-300 MWe. There are about 440 such units in the United States that currently are not equipped with SCR, flue gas desulfurization (FGD), or mercury control systems. These smaller units are a valuable part of the nation's energy infrastructure, constituting about 60 GW of installed capacity. However, with the onset of the Clean Air Interstate Rule, Clean Air Mercury Rule, and various state environmental actions requiring deep reductions in emissions of SO{sub 2}, NO{sub x}, and mercury, the continued operation of these units increasingly depends upon the ability to identify viable air pollution control retrofit options for them. The large capital costs and sizable space requirements associated with conventional technologies such as SCR and wet FGD make these technologies unattractive for many smaller units. The Greenidge Project aims to confirm the commercial readiness of an emissions control system that is specifically designed to meet the environmental compliance requirements of these smaller coal-fired EGUs. The multi-pollutant control system is being installed and tested on the AES Greenidge Unit 4 (Boiler 6) by a team including CONSOL Energy Inc. as prime contractor, AES Greenidge LLC as host site owner, and Babcock Power Environmental Inc. as engineering, procurement, and construction contractor. All funding for the project is being provided by the U.S. Department of Energy, through its National Energy Technology Laboratory, and by AES Greenidge. AES Greenidge Unit 4 is a 107 MW{sub e} (net), 1950s vintage, tangentially-fired, reheat unit that is representative of many of the 440 smaller coal-fired units identified above. Following design and construction, the multi-pollutant control system will be demonstrated over an approximately 20-month period while the unit fires 2-4% sulfur eastern U.S. bituminous coal and co-fires up to 10% biomass. This Preliminary Public Design Report is the first in a series of two reports describing the design of the multi-pollutant control facility that is being demonstrated at AES Greenidge. Its purpose is to consolidate for public use all available nonproprietary design information on the Greenidge Multi-Pollutant Control Project. As such, the report includes a discussion of the process concept, design objectives, design considerations, and uncertainties associated with the multi-pollutant control system and also summarizes the design of major process components and balance of plant considerations for the AES Greenidge Unit 4 installation. The Final Public Design Report, the second report in the series, will update this Preliminary Public Design Report to reflect the final, as-built design of the facility and to incorporate data on capital costs and projected operating costs.

01 COAL, LIGNITE, AND PEAT↗

Waste Coal Fines Reburn for NOx and Mercury Emission Reduction

Injection of coal-water slurries (CWS) made with both waste coal and bituminous coal was tested for enhanced reduction of NO{sub x} and Hg emissions at the AES Beaver Valley plant near Monaca, PA. Under this project, Breen Energy Solutions (BES) conducted field experiments on the these emission reduction technologies by mixing coal fines and/or pulverized coal, urea and water to form slurry, then injecting the slurry in the upper furnace region of a coal-fired boiler. The main focus of this project was use of waste coal fines as the carbon source; however, testing was also conducted using pulverized coal in conjunction with or instead of waste coal fines for conversion efficiency and economic comparisons. The host site for this research and development project was Unit No.2 at AES Beaver Valley cogeneration station. Unit No.2 is a 35 MW Babcock & Wilcox (B&W) front-wall fired boiler that burns eastern bituminous coal. It has low NO{sub x} burners, overfire air ports and a urea-based selective non-catalytic reduction (SNCR) system for NO{sub x} control. The back-end clean-up system includes a rotating mechanical ash particulate removal and electrostatic precipitator (ESP) and wet flue gas desulfurization (FGD) scrubber. Coal slurry injection was expected to help reduce NOx emissions in two ways: (1) Via fuel-lean reburning when the slurry is injected above the combustion zone. (2) Via enhanced SNCR reduction when urea is incorporated into the slurry. The mercury control process under research uses carbon/water slurry injection to produce reactive carbon in-situ in the upper furnace, promoting the oxidation of elemental mercury in flue gas from coal-fired power boilers. By controlling the water content of the slurry below the stoichiometric requirement for complete gasification, water activated carbon (WAC) can be generated in-situ in the upper furnace. As little as 1-2% coal/water slurry (heat input basis) can be injected and generate sufficient WAC for mercury capture. During July, August, and September 2007, BES designed, procured, installed, and tested the slurry injection system at Beaver Valley. Slurry production was performed by Penn State University using equipment that was moved from campus to the Beaver Valley site. Waste coal fines were procured from Headwaters Inc. and transported to the site in Super Sacks. In addition, bituminous coal was pulverized at Penn State and trucked to the site in 55-gallon drums. This system was operated for three weeks during August and September 2007. NO{sub x} emission data were obtained using the plant CEM system. Hg measurements were taken using EPA Method 30B (Sorbent Trap method) both downstream of the electrostatic precipitator and in the stack. Ohio Lumex Company was on site to provide rapid Hg analysis on the sorbent traps during the tests. Key results from these tests are: (1) Coal Fines reburn alone reduced NO{sub x} emissions by 0-10% with up to 4% heat input from the CWS. However, the NO{sub x} reduction was accompanied by higher CO emissions. The higher CO limited our ability to try higher reburn rates for further NO{sub x} reduction. (2) Coal Fines reburn with Urea (Carbon enhanced SNCR) decreased NO{sub x} emissions by an additional 30% compared to Urea injection only. (3) Coal slurry injection did not change Hg capture across the ESP at full load with an inlet temperature of 400-430 F. The Hg capture in the ESP averaged 40%, with or without slurry injection; low mercury particulate capture is normally expected across a higher temperature ESP because any oxidized mercury is thought to desorb from the particulate at ESP temperatures above 250 F. (4) Coal slurry injection with halogen salts added to the mixing tank increased the Hg capture in the ESP to 60%. This significant incremental mercury reduction is important to improved mercury capture with hot-side ESP operation and wherever hindrance from sulfur oxides limit mercury reduction, because the higher temperature is above sulfur oxide dew point interference.

01 COAL, LIGNITE, AND PEAT↗

Design, Test and Demonstration of Saturable Reactor High-Temperature Superconductor Fault Current Limiters

Zenergy Power has successfully designed, built, tested, and installed in the US electrical grid a saturable reactor Fault Current Limiter. Beginning in 2007, first as SC Power Systems and from 2008 as Zenergy Power, Inc., ZP used DOE matching grant and ARRA funds to help refine the design of the saturated reactor fault current limiter. ZP ultimately perfected the design of the saturated reactor FCL to the point that ZP could reliably design a suitable FCL for most utility applications. Beginning with a very basic FCL design using 1G HTS for a coil housed in a LN2 cryostat for the DC bias magnet, the technology progressed to a commercial system that was offered for sale internationally. Substantial progress was made in two areas. First, the cryogenics cooling system progressed from a sub-cooled liquid nitrogen container housing the HTS coils to cryostats utilizing dry conduction cooling and reaching temperatures down to less than 20 degrees K. Large, round cryostats with warm bore diameters of 1.7 meters enabled the design of large tanks to hold the AC components. Second, the design of the AC part of the FCL was refined from a six legged spider design to a more compact and lighter design with better fault current limiting capability. Further refinement of the flux path and core shape led to an efficient saturated reactor design requiring less Ampere-turns to saturate the core. In conclusion, the development of the saturable reactor FCL led to a more efficient design not requiring HTS magnets and their associated peripheral equipment, which yielded a more economical product in line with the electric utility industry expectations. The original goal for the DOE funding of the ZP project Design, Test and Demonstration of Saturable Reactor High-Temperature Superconductor Fault Current Limiters was to stimulate the HTS wire industry with, first 1G, then 2G, HTS wire applications. Over the approximately 5 years of ZP's product development program, the amount of HTS wire employed per FCL and its cost as a percentage of the total FCL product content had not dropped substantially from an unsustainable level of more than 50% of the total cost of the FCL, nor had the availability increased (today the availability of 2G wire for commercial applications outside of specific partnerships with the leading 2G wire manufacturers is extremely limited). ZP had projected a very significant commercial potential for FCLs with higher performance and lower costs compared to the initial models built with 1G wire, which would come about from the widespread availability of low-cost, high-performance 2G HTS wire. The potential for 2G wires at greatly reduced performance-based prices compared to 1G HTS conductor held out the potential for the commercial production of FCLs at price and performance levels attractive to the utility industry. However, the price of HTS wire did not drop as expected and today the available quantities of 2G wire are limited, and the price is higher than the currently available supplies of 1G wire. The commercial option for ZP to provide a reliable and reasonably priced FCL to the utility industry is to employ conventional resistive conductor DC electromagnets to bias the FCL. Since the premise of the original funding was to stimulate the HTS wire industry and ZP concluded that copper-based magnets were more economical for the foreseeable future, DOE and ZP decided to mutually terminate the project.

24 POWER TRANSMISSION AND DISTRIBUTION↗

NSLS-II 500 MHz Upstream Superconducting Cavity Commissioning

The NSLS-II Storage Ring RF system was designed to be equipped with up to four CESR-B type 500MHz niobium superconducting cavities. The first one has been installed and commissioned with beam at the upstream location of Cell 24 RF straight. Prior to tunnel installation, cryogenic and RF tests had been performed in the blockhouse to ensure that the cavity could provide enough energy gain for electron beam current of 25 mA for commissioning, and up to ~300 mA for early operation depending upon the total energy loss per turn at that time. After the blockhouse test, the cavity was installed in the storage ring tunnel, where it was then cooled down, conditioned, and finally commissioned with up to 50 mA of beam current. The NSLS-II LHe Cryogenic Plant was used to maintain the cavity temperature at 4.5K. The blockhouse interfaces with the cryogenic manifold box via a vacuum jacketed line, while in the tunnel the cryomodule is fed by a valvebox which is supplied by the same manifold box. The helium gas is recovered by the close-loop LHe system, and the nitrogen gas is vented outside of the RF building through a vent line. This report contains three parts describes cryogenic and RF tests in the blockhouse and cavity commissioning in the tunnel. Within the sections, the cryogenic operation is introduced first then the RF test is described. Section 5 describes further studies proposed for the next operation period.

36 MATERIALS SCIENCE↗

Investigation Of Adhesion Formation In New Stainless Steel Trim Spring Operated Pressure Relief Valves

Examination of proof test data for new (not previously installed) stainless steel (SS) trim spring operated pressure relief valves (SOPRV) reveals that adhesions form between the seat and disc in about 46% of all such SOPRV. The forces needed to overcome these adhesions can be sufficiently large to cause the SOPRV to fail its proof test (FPT) prior to installation. Furthermore, a significant percentage of SOPRV which are found to FPT are also found to &#x27;&#x27;fail to open&#x27;&#x27; (FTO) meaning they would not relief excess pressure in the event of an overpressure event. The cases where adhesions result in FTO or FPT appear to be confined to SOPRV with diameters < 1 in and set pressures < 150 psig and the FTO are estimated to occur in 0.31% to 2.00% of this subpopulation of SS trim SOPRV. The reliability and safety implications of these finding for end-users who do not perform pre-installation testing of SOPRV are discussed.

42 ENGINEERING↗

Variable frequency response testbed to validate protective relays up to 20 kHz☆

Microgrids operate in islanding or utility grid mode. In islanding mode, distributed energy sources with power electronics inverters can generate fault currents over a wide range of frequencies. To gain a better understanding of the nature of these events, it is crucial to measure currents at frequencies of up to 20 kHz at transient states with protective relays. Protective relays at these frequency responses should be tested prior to being installed in microgrids. However, testing at high-frequency currents cannot be done with Relay Test Equipment (RTE) that generate signals up to 50th Harmonic for 60 Hz (3 kHz). In this study, a frequency response method and testbed for high-frequency currents of up to 20.16 kHz was developed and tested. The testbed utilized a RTE and High-Frequency Power Source/ Amplifier. Furthermore, frequency relay experiments were run at frequencies of up to 1 and 20.16 kHz at a current magnitude of 0.1 and 0.5 A, respectively. The events were collected, and the current magnitude and frequency were plotted at time and frequency domain, respectively. The study of current magnitude and frequencies of up to 20.16 kHz for two overcurrent relays was performed and validated the variable frequency testbed and methodology.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Comparison of modeled and measured performance of a GSO crystal as gamma detector

We have modeled, tested, and installed a large, cerium-activated Gd{sub 2}SiO{sub 5} crystal scintillator for use as a detector of gamma rays. We present the measured detector response to two types of incident photons: nearly monochromatic photons up to 40 MeV, and photons from a continuous Compton backscattering spectrum up to 200 MeV. Our GEANT4 simulations, developed to determine the analyzing power of the Compton polarimeter in Hall A of Jefferson Lab, reproduce the measured spectra well.

Geant4 Gamma detection↗

Integrating HPC simulations and physical experiments to characterize the effects of gamma radiation on seismic protective devices

Seismic protective systems, composed of seismic isolators and dampers, can substantially reduce the effects of earthquake shaking on nuclear power plants and components therein. To enable the use of these devices to protect equipment inside a plant and close to a source of radiation, the U.S. Department of Energy (DOE) funded a project at the Idaho National Laboratory (INL) and the University at Buffalo to characterize the effects of absorbed gamma dose on their mechanical properties. An early task in the project was to determine the exposure time required in the INL Foss Therapy Services (FTS) 60 Co gamma irradiator to achieve a target absorbed dose in the materials used to construct isolators and dampers, including fluids, polymers, composites, and metals. This task required the novel integration of high-performance computing (HPC), Monte Carlo N-Particle (MCNP) simulations, and irradiation experiments using Fricke dosimetry. An MCNP model of the FTS irradiator at INL was developed and validated using Fricke dosimetry. Simulations of three experiments in the irradiator, two with Fricke vials only and one with Fricke vials and a large-size isolator, predicted the Fricke-measured absorbed dose rate to within 15% in all three cases, providing high confidence in the calculation of the gamma dose absorbed in the materials comprising the seismic protective devices. The simulations demonstrated that the effects of photon scattering on absorbed dose rate in the FTS irradiator are negligible for test articles installed close to the cobalt sources and near the rear of the irradiator. The validated MCNP model of the FTS irradiator is being used to support ongoing DOE-funded experiments on seismic protective devices and could be applied to future, non-seismic-related experiments. In conclusion, the novel validation process successfully deployed for the FTS irradiator at INL could be applied to other irradiators, requiring new MCNP models and simulations, and irradiation experiments using dosimeters.

42 - ENGINEERING↗