Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “infrastructures”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

A Systematic Review of Quantitative Resilience Measures for Water Infrastructure Systems

Over the past few decades, the concept of resilience has emerged as an important consideration in the planning and management of water infrastructure systems. Accordingly, various resilience measures have been developed for the quantitative evaluation and decision-making of systems. There are, however, numerous considerations and no clear choice of which measure, if any, provides the most appropriate representation of resilience for a given application. This study provides a critical review of quantitative approaches to measure the resilience of water infrastructure systems, with a focus on water resources and distribution systems. A compilation of 11 criteria evaluating 21 selected resilience measures addressing major features of resilience is developed using the Axiomatic Design process. Existing gaps of resilience measures are identified based on the review criteria. The results show that resilience measures have generally paid less attention to cascading damage to interrelated systems, rapid identification of failure, physical damage of system components, and time variation of resilience. Concluding the paper, improvements to resilience measures are recommended. The findings contribute to our understanding of gaps and provide information to help further improve resilience measures of water infrastructure systems.

42 ENGINEERING↗

Contour Crafting Simulation Plan for Lunar Settlement Infrastructure Build-Up

Economically viable and reliable building systems and tool sets are being sought, examined and tested for extraterrestrial infrastructure buildup. This project focused on a unique architecture weaving the robotic building construction technology with designs for assisting rapid buildup of initial operational capability Lunar and Martian bases. The project aimed to study new methodologies to construct certain crucial infrastructure elements in order to evaluate the merits, limitations and feasibility of adapting and using such technologies for extraterrestrial application. Current extraterrestrial settlement buildup philosophy holds that in order to minimize the materials needed to be flown in, at great transportation costs, strategies that maximize the use of locally available resources must be adopted. Tools and equipment flown as cargo from Earth are proposed to build required infrastructure to support future missions and settlements on the Moon and Mars.

Infrastructure↗

Geologic Maps for Civil Engineering and Infrastructure Planning

The Artemis Program mandate for sustainable, long-term presence on the Moon requires learning to "Live Off the Land". Geologic maps enable a paradigm shift to model the development and scaling of infrastructure for robotic and human exploration inside a bounded system on the lunar surface. Relying on geologic maps produced from orbital data and robotic precursor missions, in-situ resource utilization (ISRU) will be required to produce infrastructure, building materials and consumables. The ISRU value chain must be mapped to identify linkages of resources, producers, processes and equipment capabilities for transforming excavated regolith into usable feedstocks. Coordination will be required to balance supply and demand across the whole system of lunar infrastructure and operations, at each stage of development.

Geologic Mapping↗

In Situ Nuclear Characterization Infrastructure

To be able to evolve microstructure with a prescribed in situ process, an effective measurement infrastructure must exist. This interdisciplinary infrastructure needs to be developed in parallel with in situ sensor technology. This paper discusses the essential elements in an effective infrastructure.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Facilities and Infrastructure FY 2017 Budget At-A-Glance

The Facilities and Infrastructure Program includes EERE’s capital investments, operations and maintenance, and site-wide support of the National Renewable Energy Laboratory (NREL). It is the nation’s only national laboratory with a primary mission dedicated to the research, development and demonstration (RD&D) of energy efficiency, renewable energy and related technologies. EERE is NREL’s steward, primary client and sponsor of NREL’s designation as a Federally Funded Research and Development Center. The Facilities and Infrastructure (F&I) budget maintains NREL’s research and support infrastructure, ensures availability for EERE’s use, and provides a safe and secure workplace for employees.

Budget, Finance, FY 2017, Facilities, Infrastructu↗

New EVSE Analytical Tools/Models: Electric Vehicle Infrastructure Projection Tool (EVI-Pro)

This presentation addresses the fundamental question of how much charging infrastructure is needed in the United States to support PEVs. It complements ongoing EVSE initiatives by providing a comprehensive analysis of national PEV charging infrastructure requirements. The result is a quantitative estimate for a U.S. network of non-residential (public and workplace) EVSE that would be needed to support broader PEV adoption. The analysis provides guidance to public and private stakeholders who are seeking to provide nationwide charging coverage, improve the EVSE business case by maximizing station utilization, and promote effective use of private/public infrastructure investments.

30 DIRECT ENERGY CONVERSION↗

National Plug-In Electric Vehicle Infrastructure Analysis

This presentation describes a study conducted by the National Renewable Energy Laboratory quantifying the charging station infrastructure required to serve the growing U.S. fleet of plug-in electric vehicles (PEVs). PEV sales, which include plug-in hybrid electric vehicles (PHEVs) and battery electric vehicles (BEVs), have surged recently. Most PEV charging occurs at home, but widespread PEV adoption will require the development of a national network of non-residential charging stations. Installation of these stations strategically would maximize the economic viability of early stations while enabling efficient network growth as the PEV market matures. This document describes what effective co-evolution of the PEV fleet and charging infrastructure might look like under a range of scenarios. To develop the roadmap, NREL analyzed PEV charging requirements along interstate corridors and within urban and rural communities. The results suggest that a few hundred corridor fast-charging stations could enable long-distance BEV travel between U.S. cities. Compared to interstate corridors, urban and rural communities are expected to have significantly larger charging infrastructure requirements. About 8,000 fast-charging stations would be required to provide a minimum level of coverage nationwide. In an expanding PEV market, the total number of non-residential charging outlets or 'plugs' required to meet demand ranges from around 100,000 to more than 1.2 million. Understanding what drives this large range in capacity requirements is critical. For example, whether consumers prefer long-range or short-range PEVs has a larger effect on plug requirements than does the total number of PEVs on the road. The relative success of PHEVs versus BEVs also has a major impact, as does the number of PHEVs that charge away from home. This study shows how important it is to understand consumer preferences and driving behaviors when planning charging networks.

25 ENERGY STORAGE↗

U.S. EV Infrastructure: Analysis and Projections

This presentation addresses the fundamental question of how much charging infrastructure is needed in the United States to support PEVs. It complements ongoing EVSE initiatives by providing a comprehensive analysis of national PEV charging infrastructure requirements. The result is a quantitative estimate for a U.S. network of non-residential (public and workplace) EVSE that would be needed to support broader PEV adoption. The analysis provides guidance to public and private stakeholders who are seeking to provide nationwide charging coverage, improve the EVSE business case by maximizing station utilization, and promote effective use of private/public infrastructure investments.

30 DIRECT ENERGY CONVERSION↗

A Convergence of Public-Private Benefits in Denver: Surveys and Analyses to Inform Urban Mobility-, Energy-, Infrastructure- and Behavior-Related Innovation: Preprint

Cities, public transit agencies, and new private ride hailing services seek to understand emerging traveler dynamics, the shifting demographics of urban travelers,and new energy-efficient mobility opportunities. This includes exploring how new infrastructure investments, public and private mobility services, and smart-phone mobility apps are reshaping behaviors, demands (e.g. mobility-on-demand services), travel experiences and energy-efficient urban travel preferences. Currently, cities and metropolitan regions are providing and experimenting with many new mobility options, technologies, and personalized information services at the intersection of urban mobility, energy, and infrastructure systems (e.g., new commuter rail). To date, technology alone has not been able to crack the nut of 'creating faster trip times, less congestion, safer streets, and cleaner air for its citizens through fewer cars on the road'. This paper focuses on this gap by offering new concepts and potential for integrated approaches. Accommodating more vehicles miles traveled in cities, without increases in person miles traveled (PMT), could be costly, generating: 1) tremendous demands for new infrastructure, land, road space, materials, and energy; 2) higher traffic fatality risks; and 3) worsening air quality. Therefore, this study focuses on reducing single occupancy vehicle use by enhancing integrated mobility, helping transit and ridehailing increase occupancy in ways that also reduce energy use, and improve quality of life for urban travelers and communities. This study focuses on a survey of urban travelers in Denver, as a representative case study for metropolitan regions experiencing rapid growth, ageing populations, increased urban sprawl, traffic-related delays, and inefficient energy use per PMT.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Cybersecurity for Electric Vehicle Fast-Charging Infrastructure: Preprint

The integration of electric vehicles (EVs) into electric grid operations can potentially leave the grid vulnerable to cyberattacks from both legacy and new equipment and protocols, including extreme fast-charging infrastructure. This paper introduces a co-simulation platform to perform cyber vulnerability analysis of EV charging infrastructure and its dependencies on communications and control systems. Grid impact scenarios through linkages to power system simulation tools such as OpenDSS and vehicle infrastructure-specific attack paths are discussed. An adaptive platform that assists with predicting and solving evolving cybersecurity challenges is demonstrated with a cyber-energy emulation that accelerates the analysis of cyberattacks and system behavior.

47 OTHER INSTRUMENTATION↗

Cybersecurity for Fast Charging EV Infrastructure

The integration of electric vehicles (EVs) into electric grid operations can potentially leave the grid vulnerable to cyberattacks from both legacy and new equipment and protocols, including extreme fast-charging infrastructure. This paper introduces a co-simulation platform to perform cyber vulnerability analysis of EV charging infrastructure and its dependencies on communications and control systems. Grid impact scenarios through linkages to power system simulation tools such as OpenDSS and vehicle infrastructure-specific attack paths are discussed. An adaptive platform that assists with predicting and solving evolving cybersecurity challenges is demonstrated with a cyber-energy emulation that accelerates the analysis of cyberattacks and system behavior.

ADVANCED PROPULSION SYSTEMS,POWER TRANSMISSION AND↗

The Bipartisan Infrastructure Law Provides Opportunities for Water Power Across Several Programs

President Biden signed the Infrastructure Investment and Jobs Act into law on November 15, 2021. The $1.2 trillion deal, commonly called the Bipartisan Infrastructure Law (BIL), is a long-term investment in the nation’s infrastructure, workers, families, and competitiveness. The investment is historic for the U.S. Department of Energy (DOE), which will receive more than $62 billion from the BIL to stand up 60 new programs, including 16 demonstration and 32 deployment programs, and expand funding for 12 existing research, development, demonstration, and deployment programs. The BIL-funded programs outlined in this fact sheet are most relevant for hydropower and marine energy.

BIL↗

2020 Status Report - Research Reactor Infrastructure Program

This presentation will discuss the purpose and scope of the Department of Energy - Research Reactor Infrastructure (RRI) Program. Personnel involved in the program will be introduced and contact information will be provided for team member. Information will be provided to conference attendees as to the status of the core activities of the program. These activities include fresh fuel element fabrication and spent nuclear fuel shipment returns to the DOE. Current and future issues pertinent to the RRI program will also be presented. The RRI program maintains fuels support contracts and provides nuclear reactor fuel at no or low cost to 24 U.S. universities operating a total of 25 reactor facilities. These facilities include: - Twelve TRIGA facilities - Eight plate fueled facilities - Three AGN facilities - One Pulstar fueled facility - One Critical facility The title for the fuel remains with the United States government and when the universities are finished with the fuel, the fuel is returned to the United States government for long-term storage. Mission of the Research Reactor Infrastructure Program: The Research Reactor Infrastructure Program is funded by the U.S. Department of Energy, Office of Nuclear Energy and is managed by the Idaho National Laboratory (INL) in Idaho Falls, Idaho. The program goals are: - Keep all U.S. operating university reactor programs supplied with nuclear fuel. - Provide assistance for movement of irradiated nuclear fuel from U.S. universities, after the DOE receipt facility authorizes the fuel receipt.

99 GENERAL AND MISCELLANEOUS↗

Airport Infrastructure Planning Using Multi-Stage Stochastic Programming

The Athena project, funded by the Department of Energy, has worked to identify the critical infrastructure at Dallas Fort Worth (DFW) Airport which influences mobility between the airport and the surrounding city of Dallas. Using scalable methods that can leverage HPC resources we have developed a multi-stage stochastic infrastructure expansion model for determining parking and curb modifications to the DFW Airport over a 20-year horizon. Additionally, we have explored the impacts of congestion pricing in conjunction with infrastructure modifications. Our multi-stage stochastic model is implemented using the mpi-sppy software and solved in parallel using progressive hedging on the National Renewable Energy Laboratory's HPC system Eagle. In this talk we present results from solving this model at scale.

airport planning↗

Enhancing the EVI-X National Framework to Address Emerging Questions on Charging Infrastructure Deployment

As large national investments in EV charging continue to be made, this project seeks to improve the state-of-the-art in EV infrastructure analysis. New and improved quantitative analysis capabilities will position VTO to support EERE Leadership, assist the DOT/DOE Joint Office through timely analysis, and provide a strategy for the deployment of the national charging network. This project supports on-going development of NREL's EVI-X Suite of charging infrastructure analysis tools, including tools supporting large-scale network planning, local site design decisions, and comprehensive financial analysis. EVI-X development complements and leverages other VTO-funded efforts to ensure inputs to EVI-X and output produced by EVI-X are consistent with and well-integrated into the VTO portfolio (e.g., EV adoption scenarios from TEMPO, charging infrastructure design provided to EVs@Scale, etc.).

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗

Fast Charging Infrastructure for Electrifying Road Trips to and from National Parks in the Western United States

This study investigated the fast-charging infrastructure needed by 2030 to enable seamless electrified road trips to and from national parks and monuments in seven western states: Washington, Oregon, Idaho, Wyoming, Utah, Nevada, and Arizona. It also estimated impacts to the electric grid. The research team investigated how on-route charging infrastructure projections change with different parameters or assumptions, as do related charging loads and grid impacts. NREL conducted the study in partnership with utility service provider PacifiCorp and Utah State University as part of the Western Smart Regional EV Adoption and Infrastructure at Scale project.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗

Become EV Friendly With Planning Resources for Charging Infrastructure

State and local governments are key to the successful build-out of a nationwide electric vehicle (EV) charging infrastructure network. Visit the Alternative Fuels Data Center for resources on EV infrastructure planning, including key considerations and best practices for navigating regulatory updates to streamline infrastructure build-out.

ADVANCED PROPULSION SYSTEMS↗

Commercial EV Charging Infrastructure: Modeling Concepts & Techniques

This presentation offers an overview of key concepts and techniques for modeling global commercial EV charging infrastructure. We begin by comparing the unique needs of commercial vehicles with those of personal vehicles. Next, we delve into network design topics, including phased deployment of public infrastructure, port sharing across and within fleets, power requirements for en-route charging, and strategies for estimating depot charging availability. Finally, we outline the primary steps NREL follows in conducting an EV charging infrastructure needs assessment.

ADVANCED PROPULSION SYSTEMS,DIRECT ENERGY CONVERSI↗