Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “contractors”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

Reflections on Centaur Upper Stage Integration by the NASA Lewis (Glenn) Research Center

The NASA Glenn (then Lewis) Research Center (GRC) led several expendable launch vehicle (ELV) projects from 1963 to 1998, most notably the Centaur upper stage. These major, comprehensive projects included system management, system development, integration (both payload and stage), and launch operations. The integration role that GRC pioneered was truly unique and highly successful. Its philosophy, scope, and content were not just invaluable to the missions and vehicles it supported, but also had significant Agencywide benefits. An overview of the NASA Lewis Research Center (now the NASA Glenn Research Center) philosophy on ELV integration is provided, focusing on Atlas/Centaur, Titan/Centaur, and Shuttle/Centaur vehicles and programs. The necessity of having a stable, highly technically competent in-house staff is discussed. Significant depth of technical penetration of contractor work is another critical component. Functioning as a cohesive team was more than a concept: GRC senior management, NASA Headquarters, contractors, payload users, and all staff worked together. The scope, content, and history of launch vehicle integration at GRC are broadly discussed. Payload integration is compared to stage development integration in terms of engineering and organization. Finally, the transition from buying launch vehicles to buying launch services is discussed, and thoughts on future possibilities of employing the successful GRC experience in integrating ELV systems like Centaur are explored.

Launch Vehicle↗

Ultrasonic Method for Deployment Mechanism Bolt Element Preload Verification

Deployment mechanisms play a pivotal role in mission success. These mechanisms often incorporate bolt elements for which a preload within a specified range is essential for proper operation. A common practice is to torque these bolt elements to a specified value during installation. The resulting preload, however, can vary significantly with applied torque for a number of reasons. The goal of this effort was to investigate ultrasonic methods as an alternative for bolt preload verification in such deployment mechanisms. A family of non-explosive release mechanisms widely used by satellite manufacturers was chosen for the work. A willing contractor permitted measurements on a sampling of bolt elements for these release mechanisms that were installed by a technician following a standard practice. A variation of approximately 50% (+/- 25%) in the resultant preloads was observed. An alternative ultrasonic method to set the preloads was then developed and calibration data was accumulated. The method was demonstrated on bolt elements installed in a fixture instrumented with a calibrated load cell and designed to mimic production practice. The ultrasonic method yielded results within +/- 3% of the load cell reading. The contractor has since adopted the alternative method for its future production. Introduction

Johnson, Eric C.↗

Reflections on Centaur Upper Stage Integration by the NASA Lewis (Glenn) Research Center

The NASA Glenn (then Lewis) Research Center (GRC) led several expendable launch vehicle (ELV) projects from 1963 to 1998, most notably the Centaur upper stage. These major, comprehensive projects included system management, system development, integration (both payload and stage), and launch operations. The integration role that GRC pioneered was truly unique and highly successful. Its philosophy, scope, and content were not just invaluable to the missions and vehicles it supported, but also had significant Agency-wide benefits. An overview of the NASA Lewis Research Center (now the NASA Glenn Research Center) philosophy on ELV integration is provided, focusing on Atlas/Centaur, Titan/Centaur, and Shuttle/Centaur vehicles and programs. The necessity of having a stable, highly technically competent in-house staff is discussed. Significant depth of technical penetration of contractor work is another critical component. Functioning as a cohesive team was more than a concept: GRC senior management, NASA Headquarters, contractors, payload users, and all staff worked together. The scope, content, and history of launch vehicle integration at GRC are broadly discussed. Payload integration is compared to stage development integration in terms of engineering and organization. Finally, the transition from buying launch vehicles to buying launch services is discussed, and thoughts on future possibilities of employing the successful GRC experience in integrating ELV systems like Centaur are explored.

Centaur↗

NASA Conference on Thermal Radiation Problems in Space Technology: A Compilation of Summaries of the Papers Presented

This document contains summaries of the talks presented at a small NASA Conference on Thermal Radiation Problems in Space Technology held at the Langley Research Center on September 12 and 13, 1960. The conferees were NASA members and NASA contractors directly concerned with radiation characteristics of materials and with thermal problems of spacecraft. The purpose of the conference was not only to present significant research information but also to provide an opportunity for the conferees to become aware of each other's fields of interest, activities, techniques, and problems. As arranged herein, the first set of talks, mostly by the contractors, is concerned with surfaces and surface coatings, and with the determination of their pertinent characteristics. The second set of talks, mostly by NASA personnel, is concerned with spacecraft and their thermal problems.

Source record↗

Advanced Stirling Convertor (ASC) Technology Maturation

The Advanced Stirling Convertor (ASC) development effort was initiated by NASA Glenn Research Center (GRC) with contractor Sunpower Inc. to develop high efficiency thermal-to-electric power conversion technology for NASA Radioisotope Power Systems. Early successful performance demonstrations led to the expansion of the project as well as adoption of the technology by the Department of Energy (DOE) and system integration contractor Lockheed Martin Space Systems Company as part of the Advanced Stirling Radioisotope Generator (ASRG) flight project. The ASRG integrates a pair of ASCs to convert the heat from a pair of General Purpose Heat Source (GPHS) modules into electrical power. The expanded NASA ASC effort included development of several generations of ASC prototypes or Engineering Units to help prepare the ASC technology and Sunpower for flight implementation. Sunpower later had two parallel contracts allowing the last of the NASA Engineering Units called ASC-E3 to serve as pathfinders for the ASC-F flight convertors being built for DOE. The ASC-E3 convertors utilized the ASC-F flight specifications and were built using the ASC-F design and process documentation. Shortly after the first ASC-F Pair achieved initial operation, due to budget constraints, the DOE ASRG flight development contract was terminated. NASA continues to invest in the development of Stirling RPS technology including continued production of the ASC-E3 convertors, seven of which have been delivered with one additional unit in production. Starting in FY2015, Stirling Convertor Technology Maturation has been reorganized as an element of the RPS Stirling Cycle Technology Development (SCTD) Project and long-term plans for continued Stirling technology advancement are in reformulation. This paper provides a status on the ASC project, an overview of advancements made in the design and production of the ASC at Sunpower, and a summary of acceptance tests, reliability tests, and tactical tests at NASA GRC that demonstrate the capabilities of the ASC.

radioisotope↗

Ensuring Payload Safety in Missions with Special Partnerships

The National Aeronautics and Space Administration (NASA) Expendable Launch Vehicle (ELV) payload space flight missions involve cooperative work between NASA and partners including spacecraft (or payload) contractors, universities, nonprofit research centers, Agency payload organization, Range Safety organization, Agency launch service organizations, and launch vehicle contractors. The role of NASA's Safety and Mission Assurance (SMA) Directorate is typically fairly straightforward, but when a mission's partnerships become more complex, to realize cost and science benefits (e.g., multi-agency payload(s) or cooperative international missions), the task of ensuring payload safety becomes much more challenging. This paper discusses lessons learned from NASA safety professionals working multiple-agency missions and offers suggestions to help fellow safety professionals working multiple-agency missions.

Agency launch service organizations↗

Advanced Stirling Convertor (ASC) Technology Maturation

The Advanced Stirling Convertor (ASC) development effort was initiated by NASA Glenn Research Center with contractor Sunpower, Inc., to develop high-efficiency thermal-to-electric power conversion technology for NASA Radioisotope Power Systems (RPSs). Early successful performance demonstrations led to the expansion of the project as well as adoption of the technology by the Department of Energy (DOE) and system integration contractor Lockheed Martin Space Systems Company as part of the Advanced Stirling Radioisotope Generator (ASRG) flight project. The ASRG integrates a pair of ASCs to convert the heat from a pair of General Purpose Heat Source (GPHS) modules into electrical power. The expanded NASA ASC effort included development of several generations of ASC prototypes or engineering units to help prepare the ASC technology and Sunpower for flight implementation. Sunpower later had two parallel contracts allowing the last of the NASA engineering units called ASC-E3 to serve as pathfinders for the ASC-F flight convertors being built for DOE. The ASC-E3 convertors utilized the ASC-F flight specifications and were built using the ASC-F design and process documentation. Shortly after the first ASC-F pair achieved initial operation, due to budget constraints, the DOE ASRG flight development contract was terminated. NASA continues to invest in the development of Stirling RPS technology including continued production of the ASC-E3 convertors, seven of which have been delivered with one additional unit in production. Starting in fiscal year 2015, Stirling Convertor Technology Maturation has been reorganized as an element of the RPS Stirling Cycle Technology Development (SCTD) Project and long-term plans for continued Stirling technology advancement are in reformulation. This paper provides a status on the ASC project, an overview of advancements made in the design and production of the ASC at Sunpower, and a summary of acceptance tests, reliability tests, and tactical tests at NASA Glenn that demonstrate the capabilities of the ASC.

Stirling cycle↗

Supplier Assessment System (SAS)

Background: Sponsored by NASA Headquarters; Charter - provide information to assist the quality assurance community in evaluating and determining supplier risk; Comprehensive on-line repository of supplier information; Available to approved civil service personnel from all NASA Centers, other U.S. Government Agencies, Prime Contractors, and NASA direct support contractors; User access to specific data types or documents is controlled as needed.

Dietrich, Kristen↗

Computer Programming Resources 2018

The document is a compilation of Computer Programming resources. It is geared toward front-end and back-end web development. It specializes on an ongoing project to create a website for the Safety and Mission Assurance Directorate. The Quality Assurance System (QAS) is intended to improve the overall quality and efficiency of communication among NASA Quality Assurance Engineers and Contractors. The use of QAS software will be limited to NASA Kennedy Space Center and Contractors. It is accessible through the KSC network.

Confluence↗

Gateway Lunar Habitat Modules as the Basis for a Modular Mars Transit Habitat

This paper provides a summary of the results from a recent concept study of various configurations for a Mars Transit Habitat. The designs considered are composed of modules based on published contractor concepts proposed for the lunar Gateway through NASA’s NextSTEP program. Using these Gateway concepts as a starting point for the design of a Mars Transit Habitat has potential advantages. Both Gateway and Mars Transit Habitats will have similar requirements for long-term operations in deep space, autonomous and remote operations when the crew is not onboard, and similar requirements for transferring crew to and from a planetary surface—the Moon and Mars respectively. The contractor designs for Gateway were traded against a monolithic transit habitat previously proposed by NASA’s Mars Integration Group. In addition, these concepts were considered for a “shakedown” mission for the transit habitat hardware in cislunar space to build confidence in new systems, including the advanced environmental control and life support systems needed for Mars missions. The results presented include overall vehicle configurations, mass, and volume estimates for the selected design concepts. Two concepts using large expandable modules are identified as leading candidates for a Mars Transit Habitat and the remaining elements are identified as representative of the habitable pressure vessels needed for safe haven configurations, logistics modules, surface habitats, rovers, and descent and ascent crew cabins in the overall Mars Architecture.

Smitherman, David↗

NASA's Space Launch System Begins Moving To The Launch Site

NASA is accelerating plans for a human return to the Moon. NASA was directed by the White House in 2019 to land the first woman and next man on the Moon by 2024. NASA’s backbone for future deep space exploration is the Space Launch System (SLS), as well as the Orion crew spacecraft, Gateway outpost, and Human Landing System as part of the Artemis program. While the SLS upper stage, the Interim Cryogenic Propulsion Stage (ICPS), based on an existing commercial stage was shipped to Kennedy Space Center (KSC) in 2017, major completed components of SLS will soon begin their eastward journey that will see them at KSC in 2020 to be integrated for their history-making launch back to the Moon. Core Stage prime contractor Boeing completed the Artemis I core stage in 2019 at NASA’s Michoud Assembly Facility (MAF) and shipped it to NASA Stennis Space Center (SSC) for stage green run testing in 2020 and then to KSC. Northrop Grumman, prime contractor for the 5-segment solid rocket boosters, is scheduled to begin overland shipment of the Artemis I motor segments from Utah to KSC in 2020 to await integration. This paper will discuss SLS progress to date and planned 2020 milestones.

Bruce R Askins↗

Orion Meteoroid and Debris Analysis with a Single Kevlar® Layer Enhancement to the Propulsion Tank Multi-Layer Insulation: Comparison of the Observed Data and the Adjusted Ballistic Models

In a continual mass optimization effort for the Orion vehicle by NASA and its prime contractor Lockheed Martin Space, along with the European Space Agency (ESA) and its contractors Airbus and Thales Alenia Space-Italy (TAS-I), a series of shield characterization shots have been performed to quantify the ballistic enhancement of a single-layer of Kevlar® in multi-layer insulation (MLI). This enhanced MLI is part of Orion’s propulsion subsystem, and it is planned to replace a double-layer Kevlar® configuration starting at the Artemis IV mission. This effort has included fifty-two shield characterization shots for five different shield configurations over the four Orion propellant storage vessels. These storage vessels are located in the European Service Module (ESM). This shield characterization has been managed by the Hypervelocity Impact Technology (HVIT) group in NASA Astromaterials Research and Exploration Sciences at Johnson Space Center (JSC) for the NASA Engineering and Safety Center (NESC) and the Multi-Purpose Crew Vehicle (MPCV) program office in coordination with Lockheed Martin Space and Thales Alenia Space-Italy (TAS-I). The shield characterization has used the two-stage, light-gas-gun at the Remote Hypervelocity Test Laboratory (RHTL) of NASA JSC White Sands Test Facility (WSTF) for acceleration of projectiles to representative orbital impact speeds. From this shield characterization effort, a revised ballistic limiting equation (BLE) has been developed for each of the five representative shielding configurations of the ESM pressure vessels. This document provides a brief description of the shield configurations considered for the Orion program and the shield characterization findings. These results are compared to the assumed BLE for each configuration going into the Artemis missions that utilize this version of ballistic enhanced MLI. The models are integrated into a fourteen day High Lunar Orbit (HLO) mission as a representative reliability prediction impact for Orion, and it has been found that the predicted risk of a loss-of-crew (LOC) event is actually a little less than half of the assumed value that launched this design modification opportunity.

Joshua E Miller↗

Investigation into High Power Converter Topologies

The NESC commissioned NASA Glenn Research Center (GRC) to perform a study of high-power DC-DC converter topologies Why perform the study? • Several past contractor-led converter development programs have been plagued with development delays and cost overruns due to: • Poor initial design decisions • Complex requirements driving designs • Better inform government engineers about strengths and weaknesses of various topologies, learn about new topologies/design strategies. • Allow NASA to be better prepared for upcoming high power/high voltage power conversion systems work, such as Lunar and Martian surface missions, high power electric propulsion, as well as terrestrial systems, such as electrified aircraft. • Contractors often do not have the option to restart poor decisions – allows NASA to be better informed at the start of programs.

Power Converter↗

The Trash Compaction Processing System (TCPS) Technology Demonstrations Science Objectives and Requirement Definitions

Throughout the Next STEP Phase A and Phase B, the Trash Compaction Processing System (TCPS) is being developed for a technology demonstration (TD) on the International Space Station (ISS) in 2025. For Phase A, two contractors built proof-of-concept hardware. One contractor was chosen to build the TD hardware for Phase B. Both Phase A lessons learned and risk reduction activities at Ames Research Center (ARC) were used to write the TD science objectives, scope, and requirements. The work at ARC aims to retire technical risks and provide design data to TCPS developers and the ISS system integrators. This paper will summarize the lessons learned from the proof-of-concept hardware, the risk reduction activities, and how these lessons learned form the basis of the TD requirement matrix.

TCPS↗

Atmospheric Research 2020 Technical Highlights

Welcome to the 2020 Atmospheres Highlights report. Here we summarize research and scientific communication/outreach accomplishments from the portion of atmospheric science activities at NASA’s Goddard Space Flight Center (GSFC) that comprises the Earth Science Division’s Atmospheres organization. As in previous years, this report is intended for a broad audience, including colleagues within NASA, scientists outside the Agency, science graduate students, and members of the public. Organizationally, the report covers research activities under the Office of Deputy Organizationally, the report covers research activities under the Office of Deputy Director for Atmospheres (610AT), which is within Earth Sciences Division (Code Director for Atmospheres (610AT), which is within Earth Sciences Division (Code 610) in the Sciences and Exploration Directorate (600). Laboratories and office within 610) in the Sciences and Exploration Directorate (600). Laboratories and office within 610AT include: Mesoscale Atmospheric Processes Laboratory (612), Climate and 610AT include: Mesoscale Atmospheric Processes Laboratory (612), Climate and Radiation Laboratory (613), Atmospheric Chemistry and Dynamics Laboratory (614), Radiation Laboratory (613), Atmospheric Chemistry and Dynamics Laboratory (614), and the Wallops Field Support Office (610.W). As of this writing, the 277 personnel and the Wallops Field Support Office (610.W). As of this writing, the 277 personnel in Code 610AT consist of 53 civil servants and 224 cooperative agreement associates, in Code 610AT consist of 53 civil servants and 224 cooperative agreement associates, postdoctoral fellows and contractors, postdoctoral fellows and contractors.

Annual Report↗

LBNF CMGC Delivery Method: ICE Process

The Construction Manager/General Contractor (CM/GC) delivery method is intended to benefit the design process, value engineering, risk mitigation, and schedule optimization while promoting construction and design innovation. This delivery method is particularly suited for complex projects that require significant consideration of contractor means and methods. Fermilab’s Far Site Conventional Facilities proceeded with a CM/GC delivery method to account for the unique conditions of excavating over 300,000 cubic yards of rock in tunnels and caverns that will be constructed approximately 5000-ft deep in the repurposed Homestake Mine in Lead, SD. The experiences of the Independent Cost Estimating (ICE) process are presented.

Pelletier, Douglas↗

Heat Pump Water Heater Guide for Small Businesses

This guide is intended for building owners and facility managers interested in electrifying commercial building water heating systems via new building systems or system retrofits. This guide is also a resource for contractors becoming familiar with commercial heat pump water heaters (HPWHs). This guide focuses on integrated air-source HPWH equipment, and background information, best practices, and key considerations are included here. A building owner or facility manager should review project considerations with an engineer or contractor.

decarbonization↗

Panel Session 117: Panel: Operational Excellence Through a Strong Safety Culture (R9.1)

This panel focused on the what the Department of Energy (DOE) and its contractors are doing to promote safety and excellence. The Integrated Safety Management System (ISMS) is crucial, but additional support provided by the Energy Facility Contractors Group (EFCOG), DOE, and environmental, safety, and health (ES and H) professionals in the field are equally imperative. The panelists discussed the importance of sharing lessons learned as well as are developing performance metrics to track operational and safety successes. This panel focused on current trends in building a strong operational safety culture and will include results from recent national workshops. Safety culture is the foundation of strong operational performance. Panel discussion included best practices from industry, DOE, and US NRC and also review tools being used to measure and evaluate safety culture programs. Panelists with presentations: Strong Safety Culture Promotes Operational Excellence (Kliss McNeel, Patricia Hughes); Safety Culture (Patricia Allen); DOE Safety Culture Improvement (Julie Goeckner); Supporting Safety Culture on the Front Line (Jan Preston); Interdependence of Safety Culture and Organizational Performance (Rizwan Shah)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗