Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “electric load”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

Development of a differentially balanced magnetic bearing and control system for use with a flywheel energy storage system

The purpose of a magnetically suspended flywheel energy storage system for electric utility load leveling is to provide a means to store energy during times when energy is inexpensive to produce and then return it to the customer during times of peak power demand when generated energy is most expensive. The design of a 20 kWh flywheel energy storage system for electric utility load leveling applications involves the successful integration of a number of advanced technologies so as to minimize the size and cost of the system without affecting its efficiency and reliability. The flywheel energy storage system uses a carbon epoxy flywheel, two specially designed low loss magnetic bearings, a high efficiency motor generator, and a 60 cycle AC power converter all integrated through a microprocessor controller. The basic design is discussed of each of the components that is used in the energy storage design.

Higgins, Mark A.↗

Uncontrolled Electric Vehicle Charging Impacts on Distribution Electric Power Systems with Primarily Residential, Commercial or Industrial Loads

An increase in Electric Vehicles (EV) will result in higher demands on the distribution electric power systems (EPS) which may result in thermal line overloading and low voltage violations. To understand the impact, this work simulates two EV charging scenarios (home- and work-dominant) under potential 2030 EV adoption levels on 10 actual distribution feeders that support residential, commercial, and industrial loads. The simulations include actual driving patterns of existing (non-EV) vehicles taken from global positioning system (GPS) data. The GPS driving behaviors, which explain the spatial and temporal EV charging demands, provide information on each vehicles travel distance, dwell locations, and dwell durations. Then, the EPS simulations incorporate the EV charging demands to calculate the power flow across the feeder. Simulation results show that voltage impacts are modest (less than 0.01 p.u.), likely due to robust feeder designs and the models only represent the high-voltage (“primary”) system components. Line loading impacts are more noticeable, with a maximum increase of about 15%. Additionally, the feeder peak load times experience a slight shift for residential and mixed feeders (≈1 h), not at all for the industrial, and 8 h for the commercial feeder.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Space station electrical power distribution analysis using a load flow approach

The space station's electrical power system will evolve and grow in a manner much similar to the present terrestrial electrical power system utilities. The initial baseline reference configuration will contain more than 50 nodes or busses, inverters, transformers, overcurrent protection devices, distribution lines, solar arrays, and/or solar dynamic power generating sources. The system is designed to manage and distribute 75 KW of power single phase or three phase at 20 KHz, and grow to a level of 300 KW steady state, and must be capable of operating at a peak of 450 KW for 5 to 10 min. In order to plan far into the future and keep pace with load growth, a load flow power system analysis approach must be developed and utilized. This method is a well known energy assessment and management tool that is widely used throughout the Electrical Power Utility Industry. The results of a comprehensive evaluation and assessment of an Electrical Distribution System Analysis Program (EDSA) is discussed. Its potential use as an analysis and design tool for the 20 KHz space station electrical power system is addressed.

Emanuel, Ervin M.↗

Electric power distribution and load transfer system

A power distribution system includes a plurality of power sources and load transfer units including transistors and diodes connected in series and leading to a common power output, each of the transistors being controller switchable subject to voltage levels of the respective input and output sides of said transistors, and the voltage and current level of said common power output. The system is part of an interconnection scheme in which all but one of the power sources is connected to a single load transfer unit, enabling the survival of at least a single power source with the failure of one of the load transfer units.

Bradford, Michael P.↗

Electric power distribution and load transfer system

A power distribution system includes a plurality of power sources and load transfer units including transistors and diodes connected in series and leading to a common power output, each of the transistors being controller switchable subject to voltage levels of the respective input and output sides of said transistors, and the voltage and current level of said common power output. The system is part of an interconnection scheme in which all but one of the power sources is connected to a single load transfer unit, enabling the survival of at least a single power source with the failure of one of the load transfer units.

Bradford, Michael P.↗

Tests of an alternating current propulsion subsystem for electric vehicles on a road load simulator

The test results of a breadboard version of an ac electric-vehicle propulsion subsystem are presented. The breadboard was installed in the NASA Lewis Research Center Road Load Simulator facility and tested under steady-state and transient conditions. Steady-state tests were run to characterize the system and component efficiencies over the complete speed-torque range within the capability of the propulsion subsystem in the motoring mode of operation. Transient tests were performed to determine the energy consumption of the breadboard over the acceleration and cruise portions of SAE J227 and driving schedules B, C, and D. Tests in the regenerative mode were limited to the low-gear-speed range of the two speed transaxle used in the subsystem. The maximum steady-state subsystem efficiency observed for the breadboard was 81.5 percent in the high-gear-speed range in the motoring mode, and 76 percent in the regenerative braking mode (low gear). The subsystem energy efficiency during the transient tests ranged from 49.2 percent for schedule B to 68.4 percent for Schedule D.

Stenger, F. J.↗

State-by-State comparison of combined heat and power to photovoltaic installations at manufacturing facilities with heat and power loads

Manufacturing facilities with large electricity and steam loads commonly meet those loads with a grid and boiler (GB) system configuration. In this study, two alternatives, a natural gas turbine cycle driven combined heat and power (CHP) system configuration and a grid boiler system augmented with photovoltaics (GB-PV), are investigated sustainable manufacturing in reference to the GB system configuration. For this purpose, their discounted payback period (DPP), carbon dioxide (CO 2 ) and nitrogen oxides (NO x ) emission reductions, and primary fossil energy impacts are calculated. The major contribution of this study is that it directly compares the application of both CHP and PV technologies at an assumed manufacturing facility in all 50 states of the United States. This highlights the location-specific impacts of the facility. The examined manufacturing facility utility requirements are 5 MW of power and over 12,000 kg/h of 250 kPa and 400 K saturated steam. A DPP of less than 25 years, the technology lifetime, is found in 44 states for the CHP system configuration and 6 states for the GB-PV system configuration. GB-PV and CHP cost-effectively reduce CO 2 in 44 and 38 states, respectively. CHP is better for NO x reduction, whereas GB-PV is better for primary fossil energy reduction.

14 SOLAR ENERGY↗

An electrical connector pin protector

Spring loaded insert protects electrical connector pins from being bent due to improper mating, or probing the pins with a screwdriver. This device modifies existing electrical connectors using only springs and retaining pins.

Mc Quillen, R. B.↗

Wyandotte Integrated Renewable Energy Strategy (WIRES 2) (Final Technical Report)

Wyandotte Municipal Services (WMS), a Michigan Municipal Utility offering electric generation, transmission & distribution, water filtration & distribution and Broadband/Video sought to deploy a set of renewable energy projects for their Electric Utility that contributed to reducing the City’s environmental and energy impact, provided examples that would encourage businesses and citizens to adopt cleaner energy practices and help WMS meet the required renewable energy standards of the State of Michigan (10% in 2015, 15% in 2021). WMS generates and delivers roughly 280,000 megawatt hours (MWh) of electricity annually to more than 10,000 homes and 1,000 businesses within the City of Wyandotte. The Wyandotte Integrated Renewable Energy Strategy – WIRES 2 resulted in deployment of a set of community-scale micro-wind turbines, evaluation and installation of energy-efficient and low-maintenance light-emitting diode (LED) street lights and park lights in highly visible locations in the City and expansion of the geothermal heating and cooling district that already included residential geothermal systems, to include larger scale business/institutional systems at the Utility’s largest electric customer and at the City Library. Finally, WMS identified the need for job training in energy efficiency and renewable energy technologies to further develop a local skilled workforce in these areas. Partially funded by the grant, the wind turbine project provides a benchmark for WMS, local businesses and residents in the evaluation of utility-scale wind v. micro-wind in an urban environment as a renewable energy strategy. Also partially funded by the grant, the LED project benefited the City of Wyandotte by reducing load on the electric system for the public utility but also reduced City costs for streetlighting, parking lot lighting and park lighting without a compromise in security. The project also resulted in a visual success that has led to additional approvals for non-Grant related LED lighting installations resulting in further reduction in the electric load in the City. Commercial Geothermal installations resulted in the Utility being able to eliminate steam customers who formerly utilized the byproduct of steam from WMS electric production. Due to the reduction in natural gas prices and the overall reduction in market purchased power, it was no longer feasible for WMS to operate its Power Plant as a base load plant and to only operate on a market dispatch philosophy when market prices dictated that WMS could produce electricity cheaper than the market purchase price. This has resulted in fewer operating days for the WMS Power Plant, resulting in less environmental impact. WMS has now completely exited the steam business and the ability to offer a geothermal option to two (2) former steam customers (BASF-Wyandotte and the Bacon Memorial Library) allowed for that. In addition, peak loads have been shaved for these two (2) large customers due to the consistent temperature offered by geothermal heating and cooling, reducing the swings associated with thermostat changes caused by outside temperature changes during extreme high and low temperatures. Finally, energy efficiency and renewable energy college-level classes at Wayne County Community College allowed a group of interested students to pursue studies in those technologies through grant provided tuition, books and course materials. This effort provided a foundation of potential future employees not only for WMS but other energy efficiency/renewable energy employers such as Franklin Energy, a partner with WMS in energy optimization efforts with Wyandotte businesses.

17 WIND ENERGY↗

Project Phase 1 Report: Reducing Data Center Peak Cooling Demand and Energy Costs With Cold Underground Thermal Energy Storage (Cold UTES)

Cold Underground Thermal Energy Storage (Cold UTES) is an ultra-long duration grid energy storage technology. With Cold-UTES, low-cost grid power is converted to cold thermal energy and stored in the native subsurface rock at the point of use. Cold UTES is one approach within the general category of engineered geothermal systems. Cold UTES for peak-hour cooling of data centers (DCs) was studied for deployment in Maricopa County, Arizona and Loudoun County, Virgina using thermal storage capacities from 4 GWh-th to over 1,000 GWh-th (>1 Terawatt-hour). The two sites have different power and transmission systems, available grid energy resources, daily and seasonal load profiles, weather conditions, and grid regulatory requirements. The study results indicate high value for both locations and because of this, likely indicates value across most of the US and the world. The basis of the study was a 1,000 MW-e hourly electric use of DC computing and auxiliary loads, which was modeled as 1 GW-th of thermal load to a dry cooled heat rejection system - i.e. a cooling system that does not consume water. The electric power required for cooling the DC varies as the air temperature changes. In cold weather only the dry-coolers are used, with an electrical load for cooling load as low as 10 MW-e. In hot summer hours, chillers and dry- coolers are required, which raises the electrical load for cooling load to as much as 300 MW-e. The continuous and peak cooling electrical loads result in a grid interconnection requirement of no less than 1,300 MW-e. From both a grid and thermal design modeling perspective the 1.3 GW-e could either be a single facility or result from the total load at multiple sites.

15 GEOTHERMAL ENERGY↗

Hourly Electricity Demand Projections for Eight Combined Climate and Socioeconomic Scenarios

This dataset contains 40 years (1980-2019) of simulated historical hourly electricity demand (i.e., loads) and 80 years (2020-2099) of projected hourly loads for 54 Balancing Authorities (BAs) and 48 states plus the District of Columbia. Details about the scenarios and variables included in this dataset are in the readme.pdf file. The two primary models that created the dataset are a version of the Global Change Analysis Model with detailed sectoral resolution over the United States (GCAM-USA) and the Total ELectricity Loads (TELL) model. Links to the model source code and workflow for deriving the dataset are provided in an accompanying meta-repository: https://github.com/IMMM-SFA/burleyson-etal_2023_applied_energy. Projections are for four future climate scenarios that represent combinations of Representative Concentration Pathways (RCPs) 4.5 and 8.5 combined with two levels of climate model sensitivities: rcp45cooler, rcp45hotter, rcp85cooler, and rcp85hotter. The four climate scenarios are crossed with Shared Socioeconomic Pathways (SSPs) 3 and 5 to yield eight different future load projections: rcp45cooler_ssp3, rcp45cooler_ssp5, rcp45hotter_ssp3, rcp45hotter_ssp5, rcp85cooler_ssp3, rcp85cooler_ssp5, rcp85hotter_ssp3, and rcp85hotter_ssp5. The climate scenarios are from the IM3 Thermodynamic Global Warming (TGW) dataset which is linked below in the related metadata. The related metadata also contains links to a repository containing the raw GCAM-USA output files.

Climate Change↗

Hourly Electricity Demand Projections for Eight Combined Climate and Socioeconomic Scenarios

This dataset contains 40 years (1980-2019) of simulated historical hourly electricity demand (i.e., loads) and 80 years (2020-2099) of projected hourly loads for 54 Balancing Authorities (BAs) and 48 states plus the District of Columbia. Details about the scenarios and variables included in this dataset are in the readme.pdf file. The two primary models that created the dataset are a version of the Global Change Analysis Model with detailed sectoral resolution over the United States (GCAM-USA) and the Total ELectricity Loads (TELL) model. Links to the model source code and workflow for deriving the dataset are provided in an accompanying meta-repository: https://github.com/IMMM-SFA/burleyson-etal_2024_applied_energy. Projections are for four future climate scenarios that represent combinations of Representative Concentration Pathways (RCPs) 4.5 and 8.5 combined with two levels of climate model sensitivities: rcp45cooler, rcp45hotter, rcp85cooler, and rcp85hotter. The four climate scenarios are crossed with Shared Socioeconomic Pathways (SSPs) 3 and 5 to yield eight different future load projections: rcp45cooler_ssp3, rcp45cooler_ssp5, rcp45hotter_ssp3, rcp45hotter_ssp5, rcp85cooler_ssp3, rcp85cooler_ssp5, rcp85hotter_ssp3, and rcp85hotter_ssp5. The climate scenarios are from the IM3 Thermodynamic Global Warming (TGW) dataset which is linked below in the related metadata. The related metadata also contains links to a repository containing the raw GCAM-USA output files.

Climate Change↗

Dynamically Learning Incentives for Load Control

As electrical generation becomes more distributed and volatile, and loads become more uncertain, controllability of distributed energy resources (DERs), regardless of their ownership status, will be necessary for grid reliability. Grid operators lack direct control over end-users' grid interactions, such as energy usage, but incentives can influence behavior -- for example, an end-user that receives a grid-driven incentive may adjust their consumption or expose relevant control variables in response. A key challenge in studying such incentives is the lack of data about human behavior, which usually motivates strong assumptions, such as distributional assumptions on compliance or rational utility-maximization. In this paper, we propose a general incentive mechanism in the form of a constrained optimization problem -- our approach is distinguished from prior work by modeling human behavior (e.g., reactions to an incentive) as an arbitrary unknown function. We propose feedback-based optimization algorithms to solve this problem that each leverage different amounts of information and/or measurements. We show that each converges to an asymptotically stable incentive with (near)-optimality guarantees given mild assumptions on the problem. Finally, we evaluate our proposed techniques in voltage regulation simulations on standard test beds. We test a variety of settings, including those that break assumptions required for theoretical convergence (e.g., convexity, smoothness) to capture realistic settings. In this evaluation, our proposed algorithms are able to find near-optimal incentives even when the reaction to an incentive is modeled by a theoretically difficult (yet realistic) function.

demand response↗

Electrically Small Folded Slot Antenna Utilizing Capacitive Loaded Slot Lines

This paper presents an electrically small, coplanar waveguide fed, folded slot antenna that uses capacitive loading. Several antennas are fabricated with and without capacitive loading to demonstrate the ability of this design approach to reduce the resonant frequency of the antenna, which is analogous to reducing the antenna size. The antennas are fabricated on Cu-clad Rogers Duriod(TM) 6006 with multilayer chip capacitors to load the antennas. Simulated and measured results show close agreement, thus, validating the approach. The electrically small antennas have a measured return loss greater than 15 dB and a gain of 5.4, 5.6, and 2.7 dBi at 4.3, 3.95, and 3.65 GHz, respectively.

Scardelletti, Maximilian C.↗

Engineering Microgrids Amid the Evolving Electrical Distribution System

Non-wires alternatives and microgrid technologies are maturing and present great opportunities for electric utilities to increase the benefits they offer to their customers. They have the potential to decrease the cost of resolving traditional electrical system loading issues, contribute to carbon emissions reductions, and improve the electrical distribution system’s resilience to extreme weather events. The authors of this manuscript present a review of the research on microgrids and their practical applications. This is leveraged with the past work of the authors of this manuscript and other authors to develop specific objectives for microgrids, practical criteria for engineers to consider when deploying microgrids, stochastic methods to optimize microgrid designs, and black start requirements. This guidance is then used for the design of actual networked microgrids being deployed with adaptive boundaries.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Financing Microgrids in the Federal Sector

Recent high-impact events such as hurricanes and wildfires highlight the need for energy system resilience. One potential impact of these events is the loss of utility grid power to federal sites, negatively affecting the ability to carry out their missions. Depending on the need to sustain critical functions, it may be important to continue operations during an outage of the electric grid, or at least have power restored quickly after the event. One approach to addressing this need is through a microgrid. Microgrids can provide a more reliable solution than the traditional approach of using a backup generator at individual buildings. A microgrid can enhance a site’s electrical power system during normal operations, as well as provide reliable backup power to critical loads when electric utility power is interrupted. Many times, certain components of a microgrid (and potentially the entire system) can be justified economically and paid for out of energy savings or avoided costs. In cases where savings can cover the project costs, one of several privately financed procurement mechanisms may be used to implement the project. Procurement options available to all federal agencies include utility energy services contracts (UESC), energy savings performance contracts (ESPC), and utility services contracts (USC); other mechanisms such as a power purchase agreement (PPA), enhanced use lease (EUL), and utility privatization (UP) may also be useful to agencies that have the authority to use them. Implementing a microgrid in a comprehensive effort that also includes energy efficiency can provide an important savings component, while reducing power requirements for critical loads, thus reducing the cost of the microgrid and associated distributed energy resources (DER). However, it can be difficult to achieve enough savings and avoided costs to cover the entire microgrid system, so leveraging these avoided costs in combination with appropriated funds may be necessary to implement the full project. When a site is deciding if a microgrid is the best solution, activities early in the process include identifying critical loads and existing DERs, conversations with the local electric utility, and implementation options that work best for the agency and site. This paper explores procurement options and agreements that may be useful to federal agencies interested in implementing microgrids at their sites. Microgrid complexities, implementation considerations, and suggestions to get started are also discussed. This information will be most useful to agencies when they are exploring electric energy system resilience options and/or considering different procurement options to meet their needs.

24 POWER TRANSMISSION AND DISTRIBUTION↗