Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “commissioning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

Setup and Testing of the RS105 Wire Array Pulser

The report covers the RS105 Wire Array Pulser testbed. The setup of the wire array at Reapplication, building 996, is laid out. Setup instructions are provided. Details of the commissioning test are given. Measurement data from the commissioning test shows the field output of the array exceeds 50 kV/m and that tuning the pulser output with a peaking switch can provide a rise time of ~2.3 ns and a pulse width of ~23 ns. The field levels and timeframes shown are within the tolerance conditions of

42 ENGINEERING↗

From Stewardship to Transformation: Toward a Nuclear Enterprise for the 21st Century

The erosion of the global security environment over the last two decades has been rapid and dramatic. It appears also to be accelerating. There are deep and widening concerns in the United States and among its allies and partners that deterrence too has eroded at both the conventional and nuclear levels. The Strategic Posture Commission captured the essence of the problem in its October 2023 report—the United States seeks to meet the challenges of complex multipolar nuclear rivalry in the 21 st century with a slimmed down version of a nuclear deterrent designed in the middle of the 20 th century. With great urgency, the Commission recommended that something more and/or different is needed than simply the replacement of legacy systems with modern variants. But the U.S. nuclear security enterprise was reshaped after the Cold War to support the stockpile stewardship mission—not renewed designed, engineering, and production at scale. It has long fallen short of the agility, flexibility, and adaptiveness periodically asked of it by national leaders. In recent years, however, the message of urgency has been clearly received in the enterprise. Its culture has begun to shift. It has also been received by those in Washington D.C. responsible for funding and guiding the enterprise. The result is an enterprise in transition. Stockpile stewardship has given way to stockpile transformation. Risk aversion is giving way to risk management. Innovation and adaptation have been embraced. Experience to date has yielded some important lessons about what works and what doesn’t in terms of accelerating and delivering the needed innovation and adaptation. It has revealed the enduring character of some challenges. But it has also revealed that a much more agile and effective enterprise is within the national reach—something that will pay important dividends for deterrence, assurance, strategic stability, and peace.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Past Approaches for Spent Nuclear Fuel, High-Level, and Transuranic Waste Disposal in the United States—Part 1: Safety Criteria and Treatment of Uncertainty

The United States (US), with its 50-year experience in developing deep geologic disposal for transuranic waste, spent nuclear fuel (SNF), and high-level radioactive waste (HLW), has much to share with other countries. Yet, other countries are better able to translate the US experience and corresponding policy decisions into solutions sensible for their country when they understand the compliance requirements in US laws and regulations. This paper presents past approaches in the generic and site-specific standards of the US Environmental Protection Agency (EPA) and implementing regulations of the US Nuclear Regulatory Commission (NRC) using the framework provided by (1) key questions of the Blue Ribbon Commission on America’s Nuclear Future, and (2) international consensus standards. Both the 1985 EPA generic standards, as updated in 1993 and applied at the operating Waste Isolation Pilot Plant in southern New Mexico for transuranic waste from atomic energy defense activities, and the EPA 2008 site-specific standards and implementing regulations, as applied at the proposed Yucca Mountain repository in southern Nevada for SNF and HLW, adopt the strategy of using quantitative, probabilistic analysis to assess performance and compliance.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Recommendations for an Applicant to Calculate Activity Data for Greenhouse Gases Estimates

In 2009, the U.S. Nuclear Regulatory Commission (NRC) directed the NRC staff to address climate change issues and consider the impacts of the emissions of carbon dioxide (CO 2 ) and other greenhouse gases (GHGs) in its environmental reviews for major licensing actions (NRC 2009b). To implement this direction from the Commission, the staff issued guidance in 2011 and updated guidance in 2014 in Attachment 1 to Interim Staff Guidance COL/ESP-ISG-026 (NRC 2011; NRC 2014). This guidance provides a simpler method than the method described in RG 4.2 Rev. 3, that an applicant can use to meet the plant parameter envelope (PPE) value from the Generic Environmental Impact Statement for Licensing of New Nuclear Reactors (NR GEIS). NRC staff estimated the 97-year lifecycle GHG emissions from a reference 1000 megawatt electrical (MWe) light-water reactor (LWR) for various activities associated with construction, operation (including uranium fuel cycle), and decommissioning of nuclear power plants and presented the results in Appendix H of the NR GEIS. Appendix H of the NR GEIS includes estimates of direct emissions from construction equipment and emergency diesel engines in a nuclear facility and indirect emissions from workforce vehicular traffic, fuel transportation and the uranium fuel cycle. The NR GEIS Section 3.3 extended the estimates in Appendix H for the installation of two 1000 MWe nuclear reactors on the same site. Scaling factors were used to extrapolate the GHG emissions of a reference 1000 MWe reactor to a two-unit nuclear reactor plant (each reactor unit generating 1000 MWe). GHG emission estimates for building, operation, decommissioning and safe storage (SAFSTOR) for a two-unit nuclear reactor plant would be based on the plant’s physical size, and therefore estimates for these source categories were assumed to be twice the value of the reference 1000 MWe reactor. However, GHG emissions from the fuel cycle (including fuel transportation) were scaled upward by a factor of 3, based on plant efficiencies greater than the 80 percent assumption in Appendix H. Table 1 below shows the PPE emissions for two 1000 MWe nuclear reactors as provided in NR GEIS. The total GHG emissions for two 1000 MWe reactors were calculated as 2,534,000 metric tons (MT) of CO 2 equivalent (CO 2 (e)) based on a 97 year GHG life cycle period. The GHG emissions lifetime of 97 years for a reference nuclear reactor includes a 7-year building phase, 40 years of operation, 10 years of active decommissioning, and 40 years of SAFSTOR operations (NRC 2024). Construction equipment and vehicular traffic from workers commute would contribute to the GHG emissions during a 7-year building phase. Uranium fuel cycle, vehicular traffic, fuel and waste transportation, and testing of standby diesel generators would contribute to GHG emissions during the 40-year operations phase. While NRC’s regulations allow up to 60 years of reactor facility decommissioning, Appendix H estimated that most of the GHGs would occur over an estimated 10-year period during which to the licensee would engage in significant demolition and earth-moving activities, as discussed in Supplement 1 to NUREG-0586 (NRC 2002). Vehicular traffic by the workforce during a 40-year SAFSTOR period would additionally contribute GHG emissions. The carbon footprint for a 40-year SAFSTOR period was separately analyzed from the decommissioning activities as provided in Table YYYY-2 of the staff issued guidance in 2011 (NRC 2011).

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Laser calibration system at ProtoDUNE-HD

The Deep Underground Neutrino Experiment (DUNE) is a full experiment consisting of multiple detectors separated by a near and far site. DUNE will study long-baseline neutrino oscillations, which will provide insight into CP-violation, neutrino mass ordering, and the matter/antimatter asymmetry. Additionally, DUNE will search for nucleon decay and observe neutrinos from supernovae. DUNE relies on liquid argon time projection chambers (LAr TPCs), an excellent technology for tracking particles and reconstructing their interactions with high precision. To achieve its goals, DUNE is supported by the ProtoDUNE experiments at CERN, which serve as large-scale prototypes to validate detector technologies and calibration systems. The precise calibration of the electric field within the detector is vital for accurate 3D reconstruction of particle tracks, particularly in maintaining the consistency of charge measurements along the drift path. This work presents the development and implementation of a laser calibration system designed for ProtoDUNE-II. This poster involved the physical installation and commissioning of the laser system. The commissioning process included extensive testing to ensure alignment and operational efficiency, such as rotating the laser to observe behavior of tracks. The groundwork established during these steps is crucial for future data analysis, aiming to measure the electron lifetime (in the active volume) and map the electric field inside the detector with high precision.

Campanelli, Wallison [LIP]↗

Controls Status for Fermilab’s PIP-II Project

Testing of Cryomodule first articles at PIP-II's on-site Cryomodule Test Facility (CMTF), where EPICS based controls are already being used, has been invaluable to the project. In addition to validating hardware and controls components, it has provided opportunities to build buy-in and illicit meaningful feedback early-on. A device naming convention has also been significantly refined with an internal working group and the PIP-II integration team. Compressed air and Process Control Water (PCW) systems have been installed, and operations has been engaged in Phoebus display development in preparation for a transition to operations for these systems by 2026. Cryoplant hardware has been put in place, and collaboration between controls and PIP-IIs cryo group for IOC and display development is well underway for commissioning of cryoplant systems to begin early 2026. The project has also received beneficial occupancy of the High-Bay Building in October 2025, keeping us on schedule for Warm Front End commissioning to begin in 2027.

Crisp, Dan [Fermilab]↗

Digital Twin Framework for PIP-II Linac: AI-Driven Multi-Scale Modeling from Ion Source to 800 MeV

The PIP-II linac will enable >1.2 MW beam power for DUNE, requiring unprecedented operational reliability across its warm front-end (RFQ, MEBT) and five distinct SRF sections operating at 162.5/325/650 MHz. We present a comprehensive digital twin framework uniquely combining a fully differentiable fast beam transport code with neural network surrogates trained on high-fidelity PIC simulations, capturing space charge and nonlinear dynamics beyond traditional envelope codes while achieving 10⁴ speedup at <1% accuracy. End-to-end differentiability enables gradient-based optimization across 500+ parameters simultaneously previously impossible with conventional tools while the model incorporates static/dynamic errors and serves as a virtual commissioning platform for diverse hardware integration. The framework facilitates reinforcement learning for pulsed/CW mode transitions, predictive maintenance through anomaly detection, and autonomous tuning algorithm development with real-time execution capability. Validation against physics simulations shows excellent agreement for the front-end, with initial results demonstrating potential for 30% commissioning time reduction and proactive fault mitigation, providing a scalable blueprint for operating next-generation high-intensity accelerators.

Pathak, Abhishek [Fermilab] (ORCID:000000021704208↗

Laser Spectroscopy of Exotic Atoms and Molecules Containing Octupole-Deformed Nuclei

This project investigated the nuclear, atomic, and molecular structure of exotic atoms and molecules containing actinide isotopes. These short-lived radioactive systems are challenging to produce and study in the laboratory, yet they offer unique opportunities for fundamental science. These nuclei are predicted to exhibit pear-shaped (octupole) deformation, a rare collective nuclear behavior that dramatically enhances their sensitivity to fundamental physics phenomena such as time-reversal- and parity-violating effects. Such enhancements make them ideal probes for exploring open questions in our understanding of the universe such as the origin of the matter–antimatter asymmetry of the universe. To realize these measurements, the project led the development of a new laser spectroscopy experiment at MIT, and later commissioned at the Facility for Rare Isotope Beams (FRIB) at Michigan State University: the Resonance Ionization Spectroscopy Experiment (RISE). RISE combines the spectroscopic precision of collinear laser spectroscopy with the sensitivity of particle-detection techniques, enabling measurements of rare isotopes produced at rates as low as a few ions per second. The beamline was designed, built, and installed, and was successfully commissioned at FRIB during the grant period. RISE is now a permanent capability of the FRIB facility, and has produced several results on the study of rare atoms and molecules for nuclear structure and fundamental symmetries. In parallel with the FRIB program, the project contributed to the first precision laser-spectroscopy measurements of short-lived radioactive molecules. Working with international collaborators at CERN's ISOLDE facility, the team conducted pioneering experiments on radium monofluoride (RaF) and actinium monofluoride (AcF). The results from this work have been published in major journals of science, including Nature, Science, Nature Physics, Nature Communications, and Physical Review Letters. These findings have guided future experiments on the laser cooling of radioactive molecules, opening a new platform for precision tests of fundamental symmetries.

38 RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCLEA↗

The Monolithic Heat Pipe Microreactor Reference Plant Model Updates

This work presents the latest improvements to, and investigations performed with, the generic monolithic heat-pipe-cooled microreactor reference plant model for the United States Nuclear Regulatory Commission. This model serves as the foundation for the future detailed design evaluation models based on license applications. This model has been developed with the Comprehensive Reactor Analysis Bundle (BlueCRAB) and its specifications are based on open literature publications for the eVinci™ design . BlueCRAB is the U.S. Nuclear Regulatory Commission non-light-water reactor analysis system based on MOOSE, the Multiphysics Object-Oriented Simulation Environment framework, which can couple the Griffin, BISON, and Sockeye applications to resolve the various physics that are essential for the safety analysis of this type of reactor system. The core specifications include tristructural isotropic fuel, graphite monolith, graphite reflectors, and drums composed of graphite and B 4 C.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

U.S. Department of Energy-National Lab Equity Summit: Grid Planning and Operations (Workshop Report)

This report summarizes the U.S. DOE and national laboratories equity summit that was held on February 5, 2024, and focused on grid planning and operations. The objectives of the summit were to connect DOE and lab researchers working on grid-related equity issues, share information on current and planned grid-related equity projects and initiatives, and inspire and educate participants by hearing from our panelists about solutions and challenges to integrating equity in grid planning and operations. The summit included two panels of industry leaders. The first was a state and community perspectives panel that included representatives from a state public utility commission (Oregon Public Utility Commission), a state energy office (Washington Department of Commerce), a state utility consumer advocate (Connecticut Consumer Counsel), and industry consultants (Elevated Engagement and ArkSpring Consulting). Panelists shared successes they have seen, critical challenges related to equity and grid planning and operations, and other considerations. The second panel addressed utility perspectives and included representatives from two utilities (Commonwealth Edison and Tacoma Power), the National Rural Electric Cooperative (NRECA), and a former utility employee and legal consultant. Panelists discussed the role of the utility concerning equity, the most significant technical and data modeling needs and opportunities, and the role the labs could help advance equity in grid planning and operations. There was also a session on partner organization presentations. Argonne National Laboratory made a short presentation on the Grid Modernization Laboratory Consortium (GMLC) project they are leading on equity-informed power system planning. NARUC, NASEO, and the Clean Energy States Alliance, as partners of the GMLC project also shared updates on relevant activities and resources. During the summit, there were two rounds of lightning presentations by national labs and DOE highlighting research that addresses equity and grid planning and operations (Tables 5 and 6 and slides in the Appendix). The goal of the lightning rounds was to share information between participants to encourage collaboration and leverage ongoing research at labs and DOE. The summit included two interactive exercises where summit participants shared their perspectives on relevant equity projects and initiatives (Table 2), key challenges regarding equity and grid planning and operations (Table 3), and promising innovations or progress (Table 4). At the end of the session, participants were asked to share essential insights from the event (Table 7) and an action they plan to take as a result of the event. Participants agreed that the event was useful in helping them share and learn from each other. The project team plans to use the information from the summit as a starting point to help inform future research and technical assistance. In 2026, another Equity Summit will be held (virtually or in person) as part of the same project to help raise awareness and disseminate research and resources completed during the project's duration.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Development of a Test-Bed for Testing and Refining EarthEn’s Supercritical CO 2 Based Energy Storage System

EarthEn’s energy storage concept leverages supercritical carbon dioxide (sCO 2 ) as a working fluid and relies on compact, high-performance components operating at elevated pressures and temperatures. To accelerate component development and reduce technical risk prior to larger-scale demonstrations, Oak Ridge National Laboratory (ORNL) developed a 100 kW-scale sCO 2 test-bed under a Cooperative Research and Development Agreement with EarthEn (CRADA NO. NFE-24-10050). The objective of the work was to design and construct a flexible experimental facility capable of reproducing key thermodynamic state points and heat-transfer conditions relevant to EarthEn’s thermal energy storage (TES) cycle, with particular emphasis on enabling development and evaluation of next-generation heat exchangers and TES concepts. The test-bed consists of a closed-loop sCO 2 circulation system housed within an open-topped enclosure. In its as-installed configuration, dense-phase sCO 2 is recirculated through a printed circuit recuperator, an electrically heated section, a throttling device used to simulate turbine expansion, and a water-cooled printed circuit heat exchanger that rejects heat to the building chilled-water system before returning to the pump. The pump is driven by a variable frequency drive, enabling controlled adjustment of flow and operating point. A comprehensive instrumentation suite was integrated to support both safe operation and high-quality data collection. Installed sensors include Coriolis flow meters for sCO 2 flow rate and density, resistance temperature detectors and thermocouples distributed throughout the loop (including the heated section and key heat exchanger ports), and pressure transducers for absolute and differential pressure measurements. The facility was designed to support high-pressure (19 MPa nominal) and high-temperature (575°C nominal) operation with credited overpressure protection provided by a rupture disk. Nominal operating conditions were selected to support 100 kW-class testing while maintaining flexibility for non-heated and heated shakedown, control development, and future integration of advanced TES test sections. In parallel with facility development, a system-level thermal-hydraulic model was created using Modelica-based tools to support component sizing, anticipate performance over targeted test conditions, and establish a framework for future model calibration against experimental data. At the conclusion of the project performance period, the facility was in final assembly, and the pressure boundary was nearly completed. However, several practical challenges associated with high-pressure/high-temperature systems and specialized component procurement impacted schedule and prevented initial pump-driven operation and full commissioning within the available resources. This report documents the as-built design, operating capabilities, and instrumentation, and it summarizes key lessons learned related to heater fabrication and testing, first-of-a-kind assembly factors, specialty flange supply constraints, and fill pump corrective actions. Finally, it outlines a phased plan for future commissioning and experimental campaigns, including control and instrumentation shakedown, heater characterization, model calibration, and testing at state points representative of EarthEn’s TES cycle.

25 ENERGY STORAGE↗

Design of Ionization Profile Monitors at the Integrable Optics Test Accelerator Facility at Fermilab

The Integrable Optics Test Accelerator (IOTA) at Fermilab is transitioning from an electron beam facility to a proton beam facility for studies in nonlinear accelerator optics and space-charge dominated proton beams. This project involves the commissioning and fabrication of Ionization Profile Monitors (IPMs) to enable beam profile measurements at IOTA. In general, IPMs work on principle of residual gas ionization by the beam to generate beam profile. This work focuses on a mechanical design that leverages a controlled injection of noble gases, primarily Argon, as the ultra-high vacuum of the IOTA ring provides insufficient residual gas for ionization. Efforts to understand vacuum integration to ensure compatibility with the storage ring environment, the integration of real-time data acquisition systems and the commissioning of the IPMs will be discussed. This project provides a versatile diagnostic tool, supporting IOTA’s role as a testbed for larger-scale accelerator facilities and contributing to the broader understanding of beam physics in high-intensity, high-space-charge regimes.

Mwaniki, M. W. [IIT, Chicago] (ORCID:0000000169057↗

FY26 Progress Report on the Operation of the Activated Materials Laboratory at the Advanced Photon Source as a Nuclear Science User Facilities Partner Facility

The Activated Materials Laboratory (AML), located in the Long Beamline Building of the Advanced Photon Source (APS) at Argonne National Laboratory (ANL), provides a centralized radiological capability for preparing, handling, and supporting synchrotron experiments on activated materials. As a Nuclear Science User Facilities (NSUF) partner facility, the AML enables the receipt of radioactive shipments, open-form sample handling, encapsulation, transport of specimens to and from APS beamlines, and experimentation with dedicated equipment. The partnership includes the APS 1-ID and 20-ID beamlines, which provide high-energy x-ray scattering, tomography, and diffraction microscopy techniques for ex-situ, in-situ, and grainresolved three-dimensional (3D) characterization. All samples supported through the AML and partner beamlines must meet radiological limits of less than 100 mrem/h at 30 cm. This FY26 progress report summarizes the first full year of AML operations as an NSUF partner facility and highlights progress in both user support and capability development. By the end of FY26, the AML had received a total of 10 NSUF-awarded projects, including 2 Consolidated Innovative Nuclear Research (CINR), 7 Rapid Turnaround Experiment (RTE), and 1 Super RTE projects. Beamtime was fully delivered for 3 RTE projects and partially delivered for 1 CINR project, demonstrating successful workflows for receipt, encapsulation, beamline transfer, and radiological experiment execution. These efforts demonstrated safe radiological experiments at APS beamlines for samples with dose rates above the historical 5 mrem/h threshold and now up to 100 mrem/h at 30 cm, marking an important milestone for neutron-irradiated materials research. During FY26, the AML also expanded its experimental capabilities. A Psylotech xTS load frame with in-grip rotation was deployed for room-temperature mechanical testing with threedimensional x-ray characterization during interrupted loading. A Linkam TS1500V vacuum heater was commissioned for thermally driven studies, and temperature calibration experiments were performed to establish specimen-relevant thermal profiles. In parallel, a customized split-tube furnace for high-temperature mechanical testing entered commissioning, and initial work began on robotic sample handling to reduce worker dose and improve operational efficiency. Data workflow and beamline operations continued to mature. Together, these developments demonstrate that the AML is becoming a unique national resource for safe, efficient, and scientifically advanced characterization of activated materials at the APS.

Zhang, Xuan↗

Nuclear Physics Made Very, Very Easy

The fundamental approach to nuclear physics was prepared to introduce basic reactor principles to various groups of non-nuclear technical personnel associated with NERVA Test Operations. NERVA Test Operations functions as the field test group for the Nuclear Rocket Engine Program. Nuclear Engine for Rocket Vehicle Application (NERVA) program is the combined efforts of Aerojet-General Corporation as prime contractor, and Westinghouse Astronuclear Laboratory as the major subcontractor, for the assembly and testing of nuclear rocket engines. Development of the NERVA Program is under the direction of the Space Nuclear Propulsion Office, a joint agency of the U. S. Atomic Energy Commission and the National Aeronautics and Space Administration. This report is being reprinted for use in the U. S. Atomic Energy Commission and National Aeronautics and Space Administration educational and technology utilization programs.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Basin-Scale Relicensing Opportunity

This dataset contains 1,261 hydropower facilities with associated Federal Energy Regulatory Commission (FERC) relicensing metrics. Anticipated FERC license renewal dates are summarized by river reach for observing areas of opportunities for basin-wide collaboration on environmental mitigations. Identifying rivers and basins with facilities that have similar anticipated Federal Energy Regulatory Commission (FERC) relicensing dates may be one potential indicator that multiple licensees within the same basin may be willing to collaborate on a basin-scale relicensing effort. The hydropower relicensing process requires long-term resource allocation by agencies, hydropower owner/operators, non-governmental organizations, and tribal, state, and federal governments. Basin-scale hydropower relicensing has begun to receive attention as a potential solution for reducing licensing timelines, costs, and uncertainty which can provide benefits to a broad spectrum of participants in the licensing process. This dataset contains one a data file in comma separated (*.csv) format, a data dictionary in *.csv format, and a user guide in *.pdf format. These data are also available as an interactive web map available at:

13 HYDRO ENERGY↗

Comprehensive Database of Environmental Mitigations Extracted from FERC-Licensed Hydropower Projects Using Artificial Intelligence Techniques, 1998-2023

This dataset provides a comprehensive inventory of environmental mitigation measures required by Federal Energy Regulatory Commission (FERC) licensed hydropower facilities from 461 licenses that were issued from 1998 to 2023. These licenses constitute 446 of the 1015 FERC projects that were active at the end of 2023. 17,612 mentions of environmental mitigations were identified and categorized in 128 unique categories. Mitigations were identified using a Natural Language Processing (NLP) approach, specifically with a Bidirectional Encoder Representations from Transformer (BERT) model. Model-derived results were then reviewed and updated by a subject matter expert as needed. This dataset introduces important enhancements to previous efforts to inventory environmental mitigations, such as including associated license text for each mitigation, tracking the number of instances a mitigation was identified within a license, and providing improved location information. These enhancements significantly expand the dataset's utility, offering greater analytical capabilities and ensuring reproducibility. The dataset is downloadable as a zip file containing the metadata and dataset files.

Ruggles, Thomas [Oak Ridge National Laboratory (OR↗

ICARUS: new voyage to sterile neutrino search in the Short Baseline Program

The ICARUS collaboration operated the 760-ton T600 detector in a successful three-year physics run at the underground LNGS laboratories studying neutrino oscillations with the CNGS neutrino beam from CERN, and searching for atmospheric neutrino interactions. ICARUS performed a sensitive search for LSND-like anomalous νe appearance in the CNGS beam, which contributed to the constraints on the allowed parameters to a narrow region around $Δm^2=1 e\text{V}^2$, where all the experimental results can be coherently accommodated at 90% C.L. After a significant overhaul at CERN, the T600 detector has been installed at Fermilab. In 2020 cryogenic commissioning began with detector cool down, liquid Argon filling and recirculation. ICARUS has started operations and is presently in its commissioning phase with the aim of collecting its first neutrino events from the Booster Neutrino Beam and the NuMI off-axis beam. The main goal of the first year of ICARUS data taking will then be the definitive verification of the recent claim by NEUTRINO-4 short baseline reactor experiment both in the $ν_μ$ channel with the BNB and in the $ν_e$ with NuMI. After the first year of operations, ICARUS will commence its search for evidence of a sterile neutrino jointly with the SBND near detector, within the Short Baseline Neutrino (SBN) program. The ICARUS exposure to the NuMI beam will also give the possibility for other physics studies such as light dark matter searches and neutrino-Argon cross section measurements. The proposed contribution addresses ICARUS achievements, its status and plans for the new run at Fermilab and the ongoing developments of the analysis tools needed to fulfill its physics program.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

First Offline Results from the S3 Low-Energy Branch

We present the first results obtained from the S3 Low-Energy Branch, the gas cell setup at SPIRAL2-GANIL, which will be installed behind the S3 spectrometer for atomic and nuclear spectroscopy studies of exotic nuclei. The installation is currently being commissioned offline, with the aim to establish optimum conditions for the operation of the radio frequency quadrupole ion guides, mass separation and ion bunching, providing high-efficiency and low-energy spatial spread for the isotopes of interest. Transmission and mass-resolving power measurements are presented for the different components of the S3-LEB setup. In addition, a single-longitudinal-mode, injection-locked, pumped pulsed-titanium–sapphire laser system has been recently implemented and is used for the first proof-of-principle measurements in an offline laser laboratory. Laser spectroscopy measurements of erbium, which is the commissioning case of the S3 spectrometer, are presented using the 4f126s23H6→4f12(3H)6s6p optical transition.

Romans, Jekabs (ORCID:0000000197427745)↗